HomeMy WebLinkAboutNCDOT 131-95 Bayview Ferry FacilityClass
Permit Number
Minor Modification
131-95
STATE OF NORTH CAROLINA
Department of Environment. Health 8a Natural Resources
and
Coastal Resources Commission O M V 11
Vermit 1 0 MAR 2 91996
for L T61--
% Major Development in an Area of Environmental Conceamma"sa«osr. se"M
pursuant to NCGS 113A-118
% Excavation and/or filling pursuant to NCGS 113-229
Issued to NC Dept. of Transportation. P.O. Box 25201. Raleigh, NC 27611
authorizing development in Beaufort County at Bayview Ferry Facility, NC 306, Pamlico River
, as requested in the permittee's application dated letter dated 3/4196 including
attached workplan drawings, 6, dated revised 3/4/96.
This permit, issued on MARCH 25, 1996 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
RIPRAPBREAKWATER
1) In areas where coastal wetlands are present, the height of the riprap material shall not
exceed the elevation of the coastal wetland substrate, except for that area indicated as
Section B-B on workplan drawing sheet 6 of 7, dated revised 3/4/96.
2) The excavation or filling of vegetated wetlands is not authorized, except for that area
indicated as Section B-B on workplan drawing sheet 6 of 7, dated revised 3/4/96.
3) The proposed riprap will not exceed five feet beyond the normal water level at any point
along its alignment.
attached sheet for Additional
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31, 1998
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
v �
�' oge . Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
NC Dept. of Transportation
ADDITIONAL CONDITIONS
Permit # 131-95
Sheet 2 of 2
4) The alignment of the proposed riprap adjacent to the Mason Property must be staked by
a representative of the Division of Coastal Management (DCM) within a maximum of
30 days prior to the start of construction. Failure to initiate construction within 30 days,
or erosion of the shoreline by adverse weather conditions, will require the alignment to
be restaked by DCM within a maximum of 30 days prior to the new expected start of
construction.
5) The riprap material must be free from loose dirt or any other pollutant. It must be of
a size sufficient to prevent its movement from the site by wave or current action.
6) The riprap material must consist of clean rock or masonry materials such as, but not
limited to, granite or broken concrete.
7) The breakwaters must be marked at the waterward end with a yellow reflector extending
at least three feet above the normal water level.
GENERAL
8) Prior to any work being done at the site, a pre -construction meeting shall be held
between the applicant and a representative of DCM.
9) All work authorized by this permit must be performed in strict compliance with the
permit plans.
10) If any work is conducted from a barge, no work channels shall be excavated to enable
equipment to reach the site.
11) The temporary placement or double handling of fill materials within waters or vegetated
wetlands is not authorized.
NOTE: The Division of Environmental Management authorized the proposed
project under General Water Quality Certification No. 2665 (DEM Project
No. 95921), which was issued on 10/13/95.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project
COE Action ID. No. 199505342.
Permit Class
Permit Number
STATE OF NORTH CAROLINA
Department of Environment, Health& Natural Resources
and
Coastal Resources Commission
t,
erM t
for
% Major Development in an Area of Environmental
pursuant to NCGS 113A-118
% Excavation and/or filling pursuant to NCGS 113-229
131-95
.....................eases Iw
Issued to NC Dept. of Transportation, P. O. Box 25201, Raleigh, NC 27611
authorizing development in Beaufort County at Bayview ferry facility, NC 306,
Pamlico River
as requested in the permittee's application dated
7/31/95 & attached
workplan drawings, 7, dated revised 5/95.
This permit, issued on OCTOBER 27, 1995 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be
subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
Riprap/Breakwater
1) In areas where coastal wetlands are present, the height of the riprap material shall not exceed
the elevation of the coastal wetland substrate.
2) The excavation or filling of vegetated wetlands is not authorized.
3) The riprap material must be free from loose dirt or any other pollutant. It must be of a size
sufficient to prevent its movement from the site by wave or current action.
4) The riprap material must consist of clean rock or masonry materials such as, but not limited to,
granite or broken concrete.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31, 1998
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
AirgerN. Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
NC Dept. of Transportation
ADDITIONAL CONDITIONS
Permit 031-95
Page 2 of 2
5) The breakwater must be marked at the waterward end with a yellow reflector extending at least
three (3) feet above the NWL.
General Conditions
6) Prior to any work being done at the site, a pre -construction meeting will be held between the
applicant and a representative of the DCM.
7) All work authorized by this permit must be performed in strict compliance with the permit plans.
8) If the work is conducted from a barge, no work channels shall be excavated to enable equipment
to reach the site.
9) The temporary placement or double -handling of excavated or fill materials within waters or
vegetated wetlands is not authorized.
NOTE: The N. C. Division of Environmental Management authorized the proposed project under
General Water Quality Certification No. 2665 (DEM Project #95921), issued on
10/13/95.
