Loading...
HomeMy WebLinkAboutNCDOT 36-93 Hunter's CreekPermit Class Permit Number NEW X STATE OF NORTH CAROLINA Department of Environment, Health & Natural and Coastal Resources Commission hermit N 36-93 for — _ _ Major Development in an Area of Environmental Concem�ooww �� �� pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to authorizing development in Carteret County 's application This permit, issued on March 22, 1993 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action, or may cause the permit to be null and void. Bridge Construction 1) All construction debris, including concrete, asphalt and earthen material will be disposed of on highground and landward of all CAMA Areas of Environmental Concern unless otherwise approved. 2) The permittee must employ adequate silt and sediment control measures to prevent erosion and. to prevent runoff from entering the adjacent waters of Hunter's Creek. 3) The riprap material must be free from loose dirt and other pollutants, except in trace quantities. It must be of sufficient size to prevent its movement from the site by wave or current action. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be -accessible, on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Roger N. Schecter, Director ivision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee i I NC Dept. of Transportation Permit #36-93 Page 2 of 2 ADDITIONAL CONDITIONS NOTE: The proposed work is authorized by general permit #CESAW- 0082-N-000-0031 renewed by the U. S. Army Corps of Engineers on 1/1/92 and by General Water,Quality Certification #2765 issued by the N. C..Division of Environmental Management on 1/21/92. 0 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSWITAL/PROCESSING RECORD 3 A) APPLICANT: NC DOT (Hwy. 58/Bridge #30) COUNTY: Carteret LOCATION OF PROJECT: on NC Hwy. 58 and Hunters Creek, at Bridge #30, near Kuhns, on the Carteret/Jones County line, NC DATE APPLICATION RECEIVED COMPLETE BY FIELD: January 14, 1993 FIELD RECOMMENDATION: Attached - NO To Be Forwarded - YES ( 3- )f7- q 3, CONSISTENCY DETERMINATION: Attached - NO To Be Forwarded - YES l a_ Z4(_L FIELD REPRESENTATIVE: Jim Mercer DISTRICT MANAGER REVIEW: B) DATE APPLICATION RECEIVED IN RALEIGH: Ml�'. PUBLIC NOTICE RC'D: ADJ. RIP. PROP NOTICES REC'D: C) APPLICATION ASSIGNED TO: 75 DAY DEADLINE: MAIL OUT DATE: FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE DISTRICT OFFICE: Morehead FEE REC'D: $250.00 q_ END OF NOTICE DATE: a. 28-9 3 DEED REC'D: ON: 150 DAY DEADLINE: STATE DUE DATE: FED. COMMENTS REC'D: DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS YES NO NOTES Coastal Management Dist. Office Div. of Community Assistance Land Quality Section Div. of Env. Management State Property Office Div. of Archives & History Div. of Env. Health Div. of Highways Wildlife Resources Commission Div. of Water Resources Div. of Marine Fisheries MEMORANDUM: TO: JOHN PARKER FROM: JAMES L. MERCER SUBJECT: COMMENTS & RECOMMENDATIONS - MAJOR PERMIT APPLICATION NC DOT (HWY. 58 - BRIDGE #30), CARTERET COUNTY DATE: March 17, 1993 I have no problems with the proposed project and support issuance of the necessary CAMA permit for the bridge replacement. The following permit conditions are for your consideration: 1. The project alignment and the other aspects of construction must be undertaken in strict accordance with the permitted workplat drawings as dated in the CAMA office received January 14, 1993. 2. All construction debris, including concrete, asphalt and earthen material must be disposed of on highground and landward of all CAMA Areas of Environmental Concern unless otherwise approved. 3. The permittee must employ adequate silt and sediment control measures to prevent erosion and runoff from entering the adjacent waters of Hunters Creek. 