HomeMy WebLinkAbout52-22 David W ChappelPermit Class
NEW
Permit Number
52-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vennit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
— Excavation and/or filling pursuant to NCGS 113-229
Issued to David W. Chappel, 5007 Holly Lane Morehead City NC 28557
Authorizing development in Carteret County at adj. to Bogie Sound and the AIWW, at 5007 Holly
Lane, in Morehead City, as requested in the permittee's application dtd 1/17/22, incl att workplan drawings (3),
Sheet 2 of 4 dtd "Rev 5/17" Sheets 3 of 4 did "Rev 4/25" and Sheet 4 of 4 dtd 1/16/22.
This permit, issued on May 18, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
M meSe Lenus May Ur NUUJUUL LV 111lub, 1111pl INV1R11011L Vl UIV11 U"Iull, Vl Llaj' L.auaa LUL. YVuuu w VV iivaa "aaaa rV.u.
Docking Facility Expansion
1) This permit authorizes only the finger pier and boat lift, and uses located in or over the water that are
expressly and specifically set forth in the permit application. No other structure, whether floating or
stationary, shall become a permanent part of this docking facility without permit modification. No
non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without
permit modification.
2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharged at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced
throughout the entire existence of the permitted structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
C r Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Pennittee
David W. Chappel
ADDITIONAL CONDITIONS
Permit No. 52-22
Page 2 of 3
3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
4) This permit authorizes one (1) additional formalized boat slip for a maximum of three (3) formalized
boat slips at this docking facility.
5) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's area of riparian access to the east.
6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
7) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
Sedimentation and Erosion Control
8) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
11) All construction debris associated with the removal or construction of the permitted development shall
be contained within the authorized project area and disposed of in an approved upland location.
12) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit
197800056 (Action ID SAW-2022-00663).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4497 and assigned the project DWR Project No. 2022-0409.
David W. Chappel
ADDITIONAL CONDITIONS
Permit No. 52-22
Page 3 of 3
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 515-5400 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high-water level.
NOTE: An application processing fee of $250 was received by DCM for this project.