HomeMy WebLinkAbout156-82 Renewal Town of BelhavenPermit Class
Renewal STATE OF NORTH CAROLINA
Department of Natural Community Development
70
C, eS&�rcg ion
i
fOZ A'�1
0 Majt, 1 �"in, - onmental
n � i
07
to NCGS 113-229
Permit Number
156-82
Issued to Town of Belhaven, P. 0. Box 220, Belhaven, NC 27810
authorizing development in Beaufort County at Pantego Creek & Wynne's Gut
as requested in the permittee'sapplication dated 10/14/82 including
attached plat dated 1/14/86.
This permit, issued on /' � , - , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void.
(1) The bulkhead will be positioned on an alignment an average of 3 feet waterward
of the normal water level (NWL) elevation contour. At no point along its
alignment will it be positioned further than 8 feet waterward of the NWL
elevation contour.
(2) All fill material to be placed below normal water level will be confined
behind the permitted bulkhead.
NOTE: The work authorized by this permit is certified under Section 401 General
Water Quality Certifications No. 1272 for bulkhead construction and No.
1431 for boat ramps.
NOTE: A copy of this permit is being forwarded to the Department of Administration,
State Property Office, from which you must receive a letter of authorization
prior to proceeding with your project.
This permit action may be appealed by the permittee
or other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification
not covered hereunder requires further Departmental
approval.
All work must cease when the permit expires on
December 31. 1986
In issuing this permit, the State of North Carolina
agrees that your project is consistent with the North
Carolina Coastal Management Program.
Signed by the authority of the Secretary of DNRCD and
the Chairman of the Coastal Resources Commission.
David W. Owens, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Pennittee
Cin.44� .
PRECONSTRUCTION CONFERENCE.
Permitteels Name:
i`wm of�Be lhav'dn
Phone:
919-943-3105
Permit Number:
15fi-82 ~�
Anticipated Date of Construction: 3/23/83 - Length of time - + 3 months
Date of On -site Preconstruction Conference: 3/17183
Person(s) in Attendance:
David Gossett, Neal Sawyer -Contractor, Steve Weatherman -Town Manager, David Guthrie-
LPO, John Johnson-Engineer-L.E. Wooten
Comment on the Following:
1) Akward or unclear wording of permit conditions; None
2) Conditions that should have been added -as after thought; None
3) Project elements of concern for monitoring purposes; None
4) Deficiencies in current regulations. None
cc: �Keston Pate
Steve Brown