Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
79-15 TJ's Land Development LLC
4 =h Permit -Class NEW Permit Number 79-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to TJ's Land Development, LLC., PO Box 125, Pantego, NC 27860 Authorizing development in Beaufort County at adi. Pungo Creek, off SR 1718, Yeatesvi Ile Road. near Belhaven , as requested in the pemuttee's application dated 5/5/15, including the attached drawing (1), dated revised 2/10/14 This permit, issued on August 4, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location, and a representative of the Division of Coastal Management shall meet on -site with the permittee to ensure that the required pumpout facility is in place and operable. The pumpout facility shall be operable and maintained for the life of the marina. 2) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from each of the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered. hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program, Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources -Commission. CCY if I/ ,�_Oil---Braxton C. Davis, Director `"'Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-15 Page 2 of 4 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) The permittee shall provide a Spill Prevention Control and Countermeasure plan to the Division of Water Resources before fueling facilities are constructed and shall supply a copy of the plan to the Division of Coastal Management. 5) Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 6) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 8) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 9) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 66 docking spaces. At no time shall more than 66 vessels be moored or docked at the marina facility. Easement 12) The permittee may be required to apply for a submerged land lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. a A TJ's Land Development, LLC. ADDITIONAL CONDITIONS Uuland Development Permit # 79-05 Page 3 of 4 13) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the campsites, bathroom facilities, laundry mat, store, reception venue, pond modification with associated bullhead, and required access infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 946- 6481 for this determination. Sedimentation and Erosion Control 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 15) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 16) No Coastal Wetlands shall be excavated or filled, even temporarily. 17) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 18) No open water areas shall be excavated or filled, even temporarily. 19) This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any authorization required from the NC DEMLR Stormwater Section. TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-05 Page 4 of 4 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division of Coastal Management at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that, in accordance with the rules of the Environmental Management Commission, many non -water dependent activities are not authorized within 50 feet of the normal water level or landward edge of any coastal wetlands, whichever is more restrictive. Contact the Division of Water Resources at (252) 946-6481 for project specific clarification. NOTE: The N.C. Division of Water Resources has authorized the proposed project under General Water Quality Certification No. 3900 (DWR Project No. 14-0275 V2), which was issued on 7/8/15. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 201501116. Permit Number 79-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 _ Excavation and/or filling pursuant to NCGS 113-229 Issued to U's Land Development, LLC., PO Box 125, Pantego, NC 27860 Authorizing development in Beaufort County at adi. Pungo Creek, off SR 1718, Xeatesville Road. near Belhaven , as requested in the permittee's application dated 5/5/15. including the attached drawing (1), dated revised 2/10/14 This permit, issued on August 4, 2015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe suoject to rmes, imprisonment or ctvtt action; or may cause me permit to oe min ana vora. Marina 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location, and a representative of the Division of Coastal Management shall meet on -site with the permittee to ensure that the required pumpout facility is in place and operable. The pumpout facility shall be operable and maintained for the life of the marina. 2) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from each of the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources.Cot�t mission. I C Y VZY. Y // -tQr Braxton C. Davis, Director "bivision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-15 Page 2 of 4 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) The permittee shall provide a Spill Prevention Control and Countermeasure plan to the Division of Water Resources before fueling facilities are constructed and shall supply a copy of the plan to the Division of Coastal Management. 5) Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 6) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 8) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 9) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 66 docking spaces. At no time shall more than 66 vessels be moored or docked at the marina facility. Easement 12) The permittee may be required to apply for a submerged land lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. TJ's Land Development, LLC. ADDITIONAL CONDITIONS Upland Development Permit # 79-05 Page 3 of 4 13) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the campsites, bathroom facilities, laundry mat, store, reception venue, pond modification with associated bullhead, and required access infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 946- 6481 for this determination. - Sedimentation and Erosion Control 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 15) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 16) No Coastal Wetlands shall be excavated or filled, even temporarily. 17) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 18) No open water areas shall be excavated or filled, even temporarily. 19) This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any authorization required from the NC DEMLR Stormwater Section. TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit ff 79-05 Page 4 of 4 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of.the Division of Coastal Management at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that, in accordance with the rules of the Environmental Management Commission, many non -water dependent activities are not authorized within 50 feet of the normal water level or landward edge of any coastal wetlands, whichever is more restrictive. Contact the Division of Water Resources at (252) 946-6481 for project specific clarification. NOTE: The N.C. Division of Water Resources has authorized the proposed project under General Water Quality Certification No. 3900 (DWR Project No. 14-0275 V2), which was issued on 7/8/15. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 201501116. WX MP-1 APPLICATION for Major Development Permit (last re rlssd 1227/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/LandownerInformation Business Name .r / �R tic Project Name (if applicable) W Q 4awr, - ,yam Applicant 1: First MI Last Name Iy UT. erre z) rc Applicant 2: First Name MI Last Name ,� / /� /w � / AA A if additional applkw ts, please ~ an additional pages) wNh names listed. Mailing Address PO Boor / 2- T State ZIP 27 ntry 192,alv,�rosz- Phone No. KT 667 FAX No. - ^l /9- Street Address (if different from above) 7/� J r z6���svo city State �c ZIP z�glo Email Z Agenf/ n FoilM ArrAc#eJ Business Name. I � � a Aq Agent/r 1 ; First Name MI L, Last Name i 44fo oj� Agent/ Contractor 2: �,Fi/rst Namme MI , Last Name -Y Mailing Address 7 / /o WAS %/'iRrK See t pp Box /L� Citrr PY (j/// 1�1C State �wll/c ZIP J1 Phone No. , 2//z_3 Phone No. , C/4 a>a FAX No. M! ^^ CordraciorNN# ,r1A Street Address (if diffewd from above) %� City n/ State / / X/ ZIP A /,/'T ' 1 / s/� Email A/Z soil A RECEIVED _6 6bf m p il, CJ.,� <Form continues on back> Hr W,,Nnu>..u.r. 252-808-2.808 .. 1-888-41RCOAST .. www.nccoastalmanagement.ne` Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit I Project Location Count' (can be multiple) Street Address State Rd. tt vteoAr ei}rf�c fiij J6iS110 Xu'4J SAM$ Subdivision Name City WA^V,.¢.,F State I 9C Zip 278�a Phone No. 2i7- 3- `6776. Lot No.