HomeMy WebLinkAboutNCDOT 257 Minor Mod Neuse RiverPermit Class Permit Number
MODIFICATION/NUNOR 257
STATE OF NORTH CAROLINA
Department of Environment and Natural RS4QVces
PAMNO and
Coastal Resources Commissio P
'AUG,14 � 2003Vtrmit
a
Qkfta
for
Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to N.C. Department'of Transportation Ferry Operations, P.O. Box 57, Hatteras, .NC 27943
Authorizing development in Craven County at Neuse River (S. side at Cherry Branch Ferry
Terminal) , as requested in the pormittee's application letter dated 3121103 & 7/14/03.
including the attached workplan drawings (5): 2 dated March 2003• and 3 dated February 2003.
This permit, issued on 7/25/03 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
De Subject to Imes, 1mprSOlmlent Or OIVn allLIU1 , Vl umy uaubc um yciuu. w v,, uuu m,u r
Pile Clusters and Tettine Research Project
1) This minor modification authorizes the installation of four (4) clusters (3 piles each) to secure auxiliary
equipment and vessels in the event of storms in the locations depicted on the attached workplan
drawing. This minor modification also authorizes the jetting research project as described in the
NCDOT letter dated 7/14/03, and as depicted on the attached workplan drawings.
NOTE: The research team will install and remove a total of 10 piles at this site. A 40' x 40' working
platform will be installed at each pile location to monitor and collect data generated from the
jetted pile installation. Each working platform will require the installation of four spud piles
around the jetted pile installation site.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel. when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
June 30, 2005
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authonty of the Secretary oI Ltrnx ana me
Chairman of the Coastal Resources Commission.
ina D. Moffitt, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
N.C. Department of Transportation Permit #257
Page 2 of 2.
ADDITIONAL CONDITIONS
2) The permittee shall not attempt to clean the test Iocations of deleterious materials after testing because such
cleaning could cause more habitat disturbance then the material itself.
3) The working platforms and the test piles shall be removed in their entirety immediately upoii dbinpletion of
the research project.
4) This minor modification does not eliminate the need to obtain any additional permits, approvals or
authorizations that may be required.
5) This minor modification must be attached to the original of permit No. 257 as well as all subsequent
modifications and renewals, and all documents must be readily available on site when a Division
representative inspects the project for compliance.
6) All conditions and stipulations of the original permit and subsequent renewals remain in force under this
minor modificatibn unless altered herein.
0
MEMORANDUM:
TO: DOUG HUGGETT
FROM: BILL ARRINGTON
SUBJECT: COMMENTS & RECOMMENDATIONS - MODIFICATION REQUEST -
CAMA MAJOR PERMIT # 257 Maintenance of the channel and turning basin at the
Cherry Branch Ferry Terminal on the south side of the Neuse River in Craven
County. Request to add 4 clusters (dolphins) of three piles each at the south end of
the turning basin.
DATE: March 25, 2003
The following are my comments and recommendations regarding the above -mentioned proposal.
The proposal consists of adding four dolphins (3 piles each) 81' from the south end of the turning
basin. CAMA Major Permit # 257 was renewed September 20, 2000, for the maintenance of the
channel and turning basin of the Cherry Branch Ferry Terminal on the Neuse River in Craven
County. The Neuse River at Cherry Branch is estuarine water.
I have no objections to this proposal provided conditions for CAMA Major Permit # 257 are
adhered to.
Cc: Charles Jones
Ted Tyndall
03/25/2003 09:07 9862781
facsimile transmittal
HATTERAS INLET FERRY
NCDOT- FERRY DIVISION
HATTERAS AJLET FERRY OPERATIONS
PO BOX 57
HATTERAS, NC 27943
252-986-2136
252.986-2781(FAX)
To: Bill Arrington Date: 03/25/03
From: Morris (=ray
Re: Pages: 2
CC:
PAGE 01
03/25/2003 09:07 9862781 HATTERAS INLET FERRY
w
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MiCHAEI- F. EAU-EY I-IA7-rERAS M[.PO Box FERRY 7 OPERATIONS
LYNAO TIPPFTT
SECRETARY
C,OVERNOR HAT-rERA$, NC 27?43
March 21, 2003
Bill Arrington
Division of Coastal Management
151 B Highway 24
Heftron Plaza U
Morehead City, NC 28557
Ref: State Permit 257
PAGE 02
Dear Sir:
we would like modification to the above reference permit to allow us to install 4 clusters of three
piles at our ferry terminal at Cherry Branch, Craven County. The purpose of the pile clusters is to secure
auxiliary equipment and vessels in the event of storms.
Please find enclosed a check in the amount of $ 100.00. If you have any questions, please contact
me at my office at Hatteras (252) 986-2136.
Thank you for your help and cooperation.
Sincerely,
�A09
Morris J. Gray
Dredge Superintendent
PHONE (252) 986-2353 FAX (252) 986.2781
03/21/2003 08:02 9862781
HATTERAS INLET FERRY PAGE 01
NCDOT - FERRY DIVISION
HATTERAS INLET FERRY OPERATIONS
PO BOX 57
HATTERAS,NC 27943
252-986-2136
252-986.2781(FAX)
facsimile fansmittad
41,
Re: Pages:
CC:
�►. W .. b. 1.a.. ram. ZiL l a.