4. The riprap material must be free from loose dirt and other pollutants. It must be of sufficient size to prevent its movement from the site by wave or current action. JLM/dh cc: Charles S. Jones Cliff Winefordner, COE To: John Dorney Planning Branch 1 DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA MAJOR PERMIT APPLICATION REVIEW REVIEWER: GREGSO WQ SU RVISOR: ADKINS A, DATE: Februa WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING PERMIT YR: 93 PERMIT NO.: 93069 COUNTY: Carteret PROJECT NAME: NCDOT (Hwy 58/Bridge #30) PROJECT TYPE: Bridge PERMIT TYPE: CAMA COE #: N/A DOT#: N/A RCD FROM CDA: DCM DATE FROM CDA: January REG OFFICE: WiRO RIVER AND SUB BASIN#: 030501 *STREAM OR ADJACENT WATER BODY: Hunters Creek CLASS: C STREAM INDEX #: 20-17 *OPEN OR CLOSED: WL IMPACT: Yes WL TYPE: Unknown WL REQUESTED: 0.027 WL ACR EST: No HYDRO CNECT?: Yes WL SCORE: N/A MITIGATION: N/A MITIGATION TYPE: N/A 93 p 22, 1993 29, 1993 MITIGATION SIZE: N/A RATING SHEET ATTACHED?: N/A RECOMMENDATION: ISSUE STORMWATER PLAN REQ'D: IF YES, DATE APPROVED: PROJECT DESCRIPTION: The applicant proposes to replace Bridge #30 over Hunters Creek. WATER QUALITY CERT. (401) CERT. REQ'D: Yes IF YES, TYPE: General Certification #2765 for NCDOT Bridges SEWAGE DISPOSAL TYPE OF DISPOSAL PROPOSED: N/A TO BE PERMITTED BY: N/A IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: N/A WATER/WETLAND FILL AREA OF FILL - WATER: N/A WETLAND: 1200 sq. ft. IS FILL ELIMINATING A SIGNIFICANT USE? No DREDGING IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? N/A IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? N/A MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: (ATTACH A MARINA USE ATTAINABILITY EVAL.) FEB N 4 1993 -W N/A 93069.Feb Page Two RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: That the project be done in such a manner so as to not cause turbidity outside the immediate construction area to exceed 25 NTU. cc: Central Files Wilmington Regional Office Files DCM-Jim Mercer John Parker MEMORANDUM: TO: JOHN PARKER FROM: KATHY B. VINSON SUBJECT: CONSISTENCY DETERMINATION - MAJOR PERMIT APPLICATION - NC DOT - HWY. 58 - BRIDGE #30, CARTERET COUNTY DATE: February 24, 1993 The North Carolina Department of Transportation (DOT) proposes to replace Bridge #30, on NC Highway 58, over Hunters Creek, a tributary of the White Oak River, on the Carteret/Jones County line. Project plans include replacing existing wooden piles with concrete pilings. Marl riprap will be placed to protect the bridge abutments, with portions of the riprap being placed on Federal wetlands. Additionally, DOT proposes to regrade and resurface the approaches to the bridge from both directions. While some highground excavation will be required, erosion control methods will be used to control silt and sedimentation. No dredging or filling within the creek bed or in Federal wetlands is proposed. AECs impacted by the project include Public Trust and Estuarine Waters and the Estuarine Shoreline. I have reviewed this project for consistency with the 1991 Carteret County Land Use Plan (LUP) Update and offer the following comments. The general area of the project is located within an area of concentrated, conservation classified '404' wetlands. The AECs impacted by the project are also classified as 'Conservation'. The '404' Wetlands Conservation classification description on Page V-3 states that only uses consistent with the Policy Statement section of the Plan will be allowed in these areas. The County's policy regarding commitment to State and Federal programs (IV-16) states that "Carteret County is generally receptive to State and Federal programs, particularly those which provide improvements to the County. The County will continue to fully support such programs, especially the North Carolina