HomeMy WebLinkAbout27-87 Town of Aurora'Permit Class
New
r
STATE OF NORTH CAROLINA1
Department of Natural Resources. and Community Developme
and _
Coastal Resources Cori"ssion
�Prl1�i
for
0 Major Development in an Areabftt vironmental }
Concern pursuant to NCGS43A'I78
Excavation and/or filling pursuant to NCGS 113.229
Issued to Town of Aurora. P. 0_ . Box 86, Aurora, NC 27806
Permit Number
27-87
authorizing development in Beaufort County at South Creek (upstream of N. C. Hwy.
Bridge in Aurora) as requested in the permittee's application dated 12/16/86 including_
attached plat set. sheets 1 and 2 of 2 dated 7/86. (sheet 1 not attached)
This permit, issued on ;) / ; '�/ , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject
pernittee to a fine, imprisonment or civil action; or may cause the permit to be null and void.
0 No wetland vegetation will be excavated or filled, except where the pipeline
traverses the wooded swamp and marsh. In these locations, all wetlands
will be restored to preproject contours once the pipe is in place.
(2) The pile bents within the marsh area will be cut off at ground elevation.
(3) The pile bents within South Creek will be properly marked with reflectors
or reflectorized material, and so maintained throughout the life of the
project so as to reduce the potential for a navigational hazard.
(4) The activity shall be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction
related discharge (increases of 25 NTUs or less are not considered significant).
NOTE: An Easement is required from the Council of State through the State Property
Office, Department of Administration prior to construction of pile bents
and pipe in South Creek.
This permit action may be appealed by the pemtittee
or other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification
not covered hereunder requires further Departmental
approval.
All work must cease when the permit expires on
In issuing this permit, the State of North Carolina
agrees that your project is consistent with the North
Carolina Coastal Management Program.
Signed by the authority of the Secretary of DNRCD and
the Chairman of the Coastal Resources Commission.
David W. Owens, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
a
PEt I jrp; Rk P9 I J6
State of North Carolina
Department of Natural Resources and Community Development
Division of Coastal Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Governor
S. Thomas Rhodes, Secretary
17 December 1986
Mr. John R. Parker, Jr., Chief
Major Permits Processing Section
Office of Coastal Management
Raleigh, North Carolina 27611
Dear Mr. Parker:
The attached copy of an application submitted by:
Town of Aurora
Applicant's Name
South Creek Beaufort County
Location of Project County
David W. Owens
Director
for a State permit to perform excavation and/or fill
work in coastal North Carolina and for a CAMA major develop-
ment permit...
X for a CAMA major development permit (only) ...
has been reviewed by the Field Services Section and is being forwarded
to you along with a Field Investigation Report for further application
processing including circulation to State agencies having interest
and/or jurisdiction over the subject matter which might be affected by
the project.
The recommendation of this Section is covered on the reverse
side; X attached; will be forwarded later.
S'ncerelyy, __
LC� -
Charles S. Jones, ief
Field Services Section
CSJ:ap:3566
P.O. Box 27687, Raleigh. North Carolina 27611-7687 Telephone 919-733-2293
An Equal Oppormnity Affirmative Action Employer
(A) This agency has no objection to the project as proposed.
(8) This agency has no comment on the project as proposed.
x (C) This agency approves of the project (or project concept) and/or recommends
these minor refinements for project management.
CONDITIONS ON SEPARATE SHEET
(D) This agency
objects to the project and recommends permit denial based on a
finding of:
(1) adverse impacts under G.S. 113-229(e) 1-5 (the dredge and fill law)as
enumerated
below:
(e)0 )
... that there will be significant
(e)(2) ... that there will be signifi-
adverse effect of the proposed dred-
cant adverse effect on the value
ging and filling on the use
and enjoyment of the property of
of the water by the public;
any riparian ormers;
(e)(3)
... that there will be significant
(e)(4) ... that there will be signifi-
adverse effect on public health,
cant adverse effect on the con -
safety, and welfare;
servation of public and private
water supplies;
(e)(5) that there will be significant
adverse effect on wildlife or
fresh water,
estuarine or marine
fisheries;
(1)
Inconsistency with Rules of
the Coastal Resources Commission
as enumerated in 15 NCAC
7H (or other). Please site
rule.
(3) Inconsistency with the local Land Use Plan (Please elaborate).
(4) Inconsistency with Rules, Guidelines or Standards of
this agency or a finding that the project is in conflict
with other authority or interest as stipulated below.
(E) Attachment. Include memorandum or other documentation that support
findings relating to D1-4 or provide general comments.
