State of North Carolina
Department of Natural and Economic Resources
PERMIT
TO EXCAVATE AND/OR FILL
(Re: G. S. 113-229)
Permit No. 116-77
Permit Class
Issued to: North Carolina Department of Transportation New
Division ot highways
P. 0. Box 25201, Raleigh, North Carolina 27611
This permit authorizes,excavation and/or fill work in Hyde County, N. C.
at Nebraska Canal (at SR 1110 crossing) as requested in the permittee's
application dated 6/8/7% incl. attached plat dated 5/31/77 subject to
the conditions set forth below.
(1) That no excavated or fill material be placed at any time in any marsh
or waters of the state, outside of the alignment of the fill area
indicated on the plat.
(2) That the activity be conducted in such a manner as to prevent sig-
nificant increases in turbidity outside of the area of construction
or construction -related discharge (increases of 25 JTU's or less are
not considered significant).
THAT IF THE ABOVE CONDITIONS AND THE PLANS AND SPECIFICATIONS SUBMITTED AS PART
OF THE APPLICATION (WHERE NOT IN CONFLICT WITH THE CONDITIONS) ARE NOT FOLLOWED
PRECISELY, THE PERMITTEE IS SUBJECT TO A FINE, IMPRISONMENT, OR CIVIL ACTION AS
PROVIDED IN G. S. 113-229 (K) AND (L).
That this permit may be objected to by the permittee within twenty (20) days of the date of issuance. Failure
to submit such objection shall be interpreted as an agreement of compliance with all permit conditions.
That this permit must be displayed along with a copy of the application and the project plat in the cab (or
pilot -house) of the equipment working on the project, or be easily accessible, on site, to Department person-
nel when the project is inspected.
That any maintenance work or project modification requires further Departmental approval. Subject to
permit renewal, all work must cease when permit terminates.
This permit terminates on December 31. 1979
Issuing Date: July 27, 1977
Signed by the authority of the Secretary of the
Departme t of Natural & Econo J'c Resourcesoe
3
Form D&F-g
Revised 3/76
Edward G. McCoy Director
Division of Marine Fisheries
State of North Carolina Department of the Army
Department of Natural and Economic Resources Corps of Engineers, Wilmington Distr
(Re: GS 113-229) (Re: River and Harbor Act of 1895
Plcasc type or print and Fill in all blanks. I f the informatio.^, requested is not applicable, so
indicate by placing N; A in tine blank.
I. Applicant Information:
A. Name N._ C._ Dept-__ of Transs�ortation - Division_ of Highways
Cbst -Fin[ Zi fiddle —
P.
B. Address -----------------._..---- 0. Box 25201------ _
Raleigh N. C. 27611 11 - 214
Ciry or Town ---------State------- -- Zip
11. Location of Proposed Project: A. County Hyde _ l�€'� 101977
B. 1. City, town, community or landmark Nebraska
2. Is proposed work within city limits? Yes No x DIV. OF MARINE FIS
H RIES
C. Creek, river, sound or bay upon which project is located or nearest named body of water to project
Wvesocking Bav
Ill. Description of Operation:
A. 1. Maintenance of existing project
2. New workBridge
Replacement
B. Purpose of excavation or fill
1. Access channel
length
width
depth
2.Boat basin
length_
width
depth
3. Fill area
length_
width
depth
4.Other Pipe installation
length_601
width
20' _depth 31+
C. 1. Bulkhead
2. Type of bulkhead construction (material) NA
D. Excavated material (total for project)
1. Cubic yards 150+ 2. Type of material sand and muck
E. Fill material to be placed below "MHW (see also VI. A)
1. Cubic yards 80+ 2. Type of material Sandy baekfill around arch pipes
IV. Land Type, Excavated Material, and Construction Equipment:
A. Does the area to be excavated include any marshland? Yes _No x
B- Does the disposal area include any marshland? YesNo x
C. Disposal area 1. Location Along roadway above MHW _ _-
2. Do you claim title to disposal area? Yes
D. Fill material source if fill is to be trucked in Borrow area above MHW
E. How will excavated material be entrapped or encased? --Dikes as necessary
F. Type of equipmcnt to be used_-._Drag1ane
G. Will marshland be crossed in Iran,porting equipment to project site? (If yes, explain)—
V. Describe Intended Use of Project Area:
A. I. E /W,44 —_ Pub licHighwayt ------
2. Commercial_.__--- _. ---- --------_.--- ----
3. Flou%ing Development ur Industrial
4. Otfrer------------ ------
D.l'F-BI
Res. 3'�"
2. Elevation of lot(s) above mean high water
3. Soil type or texture
4. Type of building facilities or structures 2 @ 81" X_59" CM pipe arches
5. Method of sewage disposal or treatment
VI. Pertaining to Fill and Water Quality:
A. Does the proposed project involve the placement of fill materials below mean high water? Yes—
No-B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project completion? Yes —No X
VI1.
