Loading...
HomeMy WebLinkAboutNCDOT 168-89 Durham CreekPermit Class Permit Number NEW 168-89 STATE OF NORTH CAROLINA Department of Natural Resources and Community Development and LAUG CoastalResources CommissionV989Prn�irp for X Major Development in an Area of Environmental Conceff """"� pursuanttoNCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to NC DOT, DIV. Of Highways, Pt) Box 25201, Raleigh, North Carolina 27611 authorizing development in Beaufort County a±D° � Creek SR1955 bridge rrear Bonner -ton as requested in the pemuttee's application dated 5/17/89 including, attached plats, sheets 1-3 of 3 and sheet 4 of 4 dated 1/89. This permit, issued on \-k111 is subject to compliance with the application (where consistent with the permit), all applic< 1 eg ations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. 1) The replacement bridge will be located in accordance with the attached plats. 2) In order to protect anadromous fish, piling placement will not occur between March 1 and May 31 of any year. 3) Appropriate erosion and sedimentation control devices, measures, or structures (e.g., silt fence, diversion swales/berms, sand fence, etc.) will be used to prevent sediment from entering the adjacent wetlands, watercourses and/or property. 4) A ground cover sufficient to restrain erosion will be provided within 30 work- ing days of cmipletion of any phase of grading on cut or filled slopes. 5) A permanent ground cover sufficient to restrain erosion will be provided within the shorter of 30 working or 120 calender days after project completion. (See, Attached Sheet for Additional Conditions) This permit action may be appealed by the pemtittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1992 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. George T. E rett, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee NC DOT, DIV Of highways #168-89 Page 2 of 2 ADDITIONAL ODMITIGNS 6) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or .construction - related discharge. NOTE. The proposed project is certified under General Water Quality Certification No. 1665 issued on September 19, 1983, for incidental bridge construction. YI 1 I I rtrr State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor William W. Cobey, Jr., Secretary 27 June 1989 Mr. John R. Parker, Jr., Chief Major Permits Processing Section Division of Coastal Management Raleigh, North Carolina 27611 Dear Mr. Parker: The attached copy of an application submitted by: N.C. DOT Applicant's Name George T. Everett Director Brid e across Durham Creek Beaufort County Location of roject County X for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major development- permit .... for a CAMA major development permit (only) .... for a dredge and fill permit (only) .... has been reviewed by this District Office and is being forwarded to you along with a Field Investigation Report for further application processing, - including circulation to State agencies having interest and/or jurisdiction over the subject matter which might be affected by the project. The recommendation of this Office is X covered on the attached; will be forwarde�iater. Sincerely, � Terry Moore, Manager Washington District reverse side; P.O. Box 27687, Pakigh, North Carolina 27611-76U Tekphom 919-733.2293 A. F.., l rl....,..«,. , eta_-<_ A—__ x liit (A)_,.,This.,off d' has'no objection to* the project as proposed. --- (B-)---This'- offic4 has no comment on the project as proposed. (C) This office approves of the project (or project -concept) and/or recommends these minor -refinements for project management. (D) This office objects to the project and recommends permit denial based on a finding of: (1) adverse impacts under G.S. 113-229(e) 1-5 (the dredge and fill law)as enumerated below: (e)(1) ... that there will be significant (e)(2) ... that there will be signifi- adverse effect of the proposed dredg- cant adverse effect on the value ing and filling on the use of the and enjoyiEnt of the property of water by the public; any riparian owners; (e)(3) ... that there will be significant (e)(4) ... that there will be signifi- adverse effect on public, health, cant adverse effect.on the -con - safety, and welfare; servation of public and private water.supplies; (e),(5) that t iere will be significant adverse effect on wildlife or fresh water., estuarine or marine fisheries.