NOTE: The U. S. Army Corps of Engineers has assigned the proposed project COE Action ID
No. 199505342.
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N, Schecter, Director
10 August 1995
Mr. H. Franklin Vick, P.E., Manager
Planning and Environmental Branch
North Carolina Department of Transportation
Division of Highways
Post Office Box 25201
Raleigh, North Carolina 27611-5201
Dear Mr. Vick:
3
A74iLA
ID IFE
()nrmn73
AU8 1 4 rQ5
On 9 August 1995 I had a telephone conversation with Mr. Scott Gottfried of NC DDT's
permit section concerning an application for state permits that you submitted to this office dated
31 July 1995. The application involved a shoreline stabilization project at the Pamlico River
ferry basin and adjacent properties owned by Mr. H.G. Roper and Mr. Keith Mason in Beaufort
County, North Carolina. During this conversation I relayed deficiencies to him concerning the
application package. Mr. Gottfried acknowledged that he understood my concerns and stated
that he would re -submit a complete application package for review noting the following
deficiencies that were discussed:
(1) La. NC DOT is not the only land owner in regards to this project. DOT is also
performing development activities on the properties of Mr. H.G. Roper and Mr.
Keith Mason. These two individuals must also be included in this section along
with NC DOT.
(2) l.b. This section was left completely blank. NC DOT should be listed in this
section as authorized agent.
(3) 4.a. Should be completed for entire tract on which project is proposed.
(4) 4.b. The development activities will occur on three individual pieces of property
- NC DOT, H.G. Roper and Keith Mason. Sizes of all three properties should
be listed.
(5) 4.f. Other manmade features exist other than ferry basin, e.g. pier on Roper
property-
(6) 4.1. This question asked "If Yes, has a delineation been conducted?" NC DOT
answered the question "other".
(7) 4.m. Should be answered for all properties.
(8) 4.o. Should be answered for all properties.
(9) The three deeds that were to be submitted were omitted, no deeds were received.
1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
Mr. H. Franklin Vick
10 August 1995
Page 2
(10) The two green return receipt cards from the adjacent riparian property owners
were omitted. These must be submitted.
(11) Plats
(a) In general the plats were very light making reproducing difficult. I have
requested darker plats.
(b) Plat 7 of 7 was laid on the copy machine wrong and only one-half of the
plat was copied. This entire plat needs to be submitted.
(c) Plat 3 of 7 - normal water line needs to be shown.
I hope this listing of deficiencies will be beneficial to Mr. Gottfried in completing this
application package. As you are probably aware, I first met with NC DOT officials at this site
in October 1994. I realize the importance of this project to DOT, therefore as soon as a
complete application package is received, I will promptly begin processing of the application.
I am enclosing the incomplete application package back to you.
If you have any questions do not hesitate to contact me in the Washington Regional
Office at (919) 946-6481.
Sincerely,
David L. Gossett
Field Representative
DLG:pp
Enclosure
cc: Terry Moore - District Manager, Washington Regional Office, DCM
Preston Pate - Assistant Director, DCM
John Parker - Major Permits Coordinator, DCM
Raleigh Bland - U.S. Army Corps of Engineers, Washington Office
Scott Gottfried - North Carolina Department of Transportation
APPLICATION TRANSMITTAL/PROCESSING RECORD
North Carolina Department of Transportation, r /►�-
A) Applicant: Dora Roper, and Roland Mason County: —Beauforty"�
Location of Project: NC 306, Bayview, Pamlico River, at the north ferry dock
Date Application Received Complete by Field: 18 August 1995
Field Recommendation: Attached X To be Forwarded
Consistency Determination: Attached To be Forwarded X
Field Representative: D. Gossett District Office: Washington
District Manager Review:,/
B) Date Application Received in Raleigh: Fee Rec'd: $
Public Notice Rec'd: End of Notice Date:
Adj. Rip. Prop Notices Rec'd: Deed Rec'd:
Application Assigned to: on
C) 75 Day Deadline: 150 Day Deadline:
Mail Out Date: State Due Date:
D)
Federal Due Date:
Fed. Comments Rec'd on
Permit Final Action: Issue Deny Draft on
AGENCY
DATE COMMENTS
RETURNED
OBJECTIONS
YES NO
NOTES
Coastal Management District Office
Division of Comm. Assistance
Land Quality Section
Div. of Env. Management
State Property Office
Div. of Archives S History
Div. of Env. Health
Div, of Highways
Wildlife Resources Commission
Div. of Water Resources
t
J
Div. of Marine Fisheries
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
25 June 1997
Mr. M.J. Gray
Dredge Superintendent
North Carolina Department of Transportation
Ferry Division
Room 120, Maritime Building
113 Arendell Street
Morehead City, North Carolina 28557
Dear Mr. Gray:
/t'/
JUL 0 3 M7
This letter is in response to your recent submittal to this office an application for permits to
excavate a new channel of approximately 1,700 feet in length in order to straighten the existing channel of
the Bayview-Aurora ferry in the Pamlico River, Beaufort County, North Carolina. Upon a review of the
proposal and discussions with other Division of Coastal Management staff members, it has been
determined that an Environmental Assesment as required by the North Carolina Environmental Policy Act
(NCEPA) is needed for this project due to the excavation of a new navigation channel. The purpose of the
NCEPA is to provide a method by which decision makers may consider environmental aspects and
consequences of a proposed development.
When an Environmental Assesment is required for a project, an initial environmental document
review must be completed by the DCM prior to the submittal of a CAMA Major Development Permit
application package. Due to this requirement, I am returning the application package that you submitted.
This package has several defencies that I will not go into detail at this time, however, these will need
resolving prior to resubmittal. We can discuss these at a later date at your request.
If you have any questions concerning this entire process do not hesitate to contact myself or Mr.
Terry Moore in the Washington Regional Office at 919-946-6481, or Mr. John Parker, Major Development
Permit Coordinator, at 919-733-2295.
Thank you for your consideration in regards to this matter and if you have any questions do not
hesitate to contact me.
Sincerely,,
David Gossett
Coastal Management Representative
cc: Te�Y Moore - District Manager, DCM, Washington Regional Office
4 reston Pate - Assistant Director, DCM
John Parker - Major Permits Coordinator
1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716
An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper
MEMORANDUM
TO: ' David Gossett
FRO John Crew
DATE 31 August 1995
�
SEP" 12 05
Bayview Ferry Dock on NC 306 adjacent the Pamlico River, Beaufort County
This proposal for shoreline stabilization on the north shore of the Pamlico River at the NC DOT ferry
terminal, and adjacent property, comes under the auspices of the March 1993 CRC certified Beaufort
County Land Use Plan update. Public Trust, Estuarine Shoreline and Estuarine Water AECs are
involved.
The plan offers the following limited guidance on proposals of this type:
• County policy on AECs (page VIII-4) note "c. Support development in AECs only if
such development meets the management objectives in 15 NCAC 7H.0203 and the use
standards in 15 NCAC 711.0208 and .0209."
• County policy on State and Federal Programs (page VM-19) include "The county
remains committed to state and federal programs in planning areas, where applicable,
related to community and economic development, including erosion control, public
access, highway improvements, port facilities, dredging and military facilities."
• By definition (page IX-9) the Conservation land classification includes all AECs. County
policy is to support development within AECs only if it meets appropriate use and
performance standards.
• Non AEC portions of this proposal are shown in the Limited Transition land
classification on the county's land classification map. That class (page IX-5) calls for
emerging intense urban type development and the provision of services to support that
type development.
My opinion is if this proposal can be accomplished within appropriate AEC use and performance
standards it will not be inconsistent with county policy for AECs nor the county's land classification
map.
cc: John Parker
Preston Pate
MEMORANDUM
TO: John Parker
FROM: David Gossett t---
THROUGH: Terry Moore'P
DATE: 29 August 1995
SUBJECT: Application for CAMA Major Development Permit
North Carolina Department of Transportation,
Dora Roper and Roland Mason
Pamlico River Ferry Basin (North Dock)
Beaufort County, North Carolina
Enclosed is the application package which has been submitted to this office by the North
Carolina Department of Transportation. As you can see from the package, NC DOT is also
acting as agent for Mrs. Dora Roper and Mr. Roland Mason. The application has been
reviewed in regards to NCAC 711.0208 - Use Standards, specifically .0208(b)(7) - Bulkheads
and Shore Stabilization Measures and it has been determined that the applicant's proposal is.
consistent. Therefore, I recommend that the permit be issued with the following conditions:
(1) Prior to any work being done at the sites, a pre -construction meeting will be held
between the applicant and a representative of the DCM.
(2) The riprap and breakwater must be aligned as shown on the attached plats.
(3) In areas where coastal wetlands are present, the riprap must not be placed above
the ground elevation. No riprap is to be placed atop any coastal wetlands.
(4) If the work is conducted from a barge, no work channels will be excavated to
enable equipment to reach the site.
(5) The riprap material must be free from loose dirt or any other pollutant. It must
be of a size sufficient to prevent its movement from the site by wave or current
action.
(6) The riprap material must consist of clean rock or masonry materials such as but
not limited to granite or broken concrete. Materials such as tires, car bodies,
scrap metal, paper products, tree limbs, wood debris, organic material or similar
material, are not considered riprap.
(7) The breakwater must be marked at the waterward end with a yellow reflector
extending at least three (3) feet above the NWL.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: North Carolina Department of Transportation, Dora Roper, and
Roland Mason
2. LOCATION OF PROJECT SITE: NC 306, Bayview, Pamlico River, Beaufort County
Photo Index - 1989: 2-68-1, Q5 1984: 74-984, H5
State Plane Coordinates - X: 2,673,500 Y: 618;200 Ramsonville LL
3. INVESTIGATION TYPE: CAMA/Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 22 August 1995
Was Applicant Present - No .