(s) (lfmany, attach additional page wM list) Lor$,(r)Aw1a6 ofF'fG•��Ac.ces(e a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project — AlMI ie 0 P(r?4" C/te N< a Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. �Natural ❑Manmade ❑Unknown V.4 o Cfe eeK e. Is proposedd� "O°rk within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No !(�� work falls within. Be*v.eo1%r Covwr 4. She Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) SfY Fret- Yf6 y719Cne.r c. Size of Individual lot(s) CA 04,004 PA role, TV P I' L A L � o x 70 h a ¢ r d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water leveq (If many lot sizes, please attick additional page with a list) 7 0 (G= a r XVHW or ❑NWL e. Vegetation on tract 4rnrf WQrh*ld l ,¢ram; A yfr►firie o/tQ 33.SZ �c?ces 6f 4Ftn/y a.gNo ES d1 4f /j c�ces OF AJOY •ad CA"if (ti Wxrin,vas at /+t S�6Trd s WerILAK1 f. Man-made features and uses now on tract F'.vZ M ) .4 r /} .4 d Fr l l r iz r /w r rV 'NY g. Identify and describe the existing land uses da aceni to the proposed project site. FAyirI?wy A,40 wood 14-44, It. How does local government zone fhe tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compli nce cerlficate, lapplicable) ❑Yes ONO QkA J. Is the proposed activity pad of an urban waterfront redevelopment proposal? ❑Yes No k. Has a professional archaeological assessment been done for the tract? 8 yes, attach a copy. ❑Yes No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes o ❑NA RECEIVED National Register listed or eligible property? MAY 2 7 20t <Form continues on next page> W( 1.1-01 iH > 141; 60) r `� 252.808.2806 .. f-888.4RCOAST .. www.nccoastaimanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (if Are there wetlands on the sne? Yes []No (ii) Are there coastal wetlands on the site? I Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? as ❑No (Attach documentation, ifavailable) n. Describe existing wastewater treatment facilities. /=Q SR NiLy . mP(e d t-eeri c l'n-ilS -1 o d A 6svny4rrvr. , 6,lt•o/9•9sc yfrRegs 4fte yl�n' drrp�rK� 8,,,�r �Irr•�f oar W;!! b< ig^47- T� fTv/Lt�e rAKlC r�� I'f s9 �fux��rpnl tewnf..e Y/Z��rYHQ�vf /�^�r• o. Describe existing drinking water supply source. ^v +N r L y eK C. .H xjNfe wot re.,L Will bf.arwli WN wAr4A--rvA p. Describe e6ting storm water management or treatment systems. fToKIN w^rr,• WO /l k j04AP,� tl� i ACRE -fit -49k141 5. Acdvffles and Impacts a. VO the project be for commercial, public, or private use? Commercial ❑Public/Govemment iN ¢Ic E L KK W ❑PrivaWCommunity b. We a brief description qo�j purpose, use, and daity operations of the when complete. C — 1`i, - A4PV rNK W.'rM' JAr'SL•l jOS� fTOYK. .!•�ttd ,f-WM M I 1 Po mod, c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. eew,,fr1t✓cr P1e11L.f1J-7 ^t �A/ wN/'eKFiwwt �► /J�9/4,yf, CoAlrT� PICK 44 1gNd vS/w9 hJ6XAve . ^4 01'/e �/ji✓SKr d. List all Development activities_yooutr provov. I Ls�frnu.(r C�)f"f/Q�'%�I1/tI�/ SWIMleaf PJrfd A4C1 /le/biv4/ by A r S"' Jkf. e. Are Om proposed activities ma'vdenance of an existing project now work, or both? 1144,) Wry K K, f. What is the approximate total disturbed land area resulting from the proposed project? ❑Sq.Ft or ores 3•rz Crto n►� C G.Il• COMA WarIAN d J L9•1 V W& *Nd g. Will the proposed project Anoniach on any public easement, pudic accessway or other area ❑Yes Ro ❑NA that the pudic has established use of? h. Describe location and type of existing and proposed discharges to Ovate of the stale. ,fV ce NI/+ rc^ AV At arrF-) $A.&ar FL�w i. Will wastewater or stommater be discharged into a weyand? es ❑No /�l! 6�S FCdw. 6.�Wda.lfjrr Oma heir, l . ❑NA If yes, will this discharged water be of the same salinity as the receiving water? #1es ❑No ❑NA RECEIVE j. Is there any mitigation proposed? []Yes No ❑NA If yes, attach a mitigation proposal. MAY 2 7 1 <Form continues on back> rdot 15 V'V1Lin j'inr 3 2,12-808-2868 .. 1-888.4RGOASY .. v.; va y°r.ncccas.fzira.r:a Ser,: Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additionallnfonnation In addfhon to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complele. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. d,ro _ a b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously a orized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. rq c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.O "12 AOrt d. A copy of the dead (with state application only) or other instrument under which the applicant claims title to the affected properfies. e. The appropriate application fee. Check or money order made payable to DENR. 0 f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as prod that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised Nat they have 30 days In which to submit comments on the proposed project to the Division of Coastal Management Name ! / Phone No. 'old IS76ff VSµc4Hwly ?e 61S5 B t& A& 27t1o3� Name �//t� ��09/'1 S , i.L /� �w�-p Phone No. TINT Address Y1. &aa fdti(f wAy a.+r�i / `e �r Z %p �� Z,� �Z- l I Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract Include permit numbers, pernittee, and issuing dates. /�Stvhl.4No .f'�d twrearATY�ry �f.rtn.il •ge��C.1olS oo? /L / /y—oZ75- V, 2.tv s i A4 ' e if o — do h. Signed consultant or agent authorization form, if applicable. 77W C r I. Wetiand delineation, ff necessary. .A s�� /1) r-/-- j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) w! I, k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expend' of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act 17. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. 1 further certify at t to information provided in this application is truthful to the best of my knowledge. Date J ) Print Name //W Signature- / 2. Please indicate application attachments pertaining to your proposed project. RECEIVED ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts MAY 8 7 1015 CM MP-3 Upland Development *bbCM MP-4 Structures Information FSt "n}yUFS r 252-80E-2808 .. 1-EEE-4RCCAST .. net TO f L./aw> oavddrAI&AC� GGL Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. rtvae-raRN 14* C.4AAw ti sl, m5 S T6QL W;Tlf c. Density (give the number of residential' units and the units per acre). /t,16 Cpe«iert5 = Z Ze GI3M- gnS e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? �fes ❑No DNA (11) If y s, list the date submitted: N )P- y I" a 9 Att it 6 rl JR-- g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 1414 ig i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. /-F Ss TI�I��f ;tS %v proposed method of sewage disposal. ✓/ avT TO A1-40 k /. L / h! d n- I. Describe location and type of proposed discharges to waters of the state (e.g., surface mnoft, sanitary wastewater, industrial/ commercial effluent, 'wash down' and residential discharges). DF,= Sl +{g/ 14 r-14- e r Wd nttr►- 5'tr'A.S , All R ¢NTA'2- r d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 3 3. sz 4crl-es I. List the materials (such as mad, paver stone, asphalt, or concrete) to be used for impervious surfaces. doirll Co "tale, /tFry %!r Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? Dyes o ❑NA (✓a[tl'-ev ,,Yt i;(4 Ix) � (It) If yes, list the date submitted: F G�pl r'"tiJW� k. Have the facilities described in Item (i) received state or local approval? ❑Yes No DNA L If yes, a ach appropriate documentation. m. Does the proposed project include an innovative stormwater design? `���//// ❑Yes o DNA RECEIVED If yes, a ch appropriate. documentation. MAY 2 7 2015 s , ed: 12126106 m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) l im01au %-o itt Tr�M o. When was the lot(s) platted and recorded? o /v%SOF . /i l/ lH OhrQ yitaul-r Date A` / Project Name Applicant Name Ahm li'y'xd n. (i) Will water be impounded? E]Yes PCI No ❑NA !! (ill If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upend development? C]Yes []No A RECEIVED MAY 7 1m5 l`I44 revised: 12126/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable a. (i) he docking facility/marina: Commercial ❑Public/Govemment ❑Private/Community b. (i) ...W... Will the facility be open to the general public? ®Yes ❑No c. (i) Dock(s) and/or ier(s) K d. (i) Are Finger Piers included? tXYes []NO C 1 (ii) Number K / if2G Length C I►:CI UW3 S If s (ii Number Ito (iii) IN) Width (iii) Length 120 64E6 t (v) Floating N%� ��,,,,,,fv rL7 0ocIL 73°' Cw)Wdth (v) Floating ❑Yes ;qNo e. (i) Are Pladorms included? [k'es []No f. (i) Are BoaUifts included? XIYes ❑No /� If yes: If yes: (ii) Number 3 r�1 / ere I-, (ii) Number O (III) Lengthl � o uC (III) Length (iv) Width ; f E I i A -a1s (iv) width 1'v F 6 i (v) Floating []Yes ;qNo Note: Roofed areas are calculated from dripline dimensions. g. (i) of slips proposed h. Check all the types of services to be provided. 'Nu/mber 66 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing ..✓✓ maintenance service �O 174Dockage, fuel, and marine supplies / uv ❑❑•Dockage CWet slips") only, numberof slips: � r14 ❑ Dry storage; number of boats: _L ❑ Boat ramp(s); number of boat ramps: ❑ Other, please Describe: i. Check the proposed type of siting: ❑ Land cut and access channel []open water; dredging for basin and/or channel *Open water; no dredging required ❑Other; please describe: k. Typical twat length: r ,z I' r t r fi ✓ E K )Y 1 ,R m. i) ill the facility have tie pilings? Wes ❑No (ii) If yes number of be pilings? -tLo I j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). I. (i) Will the facility be open to the general public? Yes ❑No MAV 2 10?5 7 b=o rti DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS a. liPeck each of the following sanitary facilities that will be included In the proposed project. Office Tolets /Toilets for patrons; Number. �; Location: O 1• ,ty Showers yBoatholding tank pumpout; Give type and location: 1 f io k b. Describe treatment type and disposal location for all sanitary wastewater. A 11 / .11 1 M ` t* *A411 tV. How will overboard discharge of sewage from boats be controlled? l .. e. (1) Give the location and number of 'No Sewage Discharge' signs proposed. 6 S f fw t Z. .4 r oe.* &l e.4 d r4, Di []This section not applicable h rt� tw �0/'t�l K fTvK�, M rye Cail/rne! De4nK (ti) Give the location and number of'Pumpout Available' signs proposed. 4r rH e SA Aug, l0-c'11 's'.4 dArcw, kd lw ,� Ce)(r) I. Describe the special design, If applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. l�D 6 ekt' I-1z4A IKS n./lvwAo� klv-Zx'404-t vcy .eI e, WW K, 11 Ay 11* 10l4A.rl Tu Ze.. A.etKOIAA dy,DarcroN erg/ I«ry �ceyv.�lKji g. Where will real a from ve set maintenance be disposed of? /1 // e Ar t: ro 4-e 1P-V&AAC. �Ftfie S�the dp.Cndo+y MAI<Iwf 1-411411V i It. Give number of charm markers an No Wake" signs proposed. �_ 1. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. A,.-/ sTv r4a.,._ w. & W- aiv 4 �`� k V^jwc(, o✓r 4 -*k 4eaJ Zch'&. w I rH P /r-C T P j7e� F"c1,iy irzcic ; j. What will be the marina policy on overnight and live-abbard docks? rbo IjVAs & J0AA.j ,t/(t .v, ©veJt A/ �r ,�.,ulrec UT jiAt. dAvr D.2,.mL,# U<, k. Describe design measures that promote boat basin flushing? �' k e, (S Al A- 6.-4' j- 6 A+.il;V % RECEIVED MAY 2 7 2M I. If this project is an expansion of an existing marina, what types of services are currently provided? DCM-MW3 F'tO 0 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanauement.net revised: 12127106 %f -FOFM-DCM MP-4 (structures, Page v at h) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑ pp Yes No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes b(No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)7 If any boxes are checked, provide the number of square feet affected. 11LI346 ❑❑ SAV SB '$Jkl§6 ❑None — p. Is the proposed marina/docking facility located within or within dose proximity to any shellfish leases? ❑Yes )(No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. HIA 3. BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Rooted areas are calculated from dnpline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) (This section not applicabb a. () Number (i) Length (ii) Width 5. BREAKWATER (e.g., wood, sheetpae, etc.) iN This section not applicable a. Length b. Average distance from NHW, NWL, orwetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS This section not applicable a. Is the stmdure(s): ❑Commercial ❑Public/Govemment ❑PnvatelCortmunity C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. b. Number d. Description of buoy (color, inscription, size, anchor, etc.) �9VED MAY 2 7 1% e. Arc of the swing DCM-ivlHl9 f"� 1 252-808-2808:: 1-888-4RCOAST: —1 C06 • Forth DIvM MP-4 (Structures. Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines t (So F^oWI errc4 9 dsa«re,, Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body v e. (I) Will navigational aids be required as a result of the project? Oyes o ❑NA (it) If yes, a lain what type and how they will be implemented. b. Pmximity of structure(s) to adjacent docking facilities. ep/tc >#A#y cro Faor� iHG 10 d. Water depth at waterward end of structure at NLW or NWL & OTHER MThis section not applicable a. Give complete description: Date 7-,Ts A N ��✓ ��o�, e^'�' LG C Project Name r3brjy f. 7errenray, fY/Rti�9ye/t, Applicant Name /AJg,;rJ ` Applicant S' RECENEO MAY 29 IM DCN,4,pHD C'V (b 252-808-2808 :: 1-888-4RCOAST : www.nccoastalmonanement.net revised: 12127/06 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: TJ's Land Development, LLC 2. LOCATION OF PROJECT SITE: Project site is located off SR 1718, Yeatesville Road, in existing farmland adjacent Pungo Creek near Belhaven in Beaufort County, North Carolina. Photo Index - 2006:117-8454; J-6 2000:117-1473; J-5 1995:117-1271; K-16 State Plane Coordinates - X: 2,669,200 Y: 646,200 Pantego Quad. (lower left comer) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 29 August 2013 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received — 20 May 2015 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP — Rural with Services (B) AEC(s) Involved: PTA, PTS, CW (D) Water Dependent: Yes (D) Intended Use: Campground with, associated marina. (E) Wastewater Treatment: Existing - None. Planned - Individual Septic (F) Type of Structures: Existing - None Planned - 106 camp sites, septic system for camp sites, 66 slip marina with fuel and pump and haul wastewater system. (G) Estimated Annual Rate of Erosion: Unknown HABITAT DESCRIPTION: [AREA] DREDGED FILLED • 1 ' (A) Vegetated Wetlands 1,760 ft2 (Coastal Wetland shaded) 2, 600 ft' (Wooded 404 shaded) (B) Non -Vegetated Wetlands 9,478 W(Shaded Creek Pungo Creek bottom bottom) (C) Other 33.5 acres Uplands (D) Total Area Disturbed: 1,473,969 ft2 (33.8 acres) (E) Primary Nursery Area: No (F) Water Classification: SC NSW Open: NO RECEIVED MAY 8 7 20b b[`.R xswl h-t" 8. PROJECT SUMMARY: The applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washer and dryers, and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. TJ's Land Development, LLC Pungo Creek Beaufort County Project Setting The 46.5 acre project site is located off SR 1718, Yeatesville road, adjacent Pungo Creek near Belhaven in Beaufort County, North Carolina. The most common land use near and adjacent to the project site is agriculture, with some scattered single family residences. The site consists of 33.5 acres of uplands that is currently used as row crop farmland and 12.9 acres of wetlands. The familand has an elevation of f7' above the normal water level (NWL) and consist of sandy loam soils. At the east end of the field is a borrow pond next to a broad expanse of scrub shrub wooded 404 wetlands that transition to a Coastal Wetland marsh adjacent Pungo Creek. This wetland area is approximately 540' wide between the uplands and the normal water level (NWL) of Pungo Creek. The wooded portion of the wetland is vegetated with bald cypress Taxodium dutichum , red bay Persa borbonia , dead and stressed loblolly pines Pines taida , wax myrtle ica ceri erra and red cedar Juni eras vir 'niana . The wooded wetlands transition to an herbaceous Coastal Wetland marsh vegetated with black needlerush Auncus roemerianus), sawgrass Cladium iamaicense), and giant cordgrass S artina cynosuroides). There is an unnamed tributary off of Banjo Creek, a tributary to Pungo Creek, whose channelized head waters traverse the existing project site/field. The channelization was undertaken most likely to improve agricultural drainage. An unimproved dirt road was constructed through the field to the existing borrow pond during the winter of 2013/14. This road crossed the channelized stream with a 36" culvert pipe. An "after -the -fact" 401 Water Quality Certification from the Division of Water Resources and a Nationwide Permit 14 from the US Army Corps of Engineers authorized this improvement. The project site has 854' of Coastal Wetland marsh shoreline adjacent Pungo Creek. Water depths in Pungo Creek range from 3' at the marsh edge to +5' below the NWL approximately 150' offshore. The Environmental Management Commission classifies Pungo Creek at this location as SC NSW and the NC Wildlife Resource Commission as Inland Waters. This area of Pungo Creek is closed to shellfishing. Project Description A pre -application scoping meeting was held for this project on 21 June 2013 in the Washington Regional Office. The applicant proposes to develop the farmland into a campground with 106 camping sites, that will include supporting infrastructure such as a 50' wide x 150' long building housing full bathroom facilities, laundry mat, store, and a 100 person reception venue. A 66 slip marina is proposed in Pungo Creek as well as a large groundwater fed pond to be used for recreational purposes including swimming. A road system will be constructed to access the camping spaces and other campground and marina facilities. A 90 RECEIVED space parking lot is proposed for the campground building and a 33 space parking lot is propose`OAY 2 7 10b for the marina. Wastewater generated from the campground will be handled by onsite septic Mw."