HomeMy WebLinkAbout108-84 Minor Mod Bay Dredging & Contracting Corp. (2)Permit Class
Modification /Minor
Issued
STATE OF NORTH CAROLINA
Department of Natural Resftr�.qs;and Community Development
.�ahti•' w
Coastat-Resb,urces &i Wssion
A
a Majoi tJeoelop tfent iri [tonmental
51
& Contracti
to NCGS 113-229
authorizing development in Hyde County at Pamlico Sound
as requested in the permittee's application dated
Permit Number
108-84
i
attached plats for bulkhead and excavation 2 no date site map (chart), no date, 2 for
diked spoil area dated received 5/2/86.
This permit, issued on 1 - , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void.
(1) The bulkhead alignment will approximate the mean high water level except
for the 125 linear feet indicated on the plat, which will not exceed 19
feet from the mean high water level.
(2) All backfill material will be obtained from a highground source and confined
behind the permitted bulkhead, except that the spoil derived from the excavation
of the access channel may be used for backfill.
(3) The fill material to be placed below mean high water level will be confined
behind the permitted bulkhead.
(4) This permit does not authorize the excavation in front of the proposed bulkhead.
(5) No marsh grass will be excavated and/or filled.
(6) All excavated materials (with the exception of that allowed to dry and then
placed behind the bulkhead) will be confined above mean high water and
landward of regularly or irregularly flooded marsh behind adequate dikes
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee
or other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification
not covered hereunder requires further Departmental
approval.
All work must cease when the permit expires on
December 31. 1987
In issuing this permit, the State of North Carolina
agrees that your project is consistent with the North
Carolina Coastal Management Program.
Signed by the authority of the Secretary of DNRCD and
the Chairman of the Coastal Resources Commission.
David W. Owens, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bay Dredging & Contracting Corporation Permit #108-84
Page 2 of 2
ADDITIONAL CONDITIONS
or other retaining structures to prevent spillover of solids into any marsh
or surrounding waters.
(7) The disposal area effluent will be contained by pipe, trough, or similar
device to a point at or below the mean low water level to prevent gully
erosion and unnecessary siltation.
(8) The terminal end of the pipeline will be positioned at or greater than fifty
(50) feet from any part of the dike and a maximum distance from spillways
to allow settlement of suspended solids.
(9) A water control structure will be installed at the intake end of the effluent
pipe to assure compliance with water quality standards.
(10) The diked disposal area will be constructed a sufficient distance from the
mean high water level or any marsh to eliminate the possibility of dike
erosion into or upon any marsh and/or surrounding waters.
(11) The dike and excavated material will be properly graded and provided a ground
cover sufficient to restrain erosion within thirty (30) days of project
completion.
(12) The activity must be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction .or construction
related discharge.
NOTE: The proposed project is certified under General Water Quality Certification
No. 1272 issued on November 25, 1978 for bulkhead construction.
NOTE: In keeping with the provisions,of GS 146-6(c) the State Property Office
of the Department of Administration has granted authorization to„ fill
State-owned submerged lands as described in this permit.
IMINIffivM
TO
N=AY 'l 1986 ,
John Parker ----------------------
FROM: George Wood
SUBJECT: Modification to Permi #108-84; ClayDredging and Contracting Co
DATE: May 7, 1986
This office has received a request to modify permit #108-84 to allow dredging
by hydraulic dredge instead of by dragline. I have no objection subject to the
inclusion of the following conditions.
(1) All excavated materials will be confined above mean high water and landward of
regularly or irregularly flooded marsh behind adequate dikes or other retaining
structures to prevent spill -over of solids into any marsh or surrounding waters.
(2) The disposal area effluent will be contained by pipe, trough, or similar device
to a point at or below the mean low water level to prevent gully erosion and
unnecessary siltation.
(3) The terminal end of the pipeline will be positioned at or greater than fifty (50)
feet from any part of the dike and a maximum distance from spillways to allow
settlement of suspended solids.
(4) A water control structure will be installed at the intake end of the effluent pipe
to assure compliance with water quality standards.
(5) The diked disposal area will be constructed a sufficient distance from the mean
high water level or any marsh to eliminate the possibility of dike erosion into
or upon any marsh and/or surrounding waters.
(6) The dike and excavated material will be properly graded and provided a ground
cover sufficient to restrain erosion within thirty (30) days of project completion.
cc: Charles Jones
File