Loading...
HomeMy WebLinkAboutNCDOT 66-96 Oyster CreekPermit Class Permit Number NEW X 66-96 STATE OF NORTH CAROLINA Department of Environment, Health & Natural Resources and Coastal Resources Commission hermit for '�•� %_.'t_ru U l-S_J Major Development in an Area of Environmental Concerned ---------- pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to N_C_ Dept_ of Transportation, P.O. Box 25201, Raleigh- NC 27611 authorizing development in Hyde County at canal connected to Oyster Creek on SR 1128 near Swan Quarter , as requested in the per minee's application damd3/21/96 including attached workplan drawings, 3 dated revised Feb. 1996. This permit, issued on MAY 8 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Excavation and Fill 1) In order to protect juvenile shrimp and fin fish populations, no excavation or filling will be permitted between March 1 and September 30 of any year without the prior approval of the Division of Coastal Management, in consultation with the Division of Marine Fisheries. 2) All fill material will be clean and free of any pollutants except in trace quantities. 3) The fill material to be used as backfill over the culvert will be totally confined behind the permitted head walls. This permiLaction may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31.1999 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. u;r— Roger . Schecter, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee N.C. Dept. Of Transportation Permit #66-96 Page 2 of 2 ADDITIONAL CONDITIONS 4) The temporary placement or double handling of excavated or. fill material within waters or vegetated wetlands is not authorized. 5) No excavated or fill material will be placed at any time in any vegetated wetlands or surrounding waters outside of the alignment of the fill area indicated on the workplan drawings. 6) All excavated materials shall be confined above mean high water and landward of any wetlands behind adequate dikes or other retaining structures to prevent spill -over of solids into any wetlands or surrounding waters. Sedimentation and Erosion Control 7) Silt screens shall be placed upstream and downstream of the area of excavation prior to initiation of construction, and shall remain in place until all construction activities have been completed. 8) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. General 9) The culvert invert shall be installed one foot below normal stream bed elevation to allow for unimpeded fish passage. 10) The permittee and his contractor shall meet with a representative of the Division of Coastal Management prior to project initiation. NOTE: The N.C. Division of Environmental Management has assigned the proposed project DEM Project No. 951304. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No. 198200031 (COE Action Id. No. 199601149) which was issued on 1/3/96. State of North Carolina C-partment of Environment, i -'th and Natural Resources DM of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director Mr. Franklin Vick Planning & Environmental Branch NC Dept. of Transportation P. O. Box 27687 Raleigh, NC 27611 Dear Sir: 1. 00 EDEHNR April30, 1996 O (I MAY 0 g 19% deftnenowwaawwwwwwwft This letter is with reference to your application for a Coastal Area Management Act Major Development permit to carry out construction on property located adjacent Oyster Creek on SR1128, in Hyde County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make July 10,1996 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact this office. Very sincerely, Doug Huggett Asst. Permits Coordinator DH/aw cc: Jeff Shaffer DCM-Washington' / DCM-Morehead CityV P.O. Box 27687, �� FAX 919-733-1495 � C An Equal OpportunMy/Aiflrmative Action EmployerRaleigh, North Carolina 27611-7687 N r Voice 919-733-2293 50% recycled/10% post -consumer paper r� APPLICATION TRANSaTM/PROCESSING RECORD ✓1"' A) Applicant: _N.C. Department of Transportation County: Hyde Location of Project: Bridge #28 over a canal connected to Oyster Creek on SR 1128 near Swan Quarter Date Application Received Complete by Field: 15 December 1995 Field Recommendation: Attached X To be Forwarded Consistency Determination: Attached To be Forwarded X Field Representative: J. Schaffer p- �-- District Office: Washington District Manager Review: T B) Date Application Received in Raleigh: Fee Rec'd: $ Public Notice Rec'd: End of Notice Date: Adj. Rip. Prop Notices Rec'd: Deed Rec'd: Application Assigned to: on C) 75 Day Deadline: 150 Day Deadline: Mail Out Date: State Due Date D) Federal Due Date: Permit Final Action: Issue Deny Fed. Comments Rec'd on Draft on AGENCY DATE COMMENTS RETURNED OBJECTIONS YES NO NOTES Coastal Management District Office Division of Comm. Assistance Land Quality Section Div. of Env. Management State Property Office Div. of Archives & History Div. of Env. Health Div. of Highways Wildlife Resources Commission Div. of Water Resources Div. of Marine Fisheries "��' �IC'l�Ilnr� �j MEMORANDUM InDAPR 2'3 1996 aNwuawwaawas..4aifw TO: r A 6 0 Jeff Schaffer B John Crew DATE: /\ 15 April 1996 NC DOT Proposal to Replace Existing Bridge with Culvert - SR 1128 - Hyde County This is a modification of a NC DOT proposal submitted 15 December 1995. The only difference in this modification and the original is using one corrugated box culvert rather than three. I can offer no additional information concerning consistency with the CRC certified Hyde County Land Use Plan, so please refer to my December 28, 1995 memo on this proposal. cc: John Parker Aston Pate State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N, Schecter, Director Apt 15, 1996 Mr. H. Franklin Vick NC Dept. of Transportation Planning and Environmental Branch P.O. Box 25201 Raleigh, NC 27611 Dear Mr. Vick: [D FE PI APR 2 3 IDh rrw«.. • r.....c+aa..w..w The Division of The Division of Coastal Management hereby acknowledges receipt of the modified permit application for the proposed replacement of bridge 28 on SR 1128 over a canal connected to Oyster Creek in Hyde County. This information was received on April 10, 1996, on which date the processing of your application for a Coastal Area Management Act (CAMA) permit was renewed. The projected deadline for making a decision on your application is now April 26, 1996. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of extended review. However, an additional letter will be provided on or about the 75th day. A field report has been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review, the Division or other agencies may contact you directly. Please feel free to contact me at (919) 733-2293 should you have any questions concerning this matter. Sincerely, 51114 Doug Huggett Assistant Major Permits Coordinator cc: DCM-Morehead City DCM-Washington P.O. Box 27687. Rdeigh. North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 60%recycled/ 10%post-consumer paper Modified Application n DIVISION OF COASTAL MANAGEMENT U FIELD INVESTIGATION REPORT n APR 1 5 1996 1. APPLICANT'S NAME: NC Dept. of Transportation )�`'Aualzou6i�u 43008"64dYd•8482666� 2. LOCATION OF PROJECT SITE: Hyde County on SR 1128 over a canal connected to Oyster Creek near Swan Quarter. Photo Index - 1989: NA 1984: H8 State Plane Coordinates - X: 2,801,200 Y: 608,400 (Swan Quarter Quad Lower Left Corner) 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/24/95- Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 12/15/95 Modified App. Received - 4/10/96 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Hyde County Land Classification From LUP - Community - Land; Conservation - Water (B) AEC(s) Involved: ES, EW, PTA (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - N/A h Planned - A/A (F) Type of Structures: Existing - Bridge and boat house Planned -Aluminum Box Culvert (G) Estimated Annual Rate of Erosion: N/A Source - HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands 1,800 ft2 1,800 ft2 1,440 ft2 (Canal Bottom) (Shaded) (C) Other 1,800 ft2 1,920 ft2 (High Ground) (D) Total Area Disturbed: f.09 acre (E) Primary Nursery Area: Yes (F) Water Classification: SA ORW Open: No 8. PROJECT SUMMARY: The applicant is proposing to replace an existing bridge with a corrugated, anodized aluminum box culvert and remove an existing boat house adjacent bridge in the same canal. NC Department of Transportation Modified Bridge #28 Replacement Project Swan Quarter, Hyde County Project setting The NC Department of Transportation's (NCDOT) proposed bridge replacement site is located on SR 1128 at Bridge No. 28 crossing an unnamed canal at its confluence with Oyster Creek near Swan Quarter in Hyde County, North Carolina Bridge #28 measures ±32 ft long by 26 ft wide with f 1.2 ft of clearance between the bottom of the bridge and the w_ater's surface. The width of the canal in the project area is ±28 ft. A fish house is situated along Oyster Creek near the bridge to the southwest. The areas immediately adjacent the bridge are primarily vegetated with fescue and Bermuda grass with some Spartina patens interspersed throughout. Oyster Creek is classified as SA ORW waters by the Environmental Management Commission. Oyster Creek is designated as Coastal Waters and a Primary Nursery Area (PNA) by the NC Division of Marine Fisheries. Although this area is designated as a PNA, it is closed to shell fishing. Project description NC DOT's proposal is to replace Bridge #28, which is described above. The project as proposed is to muck out or undercut an area approximately 60 ft x 30 ft and then fill the same area to provide a bedding surface for the installation of a 24 ft wide by 60 ft long aluminum box culvert. Prefabricated aluminum head walls are proposed at each end of the culvert to retain the fill and for shoreline stabilization. The area of the proposed excavation and filling below normal water level would affect approximately 1,800 ftz of canal bottom. The area of adjacent high ground proposed to be excavated is approximately 30 ft wide by 60 ft long (1,800 ftz) while the applicant will fill an area approximately 32 ft wide by 60 ft long (1,920 ft) for the roadway embankment. The spoil material associated with the mucking out activity will be transported to a high ground disposal site. Anticipated impacts NC DDT's proposed project would result in the excavation and backfrll of approximately 1,800 ft' of canal bottom to create a bed for,the proposed box culvert. The culvert would shade a 1,440 ft' area of canal bottom and reduce the width of the canal by approximately 3 ft. The total area of high ground that would be disturbed is f1,920. Localized turbidity will occur as a result of the mucking out and filling activities. Jeffrey R. Schaffer Washington Office 10 April 1996 State of North Carolina Department of Environment, Health and Natural Resources • Division of Coastal Management James B. Hunt, Jr., Governor r� Jonathan B. Howes, Secretary E H N F1 Roger N. Schecter, Director MEMORANDUM TO: ' John Parker THROUGH: Terry Moore % FROM: Jeff Schaffer jps = DATE: 10 April 1996 SUBJECT: NCDOT Modified Major Permit Application to Replace Bridge #28 NCDOT has submitted a modified major application to replace Bridge #28 located on SR 1128 crossing an unnamed canal at its confluence with Oyster Creek near Swan Quarter in Hyde County, North Carolina. NCDOT modified their original application from 3 aluminum arch culverts to a single box culvert due to concerns raised by the NC Division of Marine Fisheries. After reviewing Subchapter 7H.0206, .0207, .0208, and .0209, I conclude that the proposed bridge replacement, as modified, is consistent with these AEC guidelines. I recommend issuance of the permit with the following conditions: A silt screen will be placed downstream of the proposed area to be excavated and a 24 hour period will elapse following excavation prior to removal of the silt screen to prevent unnecessary siltation downstream of the activity. 2. All fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 3. The fill material to be used as backfill cover over the culvert and which will be placed below normal water level will be confined behind the permitted head walls. 4. The temporary placement or double handling of excavated of fill materials within waters or vegetated wetlands is not authorized. 5. No excavated or fill material will be placed at any time in any marsh or surrounding waters outside of the alignment of the fill area indicated on the work plats. 6. All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to.prevent spill -over of solids into any marsh or surrounding waters. 7. Prior to the commencement of excavation activities, the spoil disposal area must be inspected and approved by a representative of the ,Division of Coastal Management. 1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-9466481 FAX 919-975-3716 An Equal opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper John Parker 10 April 1996 Page 2 Prior to any construction activities, the applicant is required to arrange for a preconstruction conference to discuss conditions of the permitted activity. 9. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the project without having the permit transferred to a third party. 10. Future development or changes in the proposed replacement structure at the project site may require a modification of this permit. Contact a representative of this Division at (919) 946- 6481 prior to commencement of any such activity for this -determination. . . - Kcvd wa. o S'RS STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GOVERNOR P.O. BOX25201, RALEIGH, N.0 27611-5201 March 25, 1996 Mr. Terry Moore, Field Office Manager North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management 1424 Carolina Avenue Washington, North Carolina 27889 ATTENTION: Mr. Jeffrey Schaffer, Coastal Field Representative Dear Mr. Moore: GARLAND B. GARRETT JR. SECRETARY RE. Proposed Replacement of Bridge No. 28 on SR 1128 in Hyde County: Request for Modification to CAMA Permit Application/Resumption of Permit Processing Clock The Department of Transportation (Department) has completed an alternate design for the subject bridge maintenance project in Hyde County. Enclosed are revised MP-1 and MP-5 application forms and a set of drawings depicting the new design, a corrugated, anodized aluminum box culvert (in lieu of a pipe arch). Note that the proposed box culvert will provide for almost the same water column cross- section as the existing bridge. The only difference is that approximately 5.5 feet of shallow water (<1.0 feet deep) habitat, measured at normal water elevation, will be eliminated by replacing the bridge with the box culvert. As can be seen on sheet 3 of 3 of the attached drawings, the floor of the box culvert will be countersunk to provide for a natural stream bed. The Department requests that, upon receipt of the revised application packet and related documents, the processing clock that was placed in abeyance on/about February 9, 1996 be reinitiated. If you have any questions or concerns, please call Mr. M. Randall Turner at (919) 331-4737. Sincere �j1G'� H. Franklin Vick, P.E., Manager Planning and Environmental Branch .Enclosures cc: Mr. John Parker Form DCM-MP-1 RCvd WaRc7 4/tv/u BY JVS APPLICATION (To be completed by all applicants) I. APPLICANT b. City, town, community or landmark Swan Quarter a. Landowner: Name N. C. Department of Transportation Address P.O. Box 25201 City Raleigh State N.0 Zip 27611-5201 Day Phone (919) 733-3141 Fax (919)733-9794 b. Authorized Agent: Name H. Franklin Vick P.E. Mgr P&E Branch Address P.O. Box 25201 City Raleigh State N.C. Zip 27611-5201 Day Phone (919) 733-3141 Fax (919)733-9794 c. Project name (if any) Replacement of Bridge # 28 NOTE: Permit will be issued in name of landowner(s), and/orproject name. 2. LOCATION OF PROPOSED PROJECT a. County Hyde c. Street address or secondary road number SR 1128 d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Oyster Creek 3. DESCRIPTION AND PLANNED USE ' OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existing_ bridge with an aluminum box b. Is the proposed activity maintenance of an existing project, new work, or both? both c. Will the project be for public, private or commercial use? Public Transportation d. Give a brief description of purpose, use, methods of construction and daily operation's of proposed project. If more space is needed, please attach additional pages. Public Transportation: Highway crossing of Oyster Creek; Standard Construction Methodologies 4" Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual. lot(s).NIA :. c. Approximate elevation of tract above MHW or NWL +/- E13.0 ft (USGS);+/- 498 ft assumed datum d. Soil type(s) and texture(s) of tract Mapped as Backbav and Pungo Muck: some sand e. Vegetation on tract Upland herbaceous on road causeway f Man-made features now on tract Bri e/boathouse g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) X Conservation _ Transitional Developed _ Community X Rural Other . h. How is the tract zoned by local government? i. Is the proposed project consistent with the applicable zoning? —Yes No N/A (Attach zoning compliance certificate, if applicable) j. Has a professional archaeological assessment been done for the tract? _ Yes X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? _ Yes X No Coastal (marsh) Other If yes, has a delineation been conducted? (Attach documentation, i(available) m. Describe existing wastewater treatment facilities. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface runoff from culvert crossing and gWroad-lway o. Describe existing drinking water supply source. NIA f; 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with stateapplicationonly) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. a An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guideagency personnel unfamiliar with the area to the Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. CA Stormwater Certification, if one is necessary. ®A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as, proof that such owners have received a cony of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. upon signing this form, the applicant further certifies that such notice has been provided. Name Harrv. Glenn 8- Odessa W. Jonas Address Rt. 1 Box i75 Phone Swan Ouarter. N.C. 27885 -Name Elaine G. Sadler address Box 97 Phone Vandemere. N.C. 28587 Name William F. Williams Address Rt. 1 Box 63 Phone Swan Quarter. N C 2788� f A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee. and issuing dates. e A check for S250 made payable to the Department of Environment, Health, and Natural Resources (DEMINR) to cover the costs of piocessina the application. V m A signed AEC hazard notice for projects in oceanfront and inlet areas. ® A statement of compliance with the N.C, Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds. or use of public lands, attach a statement documentima compliance with the North Carolina Environmental Policy Act. 6. CERTIFIC'4TION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. -The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 21 day of March 19 90 Print Name H. Fra =n Vicl- Simature Lan dowi orAutior&edAgent Please indicate attachments pertaining to your proposed project. DCM NIP-2 Excavation and Fill Information _ DCNI \IP-3 Upland Development DCM IMP-4 Structures Information Y DC\M N4P-5 Bridges and Culverts DCM MP-6 Marina Deveiopment NOTE. Please si�-;l and date each attachment In the space provided at the bottom of eaeli torm. Form