--. (2) Inconsistency -with .Rules of the Coastal,Resources.Commission as enumerated in 15 NCAC 7H (or other). Please site rule. (3) Inconsistency with the local Land Use Plan (please elaborate). (4) Inconsistency with Rules, Guidelines, or Standards of this agency or a finding that the project is in conflict with` other authority or interest as stipulated below. (E) Attachment. Include memorandum or other documentation that support findings relating to DI-4; or provide general comments. Signature Rn-vl ate DIVISION OF COASTAL MANAGEMENT Lat: 350 21' 35" FIELD INVESTIGATION REPORT Long: 760 51' 07" 1. APPLICANT'S NAME N.C. DOT 2. LOCATION OF PROJECT SITE Beaufort County, Bonnerton Community, - Bridge acro Durham Creek on SR 1955, no photo 3. INVESTIGATION TYPE- DREDGE & FILL X CAMA X 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 6-14-89 (B) WAS APPLICANT PRESENT No 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 6-13-84 , OFFICE Washington 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Beaufort County LAND CLASSIFICATION FROM LUP Conservation DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP None (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE COASTAL WETLANDS PUBLIC TRUST WATERS X ESTUARINE WATERS OTHER (C) WATER DEPENDENT: .YES X -NO (D) INTENDED USE: PUBLIC X PRIVATE COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING N/A PLANNED N/A (F) TYPE OF EXISTING Bridge (G) ESTIMATED ANNUAL RATE OF EROSION N/A SOURCE. 7. HABITAT DESCRIPTION: AREA (A) VEGETATED WETLANDS DREDGED FILLED OTHER TMha sp 7 Scixpus spp. _ sq (B) NON -VEGETATED WETLANDS: (C) OTHER sq• Open water + 1000 ft. _ (D) TOTAL AREA DISTURBED: + 1050 sq.ft. 8. PROJECT SUMMARY: Environmental settin The proposed project site is in the Bonnerton Con¢mmity of Beaufort County at the bridge across Durham Creek on SR 1955. Durham Creek is a tributary to the Pamlico River, which averages + 7' in depth and is + 13.0' in depth in the channel at the bridge crossing. The existing bridge is + 170' in length and it averages + 5' above the normal water level, thus allowing navigation by small vessels. The existing filled approaches to the bridge are mostly highground, however, some narrow fringes of.Typha spp. and.Scirpus spp. have volunteered at the waters edge on the approaches. Project proposal The applicant is proposing to replace the existing deteriorated bridge with a new bridge. The new bridge will be 210' in length and will be constructed at the same location as the existing bridge. The new bridge will average + 7' above the normal water level, therefore, no significant change in vessel traffic will occur. Class II riprap will be placed beyond the no_17al water level at both approach ends to secure the slopes. Environmental impact The project as proposed should have a minimal environmental impact. + 50 sq.ft. of wetland vegetation (Typha spp. and Scirpus spp.) which has volunteered on the existing approaches will be filled. Also + 1000 sq.ft. of open water area will be filled by the placement of riprap at the toe of the approaches for stabiliza- tion. A total of + 60 cubic yards of riprap will be placed beyond the normal water level. The bridge replacement will not significantly change upland development upstream of the existing bridge, since no significant change in bridge elevation will occur. David L. Gossett - Washington Office - 27 June 1989 I icipated development activities, including construe- tiorl, excavation, filling. paving. land Clearing, and stormwater control. If the requested information is not relevant to your Project, write NIA (not ap- plicable). Items 1.4 and 8.9 must be completed for all projects. Add= P. O. Box 25201. City Raleigh State Nc Zip _ 27611 Day phone 711-2031 Landowner or X_ Authorized agent b. Project name (if any) N/A Landowner,c. If die applicant is not die address.the owner's name and -roada. Stz address or secondary b. City, town, community, or'landmark Bonnerton c. County ­_ Be-aufort d. Is pro work within city limits or planning uasd ... • e. Name of body of water nearest r, - - a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). Renlarement of Rridrte over Durham rreek If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? New Work c. Will the project be for community, private, or commercial use? Public YU011C '1Tdn5pU1LdLlUI1 a. Size of entire tract N/A b. Size of individual lots) N/A c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum N/A d. Soil types) and texture(s) of tract Road Fill e. Vegetation on tract Sur-reacinnal Veqefatic Around Bridge, Open Water 7n Fill Area f. Man-made features now on tract Existino Bridge g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult: the local land use plan.) Conservation Y Transitional Developed Community Rural Other h. How is the tract zoned by local government? L How are adjacent waters classified? SC j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? now Complete this section if the project includes any upland development a. Type and number of buildings, facilities, or =uctusrs proposed N/A b. Number of lots or parcels N/A c. Density (Give the number of residential units and the units per acre.) N/A d. Size of area to be graded or disturbed e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, _ buildings, or rooftops. .. 