VIll.
2. Type of discharge
3- Location of discharge
Present rate of shoreline erosion (if known):
Unknown
List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for
work in project area, if applicable:
IX. Length of time required for project activity: 4 weeks
X. In addition to the completed application form, the following items must be provided:
A. Attached a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the owner of said property,
then forward a copy of the deed or other instrument under which the owner claims.title plus written
permission from the owner to carry out the project on his land. (Note: Federal law requires the
applicant to be the owner or his designated agent)-
B. Attach an accurate work plat drawn to scale on 8%:" X 11" white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G. S. 113-229 (g) (9) and (10)). Enter date served See below
Such owners have 30 days in which to submit comments to agencies listed below-
D. List the names and complete addresses of the riparian landowners with property adjoining applicant's
tract.
Division of Highways representatives to contact all adjoining property
i
owners relative to proposed construction.
DATE—
Apptica is Signature
Manager of Technical Services
Send one completed copy each to:
Permit Section
Division of Marine Fisheries -
Department of Natural & Economic Resources
P. O. Box 27687
Raleigh, North Carolina 27611
Ph. 919-829-3767
District Engineer
Department of the Army
Wilmington District Corps of Engineers
P. O. Box 1890
Wilmington, North Carolina 28401
(Note: attach Corps cover letter)
Ph.919-763-9971 Ext.565
D& F-B2
Rev. 3174
1.9
NOTE:
uix
CHANNEL WORK IMMEDIATELY DOWNSTREAM
FROM ROADWAY BEING PERFORMED
BY
Le
MR. EARL PUGH PERMIT NO. $6-77
'
LP ,.
�uxx 0 uvc
nn
Y/C/A//Tj� NY.9P
_
i All
I.
E
1
-
1
_ _
Aw arzD 2 .PT 3LLx'x/3TiNG, 7iKBER BR/DscT
d/.rs9 c//. tvips o �� ^/o• /o
L Ayv/ u6
TO
s
A NORTH CAROLINA DEPARTMENT
OF TRANSPORTATION
z HYDE COUNTY
.30�
PROPOSED INSTALLATION OF
C.M. PIPE ARCHES 2 AT
81x5T ON SR 1110 AT
NEBRASKA CANAL
MAY 31, 1977 SHEET 1 of
1
Div. Marine Fisheries
PO Box 769
Morehead•City, NC 28557
June 16, 1977
MEMORANDUM TO
- John
Parker
From
R. D.
Nelson
Subject
App.
for State
permit DOT Div. Hwy. 6 8-77
Location - Hyde County - Nebraska Canal on SR 1110 at Nebraska
Investigative process - Site investigated June 3, 1977. App. rec. Raleigh 6-10-77;
Morehead 6-13-77.
Environmental setting - The site encompasses some 60' of Nebraska Canal, lying on
either side of SR 1110. The existing canal which enters into Wysocking Bay measures
approximately 25' wide at this point, with an existing depth of less than 3'. The
canal(and spoil piles)at this point is constructed entirely in high land with some
commercial and residential development located in the immediate vicinity. The canal
appears to be relatively shallow for the majority of its length, with a mud substrate.