Signature
I A—I-1 —lile
Date
Town of Aurora
Beaufort County
CONDITIONS:
(1) No wetland vegetation will be excavated or filled except where the
pipeline traverses the wooded swamp and marsh. In these locations all
wetlands will be restored to preproject contours once the pipe is in place.
(2) The pile bents within the marsh area will be cut off at ground elevation.
(3) The pile bents within South Creek will be properly marked with reflectors
so as to avoid any navigation hazard.
DLY
David L. Gossett - Washington Office - 17 December 1986
OFFICE OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. Applicant's name Town of Aurora
2. Location of project site Beaufort County; Town of Aurora, South Creek, upstream of
NC 33 Bridge, no photo
3. Investigation type: Dredge 6 Fill' CAMA X
4. Investigative procedure: (A) Dates of site visit 12-15-86
(B) Was applicant present No
5. Processing procedure: Application received 12-16-86" Office_ Washington
6. Site description: (A) Local Land Use Plan Town of Aurora
Land classification from LUPConserVation'
Development constraints identified in LUP None
(B) AEC(s) involved: Ocean Hazard Estuarine shoreline
Coastal wetlands Public trust waters
Estuarine waters Other
(C) Water dependent: Yes No Other Discharge
(D) Intended use: Public X Private Commercial
(E) Type of waste water treatment: Existing -Lagoon system - discharge to ditch
Planned Lagoon system - discharge to South Creek
(F) Type of structures: Existing."Lagoon system
Planned 6" outfall line with dual diffuser
(G) Estimated annual rate of erosion N/A Source N/A
7. Habitat description:
(A)
Vegetated wetlands: Dredged
Typha spp. + 1000 sq.ft.
Wooded swamp ± 400 sq.ft.
(B) Non -vegetated wetlands:
(C) Other:
Open water
(D) Total area disturbed: ± 1400 sq.ft
Pipe + 50 sq. ft.
+ 50 sq. ft.
8. Project summary The anplicant is Proposing to relocate an existing domestic sewage
outfall from a ditch to South Creek
Environmental settin
The Town of Aurora presently operates a + 5 acre two stage domestic sewage lagoon.
The discharge from the lagoon system empties into an adjacent ditch which connects
to an unnamed tributary of South Creek. The lagoon system is located on highground
adjacent to a wooded swamp and a Typha spp. marsh system which borders South Creek.
Project proposal
The applicant is proposing the elimination of the present discharge location -by
constructing a + 1400' force main outfall line to South Creek. The 6" force main
will be placed within a + 2' wide trench. Along the existing ditch the pipe will
be buried along + 600' of existing spoil area. Once the pipe leaves the end of the,
spoil area it will traverse + 200' of wooded swamp, + 500' of Typha sue, marsh,
and then will extend into South Creek + 80' where it will branch into two 20' long
sections at a 45 degree angle. The wastewater will be discharged at the end of the
two branches.
Unlike the pipe when it crosses the spoil area, wooded swamp, and Typha sW., the
section of pipe which extends into South Creek will not be placed in a + 2 wide
trench. The creek portion of the pipe will not be buried but will be aTlowed to
lay on the bottom of South Creek with support from 7 pile bents 20' apart. These
pile bents will extend + 3' above the water surface and properly marked with
reflectors. The section of pipe through the Typha spp. marsh will be supported by
pile bents within the trench. Once the pipe is in place, the trench area will be
restored to its original elevation with the wooded swamp and marsh.
Environmental impact
The project as proposed will involve the excavation of + 1000 sq.ft. of Typha spp.
marsh and + 400 sq.ft. of wooded swamp. These areas will be restored to their
original elevation once the outfall pipe is in place.
David L. Gossett - Washington Office - 17 December 1986
vt/�b A
APPLICATION t i— 16—o'6
FOR
PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION
EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT
Department of Administration State of North Carolina Department of the Army
(GS 146-12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District
(GS 113-229, 143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320-329)
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank.
