HomeMy WebLinkAbout17-22 Brandon MitchellPermit Class Permit Number
NEW 17-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Brandon Mitchell, 1510 Small Ct., Kill Devil Hills, NC 27948
Authorizing development in Dare County at adj. to a canal off Albemarle Sound, at 156 Sir Chandler Dr., in
Colington, as requested in the permittee’s application dtd ”Rev 12/3/21 (MP-1,4), 10/6/21 (MP-2), & “Rev 12/13/21 (MP-3),
incl att workplan drawings (8), Sheets 1,2 of 8 dtd “Rev 12/3/21” & Sheets 3-6 of 8 dtd 10/7/21 & Sheets 7-8 of 8 dtd 11/7/21.
This permit, issued on February 21, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Shoreline Stabilization – Bulkhead
1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached
workplan drawings.
2) No open water shall be excavated or filled, even temporarily, outside of the approved bulkhead
alignment.
3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start
of construction.
(See attached sheets for Additional Conditions)
Brandon Mitchell Permit No. 17-22
Page 2 of 3
ADDITIONAL CONDITIONS
4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles,
or other suitable materials approved by Division personnel.
5) The bulkhead shall be constructed prior to any backfilling activities.
6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
7) This permit does not authorize any excavation waterward of the approved alignment.
8) The fill material shall be clean and free of any pollutants except in trace quantities.
9) Unless altered herein, all backfill material shall be obtained from a high ground source and confined
behind the permitted bulkhead.
10) No backfill material is to be placed within 30 feet of the normal water level, except that which will be
used to backfill the area behind the permitted bulkhead.
11) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead.
Docking Facility
12) This permit authorizes only the piers and other structures and uses located in or over the water that are
expressly and specifically set forth in the permit application. No other structure, whether floating or
stationary, shall become a permanent part of this docking facility without permit modification. No non-
water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit
modification.
13) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharged at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout
the entire existence of the permitted structure.
14) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
15) This permit authorizes a maximum of three (3) formalized boat slips.
16) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner’s area of riparian access.
17) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
Brandon Mitchell Permit No. 17-22
Page 3 of 3
ADDITIONAL CONDITIONS
18) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
Upland Development
19) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property, including the boardwalk, all as
expressly and specifically set forth in the attached permit application and workplan drawings.
Sedimentation and Erosion Control
20) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
21) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
22) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
General
23) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
24) All construction debris associated with the removal or construction of the permitted development shall
be contained within the authorized project area and disposed of in an approved upland location.
25) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2022-00131).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 2021-1857.
NOTE: Future development of the permittee’s property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: An application processing fee of $250 was received by DCM for this project.