-twmq le14-V TJ's Land Development, LLC Pungo Creek Page Two systems. The marina will have a pump and haul system that will pump to a holding tank near the base of the marina pier from which the wastewater will be trucked to local municipality for disposal. The application did not include any documentation authorizing the proposed methods of wastewater disposal. The 66 slip marina will be accessed by an 8' wide pier of which ±50' is over highground, ±300' is over wooded 404 wetlands, ±240' is over Coastal Wetlands marsh and ±140' over open water. The applicant desires to build the pier 8' wide because of the distance to the slips and the extra width would allow traffic to pass on the pier. The applicant proposes to mitigate for this impact by constructing the pier with the decking elevated 5' above the ground level to reduce the shading impact. The pier will access an 8' wide x 586' long T-shaped dock with 66 slips. The dock will have a square shaped, roofed, platform 30' x 30' at the intersection of the access pier and dock. This platform will support the fueling area as well as the marine pumpout. Two 15' x 30' slips will be designated for use by boats fueling or pumping out onboard holding tanks. There is also proposed 2-25' x 25' roofed platforms at each end of the dock. There will be 24- 18' x 40' slips with a "stern to" orientation on the offshore side of the dock accessed by 14-3' x 20' finger piers. The inshore side of the dock will have 40-10' x 10' boat lifts accessed by 22-3' x 20' finger piers providing access to the boatlifts. The existing borrow pond will be modified and enlarged to 3.6 acres. An area of the existing pond will be filled ±50' x 250' for more highground space to accommodate camping spaces and the perimeter road around the campground. Fill generated from the pond excavation will be used onsite to build up the existing ground elevations where they do not meet the base flood elevation. Fill dirt will also be sold and trucked offsite. The applicant states that a mining permit application has been submitted to the Division of Land Resources. The applicant plans to construct a bulkhead around the perimeter of the pond. An 8' wide pier system with a covered platform and a 20' x 40' T-head platform are proposed to be constructed in the 3.6 acre pond. The pond will be pumped out to prevent putrefaction pumping the pond water to highground with sheetflow of more than 50' into ditches. Project Impacts The development of the campground spaces and associated infrastructure including the pond excavation will disturb 33.5 acres of uplands. The access pier over wetlands will shade 2,600 ftz of wooded wetlands and 1,760 ftz of Coastal wetlands. The proposed dock, platforms and finger piers will shade 9,478 ftz of Pungo Creek bottom. Construction of the pier, dock and slips will result in some localized short-term turbidity. The marina will increase boat traffic in Pungo Creek and their associated impacts. Steve Trowell — Washington Regional Office — 20 May 2015 RECEIVED MAY 27 1011 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Tobin J. Tetterton County: Beaufort LOCATION OF PROJECT: Off of SR 1718, Yeatesville Rd., in existing farmland adjacent to Pungo Creek near Belhaven in Beaufort County, North Carolina DATE APPLICATION RECEIVED COMPLETE BY FIELD: 20 May 2015 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Steve Trowell DISTRICT OFFICE: Washington DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE RECD: $ 400.00 (100% or 60/40) C) PUBLIC NOTICE RECD: END OF NOTICE DATE: ADJ. RIP. PROP NOTICES RECD: 7 / DEED RECD: C&VED APPLICATION ASSI T : G—X k[,ON: 1S 7 �� 75 DAY DEADL 50 DAY DEADLINE: MAIL OUT DATE: FEDERAL DUE DATE: STATE DUE DATE: FED COMMENTS RECD: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON CS"r4-A:IJt4 hN,i AGENCY DATE COMMENTS RETURNED OBJECTION S: YES NO NOTES Coastal Management - Regional Representative OIN S Coastal Management - LUP Consistency Division of Community Assistance Land Quality Section Division of Water Quality Storm Water Management (DWQ) State Property Office Division of Archives & History Division of Environmental Health Division of Highways Wildlife Resources Commission v/ Local Permit Office Division of Marine Fisheries Corps of Engineers 5 � zolso�llb grit) Memorandum To: Daniel Govoni Through: Kelly Spivey From: Steve Trowel Date: 20 May 2015 Subject: Us Land Development LLC Major CAMA Permit Application Enclosed is a Major CAMA permit application package submitted by Mr. Hood Richardson on behalf of Mr. Toby Tetterton with Us Land Development, for the construction of a campground to be sited in an existing ag field and a 66 slip marina in Pungo Creek located off SR 1718, Yeatesville Road, near the Town of Belhaven in Beaufort County, North Carolina. This project was reviewed and discussed at a 21 June 2013 scoping meeting conducted in the Washington Regional Office. There were no significant objections or issues identified by the review agencies during this meeting. The marina will offer a pumpout to handle disposal of onboard waste water utilizing a pump and haul system. The marina will have a "no live aboard" policy. The marina will provide boat fueling services and there was no information in the application package concerning plans to handle fuel spills. Water depths at the proposed marina site are 5' or greater so there are no submerged aquatic vegetation issues and water depths will support the size vessels anticipated at this facility. Staff has reviewed the applicants project applying the use standards found in 7H.0207, 7H.0208 and most specifically those found in 7H.0208(b)(5)(A)-(Q) and 7H.0208(6)(A)-(J) and have found that the applicant's proposal is consistent with the exception of 7H.0208(b)(6)(C) that limits piers and docking facilities over Coastal Wetlands to 6' in width. The applicant is proposing an 8' wide access pier over wooded 404 wetlands and Coastal Wetlands. I feel this inconsistency can be handled by permit condition restricting the width over wetlands to 6'. Also, the marina will offer fuel services. Therefore, I feel the permit should be conditioned that an Emergency Fuel Spill Response Plan be submitted prior to DCM for approval prior to occupancy of any slip. These additional permit conditions along with the standard erosion control and marina development conditions, should prevent any inconsistency in the Divisions rules for marina development. Therefore, barring any significant objection to the project from the other state and federal regulatory or review agencies, staff recommends issuance of the permit. RECEIVED MAY 2 7 70b Pat McCrory Governor North Carolina c. t5. 05. 2z. oL� A��A �CDETIR Department of Environment and Division of Coastal Management Natural Resources Donald R. van der Vaart Secretary TO: Mrs. Maria Dunn NC Wildlife Resources Commission FROM: Daniel Govoni Respond to Daniel Govoni Major Permits Processing Coordinator Coastal Management Division Morehead City Office 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. Signed I . na�A n� WC This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. 