Loading...
HomeMy WebLinkAbout87-94 TX Beamer, Mark & VanessaPermit Class 1 Permit Number TRANSFER 87-94 STATE OF NORTH CAROLINA Department of Environment. Health & Natural Resources and o F Coastal Resources Commission Vermit LMAYVLO514 for ` % Major Development in an Area of Environmental Concern ^------ pumuant to NCGS 113A-118 % Excavation and/or filling pursuant to NCGS 113-229 Issued to Mark & Vanessa Beamer, 105 Riverview Street, Belhaven, NC 27810 authorizing development in Beaufort County at Tarklin Creek, off of SR1708 as requested in the permittee's application AMW NO& ird attached workplan drawings, sheets 1-4 of 4 dated 2/9/94. This permit, issued on APRIL 25, 1995 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Excavation 1) Excavation in Tarklin Creek as depicted on sheet 2 of 4 at cross section CI-C2 to provide an access channel is hereby deleted. Excavation will not extend beyond a line approximating the drainage ditch/Creek interface. (See also Condition No. 3, below). 2) In order to avoid periods of high biological activity, no work will be performed between the dates of March 1 and September 30 of any year without the prior approval of the N. C. Division of Coastal Management. 3) No work will be conducted at the site until a pre -construction meeting is held between the permittee, contractor, and a representative of the Division of Coastal Management. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1997 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. 4-4.11� Roger N. Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Mark & Vanessa Beamer Permit # 87-94 Page 2 of 4 ADDITIONAL CONDITIONS 4) The proposed boat basin will not have a depth exceeding 3 feet at normal water level. 5) The temporary placement or double -handling of excavated or fill materials within waters or vegetated wetlands is not authorized. Fill of vegetated wetland is not authorized. 6) All excavated materials will be confined landward of the normal water elevation contour and any vegetated wetlands. Bulkheadine 7) ' The bulkhead alignment will approximate the normal water level at the time of construction. 8) The bulkhead must be constructed prior to any backfilling activities. 9) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 10) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted, except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 11) The fill material will be clean and free of any pollutants, except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. Rinrap 12) The riprap will not extend waterward more than 3 feet from the normal water level at any point along its alignment at the time of its construction. 13) The riprap material must be free from loose dirt or any other pollutant. It must be of a size sufficient to prevent its movement from the site by wave or current action. 14) The riprap material must consist of clean rock or masonry materials such as, but not limited to, granite or broken concrete. 15) The proposed riprap will not be placed higher than the elevation of the adjacent marsh. Mark & Vanessa Beamer Permit #87-94 Page 3 of 4 ADDITIONAL CONDITIONS Mitigation 16) The created wetland area must be completed prior to the beginning of any other portion of the project. The area must be approved by a representative of the Division of Coastal Management. Pier and Boathouse 17) The pier and associated structures shall have a minimum setback of 15 feet between any parts of the structure and the adjacent property lines as extended perpendicular to the channel at the points where they intersect the shoreline. 18) The alignment of the proposed pier will be staked by the applicant and approved by a representative of the Division of Coastal Management prior to construction. 19) The boathouse shall not be completely enclosed or have side coverage more than one-half the height of the side, from the roof waterward. General 20) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of this docking facility without permit modificaiton. No non -water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 21) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 22) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having the permit transferred to a third party. 23) The authorized structure and associated activity will not cause an unacceptable interference with navigation. 24) All project activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the water body is 50 NTUs or less are not considered significant.