35pnair, Or cpivaac, W uc ...w .va LJnVc sr:ifaces Asphalt & Concrete IL If applicable, bas a storm*ater management plan been submitted to the Division of En- vironmental Management N/A i. Describe proposed sewage disposal and/or waste water treatment fadlitiis N/A j. Have these facilities received state or local apptovaj? N/A k. Describe existing treatment facilities. N/A w ... ....,.....v_ C. Type of material N/A d. Does the area to be excavated include marsh- land, swamps, or other -wetlands?_ N/A e. High ground excavation, in cubic yards N/A f. Dimensions of spoil disposal area N/A g. Location of spoil disposal area N/A h. Do you claim title to the disposal area? N/A j. 1. Describe. location and type of 6vibarges to waters of the state (for examplersutface runoff, k. sanitary wastewater, industrial/commercial effluent, or "wash dowrel. Surface Runoff 1. M. n. m. Water supply source N/A o. n. If the project is oceanfront development, describe the steps that will be taken to main- p_ rain established public beach accessways or pro q- vide neov access. N/A o. if the project is on the oceanfront, what will be the elevation above mean sea level of the fast habitable floor? N/A a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW . Upland fill areas If not, attach a letter granting permission from the owner. Will a disposal area be available for future maintenance? I N/A If so, where? Does the disposal area include any marshland, swampland,'or water areas? N/A Will the fill material be placed below mean high water? 'Yes Amount of fill in cubic yards 60 r _ v _ Type of fill material Rork Fi 1 l Source of fill material Qlarnz Will fill material be placed on marsh or other wetlands? No. Tn Open Water Dimensions of the wetland to be filled See 6a How will excavated or fill material be kept on site and erosion controlled? Floating Silt Fence, Silt Basins, Etc. What type of construction equipment will be used (for example, dragiine, backhoe, or hydraulic dredge)? Standard Roadway Construction Eauipment s. Will wetlands be crossed in transporting equip- ment to the project site?_ If yes, explain the steps that will be taken to lessen en- vironmental impacts. Along Existin4 Roads a. Length of bulkhead or rip rap N/A b. Average distance waterward of mean high- water or normal water level N/A C. Shoreline erosion during preceding 12 months, in feet N/A d. Type of bulkhead material ` N/A e. Amount of fill, in cubic yards, to be placed below mean high water N/A f. Type of fill material N/A 2 IIW__ - In addition to die completed application form,, die following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrianent under which the owner claims title, plus written permis- sion from the owner. to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 lh x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location reap is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management, The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name See Attached Sheet Address Name_ Address Name_ Address for work on the project trace Include permit - numbers, permittee, and issuing dates. A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at - each a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.GS. 113A-1 to 10). Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North- • , m. Carolina's approved Coastal Management Program and will be conducted in a manner consistent with:, such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the day of A 19--,b—q. X 1-an owner or uthorized agent Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. 3 �iyji�i�•�1jr� �'r� Est �t �1t COUNTY• • SCALE — 1 G 1 L L x•, ili •,; �" " i 11 I 1141 -v° VM1,k S yy 1. j 1112 SITE j L., t �yeT O. L v B E A C H A M J. im S A Y A N N A )�IU° Ito! lsi • I°... ItMM Itli Gods ItiG 0 v � - w1 cu all / PROJECT VICINITY MAP N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS BEAUFORT COUNTY PROJECT 8.2150401 B-2003 PROPOSED BRIDGE REPLACEMENT ON SR 1955 OVER DURHAM CREEK SHEET \ OF 3 JAN. 1989 W.E. MILLER 0 W.E. MILLER I/COUNTY OF/ h BEAUFORT DRAINAGE AREA•-2B---SQMI AVE FLOW.-3.I-CFS LEON D.BONNER,II! aM DURHAM CREEKcn \ N O PROPOSED BRIDGE PROPOSM FILL SLOPEir— EXISTING BRIDGE DURHAM CREEK -SCALE, f - wd' TEXAS GULF SULFUR CO. — DENOTES FILL IN OPEN WATER AREA OF FILL IN OPEN WATER . I000 _I SQ. FT. FILL BELOW WIT 60 CY TOTAL FILL 3600 CY n PPOPOSED FILL TIMBER BULKHE xz zz z m o0 t=]rro4 n HwOti1 in to 0 tl to W H H' U WCt-J �0 m Hh1 t*]St1NQul Hy '.d H F--. h i O o tjLnozo h1t1m [ts]�HO� o hJ U��rOx� 2 n1 > i H %D N H co O O z zw �-EXISTING FILL -10 BOCK FILL � _ -5 AD MHT M f:i T-" _� ►asL. SECT[ON A -A �=DENOTES FILL IN OPEN WATER 020' 40 SCALE: mamma HOROZONTAL 0 1020' VERTICAL ,i - G 1540 ' ..10 16+i 0 I 17 + i 0 . so S"A 15+B6 5 C@ 47 Coxva 'LA9 GY. G:;Hve CL. 1,18 co, SKEW 10 PROPOSED BRIDGE - EXISTING BRIDGE ic RIPRAP .47 ` RIP RAP--1 -10 EnInroro ' �oz x �D Z W tA � M µ_ ._.. S EXISTING 13ED - 1 . 1CAL"E fd H „ , , PROPOSED 13R. PILES- 0 — � :HORIZONTAL,., I =30 VERTICAL: I" = 10 EXISTING BR. E PILES Oj Uri H N x° o. � 00 • .x W