943 Washington Square Mall, Washington, NC 27889 252-946-6481 \ FAX: 252-948-0478 Internet: www.nccoastalmanagement.net An Equal opportunity 1 Affirmative Action Employer - Made in part by recycled paper RECEIVED JUN 0 8 2015 M-"-InH F-" a North Carolina Department of Administration Pat McCrory, Governor Bill Daughtridge, Jr., Secretary June 5, 2015 To: Daniel Govoni Major Permits Processing Coordinator From: Joy Waym Property Real A Re: CAMA /DREDGEPermit Application Review Applicant — Tobin J. Tefferton 66-slip marina State Property Office Reply: The project will require a Submerged Land Easement provided that it is confirmed that the applicant is a riparian fee owner and can qualify for a submerged lands easement. Please confirm that the proposed facilities are not located within the USACE AIW W 1000' easement area. RECEIVED SUN 11205 M Mailing Address: Telephone (919) 807-4650 Location: 1321 Mail Service Center Fax (919) 733-1431 116 West Jones Street Raleigh, N.C. 27699-1321 State Courier #52-71-78 Raleigh, North Carolina An Equal Opportunity / Affirmative Action Employer Web: http://w .ncspo.org NCDENR North Carolina Department of Environment and Division of Coastal Management Pat McCrory Governor hTJ I aiure) ; Fill :IlIt1„ I TO: Mr. Tim Walton Director State Property Office Natural Resources R EC �pn0t7.1 van der Vaart � � �/ �,�retary MAY 2 2 20'` DOA STATE PROPERTY OFFICE FROM: Daniel Govoni Respond to Daniel Govoni Major Permits Processing Coordinator Coastal Management Division Morehead City Office 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterion PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. Signed This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946.64811 FAX: 252-948-0478 Internet: www.ncooastalmanagement.net An Equal Opportunity 1 Affirmative Acton Employer - Made in pat by recycled paper RECEIVED JUN I 1 1015 �e�.waiWrlU G1Fv Pat McCrory Governor TO: FROM: w WDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management MEMORANDUM Mr. Lee Padrick Division of Community Assistance Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton Donald R. van der Vaart Secretary Respond to Daniel Govoni Morehead City Office PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. ✓This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed�Date S� ;L F lr^ RECEIVED JUN 01 101 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-64811 FAX: 252-948-0478 Internet: www.ncooastalmanagement.net An Equal opportunity 1 Affirm Bove Action Employer - Made in Part by recycled paper PWA } NCDENR North Carolina Department of Division of Co t I n c Pat McCrory Governor Natural Resources u l% 9 D Donald R. van der Vaart MAY 2 8 2015 Secretary Shellfish $anitatic ME y� & - . , uali y ational Sac' on TO: Ms. Patti Fowler NCDENR Division of Environmental Health FROM: Daniel Govoni Respond to Daniel Govoni Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue --� Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. T This office has no comment on the proposed project. Signed This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. dkk- si-p, W, 5/.Vls RECEIVED JUN 01 1015 943 Washington Square Mall, Washington, INC 27889 W.wruanu Phone: 252-946-6481 1 FAX: 252-948-0478 Internet: www.nccoastaimanagement.net An Equal opportunity \ Afirtnative Action Employer- Made in part by recycled paper (252) 247-3330 fax daniel.aovoni@ncdenr.aov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE Govoni, Daniel From: Bland, Raleigh W SAW<Raleigh.W.Bland@usace.army.mil> Sent: Tuesday, June 30, 2015 2:58 PM To: Govoni, Daniel Subject: RE: Comments (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE TJ's Land Development, LLC 201501116 PGP 198000291 Tier II 30Jun15 Fred Willard 201501013 PGP 198000291 Tier II 30Jun15 Thanks! Congratulations on your MOVE to the 2nd Floor! ---Original Message ---- From: Govoni, Daniel [mailto:daniel.govon!Ccancdenr.govl Sent: Tuesday, June 30, 2015 9:17 AM To: Bland, Raleigh W SAW; Pelletier, Josh R SAW Subject: [EXTERNAL] RE: Comments (UNCLASSIFIED) Any update on: Billy Roughton Fred Willard Tobin Tetterton thanks Daniel M. Govoni Policy Analyst NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 (252) 247-3330 fax daniel.govoni@ncdenr.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Bland, Raleigh W SAW [mailto:Raleigh.W.Bland@usace.army.mill Sent: Thursday, June 18, 2015 7:16 AM To: Govoni, Daniel Subject RE: Comments (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE South Bay Pointe SAW 201501118 PGP 198000291 Tier II PGP 18Jun15 Eastern Carolina Yacht Club SAW 201501117 PGP 198000291Tier II PGP 18Jun15 Thanks! -----Original Message ----- From: Govoni, Daniel[mailto:daniel.eovoni@ncdenr.eovl Sent: Wednesday, June 17, 2015 9:54 AM To: Bland, Raleigh W SAW; Pelletier, Josh R SAW Cc: Huggett, Doug Subject: [EXTERNAL] Comments Hello, just a reminder on some projects I will need comments on soon: Billy Roughton, Dare County South Bay Point LLC, Beaufort County David Bradley, Currituck County Fred Willard, Tyrrell County Eastern Carolina Yacht Club Inc., Craven Thanks! Daniel M. Govoni Policy Analyst NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252)808-2808 2 A&Mi' P�CUM (V i/ 7, f ftutvY?i ry SGt(v ;0:`;r? D 1ts[0'1 ;.I Cussl:?'- F" 4 tr�Crara C�,-aslti P. van dr- 'dazf MEMORANDUME� TO: Ms. Renee Gledhill -Early NC Department of Cultural Resources Archives & History Building FROM: Daniel Govoni Respond to Daniel Govoni Major Permits Processing Coordinator Morehead City Office Coastal Management -Division 400 Commerce Avenue Morehead City NC 28557 � �N�' d J ` 13 DATE: 21 May 2015 t3 SUBJECT: CAMA Application Review APPLICANT: Tobin.f.Tetterton 4't{`v LyV PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT': Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 1 t June 2015. Please contact Steve Trowell at 252A48-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments - Signed It t.tbLO _` LhJ'��� Date ' MAY 'L 7 2015 Pat McCrory Governor NC6 R North Carolina Department of Environment and Natural Resources Division of Coastal Management MEMORANDUM TO: Mr. Shane Staples' Division of Coastal Management 943 Washington Sq. Mall Donald R. van der Vaart Secretary FROM: Daniel Govoni Respond to Dsniel Govoni Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 RECEIVED SUBJECT: CAMA Application Review MAY 2 6 2015 DCM-Rsherles APPLICANT: Tobin J. Tetterton WARD PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creels y Pletrge indicate below your position or v�wpoita on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project When appropnote, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. AThis office has no comment on the proposed project This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date y 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-648fi FAX 252-948-0478 Internet www.naoastalmanagementret An EquN oppodunfly \Aramabve Allan Employer —Made N pad by recyded paper Pat McCrory Governor TO: r1C.DENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Mr. Ken D. Pace NCDOT Roadside MEMORANDUM FROM: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton Donald R. van der Vaart r JUN - 1 2015 Respond to Daniel Govo Morehead City Office PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. 'PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. VX This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed ' Date 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-64811 FAX:252-948-0478 Internet: www.nocoastalmanagement.net An Equal opportunity 1 AfRrmaMAcllon Employer— Made in part by recycled paper North Carolina Pat McCrory Governor e�� NCDENR Department of Environment and Division of Coastal Management Natural Resources Donald R. van der Vaart Secretary TO: Ms. Maureen Meehan -Will District Planner Division of Coastal Management FROM: Daniel Govoni Respond to Daniel Govoni Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip martin in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed projecL When appropriate, in depth comments with supporting data are requested. REPLY y� This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. ll}� S Date I l✓ RECEIVED 943 Washington Square Mall, Washington, NC 27889 MAY 2 6 20b Phone: 252-946-64811 FAX: 252-948-0478 Internet: www.nocoastalmanagement.net nr ��aaury t`t� An Equal opportunity \ Affirmative Action Em&yer - Made in part by recycled paper �r NCDENR North Carolina Department of Environment and Division of Water Resources Pat McCrory Governor June 2, 2015 MEMORANDUM: To: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City, NC 28557 Natural Resources From: Dyk Luben, P.E., Regional Engineer, PWSSNVaRO Subject: CAMA Application Review Applicant: Tobin J. Tetterton Donald R. van der Vaart Secretary Project Location: SR 1718, Yeatsville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, NC. Proposed Project: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. REPLY: This office has no objection to the project as proposed. _X_ This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. RECEIVED AM 06 2015 SIGNED DATE G/ 2 �/S- Public Water Supply Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-64811 FAX: 252-948-00401 Internet: www.ncwater.org/pws/ An Equal Opportunity 1 Affirmative Action Employer L. NOT A CAMA PERMIT WORM North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 8, 2015 TJ's Land Development, LLC Attn: Mr. Tobin Tetterton PO Box 125 Pantego, NC 27860 Donald R. van der Vaart Secretary DWR q 14-0275 Ver. 3 BeaufortCounty Subject: Approval of 401 Water Quality Certification with Additional Conditions Approval of Tar -Pamlico River Riparian Buffer Impacts with Additional Conditions T1's Land Development, LLC - Marina and Infrastructure Dear Mr. Tetterton: You have our approval for the impacts listed below for the purpose described in your application dated May 21, 2015 and received by the Division of Water Resources (Division) on May 26, 2015. These impacts are covered by the attached Water Quality General Certification Number 3900, Tar -Pamlico River Riparian Buffer Rules, and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USAGE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)] Type of Impact Amount Approved (units) Permanent Amount Reduced (units) Temporary Plan location/ Reference Attached 404 Wetland W-1 (Access Pier) 0.05 (acres) 0 (acres) LAMA Permit Figure Coastal Wetlands W-2 (Access Pier) 0.04 (acres) Open Water OW-1 (Access Pier) 0.03 (acres) 0 (acres) LAMA Permit Figure Division of Water Resources -Water Quality Regional Operations Section - Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946&1811 Fax: 252-97"7161 Internet: www.ncdenr.gov An Equal OpporkinilyIAFimadveAdw Employer —blade in pat by recycled pap" TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR814-0275 Ver. 3 401 AND BUFFER APPROVAL Page 2 of 6 OW-2 (Docking Facility) 0.19 (acres) 0 (acres) CAMA Permit Figure Buffers -Zone 1 B-1(Access Pier) 240 (square feet) 0 (square feet) CAMA Permit Figure Buffers -Zone 2 B-2 (Access Pier) 160 (square feet) 0 (square feet) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 3. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certification(s) 3900. [i5A NCAC 02B .0507(c)] Continuing Compliance 4. Pump-outs/Sewage Disposal No sewage shall be allowed to be discharged at any time from boats using the marina. Appropriate signage should be posted prohibiting sewage discharge and providing appropriate waste disposal information. 115A NCAC 02H .0506 (b)(3)] 5. Fueling Facilities Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)] 6. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Washington Regional Office at 252.946.6481 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A] 7. Turbidity Standard TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR # 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 3 of 6 The Permittee shall adhere specially to 15A NCAC 02B .0220 Tidal Salt Water Quality for Class SC Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. [15A NCAC 02B .0220] 8. 521 The permittee shall report to the local DWR Regional Office, within 24 hours, all significant spills as defined under Section 311 of the Clean Water Act (Ref; 40 CFR 110.10 and CFR 117.21) or section of CERCLA (Ref: 40 CFR 302.4). Additionally, the permittee shall report spills including: any oil spills of 25 gallons or more and any spill regardless of amount that causes sheen on surface waters. 9. Number of Slips/Dock Space Use of dock space other than the approved 66 slips is prohibited. Handrails or other devices, including signage, should be used to discourage use of any dock pace other than the 66 designated dockage slips as shown in the approved plan. [15A NCAC 07H .12051 Other Conditions 10. Re Opener Clause TJ's Land Development, LLC and their authorized agents shall conduct their activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. TJ's Land Development, LLC shall require their contractors (and/or agents) to comply with all of the terms of this Certification,and shall provide each of their contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWR may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 21-1.0507(d). Before modifying the certification, DWR shall notify the TJ's Land Development, LLC and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 211.0504. Any new or revised conditions shall be provided to DWR in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR tf 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 4 of 6 11. Any marina project that proposes a pumpout with a storage tank are classified as a Non - Pumpers and will need to obtain a "Non -Pumper" permit from the Division of Waste Management, Solid Waste Section and provide a copy to this Office prior to the construction of the facility. [G.S. 130A-291.1(el)] 12. Fueling at Marina Projects Any marina project that proposes to dispense or store fuel shall provide an EPA approved Spill Prevention Control and Countermeasure (SPCC) plan to this Office before the fueling facilities are constructed. 115A NCAC 02H .0506(b)(3)] 13. State Stormwater Management Plan (SMP) and General Permit NO.NCG190000 Approved by Division Stormwater Program Required You are required to provide one copy of the state stormwater management plan (SMP) and National Pollutant Discharge Elimination System General Permit No. 190000 (NCG190000) approval letters from the Division of Energy, Mining and Land Resources (DEMLR) to the DWR 401 & Buffer Permitting Unit (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification occur. The project must be constructed and maintained in compliance with the approved SMP and NCG390000. After the approval letter is submitted to the Division, the SMP and NCG190000 may not be modified without prior written authorization from DEMLR. If the SMP and NCG390000 are modified in the future, then you shall provide an approval letter for the.modifications to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications. [35A NCAC 02H .0506(b)(5)] 14. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained to flow in a diffuse manner at a non -erosive velocities through the entire protected stream buffers without re -concentrating. If this is not possible it may be necessary to provide stormwater facilities that are considered to remove nitrogen and phosphorus. Additionally, a stormwater management plan for this project shall provided to this Office before any impacts approved herein are conducted. The plan shall specify all stormwater discharge points, plan details, and calculations to indicate that diffuse flow through the protected buffers or nitrogen and phosphorus removal as described above will be achieved. 15. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 & Buffer Permitting Unit, NC Division of Water Resources, 1617 Mail Service Center, Raleigh, NC 27699-1650. [15A NCAC 02H .0507 (c)] 16. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at A e. TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR # 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 5 of 6 htto://portal.ncdenr.org/web/wp/swp/ws/401/certsandi)ermits/apply/forms). [35A NCAC 02H .0506(b)(5)] 17. This approval and its conditions are final and binding unless contested. [G.5.143-215.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between B:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedFx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609.6285 One (1) copy of the petition must also be served to DENR: Sam H. Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water. Please contact Anthony Scarbraugh at 252-948-3924 or anthony.scarbrau¢hQncdenr.eov if you have any questions or concerns. Sincer Robert Tankard, Assistan Regional Supervisor Water Quality Regional perationsSection Division of Water Resources, NCDENR TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR # 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 6 of 6 Enclosures: GC 3900 Certification of Completion cc: Daniel Govoni, DCM Morehead City Steve Trowell, DCM WaRO Raleigh Bland, USACE Washington Regulatory Field Office (via email) Pat McClain, DEMLR WaRO (via email) Laserfiche File [F 750i I: 3MM..,+,m.m.u•.uw ter— m.auia .vomo.mw .� , . WNAOa'BIf00A1A05510N oaysiax as wJuear�souJues Q M, ownv my "nz,rva— — ArPA `z, k ; ;a i.` i 248 o 4r��ie.A'CHPR�� .. CM PERM • •_N,,;Lrwartn on iJ'S UND DMLOPYFNT. LLC � wwiu 4 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary August 4, 2015 TJ's Land Development, LLC P.O. Box 125 Pantego, N.C. 27860 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggettt Major Permits and Consistency Manager N.C. Division of Coastal Management 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity/ Affirmative Action Employer DCM Coordinator: Permitee: DCM Field Offices Elizabeth City Morehead City ashinggAo Wiliff gton MAILING DISTRIBUTION SHEET Permit # o 1-4 L4� (with revised work plan drawings) US ACOE Offices: Washington: Raleigh BPeeler ra William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: Water Quality: Washington: Wilmington: Wildlife Resources: LPO: Fax Distribution: Tyler Crumbly enee G edhill-Ea Diane i O) oey White (WARO S ane Sta Gregg odnar thony Scarbrau�I sent6rmwater Joanne Steenhuis — 401 Chad Cobum - 401 Linda Lewis - Stormwater k I 1 •:0 o Permitee Agent #:_ SCALE 1:24 000 i 05 0 03LOMEFERS 1 P 1000 500 0 METERS 1000 2000 1 0.5 0 MILES "35 1000 2 0 1000 mm 0 - 30M 4000 `1100 6000 70M w 90M 10000 FEET m FREE UNION CHURCH RD 32'30' -_ N 10 s N s h i SEED nCK NECK I 7A34 t - -10 • 5 N '33 10 Yeatesville 10 0 WgTERS Rp 10 T s Y ^ `32 PQ 650000—� 1 . FEET - 5.. . RECEIVED le, / Mar $7 161�r . - DC`M-i'AHD Z`It`� Graveyard_ i Point -- 2 670 00D FEET 342 343 '44 346 7s°a5' a r3o• PANTEGO QUADRANGLE — CONTOUR R(TERVAL s FEET NORTH CAROLINA-BEAUFORT CO. NORTH AMERICAN VERTICAL DATUM OF 1988 7.5-MINUTE SERIES SWAMP / r _ 18 l• 1. 