DCM-MP-5 ;'� G Lii A e N rt Y CULVERTS Attach this form to Joint Application for CAt%tA 1,12ior Permit, Fomt DCM-\IP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. I. BRIDGES N/A a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at L'II W or NWL . e. Will proposed bridge replace an existing bridge? Yes No If yes, (11 Length of existing bridge (21 Width of existing bridge (1) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No If yes. (1) Length of existing culren (3) Width of existing culvert (3) Height of the. top of the existing culvert above the %I PN or \ln (4) Will all, or a part of, the existing culvert be removed" (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow^ _ Yes _ No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? _ Yes _ No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters^ _ Yes _ No If ves, explain n. Have you contacted the U.S. Coast Guard concerning their approval? _ Yes _ No - If yes, please provide record of their action. For DCM-11-IP-5 2. CULVERTS J. Will the proposed culvert affect existing navigation potential'? _ Yes X No If yes, explain . a. Water body in which culvert is to be placed Canal, a tributary to Ovster Creek b. Number of culverts proposed 1 3. EXCAVATION AND FILL a Type of culvert (construction material, style) a. Will the placement of the proposed bridge or culvert Anodized Aluminum box culvert (corrugated) require any excavation below the NUMI or _'MIL? X Yes No Kled:e. 4101 , d. Will proposed culvert replace an existing bridge? p p p bridge? d If yes, 3O oil ya: (1) Length of area to be excavated +!- sr ft Iw� R X Yes _ No (2) Width of area to be excavated 60 ft It yes, (3) Depth of area to be excavated 6.0 ft (1) Length of existing bridge 31.7 ft (4) Amount of material to be excavated in cubic (2) Width of existing bridge 26 ft yards +I- 440 cu vds (3) Navigation clearance underneath existing y bridge 1.2 ft (vert): +/- 28 ft (horiz) b. Will the placement of the proposed bridge or culvert (4) Will all, or a part of the existing bridge be require any excavation within: No removed? (Explain) All of existing bridge to _ Coastal Wetlands SAVs Other Wetlands be removed _ _ _ If yes, ((1) Length of area to be excavated e. Wi11 pinculvert replace an existing culvert? (2) Width of area to be excavated (3) Amount of material to be excavated in cubic _ Yeses Y No yards If yes. (1) Length of existing cuh'ert c. Will the placement of the proposed bridge or culvert (2) Width of existing culvert require any highground excavation? (3) Height of the top of the existing culvert above y X Yes No the NERV or IN INI _ If yes, (4) Will all, or a part of, the existing culvert be V (1) Length of area to be excavated -r'- 30 ft removed? (Explain) (2) Width of area to be excavated +1-60ft x 3ft (3) Amount of material to be excavated in cubic yards +j- 200 cu vds f. Length of proposed culvert +i- 60 ft (average length) d. If the placement of the bridge or culvert involves any g. Width of proposed culvert 24 it excavation, please complete the following: (1) Location of the spoil disposal area h. Height of the top of the proposed culvert above the Upland site to be determined (2) Dimensions of spoil disposal area NETT' or NA L .1.2 8 see d. (1) i. Will the proposed culvert affect existing water flow? (3) Do you claim title to the disposal area? _ Yes X No Yes No see d. 1) If yes, explain _ _ If no. attach a letter granting permission from — the opener. Form DCM-MP-S (4) Will the disposal area be available for future maintenance? _ Yes No see d. 1) (5) Does the disposal area include any coastal wetlands (marsh), SAV s, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. seed. (1) (6) Does the disposal area include any area below the 1 UMI or I\TWL?. Yes X No If yes, give dimension if different from INo. 2 above. see d. (1) e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHLVorNWL? X Yes NO If yes, (1) Length of area to be filled -i- 60 ft (2) Width of area to be filled 27 ft (3) Purpose of till backt711 for box culvert f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands SAVs Other Wetlands If yes, NO (1) Length of area to, be tilled _ (2) Width of area to be filled (3) Purpose of till g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be tilled 60 ft (2) Width of area to be filled 32 ft (3) Purpose of till Roadway Embankment 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? _ Yes X No If yes, explain in detail None anticipated c. Will the proposed project require the construction of any temporary detour structures? _ Yes X No If yes, explain in detail done anticipated d. Will the proposed project require any work channels'? Yes X No If yes, complete Form DCM-\NLT-2 e. How will excavated or till material be kept on site and erosion controlled? Stringent application of NCDOT7s BTvIl's for the Protection of Surface f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Backhoe. trucks. etc. g. Will wetlands be crossed in transporting equipment to project site? —Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the. placement of the proposed bridge or culvert require any shoreline stabilization? X Yes '`To If yes, explain in detail Proposed headwalls at both ends of culvert will stabilize backfills NCDOT- . Franklin "'c P.E.'17 q t r Ject t\ae - March 21. 1996 Date aF' aet � sue+u 1 i / covo�- 45 .Q rvre 112A { f,� 127 J 721 6 b ister L.ondinfl .,�: �.a :fir i�1�1r,��i��I►��r� � Hyde County, h y � .R(F nGE �,T3Y5o�1(:-: 6two FA ?North Carolina Depafanen[ of Transportation Division ofm-41ways County: Hyde Quad: Swanquarter Basin: Tar -Pamlico Project: Replace Eddee =?3 on SR 11'3 Over Canal Date: 09 / 20 / 95 . VicinityMap Sheet 1 of 3 Nor-rH O��A2�y GLFNrI •a' OPESSA SORRES SO)( 57s S BAN QvAQ"rEQ 1 N (I 27885' 5'91' C.A. COX � fxisEiNq G _ �U r3 -fACCK F—P.P To S \J A r1 N' 63' 00' zoo 5-r To Q\)Ag"TER _ _ 511K, 1128 — — — .5.2. t12y Proposed! Box cvlperf oy5 Hug -LACY. O -rf3M CRCek ��� DeoME5 L ncA\jATioO 8OA-r SHED SCALE_ MA25u RE��sFD FEB• '9(v OEIAliAE G. 5ADL[2 3 WlIIl.AM F VlAiAMS go -A 9 7 Qk 1 t3ox (03 VANDEMEZ� QUAp-rclz IC. ze5g7 z7g65 SCALE l"=5O'HORZ.,1"=1O'VERT DATUM IS ASSUMED ELEVATION: 500 j(, rjR'� ELEv. SO. 16+701 1z00 sKtV1 v cr. G?, eL.If7g.s WL ELw "-496,6 49n 1/ 90 ?too /a too iitoo SCALE 1"=20'HORZ.,l"=lO'VERT sE"roe H -19 4 ZO /Z O DATUM IS AAS.SUME:R E.LEVATI:ot4. I Q'_ 1V X S'9" ALOMINOM abA - C G Pv sZ- • 499.E Ne a-ilwfi `� 50n �HsAD watt Snn or NWL ��• 996. b BED L19n 49n SECT I oN p-q ELF?�• Co G R• 0. 0% .