5. PROCESSING PROCEDURE: Application Received - 18 August 1995
Office - Washington
6. 'SITE DESCRIPTION:
(A) Local Land Use Plan - Beaufort County
Land Classification From LUP - Conservation
(B) AEC(s) Involved: Public Trust Area, Estuarine Waters
(C) Water, Dependent: Yes
(D) Intended Use: Shoreline stabilization
(E) Wastewater Treatment: Existing - Septic tanks
Planned - N/A
(F) Type of Structures: Existing - Ferry basin, pier, barn, single family dwelling
Planned - N/A
(G) Estimated Annual Rate of Erosion: t3'
Source - DCM staff observation
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands `
(B) Non -Vegetated Wetlands
(C) Other
Openwater
± 1,185 sq. ft.
(D) Total Area Disturbed: f 1,185.sq. ft. or 0.02 acres
(E) Primary Nursery Area: No
(F) Water Classification: SB-NSW Open: No
8. PROJECT SUMMARY: The applicants are proposing shoreline stabilization measures at the
Bayview Ferry and on two privately owned adjacent properties.
/i
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION,
DORA ROPER AND ROLAND MASON
Pamlico River Ferry Basin (North Dock)
Beaufort County
Environmental setting
The project that is being proposed by this application will be located on properties owned
by NC DOT, Dora Roper, and Roland Mason. NC DOT is acting as agent for Mrs. Roper and
Mr. Mason. The NC DOT property is the Pamlico River ferry basin located at Bayview on the
north side of the Pamlico River in Beaufort County. Mrs. Roper is an adjacent riparian property
owner located to the east of the NC DOT property. Mr. Mason is also an adjacent riparian
property owner located to the west of the NC DOT property. The NC DOT property has
located on it the ferry loading facilities, along with offices and restrooms. The majority of the
basin has a concrete bulkhead, however, riprap has been placed on both the east and west sides
of the basin. There is an area on the east side vegetated with SSaartina cynosuroides which has
no riprap, and an area on the west side vegetated with pines which has no riprap. The majority
of Mrs. Roper's property is vegetated with S_ an rtina cynosuroides. A small boat basin is present
into which is, a ± 15' long pier. Mr. Mason's property is a mixture of upland pines and Spartina
cynosuroides. The majority of the property is used as a pasture, and heavy grazing is occurring
within the coastal wetlands. Present on the property is a barn and single family dwelling.
Proiect proposal
The applicant is proposing the following:
(1) NC DOT property - the placement of 165' of riprap near the eastern property
line. The riprap, which will be a continuation of existing riprap, will be placed
so that it will average 1.5' beyond the NWL. The riprap will be placed at the toe
and waterward of an area of marsh vegetated with Snartina cynosuroides. _ See
plat 3 of 7 for details.
(2) Dora Roper property - the construction of a 45' long by 15' wide bottom width
rock breakwater. The breakwater will have a 3.0' wide top width and will extend
above the NWL by 0.5'. The purpose of the breakwater is to help protect an
area which is being utilized as a boat basin. See plat 3 of 7 for details.
(3) Roland Mason property - the placement of 175' of riprap near the NC DOT
western property line: The riprap, which will connect to existing NC DOT
riprap, will be placed so that it will average 1.5' beyond the NWL. The majority
of the riprap will be placed along a wooded shoreline, however, the southern
most portion will be adjacent to an area of Spartina cynosuroides. See plat 4 of
7
North Carolina Department of Transportation,
Dora Roper and Roland Mason
Pamlico River Ferry Basin (North Dock)
Beaufort County
Page 2
Environmental impacts
The following environmental impacts will occur:
(1) NC DOT property - ±247.5 square feet of open water area will be filled by the
placement of the riprap.
(2) Dora Roper property - ±675 square feet of open water area will be filled by the
construction of the rock breakwater.
(3) Roland Mason property - ±262.5 square feet of open water area will be filled by
the placement of the riprap.
David L. Gossett - Washington Regional Office - 29 August 1995
yl
5 F -
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. DIVISION OF HIGHWAYS R. SAMUEL HUNT III
GOVnWOR P.O. BOX 25201. RALEIGH. N.0 27611-5201 SECRETARY
July 28, 1995
Mr. David Gossett
Office of Coastal Management
Department of Environment, Health,
and Natural Resources
P. O. Box 1507
Washington, North Carolina 27889
Dear Mr. Gossett:
Subject: Beaufort County, Shoreline Protection on Roper and Mason Properties adjacent to
Pamlico River Ferry Basin (North Dock).
Please find enclosed a copy of the CAMA Permit application, drawings, deed of adjacent
property owners, tax map, letters of consent and a copy of the fee check for the above referenced
project. The proposed action includes the installation of rip rap along 340 feet of shoreline and
the placement of a 45 foot breakwater to protect the adjacent properties shorelines from erosion.