Department of Transportation Road and Bridge Improvement programs, which are very important to Carteret County." _ .. February 24, 1993 Page #2 Based on this statement of support for NCDOT bridge projects, it would appear that Carteret County intended to allow such work to occur in the '404' Conservation classification areas. Therefore, provided the project can be permitted in accordance to State and Federal standards, this project appears consistent with the LUP. KBV/dh cc: Preston P. Pate, Jr. Charles S. Jones James L. Mercer State of North Carolina Department of Environment, Health, and Natural Resources 512 North Salisbury Street • Raleigh, North Carolina 27604 James B. Hunt, Jr., Governor February 3, 1993 Carteret News -Times Legal Advertisement Section P. O. Box 1679 Morehead City, NC 28557 Re: Public Notice - NC DOT - Hwy. 58 - Bridge #30 Dear Sir: Jonathan B. Howes, Secretary Please publish the attached Notice in the Sunday, February 3, 1993, issue of the Carteret News -Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Dedra A. Blackwell, Division of Coastal Management, P. O. Box 27687, Raleigh, North Carolina 27611. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, 1�mes L. Mercer Field Representative JLM/dh Enclosure cc: John Parker Dedra A. Blackwell Charles S. Jones RO iiox 27687, RalriF6, North Carolina 276117687 Tduphoot 919 733 4984 Fax 4 919733-0513 An Equal Opportunin, Altirmanw Action Lmploy'+ NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR' DEVELOPMENT PERMIT The Department of Environment, Health and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental concern as designated under the CAMA was received on January 14, 1993. According to said application, the North Carolina Department of Transportation is proposing to replace Bridge #30, on NC Hwy. 58 over Hunters Creek and north of Kuhns, at i the Carteret/Jones County line. i A copy of the entire application may be examined or copied at the office of Jim Mercer, Division of Coastal Management,' located in the Division of Marine Fisheries i Building, Morehead City, N.C., (919/726-7621) during normal business hours. Comments mailed to Roger N. Schecter, Director, Division of Coastal Management, f P. O. Box 27687, Raleigh, N. C., 27611, prior to February 28, 1993, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the Public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. a PUBLISHED ON: Sunday, February 7, 1993 I DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: NC DOT (Hwy. 58/Bridge //30) 2. LOCATION OF PROJECT SITE: NC Hwy. 58 and Hunters Creek, on the Carteret/Jones County line, just north of Kuhns, Carteret County Photo Index - 1989: NOT AVAILABLE 1984: N/A * State Plane Coordinates - X: 2560200 Y: 388200 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 12/11/92 1/20/93 Was Applicant Present - YES NO 5. PROCESSING PROCEDURE: Application Received - January 14, 1993 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Carteret County Land Classification From LUP - Rural/Conservation (B) AEC(s) Involved: ES, PT, EW (C) Water Dependent: YES (D) Intended Use: Public (E) Wastewater Treatment: Existing - N/A Planned - N/A (F) Type of Structures: Existing - Bridge #30 Planned - Replace Bridge #30 (G) Estimated Annual Rate of Erosion: -0- Source - Observation 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands NO COASTAL WETLANDS (B) Non -Vegetated Wetlands NONE ; (C) Other (Air Space) Public Trust 2,250 sq. ft. Highground 43,560 sq. ft. '404' Wetlands - riprap 1,200 sq. ft. (D) Total Area Disturbed: Approximately 1 acre (E) Primary Nursery Area: NO (F) Water Classification: 'C' Open: N/A 8. PROJECT SUMMARY: The applicant proposes to replace Bridge fl30 on NC Highway 58 over Hunters Creek, at the Carteret/Jones County line. * U.S.G.S. 