- ul:i?ui�S j;-uVE O.H.W. 0ENGTES ;-TLL FlIIOVE O.H.W. -DENOTES FILL BELOW O.H.W. DENOTES EXCAV. BELOW O.H.W. D.A.= INDETERMINATE . AVERAGE DAILY FLOW =.INDETERMINATE EXCAV. BELOW O.H.W.=I-noc.Y. 1=ILL BELOW G.H.W. =ZCa C.Y. FILL IN WETLANDS =NONE TOTAL FILL=']93C.Y. rz.Cir. = c�XrS�/Np �77s ". G . = 'Vd rirJA/ 6nnon e% Gr. Gr, = 6,04OR <�r2,�e 6.a.6, = &31Av,'�tr� eGkyt�9P E.O.B. =C-n/d a6$rid�e P. xv x) P, = Pou REVISED FES. '9L, 1 N- i,- GP V I . ()I. TRiVI DIVISION OF 1-I1(lHWAY3 HYDE COUNTY 31RG. i# 2:E ON OR-1123 ov.,-- ; CANAL �FI[_L•T 3 1i1= 3 :Ui3-.95 Return to: W. D. Ferguson, Division R/W Agent N. C. Department of Transportation Right of Way Branch, P.O. Box 748 Ahoskie, North Carolina 27910 RIGHT OF WAY AGREEMENT STATE OF NORTH CAROLINA PARCEL 001 COUNTY OF Hyde PROJECT 6.0821 TOWNSHIP OF Swan Quarter SECONDARY ROAD 1128-0yster Creek Road /tMr5 1-( r t+rQgn✓S the undersigned owners of that certain property described In Deed Book 1'Str at Pago L 7.3. in the Register of Deeds Office of Hyde County, and bounded by recognizing the benefits to said property by reason of the ,construction of the proposed_ highway development, and it consideration of the bonstruction of said project, hereby grants to the Department of Transportation, the right of way as herein described -and releases the Department from all claims for damages by reason of said right of way across the lands. of the undersigned, and of the past and future use thereof by the Department, its successors and assigns, for all purposes for which the Department is authorized by law to subject such right of way; said fight of way being the width Indicated am across said property as follows: 60 Ft In width measured 30 Ft on each side of the centerline of the road, said centerline to be located by the Department and the construction or improvement of said road shall constitute the selection of sold centerline; am such additional widths as might be necessary to provide for cut and fill slopes, sedimentation control and drainage of road. It is understood and agreed that the 60 Ft right of way herelnabove referred to has been staked upon the ground and the centerline of the road Is located in the center of the right of way stakes. 'The undersigned property owners further agree not to erect any structures, including masonry mailboxes, masonry driveway headwalls, any fencing, etc., o engage in cultivation within the right of way granted heroin except as approved by the North Carolina Department o Transportation pursuant to G.S. 130.93 and N.C. Admin. Code t1gA, c02E.D404. It Is further understood and agreed that should circumstances, conditions, or actions by the North Carolina Departmen of Transportation delay or delete the proposed Improvement of said road, that the right of way granted herein shall remait until such time as released by the North Carolina Department of Transportation. It is further understood and agreed that the 15' X 20' Frame Boat House is to be removed to clear the right of way folr, the sum of S SOFA • 0 D dollars which will be paid to the undersigned upon clearing of the right of way, jjll There are no conditions to this agreement not expressed herein. The undersigned hereby covenant and warrant the they are the sole owners of said property; that they solely have the right to grant this right of way, and that they will foreve warrant and defend the title to the same against the lawful claims of all person whomsoever. IN WITNESS WHEREOF, we have hereunto set our hands and affixed our seals this the S' day of NORTH (SEAL) �Z/n,-y1_ A AUvr�.. ,g./ (SEAL) (SEAL) ✓� MES H. GURGANIJ (SEAL) COUNTY a Notary Public of the County and State aforesaid, certify that "KAN I VKS, personany appeareo oerore me this clay angAknowler Witness my hand and official stamp or seal, this the S day of My Commission Expires: The foregoing Certificate (a) of Is/are certified to be correct This Instrument and this certificate are duly registered on the day of 19 , in Book Page at o'clock M. REGISTER OF DEEDS FOR - COUNTY. BY: DeputylAssistant - Register of Deeds. State of North Carolina Department of Environment; Health and Natural. Resources Division of Coastal Management James B. Hunt, Jr„ Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director MEMORANDUM AF1 � '• EDFEE HNF1 TO: Raleigh Bland, US Army Corps of Engineers, Washington Field Office FROM: _ Jeff Schaffer, Division of Coastal Management, Washington Regional Offices DATE: 10 April 1996 — SUBJECT: NCDOT Modified Major Permit Application to Replace Bridge #28 NCDOT has submitted the attached modification to their CAMA/D&F application to replace Bridge #28 located on SR 1128 cro9sing an unnamed canal at its confluence with Oyster Creek near Swan Quarter in Hyde County, North Carolina. NCDOT has modified their original application from 3 aluminum arch culverts to a single box culvert due to concerns raised by other review agencies. If you have any questions, please call me at (919) 946-6481, ext. 299. 1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10% post -consumer paper MEMORANDUM TO: Jim Mulligan Deborah Sawyer FROM: Jeff Schaffer —�r7 DATE: 19 December 1995 SUBJECT: Modified Application for CAMA Major Permit and/or Dredge & Fill Permit N.C. Department of Transportation Bridge No. 28 — Hyde County, North Carolina Attached is'a modified application for a CAMA Major and/or a Dredge & Fill permit which was received by me on 10 April 1996. I am considering this modified application complete, have acknowledged receipt, and have resumed processing. If you have any questions do not hesitate to contact me. State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Jonathan B, Howes, Secretary Roger N. Schecter, Director February 19, 1996 Mr. H. Franklin Vick Planning and Environmental Branch N. C. Department of Transportation P.O. Box 25201 Raleigh, N.C. 27611-5201 Dear Mr. Vick: If AVI 3 �EHNF11 I Fa u 2 1'q%, lit This letter acknowledges your February 9, 1996 request for a temporary abeyance of the processing of the Coastal Area Management Act (CAMA) permit application for the proposed replacement of bridge #28 on SR 1128 in Hyde County. In accordance with your request, processing of your application will be halted until such time as a request to renew processing is received by this office. As required by T15A:07J.0204(d), during the pendency of any suspension of processing, the permit processing period will not run. If you have any questions concerning this matter, please feel free to