The majority of this work will be performed on existing NCDOT property. However, the
placement of the breakwater and some of the shoreline stabilization will take place on the two
adjacent properties.
NCDOT has received a letter (enclosed) from these two adjacent property owners
authorizing NCDOT to acquire the necessary permits on their behalf and to perform the proposed
work. The letters have been signed by Mr. Keith Mason, who has power of attorney for
Mrs. Anna M. Mason the western property owner, and by Mr. Harvey G. Roper who has power
of attorney for Mrs. Dora M. Roper the eastern property owner. Their adjacent property owners
(Mr. Dwight R. Casper and Mrs. Polly M. Strickland) have also been sent a copy of the permit
information for their review.
V"
The NCDOT is requesting that the proposed work be authorized under a Coastal Area
Management Act (CAMA) permit. By copy of this letter We are requesting the review and
issuance of a 401 Water Quality Certification from the NC Division of Environmental
• h
2
Management and Section 404 and Section 10 Permits from the. US Army Corps of Engineers. If
you have any questions regarding this request, please do not hesitate to call Scott P. Gottfried at
919-733-3 14 1, Ext. 307.
Sincerely
H. Franklin Vick, P.E., Manager
Planning and Environmental Branch
HFV/sg
Enclosures
cc: Mr. John Parker, DCM
Mr. Don Morton, PE, Highway Design Branch
Mr. A. L. Hankins, PE, Hydraulics
Mr. John Smith, PE, Structure Design -
Mr. Rick Shirley, Division 2 Engineer
Mr. Rod Gross, Ferry
w
January 25, 1995
Doug Huggett
NC Department of Transportation
Planning & Environmental
P.O. Box 25201
Raleigh, NC 27611
Dear Mr. Huggett:
This is to confirm that Glenn Roper hereby grants the North
Carolina Department of Transportation and its contractors the right
to act as our agents in securing all necessary permits for
construction on our property adjacent the Pamlico River-Bayview
Ferry Operation.
Furthermore, we hereby grant a right of easement or access for the
proposed construction as needed to carry out the specifications of
the job.
sincerely,
Ic�.�1riT�l �ti
Glenn Roper
cc: Rod Gross
w
January 25,.1995
Doug Huggett
NC Department of Transportation
Planning_& -Environmental
P.O. Box-25201 -
Raleigh, NC 27611
Dear Mr.. Huggett:
This is to confirm that Keith B. Mason hereby 'grants the North
Carolina Department of Transportation and its contractors the right
to act as our agents in securing all necessary permits for
construction on our property adjacent the Pamlico River-Bayview
Ferry operation.
Furthermore, we hereby grant a right of easement or access for the
proposed construction as needed to carry out the specifications of
the job. ,
Sincerely,
Keith'B. Mason
cc: Rod Gross
w
Form DCM-MP-1
APPILICATION -
(To be completed by all applicants)
1. APPLICANT
a. Landowner:
Name "NCDOT, Dora Roper, Roland B. Mason
Address ' P. 0. Box 25201
City Raleigh--- - State - NC
Zip 27611 Day Phone (919) 733-3141
Fax
(919) 733-9794
b. Authorized Agent:
Name N. C. Dept. of Transportation
Address P. 0.. Box 25201
City Raleigh State NC
Zip 27611 Day Phone (919) 733-3141
Fax (919) 733-9794
c. Project name (if any) Pamlico River Ferry -
North Dock
NOTE., Perr,df %iff be issued in name of lardaxner�sJ, m,dlor
project name. ----
2. LOCATION OF PROPOSED
PROJECT
a. County
b. City, town, community or landmark
near Bath '
c. Street address or secondary road number
INQ 306
d. Is proposed work within city limits or planning
jurisdiction? - Yes x No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) Pamlico River
3. DESCRIPTION AND PLANNED USE
OF PROPOSED" PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities.
Shoreline abili a ; n
b. Is the proposed activity maintenance of an existing
project, new work, or both? Both
c. Will the project be for public, private or commercial
use?_ Community
d. Give a brief description of purpose, use, methods of
construction and daily operations ,of proposed
project. If more space is needed, please attach
additional pages.- To stabilize shoreline
adiacent to ferry dock facility-.
Revised 03/95
Form DCM-MP-1
4. LAND AND WATER
CHARACTERISTICS
m. Describe existing wastewater treatment facilities.
Septic tanks
a. Size of entire tract 14.01 acres n. Describe location and type of discharges to waters
Roper, - 3.76 acres, of the state. (For example, surface runoff, sanitary
b. Size of individual lot(s) Mason - 6.9 ac; NCDOT 3.35 acwastewater, industrial/commercial effluent, "wash
down". and residential discharges.) N/A
c. Approximate elevation of tract above MHW or
NWL 2' - 3' NWL
d.. Soil type(s) and texture(s) of tract
Sand
e. Vegetation'on tract pine and/or marsh
grasses
f. Man-made features now on tract Ferry basin,
ferry dock, pier, barn, house
g. What is the CAMA Land Use Plan land
classification of the site? (Consall the 'local land use plan.)