7.5 MIN. TOPO 'STELLA' 1984 FIELD INVESTIGATION REPORT: NC DOT/HWY. 58/BRIDGE #36 PAGE #2 9. NARRATIVE DESCRIPTION: The North Carolina Department of Transportation proposes to replace on line Bridge #30, a J50' segment of Highway 58 over Hunters Creek, located about 1/2 mile north of Kuhns, on the Carteret/Jones County line. During construction, vehicular traffic will be detoured to the east along existing roadways, i.e. SR1100 and SR1103. The project should require an estimated 6-8 months to complete. The existing bridge was originally constructed in 1957. Hunters Creek is a tributary of the White Oak River. The surface waters of the creek are classified by the Division of Environmental Management as 'C'. The upper reaches of the creek at the project site .involve the Public Trust and Estuarine Waters designated Areas of Environmental Concern. The onsite inspection revealed no coastal wetlands occur within the project boundaries. Wooded swamp wetlands of the '404' type dominate all four quadrants of the highway/creek intersection. As. proposed, there will be no dredging or filling within the existing creek bed. A series of two (2) concrete pile supports will replace the four (4) rows of wooden piles now located in the creek. Marl riprap will be used to protect the bridge abutments above the MHW line. A portion of the riprap about 7'/z' wide x 80' long on each side of the bridge will be placed on section '404' wetlands. A total of 1200 sq. ft. of shaded vegetation will be displaced under the bridge. The project plans include regrading and resurfacing the two 30' wide approaches for a distance of 150' in either direction. No wooded swamp wetlands will be excavated or filled in this activity. The applicant plans to keep silt and sediment to a minimum by employing stringent erosion control measures along the construction alignment. A limited amount of highground excavation about 86' x 10' is scheduled within the bridge abutments to make way fora slightly longer bridge span. The off -site disposal area has not yet been determined by DOT. 10. ANTICIPATED IMPACTS: The bridge replacement project involves no excavation or filling of Hunters Creek. Although the new bridge span will be slightly longer than the existing 150' structure, the overall impact of the 30' wide roadway on the public trust values of Hunters Creek will remain the same at approximately 2,250 sq. ft. of air space over the creek bed. In addition, the vertical clearance will be increased by approximately 1'. The proposed project will reduce the number of support piles in Hunters Creek which should improve navigation for small recreational boats that may use the area. The proposed marl riprap under the new bridge will help protect the abutments from runoff erosion. The riprap will, however, displace a total of 1,200 sq. ft. of '404' type vegetation. PREPARED BY: JAMES L. MERCER DATE: January 25, 1993 Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 14 and 8-9 must be completed for all projects. �..�. ..a.,.e If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? Rnr-h 1 APPLICANT c. Will the project be for community, private, or a. Name N-C, Dem, of Trarisro=jrn Attn:6-J- ❑'quim commercial use? P.O. Box 25201 City Raleigh State N.C. Zip aro1 Dayphone (M)_733 __'n X Landowner or Authorized agent b. Project name (if any) c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number b. City, town, community, or landmark d. Describe the planned use of the project. Public Transportation 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract pVA b. Size of individuallot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 3 ft. %AO 27 d. Soil type(s) and texture(s) of tract Sam arri 14 irk e. Vegetation on tract Palustrine Forested Wetland f. Man-made features now on