contact me at (919) 733-2293, P.O. Box 27687, Raleigh, N.C. 27611. Sincerely, Doug Huggett Assistant Major Permits Coordinator cc: Jeff Schaffer, DCM - Washington DCM - Morehead City P.O. Box 27687, Rdeigh, North Carolina 27611-7687 Telephone 919-733-2293 FAX 919-733-1495 An Equal Opportunity Affirmative Action Employer 60% recycled/ 10% post -consumer paper !'r—yr—'1 to JP1r� �' � 3 3 O: Jeff Schaffer �1 FROM: John Crew 1 DATE: December 28, 1995 SUBJECT: Replacement of Existing Bridge with Three Culverts- Hyde County State Road 1128 over a Canal Connected to Oyster Creek near Swan Quarter This proposal involves the replacement of an existing bridge with 3 culverts and the removal of an existing boat house at the above referenced location. Estuarine waters, shorelines, public trust areas AEC's are involved and, the water body is also a PNA and ORW. The proposal comes under the auspices of the May 1992 CRC certified Hyde County Land Use Plan which offers the following limited guidance on proposals of this type. ' Considerable discussion on AEC's is included on pages 1-43, 1-46 and note the high importance the state places on their protection. County policy on commitment to state and federal programs (Page IV-13) notes the county `will continue to fully support ... the N. C. DOT road and bridge improvement programs, the CAMA planning process and permitting programs..." The landward portion of the proposal is in the community land class as noted on the land classification map (Page III-3) This class calls for limited development where limited services are provided to support this localized development, (Page III-1). The waterward portion is by definition (Page 1II-2) in the conservation class and within AEC's ,the county supports all uses permitted by 7H. My opinion is if this proposal can be accomplished within existing AEC standards, it would not be inconsistent with the 1991 Hyde County LUP update. CC: Xreston Pate John Parker N.- DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: NC Dept. of Transportation 2. LOCATION OF PROJECT SITE: Hyde County on SR 1128 over a canal connected to Oyster Creek near Swan Quarter. Photo Index - 1989: NA 1984: H8 State Plane Coordinates - X: 2,801,200 Y: 608,400 (Swan Quarter Quad Lower Left Corner) 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10/24/95 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 12/15/95 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Hyde County Land Classification From LUP - Community - Land; Conservation - Water (B) AEC(s) Involved: ES, EW, PTA (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - N/A Planned - A/A (F) Type of Structures: Existing - Bridge and boat house Planned - Culverts (G) Estimated Annual Rate of Erosion: N/A Source - 7 HABITAT DESCRIPTION: [AREA] DREDGED FTT,T.FT) nTUFu (A) Vegetated Wetlands (B) Non -Vegetated Wetlands 2,100 ft2 2,100 ftz (Canal Bottom) (C) Other 2,100 ftz (High Ground) (D) Total Area Disturbed: f.05 acre (E) Primary Nursery Area: Yes (F) Water Classification: SA ORW Open: No 8. PROJECT SUMMARY: The applicant is proposing to replace an existing bridge with 3 culverts and remove an existing boat house adjacent bridge in the same canal. NC Department of Transportation Bridge #28 Replacement Project Swan Quarter, Hyde County Project setting The NC Department of Transportation's (NCDOT) proposed bridge replacement site is located on SR 1128 at Bridge No. 28 crossing an unnamed canal at its confluence with Oyster Creek near Swan Quarter in Hyde County, North Carolina. Bridge #28 measures ±32' long by 26' wide with f2.5' of clearance between the bottom of the bridge and the water's surface. A t12' wide by f 14' long boat house is situated on the downstream side of the existing bridge and sits approximately 5' from the bridge along the east side of the canal. A fish house is situated along Oyster Creek near the bridge to the southwest. The areas immediately adjacent the bridge are primarily vegetated with fescue and Bermuda grass with some Spartina patens interspersed throughout. Oyster Creek is classified as SA ORW waters by the Environmental Management Commission. Oyster Creek is designated as Coastal Waters and a Primary Nursery Area (PNA) by the NC Division of Marine Fisheries. Although this area is designated as a PNA, it is closed to shell fishing. Project description NC DOT'S proposal is to replace Bridge #28, which is described above. The project as proposed is to muck out or undercut an area approximately 70' X 30' and then fill the same area to provide a bedding surface for the installation of three 95" (or 7.9') wide by ±67' long metal culverts. Head walls are proposed to retain the fill and for shoreline stabilization on the adjacent canal banks. The area of the proposed excavation and filling consists of approximately 2,100 ft2 of canal bottom. The spoil material associated with the mucking out activity will be transported to a high ground disposal site. Anticipated impacts NC DOT's proposed project would result in the excavation and backfill of approximately 2,100 ftz of canal bottom to create a bed for the proposed culverts. Localized turbidity will occur as a result of the mucking out and filling activities. Jeffrey R. Schaffer - Washington Office - 19 December 1995 -State of North Carolina Department of Environment, 70 Health and Natural Resources • Division of Coastal Management 1 James B. Hunt, Jr., Governor�p� Jonathan B. Howes, Secretary C) FEEH N Roger N. Schecter, Director MEMORANDUM TO: John Parker THROUGH:.Terry Moore 714 FROM: Jeff Schaffer v-,Py DATE: 19 December 1995 SUBJECT: NCDOT Major Permit Application to Replace Bridge #28 After reviewing Subchapter 7H.0206, .0207, .0208, and .0209, I conclude that the proposed bridge replacement is consistent with these AEC guidelines. I recommend issuance of the permit with the following conditions: A silt screen will be placed downstream of the proposed area to be excavated and a 24 hour period will elapse prior to removal of the silt screen to prevent unnecessary siltation downstream of the activity. 2. All fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 3. The fill material to be used as backfill cover over the culverts and which will be placed below normal water level will be confined behind the permitted head walls. 4. The temporary placement or double handling of excavated of fill materials within waters or vegetated wetlands is not authorized. 