Conservation x Transitional
Developed Community
Rural Other
h. How is the tract zoned by local government?
No zoning
i. Is the proposed project consistent with the applicable
zoning? x Yes No
(Anach zoning compliance eersifiewe, if applicable) ...
j. Has a professional archaeological assessment been
done for the tract? Yes x No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes x No
1. Are there wetlands on the site? x Yes _ No
Coastal (marsh) x Other
If yes, has a delineation been conducted? N0
(Anach docvnrnranon, if available)
o. Describe existing drinking water supply source.
Groundwater wells
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims tide,
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims tide, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross -sectional drawings) drawn to scale in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue -line
prints or other larger plats are acceptable only if an
adequate number of qualit=wpies are provided by
applicant.. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Revised 03195
Form DCM-MP-1
site. Include highway or secondary road (SR)
numbers, landmarks, and the like.
6. CERTIFICATION AND PERMISSION
TO ENTER ON LAND
° A Stormwater Certification, if one is necessary.
° A list of the names and complete addresses of the
I understand that any permit issued in response to this
adjacent waterfront (riparian) landowners and
application will allow only the development described in
signed return receipts as prop[ that such owners
the application. The project will be subject to conditions
have received a'copy of the application and plats
and restrictions contained in the permit.
by'certifred mail. Such landowners must be advised
I certify that to the best of my knowledge, the proposed
that they have 30 days in which to submit comments
activity complies with the State of North Carolina's
on the proposed project to the Division of Coastal -
approved Coastal Management Program and will be
Management. Upon signing this form,'the applicant
conducted in a manner consistent with such program.
further certifies that such notice has been provided.
Name SEE SHEET 7• t]F 7 in the - - _ :
I certify that I am authorized to grant, and do in'fact,
Address �FRMTT nRAWTNBS '
grant permission to representatives of state and federal
Phone
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
Name
permit application and follow-up monitoring of the
Address
project.
Phone
I further certify that the information provided in this
Name
application is truthful to the best of my knowledge.
Address
Phone
Sf
° A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
A
° A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
° A signed AEC hazard notice for projects in
oceanfront and inlet areas.
A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - i to
10) If the project involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
This is the jZ day of
Print Name
Signature
Icndowner or Authorised Agent
Please indicate attachments pertaining to your proposed
project.
f DCM MP-2 Excavation and Fill Information
_ DCM MP-3 Upland Development
_ DCM MP-1. Structures Information
_ DCM MP-5 Bridges and Culverts-
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Revised 03195
Form DCM-NIP-2
_UXE-A-VAT ION
AND FILL
bridgesr
Attach this form to Mint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
Describe below the purpose of proposed excavation or
fill. activities. All values to be given in feet. .
Average Final
Existing Project
Leuth Width Depth Depth
Access
channel
(MLW) or (NWL)
Canal
Boat
basin
Boat
ramp
Rock
groin
Rock
breakwater
Other
(Excluding
shoreline
atabiliz don)
Revised 03/95
45'
15'
.:.P,..m
'grsl=m-'
�C �
1. EXCAVATION
a. 'Amount of material to be excavated from below
MHW or NWL in cubic yards N/A
b. Type of material to. be excavated N t A
c. Does the area' to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? _ Yes _ No
d. Highground excavation.in cubic yards N/A
2. DISPOSAL OF EXCAVATED
MATERIAL
a. Location of disposal area N/A
b. Dimensions of disposal area N/A
c. Do you claim title to disposal area? N/A
Yes —:No
If no, attach a letter granting permission from the
owner.
d. Will a disposal area be available for future
maintenance? —Yes „`_ No N/ A-
lf yes, where?
Form DCM-MP-2
e. Does the disposal area include any coastal/wetlands
(marsh), SAVs or other wetlands.
yes No
f. Does the disposal include any area in the water? N/A
Yes No
3. SHORELINE' STABILIZATION
a. Type of shoreline stabilization
'Bulkhead X Riprap
b. Length Site A=165' Site B=175'
c. Average distance waterwaYd of MHW or NWL
1.5'
If yes,
(1) Amount of material to be placed in the
water 55 c.v. rock
(2) Dimensions of fill area 45' x 15'
(3) _ Purpose of fill RrPskwAtPr
b. Will fill material be placed in coastal wetlands
(marsh), SAVs or other wetlands?
Yes X No .
If yes,
(1) Dimensions of fill area
(2) Purpose of fill
5. GENERAL
d. Maximum distance waterward of MHW or NWL
AI
e. Shoreline erosion during preceding 12 months
+/-3'
(Source of information) Observation
f. Type of bulkhead or riprap material
Sonte rip rap
g. Amount of fill in cubic yards to be placed below
water level
(1) Riprap.Site A=49 cy; Site B=42cy
(2) Bulkhead backfill N/A
h. Type of fill material
Stone
1. Source of fill material Quarry
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
a. Will fill material be brought to site?