tract N . r`- sR c. County Carteret & Janes g. What is the CAMA Land Use Plan Classification of d. Is proposed work within city limits or planning the site? (Consult the local land use plan.) jurisdiction? No x Conservation _Transitional 0 e. Name of body of water nearest project Developed _ Community Fltrrtem Creek _Rural _Other 0 ° h. How is the tract zoned by local government? Unzoned 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). Replace bridge over Ftarters Creek at sam cmb with off -'site detour. i. How are adjacent waters classified? j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 3/91 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or in. Water supply source N / A structuresproposed One Bridge n. If the project is oceanfront development, describe the steps that will be taken to maintain established b. Number of lots or parcels N/A public beach accessways or provide new access. c. Density (Give the number of residential units and the N/A unitsperacre.) N/A d. Size of area to be graded or disturbed o. If the project is on the oceanfront, what will be the N/A elevation above mean sea level of the first habitable e. If the proposed project will disturb more than one floor? N/A acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. 6 EXCAVATION AND FILL If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land INFORMATION Resources? N/A - f. Give the percentage of the tract within 75 feet of a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are mean high water to be covered by impermeable covered in Section 7). surfaces, such as pavement, buildings, rooftops. No Net Increase Length Width Depth g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. rnnr.rPYe A Asphalt h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? N/A Describe proposed sewage disposal and/or waste water treatment facilities. N/A S �j. Have these facilities received state or local approval? $ N/A 0 k. Describe existing treatment facilities. 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). Surface Runoff Access channel OMILW) or (NWL) Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW (404 wetlands only) Upland fill areas b. Amount of material to be excavated from below water level in cubic yards N/A c. Type of material N/A d. Does the area to be excavated include marshland, swamps, or other wetlands? N/A e. High ground excavation, in cubic yards 119 f.V 3/91 �:. ,. .�'t�±"r--m.••..::.t•^!_Z;. .pr,.t.-..,� ..z�,.�„!"•;cC�-^�:-+*,v�C: �¢Tq"".+cr..+;.�w-y lam`. .VK,n, 7..T'�,T,.�'.794'F^�R'�.•T?C![a•.;""'�E}�'��.+P f. Dimensions of spoil disposal area " Approoved upland site not ypfi dote ;nai g. Location of spoil disposal area Upland Waste Site h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. Will a disposal area be available for future maintenance? N/A If so, where? j. Does the disposal area include any marshland, swamps, or water areas? No k. Will the fill material be placed below mean high )water? No 1. Amount of fill in cubic yards None B .1 nw MHW m. Typeoffill material Granular n. Source offillmaterial Suitable Borrow ,o. Will fill material be placed on marsh or other wetlands? Yes p. Dimensions of the wetland to be filled 15' x 80' q. How will excavated or fill material be kept on site and erosion controlled? By stringent erosion control methods r. What type of construction equipment will be used (for example, dragline, backboe, or hydraulic dredge)? Highway Construction Equipment s. Will wetlands be crossed in transporting equipment to project site? No If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap 80, b. Average distance watcrward of mean high water or normal water level 15' c. Shoreline erosion during preceding 12 months, in feet I Inlenn,.,n .. d. Type of bulkhead material Class 8 Stoop e. Amount