I. Applicant Information
A. Name— Town of Aurora
Last First Middle
B. Address v n Piny RF,
Street, P. O. Box or Route
]aurora. N.C. 27806
City or Town State Zip Code Phone
11. Location of Proposed Project:
A. County Beaufort
B. 1. City, town, community or landmark Town of Aurora
2. Is proposed work within city limits? Yes —No X
C. Creek, river, sound or bay upon which project is located or nearest named body of water to project
South Creek
III. Description of Project Effluent Pump Station and Force
A. 1. Maintenance of existing project 2. New workMain for Existing Wastewater
B. Purpose of excavation or Fill Treatment Lagoon
I. Access channel_ N/A length width depth
2. Built. basin N/A length width depth
3. Fill area N A length width depth
4. Other).2y1.RtLSta & Fnrrp }Qegit 14()0 width2'-0" depthvalves V-0" to 1'-0"
C. I. Bulkhead length N/A Average distance waterward of MHW (shoreline) excavate & restore to
2. Type of bulkhead construction (material) original condition
D. Excavated material (total for project)
t. Cubic yards 250 cy 2 Type of material
E. Fill material to be placed below MHW (see also Vl. A)
1. Cubic yards —0 2. Type of material
IV.
Land Type, Disposal Area, and Construction Equipment:
A. Does the area to be excavated include any marshland, swamps or other wetland? Yes X No
B. Does the disposal area include any marshland, swamps or other wetland? Yes No x
C. Disposal Area
1. Location N/A
2, Do you claim title to disposal area? N/A
D. Fill material source if fill is to be trucked in �y7'
L. How will excavated material be entrapped and erosion controlled?
I'. I ype al equipment to be used
G. Will marshland be crossed in transporting equipment to project site? If yes, explain Force Main goes through
A�IIn— T.F. of wetland (1'-0"depth ditch) to discharge into South Creek
F-81
. 10/78
_ V. Intended Use of Project Area (Describe)
A. 1. Private
2. Commercial
3. Housing Development or Industrial _
4. Other Town of Aurora
B. 1. Lot size(s)
2. Elevation of lot(s) above mean high water N/A
3. Soil type and texture
N/A
4. Type of building facilities or structures Pttmn Station
5. Sewage disposal and/or wastewater treatment A. Existing_ X PlannedP_UMP Sta. Addition
B. Describe Anrnra Efflnant- Pump Sta b POLOP Main for Existing Lggoon
6. ' Land Classification'(circle one) DEVELOPED TRANSITIONAL COMMUNITY RURAL
CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis)
VI. Pertaining to Fill and Water Quality:
A. Does the proposed project involve the placement of fill materials below mean high water? Yes —No X
B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project completion? Yes X No
2. Type of discharge Fxistina Treated W Stewater Effluent
3. Location of discharge South Creek 165 F.
South of NC33 Dridge
VIL Present rate of shoreline erosion (if known): Not known
VIII. List permit numbers and issue dates of p�e kus Department of Army Corps of Engineers or State permits for
work in project area, if applicable: //
IX. Length of time required to complete project: 6MTI
X. In addition to the completed application form, the following items must be provided:
A. Attach a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the owner of said property,
then forward a copy of the deed or other instrument under which the owner claims title plus written
permission from the owner to carry out the project on his land.
B. Attach an accurate work plat drawn to scale on 8% X 11 " white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G.S. 113-219 (d))Enter date served
D. List names and complete addresses of the riparian landowners with property adjoining applicant's.
Such owners have 30 days in which to submit comments to agencies listed below.
XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies
with the State of North Carolina's approved coastal management program and will be conducted in a
manner consistent with such program.
XII. Any permit issued pursuant to this application will allow only the development described in this appli-
cation and plat Applicants should therefore describe in the application and plat all, anticipated devel-
opment activities, including construction, excavation, filling, arldT%nc6cleafilte- .. j /1!n _ P
DATE (DaeV b« )G )9 K
Applicant's Signature
qw--j
D6F-87 Rev. 10/78 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS
u
TOWN OF AURORA
PROPOSED EFFLUENT PUMP STATION 4 FORCE MAIN ADDITION
TO T HC
EXISTING W,-�5TC WATER TREATMENT PLANT
EPA - r-370597 -02
COVER H Er TOWN OF ^UROFA -N
5,5M. MAP SANfrAeY SEWER SYSTEM MAP PRIDGIE
CONSULTANTSy INC.
PH
I
LAND" Sam
'�` 1�f--+-a;: �II 1 .;'r.-7-•_•:._--�-` _-_ -' /.In(� Oat
N"ping Rachel Cv79) � a � rR1k� 1. '� if•� � '
ar LIN
ve
• '.,yam•Shi—
Win GT ch • 6_
Ism
Y o �
Swam
.amp. _ v /
(,: are •
.rs tc104
"
83
- �i1J II �Ia1007}
III
O.II•
i ;,,,
rmj / Ift1 �alMoa 24 tel
Ch pLA •Cedar Grove Flo. y
II'' a '�•wlo
\4
1 � •N
loot `I
Sa �
_-136 47'30' 339
'•� aBAYBOROI
J66a al NC
rl i1 L�;�
JL
. MAN
r MntY
r: rl-(•vt:NT WNP 5TATION
>uu IY•I'•o•
E.", V+600N! '
�.4n •.�y! xC •ewY
,I
Tura ;�... .::'- j
ei
... ....max......... .. — • —��^ • �� .
