HomeMy WebLinkAbout11-16 Stevens TowingPermit Class Permit Number
MODIFICATION/MINOR 11-16
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Stevens Towing Company, 125 Dye Plant Rd., Edenton, NC 27932
Authorizing development in Chowan County at adj. to the Chowan River, end of SR 1220, at
125 Dye Plant Rd. , as requested in the permittee’s letter dated 1/21/22,
including the attached workplan drawing (1) Sheet 1 of 1 dated “Revised 12/10/21”.
This permit, issued on March 29, 2022 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2023
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
1) Unless specifically altered herein, this Minor Modification authorizes the additional 12 tie pilings, 42
linear feet of bulkhead and rip rap located adjacent to the existing pump house and steel groin, all as
expressly and specifically set forth in the attached letter and workplan drawings. Any additional
development activities may require a modification of this permit.
(See attached sheet for additional conditions)
Stevens Towing Permit No. 11-16
Page 2 of 2
ADDITIONAL CONDITIONS
General
2) All debris associated with the removal or construction of the permitted docking facility shall be
contained within the authorized project area and removed to an appropriate upland location.
3) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
4) This Minor Modification shall be attached to the original Permit No. 11-16, which was issued to the
permittee on 1/28/16, as well as all subsequent modifications, refinements, and renewals, and copies of
all documents must be readily available on site when Division personnel inspect the project for
compliance.
5) All conditions and stipulations of the active permit remain in force unless specifically altered herein.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers assigned the project Action ID SAW-2015-02613.
NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2015-1280.
NOTE: A minor modification application processing fee of $100 was received by DCM for this project.