offill, in cubic yards, to be placed below mean high water 0 f. Type of fill material N/A 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to cant' out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 3191 Name " JOnius A; Godwi6' Address P.O. Box 966. Swansboro, N.C. 28584 Name Theodore E. Morris Address Bt. 1, Box 6 Stella, N.C. 28582 Name Mary T. Mnrria Address Star Rt., Box 85 Swansboro, N.C. 28584 A list of previous stale or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $250 made payable to the Department of Environment, Health, and Natural Resources to cover the costs ofprocessing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9. CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow'only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project T� This, the J.Z day of J CA #1 U4 19�' dF'� I1 LandoN&mer or Authorized agent 3191 70 y� y ,,' L•• ; ' IIwr11� '� .. 1 it •, E wn . u f l Pluunl Hill✓ ISe PinA Hill �� /• '.J: EI�N . \ / ,`fHOFMANN Hill`/ I eulvill I PileH Drrr1 S/ ID RlcDl tndill 1 1.•,FORES' I I OUnbin Cud^. i�^: f0in hlDvine Mlle, JNellur 7 '0 -rN t ,E itlnN " r / u NDIIYriI p Der pppII Milli lli CN. / y5 L + MIriD. OlYmoii;lpdue BeID010 'tile, 7B A dfnD^P A M L Bern J� A•,^'�' My ei Lil D\ R gtiiyn I. ry n t/ S ITE' `P --v- ecslirilhl---' RF rQlle CROAiAN c'..t ' •• �r r rnnei r e. n•"'•O, n .r_ �.. Rirey -Such LnA' I. V lr C�. NAT N L ! •�� t '' 1 ERis Rim•m Hulo.e�� 'i•I Nr JDn,C C\ 70 fe Omt � A u . R ,,st� +I2culuity Fo EST SiIveQJ J q Ir 1 'm el' 15 Cs Pele tier �,�, �iiti:l;: If - j 0Mi0wt PvII m 'Oce n '• t 11ieIQ OBesPPt•loi LeJ +lei' .�\, A It+ 71 _ DeU Q PincJol \ Rt.,'n<Y Teen,.. n IlS/ jH.n pui 5nvn • \bSl ILnc :n: Fe Hu\ 0 BfY Z So m /� —/ 1je Ilfl BucD I I� \ _ \•eID` �: 4. CJHl1lIfVNI a7✓ Lln` IQI Q 1 ID 4 A; A. • � {.•� • � l I y wurNl us! �lr._., /.IL1e Bc. cA f� is .,,w ed •'o il. HGr,! oil Hill 10 10 C/ Oieon AIn 0 10 10 JO 12 y , I 4 BE PROJECT al O NES. o r J1D1 i• -` 1 UK U22.� ; . ENU PROJ _D, P —6319 24 st e r: — Al. ' r ..i N.C. DEPT. OF TRANSPORTATION t - DETOUR ROUTE DIVISION OF HIGHWAYS CARTERET- JOKES COUNTIES PROJECT 8.1161101 (B-1104) BRIDGE OVER HUNTERS CREEK CARTERET CO. BRIDGE NO. 30 SHEET I OF 4 15 CL z THEODORE E. MORRIS • rn ' PROP. FILL - TO MAYSVILLE :..- -11-- - y- `- ---I-- --L TO KUHNS i ---- - ---- F - v -- EXIST. FILL + i SCALE 1 50 \ 0 2 U MARY T.MORRIS N.C. DEPT OF TRANSPORTATION DIVISION OF HIGHWAYS CAPTERET- JONE5 COUNTIES PROJECT 8.1161101 (B-1104) BRIDGE OVER HUNTERS CREEK CARTERET CO. BRIDGE NO. W SHEET 2 OF 4 i 13foo /y+oo /S+oo- /6+60 17+00 -(J.04r7% Cv'�m e • L2 �' � - - - - - � EUA SS�C+ rl•9' kl I NoR1A9 WrERSU2fRC- � hLA 5cpu Holz. ! 5G vEKTiCr� . I = 10, sAX- ar1r."9 sWA TCR to JJ N.C. DEPT OF TRANSPORTATION DIVISION OF HIGHWAYS CARTERET= JONES COUNTIES PROJECT 8.1161101 (8-1104) BRIDGE OVER HUNTER'S CREEK CARTERET CO. BRIDGE NO, 3O SHEET _-_ OF 9 20 N N 13+-50 16.50 PROP. FILL PROP, FILL 30 20 10 0 1I0 20 30 SECTION A -A N.C. DEPT. OF TRANSPORTATION SITE QUANTITIES DIVISION OF HIGHWAYS FILL IN W%TLANDS�03AC CARTERET- JOKES (qv 4 ) S. to FILL BELOWyO•H.W. _Cy C4UNT1L TOTAL FILL 400 Cy PROJEF T 8.I 161 IOII (B; 1104) r BRIDGE OVER HUNTERS CREEK CARTERET CO. BRIDGE NO. 3O HORIZ. AND VERT. SHEET 4 OF 4 SCALE -- ----.