' t Phi \
EXISTING LAGOON! \�
I• EF5 PUMP STATION FpeOE hiyl DIFFUSER
IJ-
,I
.. .. _..... .. ... ,r ... r .r _r
...... -... n... APR— Op'Lrr } u
TOWN OF AVR02A
0e FM PtAxtp¢pF.E EFF PUMP 5�A.. ORCE MAIN rP ' a' PE'r.as F A DIFFuSeR '•"' CONSUL N
�•�' � F 4 ER Sr ' AGOON ...+oar .rou CONSULTANTS, INC. t
, ro>+eNx oue¢.ti xc nuw.xc • .Ev. ¢,.axc n'�oI"
n
LqM 6'LV
v
=I
` CypCLL pIMU>lR LONG
430' if 1� •
> O'
Ex15r. LA400NS '
STAGE em.Rl 2.e
QWwf.
SUQ/. As0.,•. 1 e Ac.
N.
O
N
112
' • I1'LNP lLM1.o
CMP [L1•e EDIKR [•D.• I
'LAGOON 5rDRAG6
O.o SUIF.Ac.R 3' PREEeOA"
•15.0 AT. eT -4.78 MG.
LA H C^PPLITY • 0.1W MID.
1�.
.I
Dor. eLlp• ..
C L
I
6
WAT. >uQF AQFA
1•a G..
o
LOGTION MAY
3 NOrFIPll
,,. _.....,,•
Y•MOTCN Pn¢EI D56,=-
=+ a
LN INOFILLD
• IN 71 appRDVGD DY
•
-
all. T ,
-f t GNG ¢. TO ONre0.M TO QYU•T.LOY p,
rnLT. C•EC'. U•QWCf p[
L'a £ONr TPnF DLD•e'CC1T.'
3
DO I
STATION
0
STONE NAuCW AV 12'NIR I-DI.P
fiX15r.8ff, 12'--
cawc� `-��P.JiJKT
SW+MP-NOT'e: '
Q ClToma GONST. AREA CATTAIL Wei LAND
_
TO a%1ST CONTOURS Pr. 1.o•APe¢Oz.NSL ..• ;
�'•.e 4 MAT-L. • J >Le D�'. L'.' yr.•L•S
lrhs, - u•'° d
UN ,•.,WIN
6• D.1. I`OQ�
NrD rQIlUrA¢Y
PROP.
{
PLAN
o
b
EX15T-ING LAGOON 6
g c
�
EFF• PUMP 5TATION FOP-GE=W,4,1 N } DIFFUSER
�
D
9GAlE I•. ImI
J N b <
F
12
y p d N
"•l—C1LC �
y
IL
WLTIL! !DN IF8
600 LF f p-plp6-LAIDON CR6ASOROTIMDEQ �x i1M4NeD
JLE_B N N AE AJOINT
U. .. _ .. _. .. "t�✓OINT
d,
11
�.
.._ .. _... ....__ 1
-
10
e
_• ••�••
i
PILL fROM ••
DIRK Te v.5.
..
•• J •...
"�-- "�-
i
d
b
D
I
. _. flii. • iG
�
LI dl
4
__ .. -
3
I eJ.e 1
!'-�-
_ _•• L.
...e.. L• a ..•ae
x
'
MSLo
..-..—.1
I2'g5•TN v,
Oat.• ro Rc€ M I
_
: v¢on. PUMP >rA.
La�D1uRe— ...
�_ _ I
.. .. �_. ...... 1 _
-a
Ix•wvQ -
111
e
I..I
-
Leh
•••rym
�• _ i ! i 1 I'� I I I
•'S
NOo I.O.
mQl
noo J.
♦.m D•m c•w T.m alw n.00 1r*n n'oo 131.1 q,y,
.
Nn re: ♦.nrJ• nr rnc.
no.e pmeM � — �—
M+.,xwx rvArfiR EI. l.o P120FILE
DCALs VrRr l'.n`..•'-��n .v. � •Inn'
r—
1- F�116E FAllQlC-32"MIN.
