Loading...
HomeMy WebLinkAbout87-94 Hill, TedV.- Permit Class Permit Number NEW 87-94 STATE OF NORTH CAROLINA Department of Environment, Health & Natural Resources and Coastal Resources Commission r - Vamit Ij I N 2. 1994 for �� Major Development in an Area of Environmental Concdtif+ '_/uLJ U I !7X pursuant toNCGS 113A-118 ......r•u0ayft Excavation and/or filling pursuant to NCGS 113-229 Issued to Ted R. Hill, H, Route 1, Box 947-A, Belhaven, NC 27810 authorizing development in Beaufort County at Tarklin Creek, off of SR1708 as requested in the permittee's application dated 3/15/94 including attached workplan drawings, sheets 1-4 of 4 dated 2/9/94. This permit, issued on JUNE 17, 1994 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Excavation 1) Excavation in Tarklin Creek as depicted on sheet 2 of 4 at cross section Cl-C2 to provide an access channel is hereby deleted. Excavation will not extend beyond a line approximating the drainage ditch/Creek interface. (See also Condition No. 3, below). 2) In order to avoid periods of high biological activity, no work will be performed between the dates of March 1 and September 30 of any year without the prior approval of the N. C. Division of Coastal Management. 3) No work will be conducted at the site until a pre -construction meeting is held between the permittee, contractor, and a representative of the Division of Coastal Management. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires furtherDepartmental approval. All work must cease when the permit expires on December 31 1997 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Rog N. Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ted R. Hill, II Permit #87-94 Page 2 of 4 ADDITIONAL CONDITIONS 4) The proposed boat basin will not have a depth exceeding 3 feet at normal water level. 5) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetland is not authorized. Fill of vegetated wetland is not authorized. 6) All excavated materials will be confined landward of the normal water elevation contour and any vegetated wetlands. Bulkheadine 7) The bulkhead alignment will approximate the normal water level at the time of construction. 8) The bulkhead must be constructed prior to any backfilling activities. 9) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 10) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 11) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. . Riprap 12) The riprap will not extend waterward more than 3 feet from the normal water level at any point along its alignment at the time of its construction. 13) The riprap material must be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. 14) The riprap material must consist of clean rock or masonry materials such as, but not limited to, granite or broken concrete. 15) The proposed riprap will not be placed higher than the elevation of the adjacent marsh. Ted R. Hill, H ADDITIONAL CONDITIONS Mitigation Permit #87-94 Page 3 of 4 16) The created wetland area must be completed prior to the beginning of any other portion of the project. The area must be approved by a representative of the Division of Coastal Management. Pier and Boathouse 17) The pier and associated structures shall have a minimum setback of 15 feet between any parts of the structure and the adjacent property lines as extended perpendicular to the channel at the points where they intersect the shoreline. 18) The alignment of the proposed pier will be staked by the applicant and approved by a representative of the Division of Coastal Management prior to construction. 19) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. General 20) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structures; whether floating or stationary, may become a permanent part of the docking facility without permit modification. No non -water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 21) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 22) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third parry. 23) The authorized structure and associated activity will not cause an unacceptable interference with navigation. 24) All project activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 25 NTUs or less are not considered significant. Ted R. Bill, 11 Permit #87-94 Page 4 of 4 ADDITIONAL CONDITIONs 25) A permanent ground cover sufficient to restrain erosion will be provided on all exposed areas within the shorter of 30 working or 120 calendar days after project completion. 26) Appropriate erosion and sedimentation control devices, measures, or structures will be used to prevent sediment from entering the adjacent wetlands/watercourses/property (e.g., silt fence, diversion swales/berms, sand ':fence, etc.). NOTE: The Division of Environmental Mangement authorized the project under General Water Quality Certification No. 2665 on May 12, 1994. APPLICATION TRANSMITTAL/PROCESSING RECORD A) Applicant: Ted'R. Hill, II County: Beaufort' Location of Project• Off SR 1708, adiarent Battalina Creek. 6 April 1994 To be Forwarded X Consistency Determination: Attached To be Forwarded X Field Representative: D. Gossett District Office: Washington District Manager Review: B) Date Application Received in Raleigh: Fee Rec'd: Public Notice Rec'd: End of Notice Date: Adj. Rip. Prop Notices Rec'd: Deed Rec'd: Application Assigned to: on C) 75 Day Deadline: 150 Day Deadline: Mail Out Date: State Due Date: D) Date Application Received Complete by Field: Field Recommendation: Attached Federal Due Date: Permit Final Action: Issue Fed. Comments Rec'd on Deny Draft on AGENCY DATE COHNENT S RETURNED OBJECTIONS YES NO NOTES Coastal Management District Office Division of Comm. Assistance Land Quality Section Div. of Env. Management State Property Office Div. of Archives & History Div. of Env. Health Div. of Highways7, Wildlife Resources Commission Div. of Water Resources Div. of Marine Fisheries "" ••••.••••••••••• MEMORANDUM TO: John Parker FROM: David Gossett P THROUGH: Terry Moore DATE: 2 June 1994 SUBJECT: Recommendation for Permit Denial Mr. Ted Hill, III Battalina Creek Beaufort County, North Carolina 3 JUN 06 F2;' 3 1 �fYYY�YYNI Y YIN"y iyYYhoyam As you are aware, the North Carolina Division of Coastal Management has received from Mr. Hill an application for a CAMA Major Development Permit and a Dredge and Fill Permit to perform various development activities on his property adjacent to Battalina Creek near the Town of Belhaven in Beaufort County, North Carolina. A portion of Mr. Hill's proposal involves the excavation of a access channel from Battalina Creek through an area of Distichlis s ica (42' by 10' or approximately 420 sq. ft.) to highground where a boatbasin and boathouse is to be placed. As can be seen from Mr. Hill's proposal, he is proposing to relocate the Distichlis Vicata, which is growing within the area to be excavated, into a newly created area adjacent to the existing marsh. Although his proposal may not be consistent with the literal interruption of the management objective and use standards for coastal wetlands, I think it is consistent with the intent; and the proposal to maintain the status quo (square footage) is acceptable. The portion of Mr. Hill's proposal that does, in my opinion, conflict with NCAC 7H guidelines is his proposal to excavate a 45' long by 15' wide access channel in Battalina Creek, which is classified as a Primary Nursery Area by the North Carolina Division of Marine Fisheries. The area to be excavated has an average depth of f2' at normal water and the proposal is to excavate it to a depth of -Y at normal water to provide needed water depth to reach the proposed boatbasin. The basin is also proposed to be excavated to a depth of -Y at normal water. A review of NCAC 7H.0206(d), Estuarine Waters, Use Standards, states in part; .. . "In every instance the particular location, use, and design characteristics shall be in accord with the general use standards for coastal wetlands, estuarine waters, and public trust areas described in Rule .0208 of this Section." Referring to .0208(b)(1) Specific Use Standards, it states in part that; "Navigation channels, canals, and boat basins must be aligned or located so as to avoid primary nursery areas . . . " As previously stated, Mr. Hill is proposing to excavate an area 45' long by 15' wide in Battalina Creek which is classified as a primary nursery area, therefore his proposal is inconsistent with .0208(b)(1). ,.. MEMORANDUM Ted Hill Project 2 June 1994 Page 2 As you are aware, the application for permits that Mr. Hill has submitted also includes a 106' long pier which extends into Battalina Creek. To resolve the inconsistency as previously stated, I recommend that Mr. Hill consider the feasibility of placing the proposed boathouse on the pier thus eliminate the excavation within Battalina Creek. I also recommend that if Mr. Hill determines that this approach is unsuccessful, then his application for permits be denied based on G.S. 113A-120(a)(8) which states; "That a application for permits be denied if in any case, that the development is inconsistent with the state guidelines, or the local land use plans." If you have any questions do not hesitate to contact me. cc: Preston Pate MEMORANDUM David Gossett John Crew DATE: 20 April 1994 3 ,�APtRI 2 5 1994 U--+.........---...... ......pr SUBJECT: Ted R. Hill Application for Boathouse, Pier, Riprap and Mooring Facility, Battalina Creek, Beaufort County, North Carolina This proposal that is noted above is in Belhaven and thus comes under the auspices of the March 1993 CRC certified Land Use Plan Update. The proposal involves public trust and coastal wetland AECs. The following limited guidance is in the plan as follows: Town policy on development within AEC's (page 26-27) is to support and comply with applicable AEC standards. No specific policy on economic development or similar issues is noted. By definition, public trust AEC's and coastal wetland AEC's are considered in the conservation land class (page 55-56). That class, among other items, specifies uses including "... water oriented uses such as docks, piers, mooring pilings ... if shown not to cause a detriment to the AEC..." The landward part of this proposal appears to be in the urban transition class. That class (page 54-55) acknowledges urban type uses with the provision of services necessary to support those uses. My opinion is if this proposal can be accomplished within AEC use and performance standards, it would not be inconsistent with town