HomeMy WebLinkAbout5-22 ScerriPermit Class Permit Number
NEW 5-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Christopher Scerri, 125 Parmele Blvd. Wrightsville Beach, NC 28480
Authorizing development in New Hanover County at adj. to Middle Sound at 125 Parmele Blvd.,
in Wrightsville Beach , as requested in the permittee’s application dated 5/4/21,
including attached workplan drawings (2), both dated “5/4/21”.
This permit, issued on January 31, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DE Q and the Chair
of the Coastal Resources Commission.
For Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Docking Facility
1) This permit authorizes only the docks, piers, and other structures and uses located in or over the
water that are expressly and specifically set forth in the permit application. No other structure,
whether floating or stationary, shall become a permanent part of this docking facility without permit
modification. No non-water dependent uses of structures shall be conducted on, in or over Public
Trust waters without permit modification.
2) This permit authorizes a maximum of 4 formalized boat slips.
(See attached sheets for Additional Conditions)
Christopher Scerri Permit No. 5-22
Page 2 of 4
ADDITIONAL CONDITIONS
3) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner’s area of riparian access.
4) The authorized docking facility shall not exceed one third the width of the water body as measured from
the existing bulkhead.
5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
6) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
7) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
Excavation
8) No excavation shall take place outside of the area indicated on the workplan drawings.
9) Excavation shall not exceed -4 feet below the normal high-water level. In no case shall the depth of
excavation exceed the depth of connecting waters.
10) The temporary placement or double handling of excavated or fill materials within waters or vegetated
wetlands is not authorized.
11) All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters
and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of
petroleum products or any other hazardous waste, the permittee shall immediately report it to the National
Response Center at (800) 424-8802 and provisions of the North Carolina Oil Pollution and Hazardous
Substances Control Act will be followed.
Dredge Material Disposal
12) No dredge material shall be placed within 30 feet of the normal high-water line.
13) All excavated materials shall be confined above normal high water and landward of regularly or
irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of
solids into any marsh or surrounding waters. The barriers shall be maintained and functional until the
site is graded and stabilized.
Christopher Scerri Permit No. 5-22
Page 3 of 4
ADDITIONAL CONDITIONS
14) The dredge material disposal area shall be inspected and approved by a representative of the Division of
Coastal Management prior to the commencement of any dredging activities.
USACE Conditions
15) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish & Wildlife Service’s Guidelines, and strictly adhere to all requirements therein.
The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines2017.pdf.
16) A “Consent to Cross” authorization from the Corps of Engineers must be obtained for the Corps’ easement
prior to material disposal. Provide a written request and a map showing the disposal site and the crossing
location to Justin Arnette at Justin.R.Arnette@usace.army.mil.
Sedimentation and Erosion Control
17) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
18) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
Maintenance Clause
19) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of
any maintenance excavation work authorized by this permit, and such notification shall include:
A. The number of the original permit.
B. A statement that no dimensional changes are proposed.
C. A copy of the original permit plans with cross-hatching indicating the area to be maintained, the
area to be used for dredge material disposal, and the estimated amount of material to be removed.
The location, design and holding capacity of the dredge material disposal site shall be approved
by a representative of the Division prior to the initiation of any maintenance dredging activities.
D. The date of map revision and the permittee’s signature shown anew on the original plan.
General
20) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
21) All construction debris associated with the removal or construction of the permitted docking facilities
shall be contained within the authorized project area and disposed of in an approved upland location.
22) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
Christopher Scerri Permit No. 5-22
Page 4 of 4
ADDITIONAL CONDITIONS
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2021-02123).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 20211438.
NOTE: Future development of the permittee’s property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high-water level.
NOTE: An application processing fee of $400 was received by DCM for this project.