Loading...
HomeMy WebLinkAbout175-85 Bayview TownhomesPermit Class Ir, ) ^) Permit Ni New STATE OF NORTH CAROLINA 175 Department of Natural Res6u `-slittd Community Developm tt aMajor Development mt,' f E jronmental Concer'pur r tOCT 2 o- 19 85 ® Excavation and%orf' H g ptiisuant to NCGS 113-2 ---------------------- Issued to Bayview Townhomes, 200 Eastbrook Drive, Greenville, NC 27834 authorizing development in Beaufort Countyat the Pamlico River, old Bayview Hotel as requested in the permittee's application dated 8/27/85 i ncl udi no attached plats, 4, plan view and vicinity map dated 6/4/85 clearing plan dated 8/21/85 and cross section dated 8/22/85. qLLi This permit, issued on I0 ZL/ /ri 7 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. (1) Bulkhead construction and pier replacement will be conducted in accordance with the permit plans. (2) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction - related discharge. NOTE: Any new development on the permittee's property may require a modification to this permit. Any new development not identified in the original sediment/ erosion control plan must also be outlined in the form of an amendment to the original plan. All temporary and permanent sediment/erosion control measures, devices, and structures to be utilized during site development must be identified in any amendment to the original sediment/erosion control plan. NOTE: The proposed project is certified under General Water Quality Certification No. 1272 isued on November 10, 1978 for bulkhead construction. NOTE: In keeping with the provisions of GS 146-6(c) the State Property Office of the Department of Administration has granted authorization to fill State-owned submerged lands as described in this permit. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1988 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission - David V. Owens, Director Office of Coastal Management This permit and its conditions are hereby accepted. Signature of Perrnittee �S EP -- 51985 State of North Carolina ---------------------- Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary 3 September 1985 Mr. John R. Parker, Jr., Chief Major Permits Processing Section Office of Coastal Management Raleigh, North Carolina 27611 Dear Mr. Parker: The attached copy of an application submitted by: Bayview Townhomes Applicant's Name David W. Owens Director Bayview Beaufort County cation of Project County X for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major develop- ment permit... for a CAMA major development permit (only) ... has been reviewed by the Field Services Section and is being forwarded to you along with a Field Investigation Report for further application processing including circulation to State agencies having interest and/or jurisdiction over the subject matter which might be affected by the project. The recommendation of this Section is X covered on the reverse side; attached; will be forwarded later. CSJ:ap:3566 Sincerely a ' �- Charles S. Jones, ief Field Services Section P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer x (A) lhis agency has no objection to the project as proposed. (NO CMMMONS) (B) This agency has no comment on the project as proposed. (C) This agency approves of the project (or project concept) and/or recommends these minor refinements for project management. (D) This agency objects to the project and recommends permit denial based on a finding of: (1) adverse impacts under G.S. 113-229(e) 1-5 (the dredge and fill law)as enumerated below: NMI) ... that there will be significant (e)(2) ... that there will be signifi- adverse effect of the proposed dred- cant adverse effect on the value ging and filling on the use and enjoyment of the property of of the water by the public; &W riparian owners; . (e)(3) ... that there will be significant (e)(4) ... that there will be signifi- adverse effect on public health, cant adverse effect on the con - safety, and welfare; servation of public and private water supplies; (e)(5) that there will be significant adverse effect on wildlife or fresh water, estuarine or marine fisheries; (1) Inconsistency with Rules of the Coastal Resources Commission as enumerated in 15 NCAC 7H (or other). Please. site rule. (3) Inconsistency with the local Land Use Plan (Please elaborate). (4) Inconsistency with Rules, Guidelines or Standards of this agency or a finding that the project is in conflict with other authority or interest as stipulated below. (E) Attachment. Include memorandum or other documentation that support findings relating to D1-4 or provide general comments. Signature Q-3-`65 Date OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name Bavview Townhomes 2. Location of project site Beaufort County, Bayview; Pamlico River Photo number 12-19-84, 74-987 E-12, E-13, D-12; D-13, C-12 3. Investigation