policy for the conservation land class. cc: �reston Pate John Parker DIVISION OF COASTAL MANAGENMW FIELD INVESTIGATION REPORT 1. APPLICANTS NAME: Ted R. hill, II 2. LOCATION OF PROJECT SITE- Beaufort County, off SR 1708, Town of Belhaven Planning - - - Area, Battalina Creek (Tarklin Creek). - Photo Index - 1989: 292-14, S-10, T-10 1984: 79-961, 0-18 -- State Plane Coordinates - X: 2,711,400 Y: 660,400 Belhaven LI. 3. INVESTIGATION TYPE: CAMA and DREDGE AND FILL 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7 April 1994 _ --- _ Was Applicant Present - No - 5. PROCESSING PROCEDURE: Application Received - 6 April 1994 Office - Washington 6. SrM DESCRIPTION: (A) Local Land Use Plan - Town of Belhaven Land Classification From LUP - Conservation (B) AEC(s) Involved: Coastal Wetlands, Estuarine Waters (C) Water Dependent: Yes (D) Intended Use: Private Boating Access, Shoreline Erosion Control (E) Wastewater Treatment: Existing - Septic Tank Planned - None (F) Type of Structures: Existing - Single Family Dwelling Planned - Boathouse, Bulkhead, Retaining Wall, Pier (G) Estimated Annual Rate of Erosion: f V per year Source - DCM staff observation 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands istichli Vi= ±420 sq. ft. None (B) Non -Vegetated Wetlands (C) Other Open Water ±675 sq. ft. ±462 sq. ft. ±430 sq. ft. Highground f 1,500 sq. ft. f 8,000 sq. ft. wetland creation area. (D) Total Area Disturbed: t11,487 sq. ft. (0.26 acres) (E) Primary Nursery Area: Yes (F) Water Classification: C Open: No 8. PROJECT SUMMARY: The applicant is proposing to develop a private boat mooring facility with boathouse, pier and to stabilize his shoreline with riprap. TID R. HILL, II - Beaufort County nvironmental settin The applicant owns a 3.1 acre tract of land adjacent to Battalina Creek, off of SR 1708, within .the Town of Belhaven's Zoning jurisdictional area, in Beauforf County. Located on the lot is a single family dwelling which is served by a septic tank sewage disposal system. Potable water is supplied by an individual well located on the property. The majority of the property has an elevation of t5' above the NWL and it is vegetated with various lawn grasses. Adjacent to Battalina Creek, there is a fringe of coastal wetlands (marsh) located along the entire width ,of the property. The marsh which is vegetated predominately by Distichli Vic , and Iuncus roemerianus varies from 42' to 160' in width. Located along the applicant's western property line is a t5' wide ditch which connects to Battalina Creek and which serves as a route for upland drainage. Battalina Creek is classified as a primary nursery area by the Division of Marine Fisheries. Waters depth in the creek vary from P to 5' at normal water. The applicant is proposing the following: (1) To excavate a boating access channel from Battalina Creek into his property along the western property line. An area 45' long by 15' wide will be excavated in the creek to a depth of -T at normal water. Also, a 128' long by 15' wide access channel will be excavated into the property. This channel will also be excavated to a depth of -T at normal water.. At the landward end of this canal, the applicant is proposing to construct a boathouse which will be discussed later. As described in the submitted narrative, a portion of the channel (10' by 42') will be excavated within Distichlis spiok marsh. The remainder of the channel will be excavated within the existing drainage ditch or highground. All spoils will be placed on highground as shown on the attached plat labeled 2 of 4. (2) The construction of a 16' wide by 30' long open sided boathouse at the landward end of the proposed access channel. (3) The construction of 71' of wooden bulkhead across the land end of the boat basin an along the eastern side to the point where it intersects with the proposed retaining wall. (4) The construction of a 86' retaining wall along the landward side of the wetland area to be created. See plat 2 of 4. On the waterward side of the retaining wall, the applicant is proposing to create a wetland area which is to be substituted for the area of marsh to be excavated. The proposal is to relocate the Distichli ij= which is growing within the excavated area into the newly created area. v The emergent marsh along with 6" of sod will be relocated to the same elevation of adjacent marsh. See cross-section plant EI-E1 on plat 4 of 4 for details. When completed, a 5' wide 86' long fringe of created Distichlis VI= will be located along the landward side of the existing marsh. -- - • --_ (5) The placement of riprap along 154' of shoreline within Battalina Creek waterward of the existing marsh. The riprap will average 3' beyond the NWL and will be - _ placed no higher than the adjacent marsh. (6) The construction of a 105' long by 6' wide pier which will extend from highground into Battalina Creek. The pier will extend 30' into the creek and will have a 10' by 16' T-section at the waterward end. The pier will be positioned as shown on plat 2 of 4. Environmental imps . The following environmental impacts will occur: (1) ±675 sq. ft. of open water area will be excavated in Battalina Creek which is classified as a primary nursery area by the Division of Marine Fisheries. (2) ±420 sq. ft. of Distichlis W&M marsh will be excavated. (3) ±430 sq. ft. of Distichlis spicatamarsh will be transplanted to substitute for the area to be excavated. (4) The placement of the riprap along the shoreline should help retard ongoing erosion of the marsh adjacent to Battalina Creek. ±462 sq. ft. of open water area will be filled as a result of the riprap placement. (5) Some short term turbidity will occur in Battalma Creek as a result of the excavation and the pier placement. David L. Gossett - Washington Regional Office - 11 April 1994 -t7FAP- MP- . rhOelbf-91'r 4 -LgPj3Y-)- TOEL AdP - V504r -15.4 W) 7rjjc. *14M w M. . A -- 1.1c4A4 P--) C.D)4 -C.01457RVITLAL r2t06t&. --cinm,. 4. woj44-p- WrIL4#117-76 rf, PZ4 VjrJV2--J:b?- Tug- ---.per_._ i it - 77A 2K-u 4 —Mfzy-j A. P- M--OX.-- 4 IP7i-F po TOA r_m I f7TJ 4-0 v aT- -cw A W5 W J Ach S) A L- -W L4.1 vop, Av, X3 f2 JUSIMJS _THE- 4Y)D,;T,-AW1wLt -_ki j:'� .:t:•,j .'-"!J -a •.: %ti�'i L3a :: �Cl\ Ct•t — tn..:: " :l.L. ':� c••i '.Ji�^'.v.._--_ i�N^. IMF• npa 1�-1 l.a:,, i'•�. ntq•S�I KCI -�. �. •n,.- ,� _w .++ N ,;^'D 9 G J7_—fjY T►���9�1N_'��o1�571�I.t�i 1D_I�%.JYJR._�'il_L4_.�ItO��S _�'6____ .-_....----•. _'"���D�LJGA?E4y__/t?D�IE._.r1dG'_1.4PJ?ETd—Io_GF_�T_�'1_�_/11AR91iJ`J�L_WDJnI[sj_/20oT_M_193�_ --� ��►!n___Gxr,A✓gTJE_�9___r`_x-8�' �43o�m�T� p�2Tion1_of__.J�It-.�1fLFsS_'_�4�:f f+t1_ —$ 1�(rLOIAII.D-�D—�_ D�► .�JFIaW_—— D,79f.1✓►__yy1�R5k}._1~LE✓U11�"� ___ __ i?NEJJ_.�9s_,1_SPAT-Tt�G�►Jri2t—_Ir+�S?BGT>:D ltll�Ti.9tJ�-To__TN►5 oizl4r�lAL__.._ 11 - - ��;N6�l��Ro.u�ED.�}2F.AyJ1��S--ILI.—R�iu4T—I!�I-A,J._,q�DT.aJ,g'l. 5 � FS9►�1>_ _ �:bF _.c�.9hTi4�_W�hA�lD___.�cRo55�15__P.2oFi�Ia7Y_�+�E .> ?W4trrW -1 IL-L- "- N &-tZ.- P6._C064CA6 _-E�� �})�_�Cr1�9rID.___.4F---W��►�D—W) �I..