Loading...
HomeMy WebLinkAbout52-22 David W ChappelPermit Class NEW Permit Number 52-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vennit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 — Excavation and/or filling pursuant to NCGS 113-229 Issued to David W. Chappel, 5007 Holly Lane Morehead City NC 28557 Authorizing development in Carteret County at adj. to Bogie Sound and the AIWW, at 5007 Holly Lane, in Morehead City, as requested in the permittee's application dtd 1/17/22, incl att workplan drawings (3), Sheet 2 of 4 dtd "Rev 5/17" Sheets 3 of 4 did "Rev 4/25" and Sheet 4 of 4 dtd 1/16/22. This permit, issued on May 18, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation M meSe Lenus May Ur NUUJUUL LV 111lub, 1111pl INV1R11011L Vl UIV11 U"Iull, Vl Llaj' L.auaa LUL. YVuuu w VV iivaa "aaaa rV.u. Docking Facility Expansion 1) This permit authorizes only the finger pier and boat lift, and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharged at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2025 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. C r Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pennittee David W. Chappel ADDITIONAL CONDITIONS Permit No. 52-22 Page 2 of 3 3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 4) This permit authorizes one (1) additional formalized boat slip for a maximum of three (3) formalized boat slips at this docking facility. 5) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's area of riparian access to the east. 6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Sedimentation and Erosion Control 8) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General 10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 11) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. 12) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit 197800056 (Action ID SAW-2022-00663). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4497 and assigned the project DWR Project No. 2022-0409. David W. Chappel ADDITIONAL CONDITIONS Permit No. 52-22 Page 3 of 3 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 515-5400 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.