HomeMy WebLinkAbout33-22 Eunjin H Suh Trustee�944�......_-------:_,:__:»_......................................
Permit Class Permit Number
NEW 33-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
V e r m ft
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS I I3A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Euniin H. Suh Trustee c/o Kendall Suh, P.O. Box 5189 Ocean Isle Beach, NC 28469
Authorizing development in Brunswick County at adi to a man-made canal, at 50 Moore St,
Ocean Isle Beach as requested in the permittee's application dated 11/11/21
(MP-1 & MP-4) including work plan drawings (2) Sheets 1-2 of 2 dated 11/8/21.
This permit, issued on March 23, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
if these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be nun ana vma.
Docking Facility
1) This permit authorizes only the docks, piers, boatlift, and other structures and uses located in or over
the water that are expressly and specifically set forth in the permit application. No other structure,
whether floating or stationary, shall become a permanent part of this docking facility without permit
modification. No non -water dependent uses of structures shall be conducted on, in or over Public
Trust waters without permit modification.
2) This permit authorizes 2 additional formalized boat slips for a maximum of 4 formalized boat slips at
this docking facility.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority or the Secretary or ur y ana me i nao
of the Coastal Resources Commission.
O
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Eunjin Sub Trustee
ADDITIONAL CONDITIONS
Permit No. 33-22
Page 2 of 3
3) No portion of the authorized docking facility, including tie piles, shall extend more than one quarter of
the width of the water body. Measurements to determine width of the water body shall be made from the
normal high-water line or the waterward edge of any coastal wetland vegetation which borders the water
body, whichever is more restrictive.
4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
5) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or,
inclement weather.
7) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which
the permittee is responsible. This prohibition shall be applied and enforced throughout the entire
existence of the permitted structure.
8) Should the western adjacent lot be sold prior to the initiation of construction of the docking facility, the
permittee shall obtain a written agreement from the new owner(s) waiving the minimum setback, and
authorization to construct the portion of the docking facility within the property owner's riparian
setback, and submit it to the Division of Coastal Management prior to initiating construction of the
docking facility.
Sedimentation and Erosion Control
9) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
10) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
12) All construction debris associated with the removal or construction of the permitted docking facilities
shall be contained within the authorized project area and disposed of in an approved upland location.
13) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
Eunjin Suh Trustee Permit No. 33-22
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including but not limited to any authorizations
required from the U.S. Army Corps of Engineers.
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4501 and assigned the project DWR Project No. 20211841.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high-water level.
NOTE: An application processing fee of $250 was received by DCM for this project.