X Yes No
a. How. will excavated or fill material be kept on site
and erosion controlled? _ Rip rap _placement
only
b. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)?
Clamshell,'backhoe, barge, and dump
c. Will wetlands be cr3ssed in transporting equipment
to project site? —Yes x No
If yes, explain steps that will be taken to lessen
environmental impacts.
Revised 03M
mill N
le /4} Bull Bo r / /c\ wl la
// / xe IoundanJ •` 1L .
n ; d.•a.',::� Gu0lowf • % lM`Ck,S_ Y �� -Y •� •,,.���.1 .�
.1Ca iro \\r\
�. riaoduJ .' .:,;Plea.nl Cw,e CJIYm0u
`ti. / +
a slorw (' $cupeanon{`
ifJ WpJJIe
s• • 77 Cre,.rll I / +
:dJ Poml I •� } pq �' 3 o0a Cnrri94a• sary cr. .
.`Ila •Id..� PIfmWIF 1p
10asamr0lal i%l�h.mraralr�—(.i ON
a*WASHINGT �•/r'-_'.•'• ^` `` �` '�
M ,,,JJJ .. R
Gass Phan, Lu4
9`+� Jx xin,an/' 3t as 'T rYy
R .y^..-'1•;
f E
IA
\ / H Pete RJaJ,
\ OIJfwJ Lti99 4$ FJaenm' / aa1,
� :I 4ud" i
rille+ : ,e Panlrcn /H s E y
,Leecnnne�Y� "
a+n7
J *IO C
Tulrs,m'
T• f 4 a 7 ( 45 Vurrwrm e•tr l.4 �'Lnryln.
Co 9
Bbca lo.,n•ry \
2 E\ VI\'L�� % 2
Lanam�fdn, I 1•Scnnlm
in
Wrs l.J6 �s J W�JJ�lGelede
_ ' BaYrie sCn Ile , P _ r ��+ 45, x<. ndlanJ �•
�wnm,r _ f. srI V r .% Swan Ouuler _ Gun Rnn
(/ Pom lurr HqR `' �IVyan4'riJ Bay .
PamLco B-eaen �����Hwrllay' • t .
Co. Gosuu J Bonngion Srale of miles
. (•:: \ al.ml Ge<e nmouR 1 0 S 10 e0 30
\ �. r <� YSOI �•�
o', od, ,r •�\ ed.uJ I I 1. �'-��0"a i �l0.il.na� \ w 0 10 70 30 40 4a
5 l P
Irll { w' Ronl L• Srale of Kilometers '
\.r•..n ! 3T` � ..3 omen nl�w,avwowv:eM ll mk,amaooro.mnry fl L�bwlm.
/ .r+.
I1!1 9a 1
Imo.
LM a
r ror�o ! A C A' S O N r d
ow
l , L 4 ml l) 11y � w
C/w.ryndr R 10 nl4 \L U
.. ], - m.^.� e.•1 _ I'. - - - Iv
�FF'cl-�
N.C.D.O.T.
DIVISION OF HIGMIAYS
BEAUFORT CO.
PROPOSED SHORELINE
\ _ PROTECTION ON MASON AND
3r1 14 UiU ROPER PROPERTIES ADJCENT TO
B E A C HµA M PAMLICO RIVER FERRY BASIN .
rf NORTH DOCK
s A v A 'H IVA / Ei� r, s SHEET / OF %
1��1 �� REVISED MAY, 1995
l LA F
i7lrs. d/a M. RsP« r C'
da OA
Rf./doa3c<,r Y. �
C�
-pR,posy�o
'{�Ir RAP
Id
tII
-
•
` EYr6f,�b
III./_
/J
f G`
t ��
00
00 o
II
'
T
I.
I
'
RiPRnP �...
/
M.41
O7nr. An u
C/o
IR3
.'j Ksif! 6. 7T.�cn
1� \i
L�pm' /as4R.,dsh
- - - - - - Was %,J,jion,N.c.z7ag9�� -- - - ----. _
ks r.
N.C.D.O.T.
DIVISION OF HIGHWAYS
BEAUFORT CO.
PROPOSED SHORELINE
PROTECTION ON MASON AND
ROPER PROPERTIES ADJCENT TO
PAMLICO RIVER FERRY BASIN
NORTH DOCK
SHEET Z OF 7
REVISED MAY,1995
Mrs, (brq'M, Roper i'__
L/o Ha�Vey,G.
wo}a
W W I- m
—_ --9ir? _ ;� ..-.• Pier 3 JZS 2 H FW 0 w - to
LL
JLL Z�. '0)
rJvj L W W (n O)
_— _ �'�:' YAP• .� �� ,,a''.� u-o=�o> �I>'
YL I+o Div •00u)Z a—eLLa
_ O O -T W F- I- O O ml a
Sc) --:...7`•' U to LL O W W H 2 F- U
P"Scp?.P-Rrp •"DMI—aJ�—W"
L-i J, .ra W22(raO2W
m, E, r�4 �n Inzomaaaazv��
KHEAD
i
+
I.
