HomeMy WebLinkAbout10-22 Southern Built LLC.Permit Class Permit Number
NEW 10-22
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Southern Built LLC., PO Box 1112, Clinton, NC 28329
Authorizing development in Carteret County at adj. to a man-made canal off Bogue Sound,
at 5229 Webb Ct., in Morehead City , as requested in the permittee’s application dated 10/16/21,
(MP-1) and 12/14/21 (MP-4), including attached workplan drawings (4), Sheets 1-4 of 4 all dated 11/14/21.
This permit, issued on February 11, 2022 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Docking Facility Expansion
1) This permit authorizes only the additional boat lift and uses located in or over the water that are
expressly and specifically set forth in the permit application. No other structure, whether floating or
stationary, shall become a permanent part of this docking facility expansion without permit
modification. No non-water dependent uses of structures shall be conducted on, in or over Public
Trust waters without permit modification.
2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharged at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced
throughout the entire existence of the permitted structure.
(See attached sheets for Additional Conditions)
Southern Built LLC. Permit No. 10-22
Page 2 of 3
ADDITIONAL CONDITIONS
3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
4) This permit authorizes an additional formalized boat slip for a maximum of three (3) formalized boat
slips at this docking facility.
5) In accordance with commitments made by the permittee and in order to satisfy ordinances of the Town
of Morehead City, only two (2) vessels shall be docked at the docking facility at any time, until such a
time as a house is built on the property.
6) The authorized boat lift shall have a minimum setback distance of 15 feet between any parts of the
structure and the adjacent property owner’s area of riparian access.
7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
8) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
Sedimentation and Erosion Control
9) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
10) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
General
11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
12) All construction debris associated with the removal or construction of the permitted development shall
be contained within the authorized project area and disposed of in an approved upland location.
13) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including but not limited to any permits from
the Town of Morehead City.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Regional General Permit
197800056 (Action ID SAW-2022-00229).
Southern Built LLC. Permit No. 10-22
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Water Quality
Certification No. 004639 and assigned the project DWR Project No. 2021-1840.
NOTE: Future development of the permittee’s property may require a modification of this permit.
Contact a representative of the Division at (252) 808-2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high-water level.
NOTE: An application processing fee of $250 was received by DCM for this project.