��L- �T.4P51Lf"f�V __ P3:Y_ A i?ETA�/J)►J�j - ____�IrJALI.—ynAAb._SY �LAU�IEJ ._.STAI:�D_. _f:A1Lj20A17__TJFh_. �.'_l-I�'�N _ I,► LoN�j __tT_3 ---__:(,tNC�Trl,TN19__RETAIaIaE�_yJ.4LL.�JiW3vIn1__77�1r__1/J9Tc1eWA1ZD.__L'rJD__OF yVT �Tl__�P�EATER___bJE?iA.►D-1�I1�4_ Bk— Tv .FkAmrnl4-) AS,. -IS THE._ LonWTTZUGTPA— .. _._._$E'fAi►�11J�_.�fAtf�. LnIFA,L'_JNL-J..of.!>;._.�i►JE�_To.---1`AQa<Ltn? c.�1=1;1!�IT7iEnl_.:TWen1_ :Awp- Runt A��.TwARDS_.. jIiE _.pfAIJ40-_ 1?)dr2n3vIN� . 1 , SeCTon1 _(fo5ToTA�_-LEIJf{T1). Th4A.._ptF2s_.R1E�E..--- .Top N►S---p�oAT5 AND F/!W)Af4,-. ---_ —__ 1�L._�Rom_.__Aw_ cAd9To�`•_Wjw ..$ AD__o11kk._ LainT._APE* ant..._ _-----_At��,S �vol_SEGT)vn1 . oF,_Nly---�_. A>!A ijR<IALD IFXCEPl1NL_�"Df:E� .gwSQ,Fl FGFASF- _G4YL A 0 AT- 7s;? ;o }F_ TNr-+� gRE -- SrnrrfReW, jtr f X I4.8 FARMVJWF- ra.G. a7FA8. - i �i i r - it t 77 — nrNi J� �2bMalitiM— if1 UN{�' ��mOro N3aWclr�N�lSik 3 {lam pl�lfl o -- ci ayT�—'34L—r�NT S�r✓o15— r ��d —SJ -1 —,.Oo��rif _.fL9,0 __ a/-- 1; --=--Tcr?s= s�ff- rm6�dda�s� irk end— y s �,�"W-L(40CMWV —rrr-- ' Please type or print Carefully describe all anticipated - development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- . If you plan to build a marina, also complete and trot If the requested information is not relevant to your attach Form DCM-MP 2. . project, write N/A (not applicable). Items 14 and 8-9 must be completed for all projects ,;,:- _..__-_ _ r _ ,_,;.._ b. Is the proposed activity maintenance of an - existing project, new work, or both? ....... . WaIZK 7 APPLICANT c. Will the project be forcommunity, private. or a. Name -My 2 Out, -2 comae J,a E? Address�� 1 9,eY G6'1-A City $E LHAVid - State nl. G, d. Describe the planned use of the project. _ zip12 l0 Day phone 610.76- 87 �aQx 1�! r¢w t� -pinrt Iw .rionar� w�ln TFiIt�YAEY A'1GbJj'1� ✓ "' ' A thorued a ent L ,downeror u , g b. Project name rf any) W,A 4 LAND AND WATER c. If the applicant is not the landowner, also give the CHARACTERISTICS owner's name and address. t4 l A" . a. Size of entire tract '$. i A-cVF�, 2 LOCATION OF PROPOSED PROJECT ~— a. Street address or secondary road number h.R. /70g �!dmAPiE:l.li t.RrJE� b. City, town, community, orlandmaik � E tr1AJF.>,1 b. Size of individual lot(s) c. Elevation of tract above mean sea level or National Geodetic Vertical Datum lb +1 1 APey&k hrul, . d. Soil type(s) and texture(s) of tract hAdPl/ Lmaw1 AMP C.1.AY e. Vegetation on tract PW cs, HARbu)mD51 uyr.nr p � Yss2ro h vwn Adr) Lnah�l� r��T fjy� jZ01Pgi4T1AL,- 1torAS154Tu.17E f. Man-made features now ontracttesy¢aJe�vz�cTKriw,,,w� c. County bEA uToZT g. What is the CAMA Land Use Plan Classification of d. Is proposed work within city limits or planning the site? (Consult the local land use plan.) jurisdiction? `( -SEE ATr&4W LAMrLoF ONyP,"41O�_ZConservation Transitional e. Name of body of water nearest project Developed Community TAR 4 GPEEAG (13AI`rA1,11JA C429") Rural Other 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier).r& 11&rq6 A CA41JAIEr_ d- f3 M prJn rett ii. How is the tract zoned by local government? -RAD i. How are adjacent waters classified? j. Has a professional archaeological survey been carried out for the tract? W_ If so, by whom? N_I A- 9/89 i 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development a Type and number of buildings, facilities, or -- structumsproposed� if ) A b. Number of lots or parcels ►-1 /A c. Density (Give the number of residential units and the unitsperacre.j bJ JA- Fru. d9ae9- 8r5100' d. Size of area to be graded or disturbed - GttFA7ED WB7L d -Isk9d URAerD FKLM/67011-Wk fb' e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of land Resources? rJ f A £ Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? 