HomeMy WebLinkAbout59-22 Andy KirchmanPermit Class Permit Number
NEW 59-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Andy Kirchman, 1005 Canal Dr. Carolina Beach, NC 28428
Authorizing development in New Hanover County at adj. to Carolina Beach, at 1005 Canal Dr. in
Carolina Beach , as requested in the permittee’s application dated 12/15/21
(MP-1) and 2/1/22 (MP-2), including work plan drawings (2) Sheets 1-2 of 2, dated 2/1/22.
This permit, issued on May 27, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DE Q and the Chair
of the Coastal Resources Commission.
For Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bulkhead Replacement
1) The bulkhead shall extend a maximum of two (2) foot waterward from the waterward edge of the
existing bulkhead at any point along its alignment at the time of construction.
2) The bulkhead shall be constructed in accordance with the alignment depicted on the attached
workplan drawings.
3) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the
approved bulkhead alignment.
(See attached sheets for Additional Conditions)
Andy Kirchman Permit No. 59-22
Page 2 of 3
ADDITIONAL CONDITIONS
4) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start of
construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse
weather conditions, shall require the alignment to be re-staked by permittee and verified by DCM within
a maximum of 30 days prior to the new expected start of construction.
5) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles,
or other suitable materials approved by Division personnel.
6) The bulkhead shall be constructed prior to any backfilling activities.
7) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
8) This permit does not authorize any excavation waterward of the approved alignment.
9) The fill material shall be clean and free of any pollutants except in trace quantities.
10) Unless altered herein, all backfill material shall be obtained from a high ground source and confined
behind the permitted bulkhead.
11) No backfill material is to be placed within 30 feet of the normal high-water level, except that which will
be used to backfill the area behind the permitted bulkhead.
12) All fill material to be placed below normal high-water level shall be confined behind the permitted
bulkhead.
Sedimentation and Erosion Control
13) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
15) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
General
16) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
17) All construction debris associated with the removal or construction of the permitted bulkhead shall be
contained within the authorized project area and disposed of in an approved upland location.
Andy Kirchman Permit No. 59-22
Page 3 of 3
ADDITIONAL CONDITIONS
18) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including but not limited to any authorizations
required from the U.S. Army Corps of Engineers.
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4498 and assigned the project DWR Project No. 20220225.
NOTE: Future development of the permittee’s property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the mean high-water level.
NOTE: An application processing fee of $400 was received by DCM for this project.