9
-
.l
^iowrrn
Y �
1uGly. lr.P�!• �
Tu RNtn!&
t5 AS I IV
` -
C
tY DIVISION
—
MR IA15T,$CL1±TrON
VC.1+—CRAVCA(
6mrFT
003
N
A/E Gl$
AI
03/21/2003 08:02 9862781 HATTERAS INLET FERRY PAGE 03
T
STEEL CA
BANDING
M.W.L.
BOTTO
NOTES:
1. ILC CLUSTERS CONSIST OF
i 5 OR 7 1 2" PRESSURE.
I'REATED PILES, 50' IN LGTH.
2, PILE DESIGNATION: 2.5 PCF'
CCA-C, SALT WATER MARINE.
EXPOSURE (AWPA CS STDS)
N.C. DEPT. OF TRANSPORTATION
FERRY DIVISION
PILE CLUSTER INSTALLATION_'
TYE. PILE CLUSTER cHir"y ►3R,4Nc."-c9,4v0'vcf-
(NTS) SCALE: NONE SHEET
DATE: M,4RCH 2.003 12 OF Z
MEMORANDUM:
TO: DOUG HUGGETT
FROM: BILL ARRINGTON
SUBJECT: COMMENTS & RECOMMENDATIONS - MODIFICATION REQUEST -
CAMA MAJOR PERMIT # 257 Maintenance of the channel and turning basin at the
Cherry Branch Ferry Terminal on the south side of the Neuse River in Craven
County. Request to add 4 clusters (dolphins) of three piles each at the south end of
the turning basin.
DATE: March 25, 2003
The following are my comments and recommendations regarding the above -mentioned proposal.
The proposal consists of adding four dolphins (3 piles each) 81' from the south end of the turning
basin. CAMA Major Permit # 257 was renewed September 20, 2000, for the maintenance of the
channel and turning basin of the Cherry Branch Ferry Terminal on the Neuse River in Craven
County. The Neuse River at Cherry Branch is estuarine water.
I have no objections to this proposal provided conditions for CAMA Major Permit # 257 are
adhered to.
Cc: Charles Jones
Ted Tyndall
e3/21/2003 08:02 9862781 HATTERAS INLET FERRY PAGE 01
NCDOT - FERRY DM51ON
HATTERAS INLET FERRY OPERATIONS
PO BOX 57
HATTERAS, NC 27943
252-986-2136
252-986-2781 (PAX)
facsimile ftmsrriftal
Re: Pages:
CC:
!:,b- 22-
m
.i21/2003 08:02 9862781 HATTERAS INLET FERRY PAGE 03
1
STEEL Cl
BANDING
RR"J"
BOTTO
TYP. PILE CLUSTER
(NTS)
NOTES:
1. PILE CLUSTERS CONSIST OF
5 OR 7 1 2" PRESSURE,
TREATED PILES, 50' IN LGTH.
2. PILE DESIGNATION: 2.5 PCF'
CCA-C, SALT WATER MARINE.
EXPOSURE (AWPA C3 STDS)
N.C. DEPT, OF TRANSPORTATION
FERRY DIVISION
PILE CLUSTER INSTALLATION
SCALE! NONE SHEET
DATE; /vIlmr-H _00.3 2 OF 2
eti.rw`nawJ Y # , :u mmnv.:
�81�0 1
r •\ x * s * x A ;
o wr7t
, 7S'
6YF.vL �_
_� -/3' 1 propoStQ
p 7s
Io AI.� i
i 9D -�
1 Ic�81�oL "rMRAltIV6--
I'SPSI�/
390
G=AIL w cruN_b
EXISTING CLUSTEP,
j -RA�s nansxrnsnrfmMe _. f6S[3Nc, D£Pr, or "�Qr4Tf0a. •_` AM v
li PARRY DIVISION —
PI LE CLUSTER TN5T-kLL,4T[OAI
CkEPPY 13RFNc-Jf--CRAVEN
scn1.0 I"� /DO' v NEFT
NJ{+rcfr Zoo3
03/25/2003 09:07 9862781 HATTERAS INLET FERRY
STATE OF NORTH CAROLINA
DF.PARTMENT OF TRANSPORTATION
MICHAEI. F. EASLEY
GOVERNOR
Bill Arrington
Division of Coastal Management
151 B Highway 24
Heftron Plaza H
Morehead City, NC 28557
Ref: State Permit 257
Dear Sir:
HAT r8RAS INLET FERRY OPERATIONS LYNAO TtPPETT
PO BOX 57 SECRETARY
HA1-TERA$, NC 27943
March 21, 2003
PAGE 02
We would like modification to the above reference permit to allow us to install 4 clusters of three
piles at our ferry terminal at Cherry Branch, Craven County. The purpose of the pile clusters is to secure
auxiliary equipment and vessels in the event of storms.
Please find enclosed a check in the amount of $ 100.00. If you have any questions, please contact
me at my office at Hatteras (252) 986-2136.
Thank you for your help and cooperation.
Sincerely,
v�)46e�
Morris J. Cray
Dredge Superintendent
PHONE (252) 986-2353 FAX (252) 986-2781
03/25/2003 09:07 9862781 HATTERAS INLET FERRY PAGE 01
NCDOT- FERRY DMSICN
HATTERAS 71,LET FERRY OPERATIONS
PO BOX 57
HATTERAS, NC 27943
252-986-2136
252.986-2781(FAX)
faeskae transmittal
To: gill Arrington Date: 03/25/03
From: Morris Cray
Re: Pages: 2
CC:
is !l ZL