Project description - The applicant proposes to remove the existing bridge crossing
the canal on SR 1110 and replace the structure with two 60' long drainage pipes. In
the process, approximately 150 cu'.yds. of muck and sand material will be removed from
the canal; the pipes installed, and 80' of sand will be backfilled.around the pipes.
Environmental impact - If,the project is constructed as proposed, some short term
turbidity will occur during excavation and filling. The project appears to be purely
a highway maintenance operation in an effort to improve traffic -load on SR 1110.
R. D. Nelson
NERNorth Carolina Department of
Natural & Economic Resources
JAMES B. HUNT, JR., GOVERNOR HOWARD N. LEE, SECRETARY
June 10. 1977
Date
Mr. James T. Brown, Chief
Estuarine Studies Section
Division of Marine Fisheries
Box 769
Morehead City, North Carolina 28557
Dear Mr. Brown:
The attached copy of an application submitted by:
DOT -Division of
Applicant's *lame
Location of Project
DIVISION OF
MARINE FISHERIES
BOX 27687, RALEIGH 27611
TELEPHONE 919 733-3767
BOX 769, .MOREHEAD CITY 28557
TELEPHONE 919 726-7021
V
1 SUN ro��. �REs
1 Mp,R\�1E f\SN'r
for a state permit to perform excavation and/or fill work in coastal North
Carolina is being circulated to State and Federal agencies having jurisdiction
over the subject matter which might be affected by the project.
Please indicate on the reverse side of this form your viewpoint on the
proposed work and return to the Division of Marine Fisheries not later than
July 1, 1977
LB:sh
Sincerely,
Lee Barham, Acting Deputy Director
Division of Marine Fisheries
(Please use reverse side for comments and signature.)
(A) This agency interposes no objection to the proposed work.
❑ (B) This agency objects to the project as proposed. The objection is
based
upon findings which lead to the conclusion that there will
be one or more adverse effects as covered in G. S. 113-229 (e) 1-5.
❑
(e)(1) ... that there will be significant adverse effect
of the proposed dredging and filling on the use of
the water by the public;
❑
(e)(2) ... that there will be significant adverse effect
on the value and enjoyment of the property of any
riparian owners;
❑
(e)(3) ... that there will be significant adverse effect
on public health, safety, and welfare;
❑
(e)(4) ... that there will be significant adverse effect
on the conservation of public and private water
supplies;
(e)(5) ... that there will be significant adverse effect
on wildlife or fresh water, estuarine or marine
fisheries.
(C) Agency findings relating to item(s) A and/or B are hereby detailed.
❑
Detailed comments continued on attached sheet.
No objection with
the following condition: That no excavated of fill material
be placed at any
time in any marsh or waters of the state, outside of the alignment
of the fill area
indicated on the plat.
❑ (D) Comments are submitted that do not directly relate to item B but
are relevant to the public interest. (These comments will be for-
warded by the Department of Natural and Economic Resources to
appropriate State or Federal agencies.)
R. D. Nelson
Signed
6-16-77
Date
' Department Arm
Stare of forth Carolina P Y
Department of Natural and Economic Resources Corps of Engineers, Wilmington Distric
- (Re: GS 113-229) (Re: River and Harbor Act of 1999)
Plca.c %, a or grinz and fill in all blan!.s. If the information r_gaested is not applicable, so ,
in.aic4-e b, p!.xinI N!A i:a t'In e bl_n...
1. Applicant information:
. 1
A. Name N._C_DeDt. of Transportation — Division of H�hways
- -cast rrs[—Sfidc7le
P. O. Box 25201
B. Address ------- - ----Pa5-6oxor Route _
Raleigh N. C. 27611ral� 24
City or Town 5[a to Zip Code n $�-
11. Location of Proposed Project: IC1
A. County Hyde ly Q 177
B. 1. City, toxin, community or landmark Nebraska
2_ Is proposed work within city limits? Yes Nox
OIV. OF GSARINE F15Hj-:RIES
C. Creek, river, sound or bay upon which project is located or nearest named body of water to project
Wyesocking Bay
111. Description of Operation:
:.