5. No excavated or fill material will be placed at any time in any marsh or surrounding waters outside of the alignment of the fill area indicated on the work plats. 6. All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spill -over of solids into any marsh or surrounding waters. 7. Prior to the commencement of excavation activities, the spoil disposal area must be inspected and approved by a representative of the Division of Coastal Management. 8. Prior to any construction activities, the applicant is required to arrange for a preconstruction conference to discuss conditions of the permitted activity. 1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946-6481 FAX 919-975-3716 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper John Parker 19 December 1995 Page 2 9. _ The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the project without having the permit transferred to a third party. 10. Future development or changes in the proposed replacement structure at the project site may require a modification of this permit. Contact a representative of this Division at (919) 946- 6481 prior to commencement of any such activity for this determination. STATE OF NORTH CAROLINA DEPARTMENT OF TPANSPORTATION JAMES B. HUNT JR. DMSION OF HIGHWAYS GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 December 7, 1995 Mr. Jeffrey R. Schaffer, Field Representative N.C. Department of Environment, Health, and Natural Resources Division of Coastal Management Washington Field Office P.O. Box 2188 Washington, N.C. 27889-2188 Dear Mr. Schaffer: GARLAND B. GARRETT JR. SECRETARY Re: Proposed Replacement of Bridge No. 28 on SR 1128 in Hyde County On/about September 29, 1995 the North Carolina Department of Transportation (NCDOT) submitted a CAMA Major Development Permit application for the proposed replacement of bridge # 28 in Hyde County. A permit was required, because the unnamed tributary to Oyster Creek at the site of bridge # 28 was determined to be an Area of Environmental Concern per Administrative Code Subchapters 7H.0206/.0207. On October 20, 1995 the Division of Coastal Management (DCM) returned the application due to discrepancies in the information provided. Corrections have been made to the application as recommended in DCM's October 20th letter. The revised MP-1 and MP-5 applications and accompanying drawings are attached. Riparian landowner notification verifications are also provided. It is requested that this revised application be processed as soon as possible to enable the Bridge Maintenance program to upgrade the existing, functionally obsolete structure in the near future. If you have any questions or comments please call Mr. M. Randall Turner at (919) 331-4737 (office), or at (919) 333-2048 (cell phone). Sincerely, _D F anklin' Vick P.E. Manager 9 Planning & Environmental Branch HFV/mrt Page 2, December 7, 1995 Mr. Schaffer Enclosures cc: John Parker, Permit Coordinator, DCM Jimmy Lee, P.E., Bridge Maintenance Unit D.R. Conner, P.E., Division Engineer M. Randall Turner, Division Environmental Officer Forin DCM-MP-1 JTCCPJ(d al(OYApJe+c 11,11sllls 4 cam z APPLICATION (To be completed by all applicants) 1. APPLICANT b. City, town, community or landmark a. Landowner: Swan Ouarter Name N. C. Department of Transportation Address P.O. Box 25201 City Raleigh State Mc Zip 27611-5201 Day Phone (919) 733-3141 Fax (919)733-9794' b. Authorized Agent: Name H. Franklin Vick. P.E. ivLr. ME Branch Address P.O. Box 25201 City Raleigh State N.C. Zip 27611-5201 Day Phone (919) 733-3141 Fax (919)733-9794 C. Project name (if any) Replacement of Bridge # 28 NOTE: Permit will be issued in name of landowner(s), and'o"Project name. 2. LOCATION OF PROPOSED PROJECT a. County Hyde c. Street address or secondary road number SR 1128 d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Oyster Creek 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Replace existing bddae with arch pipes b. Is the proposed activity maintenance of an existing project, new work, or both? both c. Will the project be for public, private or commercial use? Public Transportation d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. Public Transportation: Hi6wav crossin¢ of Oyster Creek; Standard Construction Methodologies Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Approximate elevation of tract above MHW or NWL +/- E13.0 ft (USGS)'+/- 498 ft assumed datum d. Soil type(s) and texture(s) of tract Mapped as Backbay and Puneo Muck some sand e. Vegetation on tract Upland herbaceous on road causeway f. Man-made features now on tract Bridge/boathouse g. What is the CAMA Land Use Plan land classification of the site? (Con suit the local land use plan.) X Conservation Developed X Rural Transitional Community Other h. How is the tract zoned by local government? i. Is the proposed project consistent with the applicable zoning? _ Yes No N/A (Attach zoning compliance ceifiixate, if applicable) j. Has a professional archaeological assessment been done for the tract? _ Yes X No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? _ Yes X No Coastal (marsh) _ Other If yes, has a delineation been conducted? (Attach documentation, ifavailable) m. Describe existing wastewater treatment facilities. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface runoff from pipe crossing and approachwav o. Describe existing drinking water supply source. N/A 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: ® A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written pennission from the owner to carry out the project. © An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale in black ink on an 8 1/2" by I I" white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agencys use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guideagency personnel unfamiliar with the area to the Form DCM-MP-1 site. ' Include highway or secondary road (SR) numbers, landmarks, and the like. CA Stortnwater Certification, if one is necessary. ®A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Ham. Glenn & Odessa W. Jorres Address Rt. 1 Box 575 Phone Swan Quarter, N.C.27885 Name Elaine G. Sadler Address Box 97 Phone Vandemere, N.C. 28587 Name William F. Williams Address Rt. 1 Box 63 Phone Swan Quarter_ N.C. 27885 9 A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. ® A check for S250 made payable to the Department of Environment, Health, and Natural Resources (DEHATRI to cover the costs of processing the application. o A signed AEC hazard notice for projects in oceanfront and inlet areas. O