HomeMy WebLinkAbout111-21 1002 North Shore LLCPermit Class Permit Number
MODIFICATION/MINOR 111-21
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to 1002 North Shore, LLC., PO Box 65059, Fayetteville, NC 28306
Authorizing development in Brunswick County at adj. to Blane Creek, at 1002 North Shore Drive West, in
Sunset Beach , as requested in the permittee’s letter dated “received 2/8/22” including attached
workplan drawings (3), Page 1 of 3 dated 5/17/21, Page 2 of 3 dated 6/2/21, and Page 3 of 3 dated 2/8/22.
This permit, issued on May 23, 2022 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violati on of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date .
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2024
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DE Q and the Chair
of the Coastal Resources Commission.
For Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Relocation of Docking Facility
1) This permit authorizes the relocation of the previously permitted dock, pier, gazebo and other
structures and uses located in or over the water that are expressly and specifically set forth in the
permit application. No other structure, whether floating or stationary, shall become a permanent part
of this docking facility without permit modification. No non-water dependent uses of structures shall
be conducted on, in or over Public Trust waters without permit modification.
(See attached sheet for additional conditions)
1002 North Shore, LLC Permit No. 111-21
Page 2 of 2
ADDITIONAL CONDITIONS
2) In accordance with commitments made by the permittee and in order to satisfy concerns of the resource
agencies, physical stops shall be placed on the floating dock at a minimum height of 18” above the
bottom substrate to prevent the floating dock from disturbing the bottom substrate. The physical stops
shall remain in place for the life of the permitted docking facility.
3) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six
feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured
from the bottom of the decking.
Sedimentation and Erosion Control
4) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters
5) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
6) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
7) This Minor Modification shall be attached to the original Permit No. 111-21, which was transferred to
the permittee on 8/26/21, as well as all subsequent modifications, refinements, and renewals, and copies
of all documents must be readily available on site when Division personnel inspect the project for
compliance.
8) All conditions and stipulations of the active permit remain in force unless specifically altered herein.
NOTE: Should either adjacent property be sold prior to the initiation of construction; the permittee shall
be required to obtain a signed riparian corridor waiver from the new property owner prior to the
placement of any structures within the 15-foot riparian corridor.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers assigned the project Action ID SAW-2021-0128.
NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2021-0938.
NOTE: A minor modification application processing fee of $100 was received by DCM for this project.