A. I. Maintenance of existing project 2- New work Bridge Replacement
B. Purpose of excavation or fill
1. Access channel length width
depth
2. Boat basin length— width
depth-
3- Fill area length_ width
depth
4.Other pipe installation length 60t wiath 20' _depth
3t+
C. 1. Bulkhead dimensions NA-. --
2_ Type of bulkhead construction (material) NA
D. Excavated material (total for project)
1. Cubic yards 150+ 2. Type of material sand and muck
E. Fill material to be placed below NIHW (see also VI. A)
1. Cubic yards 80+ 2. Type of material- Sandy backfili
around arch pipes
V. Land Type, Excavated Material, and Construction Equipment: .
A. Does the area to be excavated include any marshland? Yes —No x
_ B. Does the disposal area include any marshland? Yes No x
C. Disposal area 1. Location. Along roadway above YHi
2. Do you claim title to disposal area? Yes
D. Fill material source if fill is to be trucked in Borrow area above MAW
E. How will excavated material be entrapped or encased? Dikes as necessary
F. Type of equipment to be used_-2'aaline
G. Will marshland be crossed in transporting equipment to project site? (If yes, explain) No
V. Describe Intended Use of Project Area:
A. 1. F/WZ6—_ Pub11-Q--Highway— —.---- _
2_ Commercial—___--__--- --- — —
3. Housing Development or Industrial
4.Oth`r-- ----- -- - -
D&F-B l
R_v 3`
B. 1. Lot size(s)
2. Elevation of lot(s) above mean high water
3. Soil type or texture
4_ Type of building facilities or structures 2 @ 81" x 59" CM pipe arches
5. Method of sewage disposal or treatment
V1. Pertaining to Fill and Water Quality:
A. Does the proposed project involve the placement of fill materials below mean high water? Yes _No_
B_ 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following projectcompletion? Yes— No x
2. Type of discharge
3_ Location of discharge
VI 1. Present rate of shoreline erosion (if known): Unknown
VII1. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for
work in project area, if applicable:
IX. Length of -time required. for project activity: 4 weeks
X_ In addition to the completed application form, the following items must be provided:
A. Attached a copy of the deed (with State application only) or other instrument under which applicant `
claims title to the affected property. OR if applicant is not claiming to be the owner of said property, ,
then forward a copy of the deed or other instrument under which the owner claims title plus written
permission from the owner to carry out the project on his land. (Note: Federal law requires the
applicant to be the owner or his designated agent). .
B_ Attach an accurate work plat drawn to scale on 8Yz" X i t" white paper (see instruction booklet for -
details). Note: Original drawings preferred - only high quality copies accepted.
C_ A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G. S. 113-229 (g) (9) and.(10)). Enter date served See below
Such -owners have 30 days in which to submit comments to agencies listed below-
D. List the namesand complete addresses of the riparian landowners with property adjoining applicant's
tract.
Division of Highways representatives to contact all adjoining; property
i
owners relative to proposed construction.
DATE G _Y
Manager of
Send one completed copy each to:
Permit Section
Division of Marine Fisheries -
Department of Natural & Economic Resources
P. O. Box 27687
Raleigh, North Carolina 27611
Ph. 919-829-3767
Signature
1 Services
District Engineer
Department of the. Army
Wilmington District Corps of Engineers
P_ O. Box 1890
Wilmington, North Carolina 28401
(Note: attach Corps cover letter)
Ph. 919-763-9971 Ext_ 565
D&F-B2
Rev. 3(74
NOTE:
CHANNEL WORK IMMEDIATELY DQWNSTREAM
FROM ROADWAY BEING PERFORMEDBY
\MR. EARL PUGH, PERMIT NO. 56-77
I 1_l_=_T_l_T_r__Q7_Fr=7T_l_T
-----------
+ -
-
---------
-
---------
Hif
__Tl
tf/.Ar-fl Co. Flps
NORTH CAROLINA DEPARTMENT
OF TRANSPORTATION
-HYDE COUNTY
PROPOSED INSTALLATION OF
C.M. PIPE ARCHES 2 AT
8fxSql ON SR 1110 AT
NEBRASKA CANAL
MAY 31., 1977 SHEET 1 of
1