WlPT4-6LINE W12E5@10GA
5P,AcING STAYS IZ606•12.54A.
r2' BUtzLP.P-71/Z OZ. WT
32"NA IN. WIDTH
3-5TEEL oP-WOor) PdFT 57" 1-IIGFI
- STEEL -SELF FASTNE2 ANGLE �o.D
WOO P - 4" DI Imo. - F,A STCN W I ZE w/4 cJ 6JTAPLE.S
IN 4-MAINTAIN IN GAOh GO/yDITIUN
32"
IOCTA LINE
Crw()N10
A14CODM gOC-L^P 5r-lZrAr Pavr,
DETAIL OF TCMPO�A-Y 51LT FL -NC
I5., WIDE
/F4 LA DDEe
NOG. STEEL
FLI& N
PUMP XL VAL HOIST
o RNST CP: E4.
ACGO
LADD
RUNG`
7
PUMP 5TA. DI F02CE MAIN
LUMP SUM BID UNIT PRIGS BID
iNG. EL.ECT-
GI BELL. TOP
VENrlLAT0V-
-CONTROL CABINEr, 5TAeTERS, PUMPS Acx E15 W"
Coyee ^TS, COM PL .50ALL BE P(A N15;�{{ED el.4,
DY T14FL Po MR 5(.l PPL4eV--YROJIOIr ACOES:, HA7CH IN COVEe
—60NDqVIT SEAL.
N l`iI ac„ ac.,
N
II ITI
�
I ,
i •NR
r YENTY
1
I I
�Il Ir = 1)
TI =T
4 TA PUm
WIMAN
y 1d
M W
5
C
eV
U
IS O.G.
1
-
P
DIP
--
_.. _..
�
2
W
L
<cATe YPLVf
EBOK
ct
�
HWL.
ALA.eAt
T
I k
aN
EL4.'H P
W
IQ
�z
v
G
SEcr1oN
IQm
O I
ON
6LAA
d
t- o
cur IN To mx15T
v
z
;.
G120 P2E-G.
al
PUMP
W/MONOLITH
CL
e.1.o
L IL
MHTDP SHAL.
'HOIST, DOUBLE
O
IjOTE
J
PUM PS
<
O 1750
.LWL.
u
N
u'
33X GO,
EfloEL 2.0
'
-
je
BOTTOM EL. — 3.0
'{PPR.Ox. EY45TGIL
- =lQf+-u eNr
♦5T CONC. M N
IG BOTTOM.
'_ BE OAST WITH
HATOH PRAMS,VENTSAETO. /L5 SHOWN
59ALL BE 210 6➢rvL A 3 Co TDN
'ZPM W/rH 5 HP.MIN.,z30/460V
I M6TOF--4"015CH-3'MAX6OIID5
—r
EF—FLUEN T PUM P STATI O N
S W4M P suzr-,
—x
PIEQ D o Rt o d m o
P ¢ V)
W �
W OD
K x
a� 24�?zn
N CL
ut-
010
�W
1 v V C
WA7'6e
Re FLSC MP5-'1,IPILE
PILES INTO ff4zz Bor.
O
d
WA, r.Suet VAPUES OMSL TD I.O:F
WArEQ DePrH -ro S!L'r VA£IM OTO
kYAT, P E P'rN 7'0 HAP-0 $ 6rtOM
4.0 a 'ro '7, 0 0
SILT SOT.
T�-P4T• GRO'"S (M EM BE2 3>��I
SWAM P WeT JanlD SouTN GRe�K
TYPICAL Clz05SECTION6
g1GN
LD
--------------�'
6,190' FLG. WYE --
C2BA.YIMSE9 PILS�
<o0X8" GR055 MaMBER
CAEA. TR.P-ATF-D
3/40GAt-V.. 601-75 —
v/� WASHERS
/ O�Q.
�O
V�
.Q
. �V(3
2D &ALV.
. 5TEA P
DI F. BENT-
5GALe 318"'f=o"
i
9ER-EGTO 2S
2F-EO'D /PILE
A
N
ml
V STYAP
O
t16N7
0
M5L
/ T'R. TIMB
3/4" 6ALV 8[XTg `t
I -
C DEN D5 A3 RED
3o" 64D1P
#— SILT 60T. / I
FLG. rV YE
c TOWN OF AURORA
r
g FLOW SURFACE �/4° MaRfNE VLYWopp
DUG7ILE 1ROI�I 9r�GK LETTE(t5
ON W HITE f3a�Gfd�uND
PIPE ON PIL5S
OECTION A -A
SIGrN DIP. BENT DETAI L
NT5 SGPI-E 518" = 1'_0"