type: Dredge & FillX CAMA X 4. Investigative procedure: (A) Dates pf site visit 6-18-85 (B) Was applicant present No 5. Processing procedure: Application received 8-23-85 Office Washington 6. Site description: (A) Local Land Use Plan Beaufort County Land classification from LUP Secondary transition Development constraints identified in LUP None (B) AEC(s) involved: Ocean Hazard Coastal wetlands Estuarine waters X (C) Water dependent: Yes No X (D) Intended use: Public Private (E) Type of waste water treatment: Existing None Estuarine shoreline X Public trust waters Other Other Commercial X Planned Septic tanks - two - each two thousand gallon systems (F) Type of structures: Existing None Planned Eight individual dwelling units (under construction) (G) Estimated annual rate of erosion None Source pCM staff obcprvation 7. Habitat description: (A) Vegetated wetlands: (B) Non -vegetated wetlands: (C) Other: Townhouse property (D) Total area disturbed: N/A N/A 2.47 acres 2.47 acres 8. Project summary The applicant is developing Bavview Townhomes on a 2.47 acre tract at Bayview. Development will consist of the construction of eight units new bulkhead and renovated pier. Environmental setting The applicant owns a 2.47 acre tract of land at Bayview at the site of the old Bayview Hotel, on the Pamlico River. The property has an elevation of + 7.0 feet above the NWL, and is bulkheaded. Located on the property is a + 430.00' long pier which is deteriorated. At the present time eight townhome units are under construction on the property. These units will be served by one septic tank per four units, and each tank will be 2000 gallons. No wetland vegetation is present at the project site. Project proposal The applicant is proposing the following: (1) Upon completion of the townhome units, final landscaping is proposed within the 75' Estuarine Shoreline Area of Environmental Concern. The area will be properly sloped and seeded. (2) The construction of a new bulkhead 339.38' in length to replace the existing deteriorated bulkhead. The new bulkhead will be placed 2' waterward of the existing bulkhead. (3) The repair of the existing pier to its present length and width. Environmental impact The project as proposed should have a minimal impact. No wetland vegetation will be excavated and/or filled. David L. Gossett - 3 September 1985 - Washington Office J. H. HUDSON CONSTRUCTION CO. GENERAL &H ENERAL CONTRACTORS • POST OFFICE BOX 1983 • GREENVILLE, N.C. 27835.1983 July 1, 1985 • HIGHWAY 264 EAST • PHONE (919) 758.2138 Coastal Management Field Services 1502 North Market Street Washington, North Carolina 27889 Attention: Mr. David Gosset Reference: Bayview Townes Bayview, North Carolina Gentlemen: Per your request, please find enclosed copies of our application and plans on the above referenced project for your use. The project consists of 2 each buildings placed on wood piles composed of 4 individual townhouse dwelling units in each building. All drives and parking areas indicated will be gravel. Site work will include removal of existing trees at the building, drives, and,sewage nitrification fields only. The heavily brushed area between the building and the bulkhead will be selectively cleared with a large majority of existing growth to remain. We made a sincere effort to locate the buildings at a 75 foot set back from the bulkhead, but failed to realize that the jog at the east end of the bulkhead would effect the required set back. As we are sure you have noticed, the building has been redesigned and will fall outside the 75 foot set back. We hope the above information will clarify our intentions on this project. Please feel free to call should there be any questions. Respectively yours, J. H. H�UUDDSON CONSSTTRUCTTI�ION CO. E. Lyn udson Vice President AER:kn • i APPLICATION FOR PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT Department of Administration State of North Carolina Department of the Army (GS 146.12) Department of Natural Resources and Community Development Corps of Engineen, Wilmington District (GS 113.229, 143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320-329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. Applicant Information A. Name Last First Middle B. Address 2 n n P-Ac+-broak Drive Street, P. O. Box or Route Greenville NC 27834 (919) 752-0025 City or Town State Zip Code Phone II. Location of Proposed Project: A. County Reanfort- B. I. City, town, community or landmark Fiavvi rsw- Nr 2. Is proposed work within city limits? Yes No C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Pamlinn kivpr 111. Description of Project A. 1. Maintenance of existing project Bulkhead 2. New work Tree and brush removal B. Purpose of excavation or fill 1. Access channel length width depth 2. Boat basin Icngth width depth 3. Fill area length width depth 4. Other LandsnaPin9 length width depth 2.47 Acres C. 1. Bulkhead length 11 q 3 R Average distance waterward of MHW (shoreline)_ 2 ' 2. Type of bulkhead construction (material) t- i rn her D. Excavated material (total for project) 1. Cubic yards NA 2. Type of material E. Fill material to be placed below MHW (see also V 1. A) 1. Cubic yards NA 2. Type of material IV. Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X B. Does the disposal area include any marshland, swamps or other wetland? Yes No lr C. Disposal Area 1. Location Trees & brush will be trucked off —site 2- Do you claim title to disposal area?_ nn D. Fill material source if till is to be trucked in none E. How will excavated material be entrapped and erosion controlled?_ Silt fencing will be installed if crnainn ic. nnfirpd where trees are removed I . I ype of equipment to be used Dozer and backhoe G. Will marshland be crossed in transporting equipment to project site? If yes, explain _ no -B 1 10/78 ;. V. Intended Use of Project Area (Describe) A. 1. Private 8 each individual dwelling unitA (townhomes) 2. Commercial 3: Housing Development or Industrial 4. Other B. 1. Lot size(s)—_2 - 47 acrpc 2. Elevation of lot(s) above mean high water =..Ara genf 7 n 1 3. Soil type and texture sand 4. Type of building facilities or structures `unnd tramp dw. l 1 ing nnit-a nn s and ni 1 i ng 5. Sewage disposal and/or waste water treatment A. Existing Planned X B. Describe —Two each 2000 gallon system w/ nitrification fields 6.'Land Classifcation'(circleone) DEVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis) VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes_ No _X B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes_No_X 2. Type of discharge 3. Location of discharge VIL Present rate of shoreline erosion (if known): not known Vlll. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, ifapplicable: nnnp IX. Length of time required to complete project: Tree removal _ 2 days • hn 1 khead maintenance X. In addition to the completed application form, the following items must be provided: ongoing A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8'h X 11" white paper (see instruction booklet for details). Note: Original drawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served D. List names and complete addresses of the riparian landowners with property adjoining applicant's. Such owners have 30 days in which to submit comments to agencies listed below. HnrA-. R Cn. 11 - .T-mpc R Ft rt XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved coastal management program and will be conducted in a manner consistent with such program. r XII. Any permit issued pursuant to this application will allow only the development described in this appli- cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land clearing. / - %TE ^27-rr f' Applicant's Signature E. Lynn Hudson, agent for Bayview 0&F-82 Townhomes tev. 10178 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS i I t • � �Z � r� � �� EKG 111111 � i.. ••.... � I4dc.caw.V �� � � � p �• uaw • WL '} �.. � 0 1K• �M:p LB �/(. •a •ems \ Jq- s camas h N.T•' -.JmD eJ�cJYD � . / •G a•JOJ.TN ' AWLICO RIVER ` 51TE,-PLLAF.j R/ A//{/ �; fit, • UWA 2 Sty 1 15 E �'O• \• � I _ —_ F I 1 r a It • •r. .�M.. Y.SYN... I� • , �� L� •\ `� r s��r►.+.� M/GI�P4G WGIOD�i n� ►JotE: 'P?odlOc ���T cl.e®a.�wr •..N.... • ••' •.� r hot — � b! ittlallvil PAA4 ICO AVER �� SITE f L�1.1 BAYvi Ew TOWtJ Not�1ES J.H. H u Ds o �j CoK?sjRUGTIOo Co. Po.e,ox iws--� G,rzeeuvl��e ►lc. I••40.0• -21-a4 z/0 - 11 o-,I AM-tsjfo I - - vtiol.l.aq y;v,,izi 1r,4Xo 4 0 +Prwus,K* 1 II I� I i �iil t �� 17 n i151X-j 0as �T£o� �i(V�y{_y A ��-� puG _ 7 �ga5 �� State of North Carolina u-"--'"----- Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary M71• DID 2MD J Mr. E. Lynn Hudson, Vice President CJ—.H­�fludson Construction Company � 983 Greenville, North Carolina 27834 Subject: for State Permits Bayvi s Bayview ounty Dear Mr. Hudson: David W. Owens Director Field Services P.O. Box 1507 Washington, NC 27889 (919) 946-6481 5 August 1985 Upon receiving your application for state permits, I contacted Mr. Worth Baker, employee of J.H. Hudson and my previous contact, concerning the proposed development, and informed him of my need to clarify several items in the application package. Since I have not been contacted by Mr. Baker, I felt I should let you know processing of the application cannot begin until these items are clarified. I will continue to hold the application in my office until I am contacted, however, no processing can begin. If you have any questions do not hesitate to contact me. Sincrel i Dav/,,////d�~LL ..Gossett Environmental Consultant DLG/aht cc: arles Jones - Chief, Field Services Section, DCM Ken Jolly - U.S. Army Corps of Engineers P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer