Loading...
HomeMy WebLinkAbout28-22 John FranckPermit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 28-22 Issued to John Franck, 1224 Pembroke Jones Rd., Wilmington NC 28405 Authorizing development in New Hanover County at adj. to Middle Sound, at 24 Sandy Point Dr.. in , as requested in the permittee's application dated 10/5/21 1 (MP-1 & MP-4), including work plan drawings (1) Sheets 1-1 of 1 dated 11/8/21 This permit, issued on March 16, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation u„piiaumiil in Vl wvii aRlvll, of 111Qy ODUSO U1G PrI1111r IV De 11U11 anU VOID Dockine Facility - Expansion 1) This permit authorizes only the dock, boatlift, platform, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes 2 additional formalized boat slips for a maximum of 4 formalized boat slips at this docking facility. (See attached sheets for Additional Conditions) this permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2025 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. r Braxton C. Davis, Director Division of Coastal Management. This permit and its conditions are hereby accepted. Signature of Permittee John Franck ADDITIONAL Permit No. 28-22 Page 2 of 2 3) No portion of the authorized docking facility shall extend more than one quarter of the width of the water body. Measurements to determine width of the water body shall be made from the normal high-water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. 4) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 6) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Sedimentation and Erosion Control 7) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 8) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) All construction debris associated with the removal or construction of the permitted docking facilities shall be contained within the authorized project area and disposed of in an approved upland location. 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4501 and assigned the project DWR Project No. 20211739. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.