-.... _ - - --.. State of North Carolina Department of Environment, Health, and Natural Resources 512 North Salisbury Street • Raleigh, North Carolina 27604 James B. Hunt, Jr., Governor January 25, 1993 Mr. B. J. O'Quinn NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P. O. Box 25201 Raleigh, NC 27611 Dear Mr. O'Quinn: Jonathan B. Howes, Secretary The Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located on NC Highway 58 and Hunters Creek, at Bridge #30, near Kuhns, on the Carteret/Jones County line, NC It was received on January 14, 1993 , and appears to be adequate for processing at this time. The projected deadline for making a decision is March 31, 1993 An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this.notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any P.O. Box 27687, Raleigh, North Carolina 27611 7687 lclephunc 919733 4994 Fax f 919 733-0513 An Equal Opptmunny Affirmative Action Employe January 25, 1993 Page #2 questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Cordially yours, Ja L. Mercer I Field Representative JLM/dh Enclosure cc: John Parker Charles S. Jones N. C. DEPARTMENT OF TRANSPORTATION TRANSMITTAL SLIP TO: FROM: ❑ NOTE AND FILE NOTE AND RETURN TO ME ❑ RETURN WITH MORE DETAILS CI NOTE AND SEE ME ABOUT THIS ❑ PLEASE ANSWER ❑ PREPARE REPLY FOR MY SIGNATURE ❑ TAKE APPROPRIATE ACTION COMMENTS: DATE I" V 1`IJ REF. NO. OR ROOM, BLDG. Tcm REF. NO. OR ROOM. BLDG. ❑ PER OUR CONVERSATION ❑ PER TOUR REQUEST ❑ FOR TOUR APPROVAL ❑ FOR YOUR INFORMATION ❑ FOR YOUR COMMENTS ❑ SIGNATURE ❑ INVESTIGATE AND REPORT STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 JAMES G. MARTIN GOVERNOR JAN141993 DIVISION OF HIGHWAYS THOMAS J. HARRELSON January 8, 1993 WILLIAM G. MARLEY, JR., P.E. SECRETARY STATE HIGHWAY ADMINISTRATOR Office of Coastal Management Department of Environment, Health and Natural Resources P.O. Box 27687 Raleigh, North Carolina 27611 ATTENTION: Mr. John Parker Dear Sir: SUBJECT: Carteret -Jones Counties, Proposed Replacement of Bridge No. 30 over Hunters Creek on NC 58 near Kuhns, State Project 8.1161101, TIP No. B-1104. The North Carolina Department of Transportation proposes to replace Bridge No. 30 over Hunters Creek on NC 58 near Kuhns on the Carteret County and Jones County line. The proposed action will involve replacing the existing bridge structure with a 150' long by 30' wide bridge. The proposed replacement bridge will be of the same elevation as the existing bridge and will provide for a slightly wider underbridge opening. This bridge replacement will take place on existing alignment and local traffic will be detoured along existing roadways. The new structure will span from bank to bank. In order to facilitate a slightly longer bridge structure, NCDOT proposes that a small amount of material be excavated from behind the present bridge abutments (see Permit Sheet 3 of 4). The new shoreline will be stabilized with Class B stone. The proposed action will not lead to encroachment into Hunters Creek, nor will clearance under the bridge be reduced. The proposed bridge construction will impact 404 jurisdictional wetlands only. On December filth, 1992, NCDOT personnel met with NCWRC representatives and NCDCM representatives. During this meeting, the proposed project was outlined. Also stated was that due to the small amount of non -coastal wetland impacted (less than 0.03 acres) and limited opportunities for on -site mitigation, NCDOT is not proposing any active mitigation to offset wetland losses at this site. No strong opposition was expressed by either agency to the project as proposed. Best management practices will be implemented to minimize any adverse effects which may be caused by project -related sedimentation. NCDOT is requesting that the proposed work be authorized under the appropriate Coastal Area Management Act (LAMA) permit. By copy of this letter, we are also requesting issuance of a 401 Water Quality Certification from the N.C. Division of Environmental Management and a Section 404 Permit from the Army Corps of Engineers. Included for your information is a permit application and permit drawings (4 pages). A processing fee of $250 is also included. If we may be of further assistance, or if you require any additional information, please contact Doug Huggett at (919) 733-9770. Sincerely,, eJJrLAe