A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certifv that I am authorized to grant, and do in fact. grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certifv that the information provided in this application is truthful to the best of my knowledge. This is the ! � day of . ��, 19 Print Name'I Yl�m V"ick P. . Signature andowner orAuthor&ed Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM IAP-4 Structures Information Y DCM MP-5 Bridges and Culverts DCNI tiiP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-MP-5 Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES v/A a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at tILW or NWL. e. Will proposed bridge replace an existing bridge? _ Yes _ No If ves. (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge ` (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? _ Yes —NO If ves, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the NIHW or N-WL, (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? _ Yes —NO If ves, explain k. Navigation clearance underneath proposed bridge I. Will the proposed bridge affect navigation by reducing or increasing the existing navigable Opening',' _Yes _,No If yes, explain in. Will the proposed bridge cross wetlands containing no navigable waters? _ Yes _ jqo If ves, explain n. Have you contacted the U.S. Coast Guard concerning their approval? _ Yes —No If yes, please provide record of their action. Form DCM-MP-S 2. CULVERTS a. Water body in which culvert is to be placed Canal, a tributary to Oyster Creek b. Number of culverts proposed c. Type of culvert (construction material, style) Anodized Aluminum Arch Pipes d. Will proposed culvert replace an existing bridge? X Yes _ No If yes, (1) Length of existing bridge 31.7 ft (2) Width of existing bridge 26 ft (3) Navigation clearance undemeath existing bridge 1.2 ft (4) Will all, or a part of, the existing bridge be removed? (Explain) All of exists bridge to be removed e. Will proposed culvert replace an existing culvert? _ Yes X No If yes, (1) (2) (3) Length of existing culvert Width of existing culvert Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert +/- 67 ft (average length) g. Width of proposed culvert 3 @. 95 in = 31 ft h. Height of the top of the proposed culvert above the MHW orNWL 1.2 ft i. Will the proposed culvert affect existing water flow? _ Yes X No If yes, explain Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X Yes —No If yes, (1) Length of area to be excavated +/- 70 ft (2) Width of area to be excavated 30 ft (3) Depth of area to be excavated 4.5 ft (4) Amount of material to be excavated in cubic yards +/- 350 cu yds b. Will the placement of the proposed bridge or culvert require any excavation within: No _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? X Yes —No If yes_, (1) Length of area to be excavated +/- 70 ft (2) Width of area to be excavated . +/- 60 ft (3) Amount of material to be excavated in cubic yards _+_/- 200 cu yds d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area Upland site to be determined (2) Dimensions of spoil disposal area see d. (1) (3) Do you claim title to the disposal area? _ Yes _ No see d. I If no, attach a letter granting permission from the owner. Form DCM-MP-5 (4) Will the disposal area be available for future maintenance? _ Yes No see d.(1 (5) Does the disposal area include any coastal wetlands.(marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) ,above. see d.(1) (6) Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. see d.(1) e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below 1VIHW or NWL? X Yes _ No If yes, (1) Length of area to be filled 30 ft (2) Width of area to be filled 61 ft (3) Purpose of fill backfill for pipes f Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs _ Other Wetlands If yes, No (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? _ Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? _ Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? _ Yes X No If yes, explain in detail None anticipated c. Will the proposed project require the construction of any temporary detour structures? _ Yes X No If yes, explain in detail None anticipated d. Will the proposed project require any work channels? _ Yes X No If yes, complete Form DCM, -MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Stringent application of NCDOT's BMPs for the Protection of Surface f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Backhoe. trucks, etc. g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? X Yes _ No If yes, explain in detail Proposed headwalls will stabilize roadwav fills in vicinity of pipes NCDOT- A. Franklin V' E. 9p I n r JeclTtan, � i 'ature /2- Date 43 .0 an A Clrs*r k Land' North CeoIina Dopmunm of Tren-po ion ti Division of Mghways County: Hyde Quad: SwanquarLer Basin: Tar -Pamlico Proje&. Replace Bridge # 28 on SR 1128 Over Canal Date: 09 / 20 / 95 Vicially Map Shoot I of 3 5�1An1 N 63' bo' E % — � GUN¢ Ti ER S.R R128 /Ot00 � ba.on � r v �AI/�E G. SAALEQ / Sox 9 -7 ANDEME12E r NC zss&� HA,zg-y GLGNI,4 QDE=%A W. �0"-4 _ R+. I lioX s7ST S�dAN ��q�TE2 t\ic Va?S ) 1 3I. V t.a HU3 SACK -f 0 112.4 PP. L C�EeK v W �— 60As : RED ro s r_ REMOV D-1 WrTN OWNERS pe;'�tss�o.y L kA l l , A,r. f V1.11; AM; R+ I BoX IG3 S4AM QKARTER/ tjc 27 SCARE '1''=5o'HoR2. . SCALE 1"=50'HORZ.,1"=10'VERT. DATUM IS ASSUMED ELEVATION f(;� 5TR. /0t2O1 /z2°sx&W 30 93"Y 67 C AP..N. - a. G'91 EI-. Ir77.5 500 EJc, GQ�� , N r , • i AiL I 9tOo SCALE 1"=20'HORZ-,1"=10'VERT DATUM IS ASSUMED ELEVArrm NE.4Dk1A Tort SECTIoN A, -A J DENOTES FILL BELOW G.H.W. , DENOTES EXCAV. BELOW O.H.W. D.A.= INDETERMINATE AVERAGE DAILY FLOW =INDETERMINATE EXCAV. BELOW O.H.W.=3.)5—C.Y. FILL BELOW O.H.W. C.Y. FILL IN WETLANDS =NONE TOTAL FILL ='�20C_Y_ O.H.W. �-LEV-=49Co.6 R s?A, 104-20, �22° SXEIy 3095" X67"C,M,P,�9, C R, G P\. SrL. 1'99•6- S,9D YVNLL s oh;w-rf, 4%, b ,B EA EL, 991, 2 Cr R. o, D j 0 Norm Carolina Department ofTranspor:stion Division of Ffi*AWs County: Hyde Quad: Swanquarter Basin: Tar -Pamlico Project: Replace Bridge # 28 on SR 1128 Over Canal Date: 09 / 20 / 95 Sections Sheet 3of 3 MEMORANDUM TO: Jim Mulligan Deborah Sawyer FROM: Jeff Schaffer 16 DATE: 19 December 1995 SUBJECT: Application for CAMA Major Permit and/or Dredge & Fill Permit N.C. Department of Transportation Bridge No. 28 Hyde County, North Carolina Attached is an application for a CAMA Major and/or a Dredge & Fill permit which was received by me on 15 December 1995. I am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me.