Loading...
HomeMy WebLinkAbout42-22 Kyle WarrenPermit Class Permit Number NEW 42-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Kyle Warren, 1324 Final Landing Road, Wilmington, NC 28411 Authorizing development in New Hanover County at adj. to AIWW, at 1324 Final Landing Road, Wilmington , as requested in the permittee’s application dated 12/8/21, including work plan drawings (5) Sheets 1-3 of 5 dated 12/8/21, and Sheets 4-5 of 5 dated 1/6/22 This permit, issued on April 26, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2025 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DE Q and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Docking Facility 1) This permit authorizes only the docks, piers, gazebo, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes a maximum of 4 formalized boat slips. (See attached sheets for Additional Conditions) Kyle Warren Permit No. 42-22 Page 2 of 4 ADDITIONAL CONDITIONS 3) No portion of the authorized docking facility, including tie piles, shall extend more than one quarter of the width of the water body. Measurements to determine width of the water body shall be made from the normal high-water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. 4) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 5) The authorized pier spanning the navigable shore parallel slough shall provide a minimum vertical navigational clearance of 6 feet, as measured from the normal high-water level to the lowest portion of the pier structure. The authorized pier shall provide a minimum horizontal navigational clearance of 10 feet. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) The authorized gazebo shall be single story and shall not be designed to allow for second story use. 8) The authorized gazebo shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches are permitted. Lattice is specifically excluded from being used under this authorization. 9) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 10) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Bulkhead 11) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 12) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 13) The bulkhead shall be constructed prior to any backfilling activities. 14) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. Kyle Warren Permit No. 42-22 Page 3 of 4 ADDITIONAL CONDITIONS 15) This permit does not authorize any excavation waterward of the approved alignment. 16) The fill material shall be clean and free of any pollutants except in trace quantities. 17) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 18) No backfill material is to be placed within 30 feet of the normal high-water level, except that which will be used to backfill the area behind the permitted bulkhead. 19) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re-staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. Sedimentation and Erosion Control 20) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 21) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 22) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. General 23) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 24) All construction debris associated with the removal or construction of the permitted docking facilities shall be contained within the authorized project area and disposed of in an approved upland location. 25) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to any authorizations required from the U.S. Army Corps of Engineers. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4698 and assigned the project DWR Project No. 20220056. Kyle Warren Permit No. 42-22 Page 4 of 4 ADDITIONAL CONDITIONS NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the mean high-water level. NOTE: An application processing fee of $400 was received by DCM for this project.