lyN B4'J. O'Quinn, PE Assistant Branch Manager Planning and Environmental Branch cc:vl�r. Jim Mercer, DCM Field Representative District Engineer, COE Mr. John Dorney, DEM, DEHNR (7 copies) Mr. Kelly Barger, PE, Project Management Unit Mr. Don Morton, PE, Highway Design Branch Mr. A.L. Hankins, PE, Hydraulics Mr. John Smith, PE, Structure Design Mr. Rick Shirley, Division 2 Resident Engineer JAMES G. MARTIN GOVERNOR THOMAS J. HARRELSON SECRETARY STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 January 12, 1993 Mr. John Parker Division of Coastal Management Department of Environment, Health and Natural Resources 225 N. McDowell Street Raleigh, North Carolina 27611 DIVISION OF HIGHWAYS WILLIAM G. MARLEY, JR., P.E. STATE HIGHWAY ADMINISTRATOR SUBJECT: Carteret -Jones Counties, Proposed Replacement of Bridge No. 30 over Hunters Creek on NC 58 near Kuhns, State Project 8.1161101, TIP No. B-1104. Dear John: Enclosed you will find payment in the amount of $250.00 for the processing of the CAMA Major Development permit application for the above referenced project. The application package was sent to your office on January 13, 1993. Thank you for your assistance. encl: ck # 410162 Sincerely, /fir i Dennis Pipkin, PE Wetland Mitigation Specialist Environmental Unit Planning and Environmental.Branch An Eoual Opportunity/Affirmative Action Employer 410162 11' IINL.Vnr(CE:, „tl UHIV I WARRANT NO. DEIIATITM17NT OF TnANSPO[ITATION DATE 1 1 64 CONTHOI_LM's 0FFICF e,1n4 1. 1 CODE INVOICE NUMBER DATE P O DERE NUMBER AMOUNT DISCOUNT NET AMOUNT , F � , I , � I , , , I 250 00 1 ' I TOTAL ; �F.. REMARKS: PROJECT NO. 8.1161101 *SEE RLVERSE SIDE OF STI IR Ma enncl v� vow, uGrvnC uCrVJ1111VU . - 66-1059 STATE OF NORTH CAROLINA 531 DEPARTMENT OF TRANSPORTATION -- RALEIGH, NORTH CAROLINA' Warrant NO. 410162 . PAY TO MO. I DAY YR. AMOUNT THE ORDER OF. '> - ..- I ' N.C: ENVIRONMENT, HEALTH AND 2-22 2 NATURAL RESOURCES $**"*`'>rl OO DIVISION OF COASTACMANAGEMENT PO Pox 27687 _ RALEIGH , NC 2761 1-7687` PRESENT TO: STATE TREASURER PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM 6'►.10162a• 1:0531i0594: S11100011160Lilm 'I EMO DATE: SUBJEC 0, /Z' I'm, U O�2%%L �15a -ZOa aV2 pU�yr�`s�si_ _0'i4ne, ae- /co no North Car ina Depart ent of Environment, � Health, and Natura Resourc s � Jv 1 z THEODORE E. MORRIS JUNIL'S . GODWIN J ' -I PROP FILL F_ T T TO MAY 5 8 -. _ .--� - - - y -_ _ `= T -1 -� - - - - I' �� TO K, U H N S --- - - „� -?•pD, , i - - - - - - a,I, o J, d F EXIST. FILL - i `-� M A R Y T.M0RRIS� 1 N.C. DEPT. OF TRANSPORTATION! DIVISION OF HIGHWAYS I CARTERET— JONES COUNTIES SCALE I"= 50' \ PROJECT 8.1161101 (B-1104) BRIDGE OVER HUNTERS CREEK CARTERET CO. BRIDGE NC, 3C SHEET 2 OF 4 ♦ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS P. 0. Box 1587 Greenville. N. C. 27835 August 23. 1993 Phone (919-830-3490) STATE PROJECT: 8.1161101 F. A. PROJECT: BRS-2352(5) COUNTY: Carteret -Jones DESCRIPTION: Grading. Drainage. Over Hunters Creek of Kuhns. Sanford Construction Comoanv P. 0. Box 3427 Sanford. N. C. 27331 Gentlemen: Paving. Guardrail. and Structure and Approaches on NC 58 Northwest The Preconstruction Conference for the above proiect is scheduled for Friday. August 27. 1993 at 10:,00_-A X .-in the Resident Engineer's Office located at 601 S Glenburnie Road i�n New Bern. N.C. Sincer v. E. B. Latham. P. E. Division Construction Engineer EBL:WCR cc: Mr. L. A. Sanderson. P. E. Mr. R. W. Reaves. P. E. d �1/etf Mr. J. C. Manning. P. E. Mr. H. L. Davis. P. E. Mr. C. W. Jr. Ever Mr. A. C. Everett Mr. R. E. Davenport. P. E. Mr. T. M. Sherrod Ms. Susan Moore Rose Mr. John Wadsworth. FHA Ms. Shervl T. Covington. Office of Civil Rights Mr. Charles Jones. N. C. Division of Coastal Management Mr. Norm Sanders. Corps of Engineers. Department of the Armv File