Loading...
HomeMy WebLinkAbout24-08 ECUPermit Class Permit Number MODIFICATION/MINOR 24-08 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to East Carolina University, 1001 East Fourth Street, Greenville, NC 27858 Authorizing development in Dare County at adj. to the Croatan Sound, at off Hwy 245, in Skyco Community, as requested in the permittee’s letter & MP-4 dtd 2/14/22 & MP-5 dtd 2/25/22, incl att workplan drawings (5) three dtd “Rec DCM-EC 2/25/22”, one dtd “Rec DCM-EC 3/3/22” & one dtd “Rec DCM-EC 2/16/22”. This permit, issued on March 29, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2026 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee 1) Unless specifically altered herein, this Minor Modification authorizes the walkway through Coastal Wetlands and the temporary access bridge, all as expressly and specifically set forth in the attached letter and workplan drawings. Any additional development activities may require a modification of this permit. 2) Any portion of the permitted walkway built over wetlands shall not exceed 2.5 feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 3) The temporary access bridge shall be removed from its supports during periods of inactivity. (See attached sheet for additional conditions) East Carolina University Permit No. 24-08 Page 2 of 2 ADDITIONAL CONDITIONS General 4) All debris associated with the removal or construction of the permitted docking facility shall be contained within the authorized project area and removed to an appropriate upland location. 5) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 6) This Minor Modification shall be attached to the original Permit No. 24-08, which was transferred to the permittee on 12/8/10, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 7) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers assigned the project Action ID SAW-2018-00023. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2017-1608. NOTE: A minor modification application processing fee of $100 was received by DCM for this project.