Loading...
HomeMy WebLinkAbout12-21Minor Mod Thorne, BarbaraPermit Class Permit Number MODIFICATION/MINOR 12-21 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ,Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Barbara Thorne 213 Kimrod Lane Charlotte, NC 28270 Authorizing development in Perquimans County at adj to the Perauimans River, at 168 Ainslev Rd., in Hertford as requested in the permittee's letter dated 11/21/22, including the attached workplan drawing (2) Drawing 1 of 1 dated 5/17/20 and Cross Section dated "Rec DCM-EC 11/2/22". This permit, issued on November 22.2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ie subject to tines, imprisonment or ctvu action; or may cause me permu w ve Hull ailu Vu,u. 1) Unless specifically altered herein, this Minor Modification removes the pier, platform, and boathouse with boat lift from the authorized project, all as expressly and specifically set forth in the permittee's letter and workplan drawings. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary or 1it;Q ana me a nan of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Barbara Thorne ADDITIONAL CONDITIONS General Permit No. 12-21 Page 2 of 2 2) All debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and removed to an appropriate upland location. 3) The pemuttee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 4) This Minor Modification shall be attached to the original Permit No. 12-21, which was issued to the permittee on 2/2/21, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 5) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers assigned the project Action ID SAW-2020-01956. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2020-1395. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. DCM Coordinator: -?::obx( --__ Permit #: ( z —Z Permittee: Agents: DCM Field Offices Elizabeth City Morehead City US ACOE Offices: Washington: Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/D WR: Washington: Wilmington: Wildlife Resources: Natural Heritage Program LPO: MAILING DISTRIBUTION SHEET PO11 �� Washington Wilmington G 2-t'Z70 (with revised work plan drawings) (OBJECTIONS ) `' xateigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Was hingt Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) on) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gunton / Andy Haines Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan /2bert Tankard — 401 ✓✓ Glenn Stewart - 401 Clif Whitfield (WARD) Jimmy Harrison Roger Thorpe-Stormwater Garey Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Holley Snider — 401 (Pender, Brunswick, New Hanover) John Perry — 401 (Onslow, Carteret) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARO) Rodney Butler (NCDOT) Travis Wilson ROY COOPER Covemor ELIZABETH S BISER Secretary BRAXTON DAVIS Director MEMORANDUM TO: FROM: THROUGH: DATE: SUBJECT: NORTH CAROLINA EnNronmentalQuallty, Gregg Bodnar, Assistant, Major Permits Coordinator, Division of Coastal Management, Morehead City \ Cynthia Rountree, Field Representative, DCM 01-f- Ron Renaldi, District Manager, NE District, DCM �9` November 21, 2022 Request for Minor Modification of Major Permit #12-21 issued to: Barbara Thorne REFERENCE: (a) Letter from Darrell Mansfield (received November 21, 2022) requesting Minor Modification to Major Permit #12-21 (b) 15A NCAC 073.0405, Permit Modification (c) DWR Project #2020-1395 (d) USACOE Action #SAW 2020-01956 Minor Modification to Major Permit 1. Barbara Thorne has requested a Minor Modification to Major Permit #12-21, which was issued on February 2. 2021 and expires on December 31, 2024. The original major permit authorized construction of a docking facility and a bulkhead. 2. Barbara Thorne has requested to modify Major Permit #12-21 to for the removal of the proposed docking facility form the permit. PRECEI ED Nov 2 2 2022 MP SECTION MHD North Carolina Department of Environmental Quality I -Division of Coastal Management North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 2 of 5 Gregg Bodnar, Assistant Major Permits Coordinator .._._ November 21, 2022 Page 2 3. I conducted a site visit on November 18, 2022 to review the Minor Modification request pursuant to the provisions of reference (a) and have determined that the request meets the requirements contained in 15A NCAC 07H .0208 USE STANDARDS. Specifically, the request to redesign the pier 07H.0208(b)(6). 4. The required fee of $100, paid by Check #4712, was received by the Elizabeth City District Office on November 11, 2022. 5. It is recommended that the Minor Modification request be granted, provided all the Permit Conditions of the original permit issued on February 2, 2021 remain in effect. 6. Notification has been received. Attachments: Copy of Minor Modification Request, including work plan drawings ECEIVED NOV 2 2 2022 POP SECTION WI Nov. 21, 2022 Division of Coastal Management 401 S Griffin St. Suite 300 Elizabeth City, NC 27909 Atten: Ron Renaldi This letter is to request a modification to the existing major permit issued to Barbara Thorne (#12-21). 1 would like to remove the pier project from the major permit. This includes the pier, platform, and boathouse including lifts. Thank you. James Darrell Mansfield Va$aW4, aol�� RECEIVED NOV 2 2 2022 I.JCM-EC 'ECOV D NOV 2 2 2022 N N el — I �>r�'gtomans�iVer IF, f`hoMe, y0 jur/ lkhga&/}>je T Odil6USe- iYC j2Ct 5j1-r/ao Dr¢wf of 1 SCa eil 4=21 N r IEH I + ED Nov J Z zon E- E.i�3E0 N IL- NOV 2 2 2022 T 6P SME a`I N PWHD fir OSO: ` \ Cross -Seem cuI Rop a&ct boo-44wag, <-40 L61-edgy, �Q)er �Q -�4 8ceved S_r , v l M7-C i ab� i w� RECEIVED NOV 2 2 2022 i der PAP ZBEICION MHD NC Division of Coastal Management Cashier's Official Receipt Received From: Permit No., A/ 44- Applicant's Name: Project Address: - -01;a� C D Date:. I L 20 &b. o Check No, County:. ?f Please retain receipt for your records as proof of payment for permit Issued. Signature of Agent or Applicant: Signature of Field Representative: Date, Date: NOV 2 2 2022 NIP SECTION MiD Permit Class NEW RECEIVED FEB 2 - 2021 DCM-EC STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vertnt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-I 18 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 12-21 Issued to Barbara Thorne 213 Kimrod Ln., Charlotte NC 28270 Authorizing development in Perouimans County at ado to the Percuimans River, at 168 Ainslev Rd., in Hertford , as requested in the permittee's application dated 5/17/20 including attached workplan drawings (3), Drawing 1 of I dtd 5/17120, Cross Section did "Rec DCM-EC 9/15/20" and Bulkhead did "REC DCM-EC 8/5120". This permit, issued on February 2, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes only the pier, platform, boathouse and finger pier, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification: No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the Chair qualified persons within twenty (20) days of the issuing date. of the Coastal Resources Commission.- I ' J This permit must be accessible on -site to Department ��%��¢Gt/`s'�/l. personnel when the project is inspected for compliance. ��u(((/// Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit,. the State ofNorth Carolina agrees that your project is consistent with the North .Carolina Coastal Management Program. Braxton C. Davis, Director Division of Coastal Management f%j �e "p l rrt it ka dr Dins are hereby accepted. Nov 2 2 2022 a Signature ofPermittee Barbara Thorne Permit No.12-21 Page 2 of 3 ADDITIONAL CONDITIONS 3) This permit authorizes a maximum of two (2) formalized boat slips. 4) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. 5) The authorized boathouse shall be single story, and shall not be designed to allow for second story use. 6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Shoreline Stabilization - Bulkhead 8) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 9) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. 10) The alignment of the authorized bulkhead/rip rap shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 11) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 12) The bulkhead shall be constructed prior to any backfilling activities. 13) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 14) The fill material shall be clean and free of any pollutants except in trace quantities. 15) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 16) No backfill material is to be placed within 30 feet of the normal water level--eAcetbat n�th�icll, 1 be used to backfill the area behind the permitted bulkhead. �-Z C� � � O, � 17) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. NOV 2 2 2022 Barbara Thorne Permit No. 12-21 Page 3 of 3 ADDITIONAL CONDITIONS Sedimentation and Erosion Control 18) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 19) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 20) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 21) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 22) All debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and removed to an appropriate upland location. 23) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2020-01956). NOTE:. The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2020-1395. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any . such activity for this determination. The permittee is further advised that many non -water dependent activities, are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $475 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. R C "WED RECEIVE. NOV 2 2 2022 FEB 2 - 1011 DCM-EC MP SECT10111,1 10HI