Loading...
HomeMy WebLinkAbout115-22 Applegate, Elliot, LaganaPermit Class Permit Number NEW 115-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Michael & Tamara Applegate, Ronald & Loretta Elliot, Anthony & Karen Lagana, 6605 Barton Creek Drive, Whitsett, NC 27377 Authorizing development in Brunswick County, at adj. to AIWW at 50, 52, & 54 Wilmington St. in Ocean Isle Beach, as requested in the permittee’s application dated 2/14/22 (MP-1), “Revised 6/14/22” (MP-2), incl. work plan drawings (4) Sheets 1-3 of 4 dated 2/9/22, and Sheet 4 of 4 dated “Revised 6/14/22”. This permit, issued on October 21, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on October 21, 2027 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DE Q and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Bulkhead Replacement 1) The bulkhead shall extend a maximum of two (2) foot waterward from the waterward edge of the existing bulkhead at any point along its alignment at the time of construction. 2) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 3) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. (See attached sheets for Additional Conditions) Michael & Tamara Applegate, Ronald & Loretta Elliot, Anthony & Karen Lagana Permit No. 115-22 Page 2 of 3 ADDITIONAL CONDITIONS 4) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. 5) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 6) The bulkhead shall be constructed prior to any backfilling activities. 7) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 8) This permit does not authorize any excavation waterward of the approved alignment. 9) The fill material shall be clean and free of any pollutants except in trace quantities. 10) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 11) No backfill material is to be placed within 30 feet of the normal high-water level, except that which will be used to backfill the area behind the permitted bulkhead. 12) All fill material to be placed below normal high-water level shall be confined behind the permitted bulkhead. 13) If the crossing of wetlands with mechanized construction equipment is necessary, temporary construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed immediately upon completion of construction. 14) The limits of disturbance associated with the construction of the authorized bulkhead shall be limited to the area necessary to set the tiebacks and for the purposes of backfilling the bulkhead, all as depicted on the attached workplans. Excessive grading or land disturbance may require Erosion and Sedimentation Control Plan authorization. Unless specifically altered herein, any grading or land disturbance activity located outside this area may require a modification of this permit. Sedimentation and Erosion Control 15) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 16) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 17) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Michael & Tamara Applegate, Ronald & Loretta Elliot, Anthony & Karen Lagana Permit No. 115-22 Page 3 of 3 ADDITIONAL CONDITIONS General 18) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 19) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. 20) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to any authorizations required from the U.S. Army Corps of Engineers. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Individual Water Quality Certification 5126 and assigned the project DWR Project No. 20220851. NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $400 was received by DCM for this project.