NEW 107-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Phillip Jethro, 115 Ansell Lane, Knotts Island, NC 27950
Authorizing development in Currituck County at adj. to a man-made canal and Capsies Creek,
at 142 Williams Dr., in Knotts Island , as requested in the permittee’s application dtd 7/12/22,
including attached workplan drawings (3), Sheet 1 of 3 dtd “Rev 7/29/22” and Sheets 2-3 of 3 both dtd 6/23/22.
This permit, issued on October 5, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
October 5, 2027
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Shoreline Stabilization – Bulkhead and Rip Rap
1) The bulkhead and rip rap shall be constructed in accordance with the alignment depicted on the
attached workplan drawings.
2) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the
approved bulkhead and rip rap alignment.
3) The alignment of the authorized bulkhead and rip rap shall be staked by the permittee and verified by
a representative of the Division of Coastal Management within a maximum of 30 days prior to the
start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by
adverse weather conditions, shall require the alignment to be re-staked by permittee and verified by
DCM within a maximum of 30 days prior to the new expected start of construction.
(See attached sheets for Additional Conditions)
Phillip Jethro Permit No. 107-22
Page 2 of 3
ADDITIONAL CONDITIONS
4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles,
or other suitable materials approved by Division personnel.
5) The bulkhead shall be constructed prior to any backfilling activities.
6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
7) This permit does not authorize any excavation waterward of the approved alignment.
8) The fill material shall be clean and free of any pollutants except in trace quantities.
9) Unless altered herein, all backfill material shall be obtained from a high ground source and confined
behind the permitted bulkhead.
10) No backfill material is to be placed within 30 feet of the normal water level, except that which will be
used to backfill the area behind the permitted bulkhead.
11) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead.
12) The rip rap material shall consist of clean rock or masonry materials such as, but not limited to, granite,
marl, or broken concrete with no exposed rebar. It shall be of a size sufficient to prevent its movement
from the approved alignment by wave or current action.
Sedimentation and Erosion Control
13) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
15) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
General
16) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
17) All construction debris associated with the removal or construction of the permitted development shall
be contained within the authorized project area and disposed of in an approved upland location.
18) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
Phillip Jethro Permit No. 107-22
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2021-01020).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Individual
Water Quality Certification No. 005081 and assigned the project DWR Project No. 2022-1056.
NOTE: Future development of the permittee’s property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.