I. I
IEYKindb�
'&.LL(nEAo I
11
1' II II
'S( t
1
1
1 1:
��oLPN•r15 =�2!'
c
v
�Q
x
u
z
a
m
3 z U) a: Lu
_ '" Q L- W F- in
0 J:2ZLLH 0)
1--1 w w . Ln a)
2 W ZUS
Oo�w r.-
l
LL O 2 0 > }
F O U w O a 2 U O
•zFo> o
oo¢wf-�ood�o.
." O o o m o w
�WLLO W W"x -0
•"D CL F- OLJE-.W"
q>QOOO:aSw>
"W wwX<OS WI
ZO m CL M a. 0- Z wx
I
ZS ....__�_._./c0
Fu-
_fir R^,��P r/.,s�..«�rTy�'t�7:�:. �,� .�U'L '•` �� (� � _....� 1
�/ -RA P
/11�s. A�� �✓%. �' /�' nil i--A PR4 LLAtLroF`
�Dp�Lantro
1,
lEr,�L \�
Washin9fan,N. U91
I•
1
i
MWL
v
2Ee sn lE, Ec_o
Sonrr, ,.t E- E
w zs p is
N.u1.L. CL. /.
p • • <_ �- Prcpeseol - - -
ZlSctAx� FL—O
-/O
EC - -!O
— I
I
zi i i5
{ h�G
EL - 'o
� l a G�K'• Lr
Prc�aseJ ic.p-"^p -
WE
/ypKAL SEGYIei.l
SEcTiohl �'-G
/1.Cr FJM< 11Fr 1Jv11-W,P_2Ap QvAm 1--1ES
SiT� A SNnL�Ecia/E �G�T£Grreii lu.
1.I SirE A �REAKWArER SSCU.1 uS
'S iTE V SFIoQELIIIE i�'t'ai•EC'f ,o wl 7-
0 -rA 1 .146
N.C.D.O.T.
Et. 10
lxaLt : = 10 �/Ezr. S T.E Q
DIVISION OF HIGHWAYS
BEAUFORT CO.
PROPOSED SHORELINE
PROTECTION ON MASON
PROPERTY ADJCENT TO
PAMLICO RIVER FERRY BASIN
NORTH DOCK SITE B
SHEET •5 OF_Z
REVISED MAY,1995
Qr oo 44
EL. 1.1
EL. 0 AkrJ O'
EL•-10 SEc-ri- i A -A -10
0
" N4 -
L-L. O
SEc?ions
ZS So,
,U. W. L. EL. 1.1
-10
y5 /co
„CLA5S-Lt .
P ZAP
EL_/O
C—C. - 10
SEGTIOn1
z57Is 1so
NG
1,1G?
EC.O 18'Cuasi O.
P�epes�d 'zp
SEc�r ro l - i7
N.C. D.O.T.
DIVISION OF HIGHWAYS
BEAUFORT CO.
PROPOSED SHORELINE
PROTECTION ON ROPER
PROPERTY ADJCENT TO
PAMLICO RIVER FERRY BASIN
NORTH DOCK SITE A
SHEET & OFF
SC,A�E: i„- 10, Jeer. SATE A REVISED MAY, 1995 -„
/ = Zo h1=erz.
_
- DnTk, NC 27809
Mrs, Dore nr. Puper �.. Rf. f 8oc 366A � � +t '
uo Ii..�yG,nepd• 36 ,Bsfh,N.c. 27eaB �. •x o:,. .
i
I TE
�I
Polly M. $T��CK luntl IP
2 Elmhu�srprrde N
-� FoyeTrcv.'1121 I11L 'dS30
v
n
i
�nww.7
n7�a.:9nna M. /'Jrssoq '`y
N.C.D.O.T.
DIVISION OF HIGHWAYS
BEAUFORT CO.
PROPOSED SHORELINE
PROTECTION`ON MASON AND
ROPER PROPERTIES ADJCENT TO
PAML•ICO RIVER FERRY BASIN
NORTH DOCK
SHEET-7 OF 7
REVISED MAY,1995
MEMORANDUM
TO: Jim Mulligan
Deborah Sawyer
FROM: David Gossett'
DATE: 29 August 1995
SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit
North Carolina Department of Transportation, Dora Roper and Roland Mason
Pamlico River Ferry Basin (North Dock)
Beaufort County, North Carolina
Attached is an application for a CAMA Major and/or a Dredge & Fill permit which was
received by me on 18 August 1995. I am considering this application complete, have
acknowledged receipt, and have begun processing.
If you have any questions do not hesitate to contact me.