0 1 A- i. Describe proposed sewage disposal and/or waste water treatment facilities. m. Water supplysdurce�JEi�, n Ifthe project is oceanfront development, describe the steps that will betaken to maintain established public beach accessways orprovide new access. o. If the project is on the oceanfront, what will be the - elevation above mean sea level of the fast habitable floor? J I A- 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- water, pierlT'SeG r boat ramp, rock jetty) Fill placed in wetland or below MHW j. Have these facilities received state or local approval? Upland fill 43 j ,a areas k. Describe existing treatment facilities. hEPfit: TAnIt, AaD PRAWEIPILP 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). 6umr rse gu.Jogr Length Width Depth b. Amount of material to be excavated from below water level in cubic yards TO Ced c. Typeofmaterial rwum Arta r uh/ d. Does the area to be excavated include marshland, swamps, or other wetlands? Wr e. High ground excavation, in cubic yards Zb 4 CM i £ Dimensions of spoil disposal area -- c. Shoreline erosion during preceding 12 months, in eet 1' =-- -- —_ g. Location of spoil disposal area A OTiR&4T 1 t1 G M d. Type of bulkhead material -TiudTeo woop �Dnu�lt� Orr I.flr A Do you claim title to the disposal area? KPh .If not, attach a letter granting permission from the ---, - owner. _= 1. Will a disposal area be available for future maintenance? ycy Ifso,where? 6A"r AS m6P66-M, aeE.o j. Does the disposal area include any marshland, swamps, or water auras? k. Will the fill material be placed below mean high water? No (Rmb ]WRAP PLA= 8ewW AAd N4fFJL� No Fru- L Amount of fill in cubic yLjz yards rPRAP = t:s. t. c,Y, m. Type of fill material``�a,A . r-xcn4471o44 of Attrzo 090hrEL n. Source of fill material 9 c .I N mmr—P /N Rcuc PPAp . o. Will fill material be placed on marsh or other wetlands? - sic, - p. Dimensions of the wetland to be filled N I �- q. How will excavated or fill material be kept on site and erosion controlled? 1hftVEA 121AWWR4D r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? BxcAja= t 0u,.1.1-/yyfJL --MCWM- s. Will wetlands be crossed in transporting equipment to project site? gyres If yes, explain steps that will be taken to lessen environmental impacts. .,wAv Te 'PSG LAm otl CoASTA•r. WfrutrJoS iJtlElTL• A�PROP2/ATE 7 SHORELINE STABILIZATION P�AW4 B:IUCAeAD — 71' a. Length of bulkhead or riprap ZMAP - t 5t' RETAiAWIL WAw- tb' b. Average distance waterward of mean high water or normal water level o' Fok Burxr)tao 3' POP RrPRAP (PROM nt ORW To 1,,V77fewneQ 77f) 9/89 e. Amount of fill, in cubic yards, to be placed below. mean high water f. Type of fill material_ R- - Roue ROVAP 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out theproject. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 W x 11 white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is apart of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. A list of previous state or federal permits issued for work on the project tract .Include permit numbers, --- -_ penmittee, and issuing dates. til I A A check for $ZWmade payable to the Department of Health, Environment & Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 11 3A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit _ I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the 'day of "IXULLI ,19M7 x Land r or Authorized agent t 4 9/89 'r,4eKLl.)J COR-5E II 10!70unJDt^1615 fa _i *%LV u . • s wi' V�G�N FrY m4q . •• . cam_ � •.+, T. crtW GlIEL ' � . � ..,. •' • 9u,v�jo RNA 1 of 4 FE5,R #49+ Trz" FR*o W.e.CDw emVp +66r'b'44d 2 L3.jtl* alM d53d GL Uladp YlAl a1 iacfp7LC3IQL 3r1 7J31� �� 4rn xd arum m 2L •may, ,:_ / wU ,t-lvb dill a S/Ma14 '9, mr..s �� i• �• / '� dnr•+laM-tVl�avo� -A ' .a 7f \ J T � OpT1WM d317Sd'J f. i4[i3'� � / I � djbrldrYl .`-0 4VIRAll/d Ga`rtlaa,:L i i Ti I T r IXV.LS •V'W'w'- f C(.niar dDyaa�• _. - /x� ,S ( '8 p / t L /JC'37T-t"n4 Qi4a4Leyj Ah wr � 3 -JS%QjtL q 029 x ,�1 I /I y d3S4j� do LYrradlfo3 -C I a T "la al"VILY9 r� N,ya ,6 4t4uf-Ix7 ' I -olrri �IM9S - g4r'avi-4 ;VIP TYPicAI. GQoy�iECTroN CA, -Az) ID'.5r. VIVA ��(' 04 D:pPeanD CILL ' ' CYIDTI I Y6:C5'NJ fiu:YNL.tD . Rcrlwn "• -- ODe@XP Wrfbh L2ohh�olJ of cR£�E.D �JEi1.AnlG �P7��fiL) hen Roar, 2AP Or. vle M-C&Fp I' N16`i/ CRAYJtaAP -nE S. 4TArgg) 'P�u�K.N-eAv �E-rnit, 4"xfe WNAL¢R4 YYT { �AYL WNAAi\�IF111¢LII I Fu.794. aEnl 11 I I Dlx. �'kP n.A¢a F eYY. I I ' C7ei.T 'RAtr4+UDJ 11 I 1 1 'A"N' yriN (4 o�cJ 9'%PL'-¢IA7f-D WgTUi,jG LL" QIEe QE7At1.. Az (7L f �RINe/4P At RIPe.Sf YID NrttlsP, 7AAd satyr eM¢"NI 6f,EJ to-iDD 1. S AlrA/tS •sir 's"n 4trb� b'�e 4 do 1� 133H �s�gllfsd S .O I • • 'i iota"p c Nt -jti'J.3d 34noy-ovd •si•r _ •si•r •,.�,•w. ter. - //// p�UyrHY9 nISy4J woad e>fyrn•va 3a v1— 14"vw Mun 6%pWdVM .J. n•LLMV "aNv -__ iI 7k19 QaVI•arV7 AftW I-OUJM'•V74 'P rim �*"rmxsz -fw1Ba 35*aHy' (�y.9�QJ+b7L�M 48_D'3ZY7 3o r/0ty.735s*7 aU.rv7es al �j/f atirrs.a sa •1 -.. W•Uad 491yJ •Y iat -_..1..,,y. yquy� �i_ pa a+9 25na - fir' -_ ' r- 46 c.J�•indtdYay� id, t7 -- _ -- ---�t7 ('22-")I3nrdr4-2 4a�d 3o rj �� 19S. Town flfanager.---- --- - Nabtb B. Nraugbn Town QCIerk : lark 3. Obamt 25 February 1994 Mr. Ted R. Hi119I Rt. 1, Box 947—A Belhaven, N.C. 27 Dear Mr. Hil Thi� 11t designation .1 Campbell Lane, This prolier Agriculture — be Extraterritorial Boat Basin,Boat with the Town of Plan of 1993. embuaub ma4 — J - reques Town Countiil 3rubp C. S&n, l6lapar Vra-Cm Waft Wen . iearge iL Cbron, 3rr. Ronnie Al. glolaerg ROP W. "eat Zoning on S.R 1708, o sled i (Residential — �it<jDis r ct pf,Ahe Town of Belhaven ict-ion e-.proposed construction of ddei� re esently in compliance en¢pring ale ulations and Land Use Upon receipt of all Federal and State permits, I will be glad to assist you in obtaining the required permits from the Town of Belhaven for Building and Locating your project. If I can be of further assistance, please feel free to call me.. Sincerely, % _ L� ,." Louis W. Martin,Jrf Zoning Administrator cc: Town Manager,Tim Johnson .Vogt ®ffire 38ox 220, 5&1 laben, 31orth Carolina 27810 (919) M-3055 • _fax (919) 943-2357 - - 'F'A. C�Ox• IS07 P.L, zq. ' _ ►lnJB REd1COW /NR.TEPdXL'5 'Feoi 4L To A"111f. R FxAr 5hwil ,AND coAMuC,7. A .$odTl}ouSF 40P Stt,K31rAo IJi7NI►J is" of t"Y j'Eo/"ERTY.. VAJJ: VO C15,7E 1010. To ffi5 jlwber.. XAV /Os e",lAWOGfA fir. • i $ELNAJEJJ I tif.G. ,'t 7QJo _ is L�Aa�C 8oyo2Ti/magi %SAS 6odAl� &4§A, N e. A76as -- - -- MEMORANDUM TO: Jim Mulligan Deborah Sawyer FROM: David Gossett % DATE: 13 April 1994 SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit Ted R. Hill, 11 Beaufort County, North Carolina Attached is an application for a CAMA Major and/or a Dredge & Fill permit which was received by me on 6 April 1994. I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me.