1770 1 27cn� evAnaall 0 pep LU2 'T 1700 1 POR 111 R41� Mil © ELMVEN q PON %k } e le I !S POP. 1,93 m fezo All j Ba71ae m � tl' o / 1 0 31 ^ 0 I tam Cola Q - 7�4 len �O ^ $IIYe11T ` lie IOIi � 0 Sock ✓ fe el.� \ ) V aW AM P �\ Ir iu \ 176 _7J J 11311 - '•.---.`.� 9 RnllmININ . a _ JACK ON' 6 W A mumeas A ' '32 1770 PMNt1<MII I 1 I y' M 2FCEIVED u Q� —0 MAY 710t Cvvn� ocN��r. a.._ — L-- 17 :� \. o µ0UN18 BAY f1! w�a 9 _ G T ftm 1F1Y NARRATIVE TJ's Land Development, LLC This project is to build a camp ground with marina on the Yeatsville Road fronting on Pungo Creek in Beaufort County. The entire tract of land is 46.47 acres with 12.95 acres of undisturbed 404 and CAMA wetlands: The remainder, approximately 33.52 acres, is farm land. 'There will be dockage for approximately 76 boats and more than 100 camp sites with sewage facilities for both the dockage and the camp sites. The wetland area is well defined and has been examined by the US Army Corps of Engineers and The Division of Coastal Management No attempt has been made to make the distinction between CAMA and 404 wetlands because the only impact in these wetlands will be limited to pile driving. CAMA wetlands are along the Pungo Creek shore lime. A pump out for boaters will be provided with disposal of the sewerage at a permitted facility. Bathrooms and other amenities will be provided at a high ground commercial facility located as shown on the plans. Elevations range from sea level to 10 feet Generally the project area is flat with grades less than one percent. The entire project area to be disturbed is farm land and the existing excavated pond. Soils are Augusta and Altavista fine sandy loam. The project includes the excavation of an approximately 3.6 acre pond that is fed by ground water. There will be no surface water flow into the pond or natural discharge. The pond will not be connected to local ditches or streams. The existing borrow pit will be enlarged to construct the pond. A mine permit is being applied for concurrently with these applications. The purpose of these permits is to construct the pond and provide a partial place to place fill dirt resulting fromthat construction. The pond will be used for recreation including swimming. Putrefaction will be avoided by periodically decanting by pumping to high ground with sheet flow of more than 50 feet into ditches. An after the fact Tar -Pamlico buffer permit has been granted to resolve the road crossing issue at the head of the designated stream. Borrow will be used to raise the ground elevation at those camper lots that are below the base flood elevation, and for raising the ground elevation at the septic tank disposal ground absorption drain fields as required by ground absorption permits. There will be an estimated surplus of about 114,000 cubic yards of borrow. The owner, TJ's Land Development, LLC intends do the excavation and construction of the RECEIVED property. Some of the borrow will be used on properties owned by Toby J. Tetterton who is also the owner of TJ's Land Development, LLC, and some of the borrow will be sold for use at other sites. MAY 2 7 ZOb Stone water strategy in these sandy silts is to avoid collecting rainwater into hardened or ditched A, conveyances. Roads will be constructed as nearly as possible without ditches. Gentle swales will be used. The Tar -Pamlico riparian buffer will be protected by sheet flowing all water into the buffer. This is a low density storm water project. 'vr'' r,rgrrr.. cAR�t s 12A8 s � row r,. RiCNV"0. "'This is a word processing form to be completed in Microsoft Word"" NC Division of Coastal Management Major Permit Application Computer Sheet (02/15/2010) Applicant: S.-c � � � Date:5202015 Project Site County v Staff: i G_ J_ District: Elizabeth City Washington ❑Morehead City ❑Wilmington Project Name:: Rover File: Date application 'received as complete" in the Field office (FCC: 1/8/2007): _Ali- /2l l y. Permit Authorization: CAMA ❑Dredge & Fill Both SITE DESCRIPTION/PERMIT INFORMATION PNA: Yes JKNo Photos Taken: YesX No❑ Setback Required (riparian): ❑Yes o Critical Habitat: ❑Yes k No Not Sure 15 foot waiver obtained: ❑Yes ZNo Hazard NNo�tification Returned: ❑Yes j5No SAV: ❑Yes No []Not Sure Shell Bottom: ❑Yes ❑No Not Sure Temporary Impacts: ❑Yes ONO Sandbags: []Yes XNo ❑ Not Sure Did the land use classification come from county LUP:j&Yes ❑No Mitigation Required (optional): ❑Yes [NNo Moratorium Conditions: ❑Yes ®No ❑NA Environmental Assessment Done: []Yes jiQNo ❑NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) Nutrient Sensitive Waters (NSW) I El Swamp Waters (SW) El High Quality Waters (HOW) ❑ Outstanding Resource Waters (ORW) WETLANDSIMPACTED (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) (SS) Glasswort (Salicomia sp.) wetlands) (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina altemifiora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus (TY) Cattail (Typha sp.) spicata) sp.) RECEIVED in (JR) Black needlerush (Juncos ❑ (SP) Salt/meadow grass (Spartina jai $ 7 10� roemerianus) patens) APPLICATION FEES gun No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 a III(D) Priv. public or oomm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 0 III(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 El Major development extension request - 11. Public or commercial/no dredge $100 and/or fill - $400 ❑ I. Private no dredge and/or fill - $250 III(C) Priv. public or comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808.2808 :: 1.888.4RCOAST :: www.nccoastalmananement.net revised: 02/15110 NC Division of Coastal Mgt. Applicati n Computer Sheet, Page 2 of 3) Applicant: Date: 5/202015 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work X Replace r Maint ❑ ❑ Y ® N S New Work 19 Replace / Maint ❑ ❑ Y IM N 3 New Work Replace i J �u\ Maint ❑ r� N ❑ Y P, New Work Replace / Maint ❑ ❑ Y 0 N f�Pjl' New Work,a Maint ❑ Replace El Z N 3 New WorkA place Maint ❑ ❑ Y JQN New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work EF Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace R CEIVED Maint ❑ ❑ Y ❑ N New Work ❑ Replace MAI ! 7 7015 Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maim ❑ ❑ Y ❑ N revised 02/1 SM0 NC DivisIio—n of Coastal - , t. App cation Computer Sheet, Page 3 of 3) Applicant:sI/ �1 Kam' Date: 520/2015 Describe below the HABITAT disturbances forthe application. All values should match the name, and units of measurement found in your Habitat code sheet Habitat Name _ DISTURB TYPE Choose One TOTAL Sq. Ft (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impads FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount 04 Dredge ❑ Fill [3 Both ❑ Other .131 Dredge Fill Both/& Other ❑ Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ - Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED MAY 2 7 1015 Kwr:-wrn� wtaw 252-808-2808 :: 1-888.4RCOA3T :: www.nccoastalmanaaement.net revised: 02/15/10 I Major Permit Fee Schedule DCM % DWQ % Development Type Fee (14300160143510009316256253) (2430016024351000952341) I. Private, noncommercial development that does not involve e filling or excavation of any wetlands or open water areas: $250 100% ($250) 0% ($0) II. Public or commercial development that does not involve he filling or excavation of any wetlands or open water areas: $400 100% ($400) 0% ($0) III. For development that Involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C. or D below applies: III(A). Private, non-commercial development, 8 General Water Quality Certification No. 3490 (See attached) can be applied: $250 100% ($250) 0% ($0) III(e). Public or commercial development, tt General Water Quality Certification No. 3490 (See attached) can be applied: $400 100% ($400) 0% ($0) III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to a r quality or aquatic life: $400 60% ($240) 40% ($160) III(D). If General Water Qua Certification No. 3490 (see attached) cannot be applied: $400 60% ($240) 40% ($160) IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60% ($285) 40% ($190) RECEIVED MAY 2 7 2015 K 6'Inr mw"", Hood Richardson, PA c-s% Engineers — Surveyors — Geologists 110 West Second Street Washington, North Carolina 27889 (252)975-3472 Aprils, 2015 CERTIFIED MAIL RETURN RECEIPT REQUESTED An: Mr. William Tankard WMT Holdings, LLC 18764 US Highway 264 East Bath, N. C. 27808 Gentlemen: TP's Land Development, Tobin J. Tetterton Manager, is applying for a CAMA Major permit to build a camper park and marina located on the north side of your property on the Yeatsville Road and fronting on Pungo Creek in Beaufort County, North Carolina. The specifics of he proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required as agent for Mr. Tetterton to notify you of the development in order to give you the opportunity to comment on the projecL Please review the attached permit application and drawings. Should you have any objections to the proposal, please send your written comments to Mr, Kelly Spivey, District Manager of the CAMA Washington Regional Office at 943 Washington Square Mall, Washington, N. C. 27889. Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions about this project, please call me at 252-975-3472 or e- ---4! t^ „ hrichardsonpana embargmail.com. You :y aso contact Mr. Tetterton at 252-944-5555. Disc S Si y 4�� ood Richardson, PE, PLS, PG RECEN0 NAY 17 208 OCM44rw i-W, Hood Richardson, PA c-m Engineers — Surveyors — Geologists 110 West Second Street Washington, North Carolina 27889 (252) 975-3472 March 17, 2015 CERTIFIED MAIL RETURN RECEIPT REQUESTED Att: Mr. Gene Grant JHG Farms, LLC 42 Queens Way Bath, N. C. 27808 Gentlemen: TJ"s Land Development, Tobin J. Tetterton Manager, is applying for a CAMA Major permit to build a camper park and marina located on the south side of your property on the Yeatsville Road and fronting on Pungo Creek in Beaufort County, North Carolina. The specifics of he proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required as agent for Mr. Tetterton to notify you of the development in order to give you the opportunity to comment on the projecL Please review the attached permit application and drawings. Should you have any objections to the proposal, please send your written comments to Mr, Kelly Spivey, District Manager of the CAMA Washington Regional Office at 943 Washington Square Mall, Washington, N. C. 27889. Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions about this project, please call me at 252-975-3472 or e- mail me at hrichardsonpa(cbembaramail.com. You may also contact Mr. Tetterton at 252-944-5555. 22icbardso /n `PE PLS, PG Agent a RECEIVED MAY 27 M E. Attics Num (fransler !rum service label) PS Form 3811, February 2004 A ■ Complete items 1, 2, and 3. Also complete Item 4 If ■ tricted DWvwy Is desked Print Your name and address an the m SO that we can return the cad to y,,, ■ Attach this card to the back of 11•re or on the front If space pf maipbtb, 1. AnideAddressedto: �z eve w f r 4,c, i.emtied Mao ❑ F�ress Mail Registered m Receipt for Merchwc lse ❑ Insured Mail -- ❑ C�-.O.D. - 4 Res iCted Delivery! !Extra Feej ❑ Yes 7009 2250 0002 7303 5645 X (/ /� ,�' ❑Agent Q R dby( PrcnmdName l/ .-.Addressee C. Date of Ivory } 0. k dsMya*kgee dTerem from item 1? ❑Yes M• •� dePerY address below: ❑ No Uornestic Return Receipt .ter• I JV very W9Md 170 63£Q L +'�90db t> IAIVI )ue D��Lf -dIeI0j ru rUzI Un (penad wewewpu3)�n"palowej,.s eesd D( fJ• Of (pb%Iuewespp,3O !ejIdw,etl OrLw0 pevTw8aft� �a�ed Za w . Ln • m 102595-024A-1540 'fiCENED V6 ♦I=JMJMI=M==mI� vCNcr r10F CMA�.�M� 1't1�.VG1'11� North Carolina Department of Environment and Natural Resources Division of Coastal Management TJ's Land Development, LLC Mr. Tobin J. Tetterton, Manager PO Box 125 Pantego, NC 27860 Dear Mr. Tetterton: 21 May 2015 Donald R. van der',Jaart Secretary RECEIVED MAY 2 7 2015 FM+MYYWf1M I,.IlXi The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located off SR 1718,Yeatesville Road, in existing farmland adjacent to Pungo Creek, near Belhaven in Beaufort County, North Carolina It was received on 20 May 2015, and appears to be adequate for processing at this time. The projected deadline for making a decision is 03 August 2015. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Steve Trowell, Field Representative for the Division of Coastal Management is responsible for processing your permit and he can be reached at 252-948-3854 or via email at Steve.Trowellna cn deringov if you have any questions. If this agency does not render a permit decision within 70 days from the 20 May 2015, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 943 Washington Square 171all, Washington, NO 27889 Phone: 252-946 64811 FAX: 252-948-0478 Internet: www.nccoastalmanagement.net An Equal Opporlunily 1 Aflirmalwe Action Employer- Made in part by recycled paper TJ's Land Development, LLC Mr. Tobin J. Tetterton, Manager 29 May 2015 Page 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Steve Trowell Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Daniel Govoni WARO RECEIVED MAY 27 2o+s N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date 6 J 1 Na ne of Property OwFe- s Applying for Permit: T 1 l ADD r✓�z ✓�Io rA4 '0At " Ll. c- Mailing Address: /?v - ,(o,< /Z- I certify that I have authorized (agent) i w � , �f G 4A� J. aD , act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) at (my property located at) This certification is valid thru (date) /� Property Owner Signature Date RECEIVED MAY 8 7 2015 HN1Y'W Ply 1.Nx Qr NCDENR North Carolina Department of Environment and Natural Resources October 2, 2014 TYs Land Development, LLC Attn: Mr. Tobin Tetterton PO Box 125 Pamego, NC 27860 John E. Skvarla, III Secretary DWR # 14-0275 V. 2 Beaufort County Subject: Approval of 401 Water Quality Certification with Additional Conditions Approval of Tar-Paml-Ko River Riparian Buffer Impacts with Additional Conditions TYs Land Development, LLC Property - Access Road (After -the -Fact) Dear Mr. Tetterton: You have our approval for the impacts listed below for the purpose described in your application dated September 20, 2014 and received by the Division of Water Resources (Division) on September 24, 2014 with subsequent information received on October 2, 2014. These impacts are covered by the attached Water Quality General Certification Number 3886, Tar -Pamlico River Riparian Buffer Rules, and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 14 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certifications) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Tar -Pamlico River Buffer Rules are met. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Plan location/ Reference Attached Stream PCN Page 4 and Site Map Road Crossing 42 (linear feet) 0 (linear feet) Buffer -Zone 1 PCN Page 5 and Site Map Road Crossing 1,200 (square ft.) 0 (square ft.) Buffers - Zone 2 Road Crossing 600 (square ft.) 1 0 (square ft.) RECEIVED MAY 2 7 ZM N-wi-twny }.u,a Divivm of Water Resources - Water Quality Regional Operations Section - Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-Wl8 Fax: 252-975-3716\ Internet: www.ncdencgov TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR# 14-0275 V. 2 401 and Buffer APPROVAL Page 3 of 3 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mading address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water and Tar -Pamlico Riparian Buffer Rules. Please contact Anthony Scarbraugh at 252-948-3924 or andw rt-garbratighoncidenr.-go if you have any questions or concerns. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDENR ErKbwres: GC 3886 Tar -Pamlico River Riparian Buffer Rules Certification of Completion cc: Raleigh Bland, USACE Washington Regulatory Field Office (via email) RECEIVED Jennifer Burdette, DWR 401 & Buffer Permitting Unit Pat McClain, DELMR WaRO (via email) MAY 2 7 20b David Moye, DCM WaRO (via email) N+.a�-uu^k buv File U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW 2013-01409 County: Beaufort NO DEPARTMENT OF THE ARMY AUTHORIZATION REQUIRED Property Owner / Agent: Toby Tetterton Address: Post Office Boa 125 Panteeo, North Carolina 27860 Telephone Number: 252-943-6677 Size and Location of Property (waterbody, road name/number, town, etc.): Property contains approximately 46 acres located southwest of the Town of Belhaven, on the west side of Puneo the woodland is wetlands. PIN 07029943. Description of Activiri: The applicant proposes to place fill material into the upland borrow pit to facilitate the development of a RV park. No fill is beine placed in wetlands. Your work as proposed does not require Department of the Army authorization for the following reason(s): There are no jurisdictional waters or wetlands within the boundaries of the property. X The proposed project does not impact jurisdictional waters or wetlands. _ The proposed project is exempt from Department of the Army regulation. Specify: This Department of the Army determination does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. For any activity within the twenty coastal counties, before beginning work, you must contact the N.C. Division of Coastal Management in Washington, North Carolina, at (252) 946-6481 to discuss any required State authorization. Any changes in the above described work must be coordinated with the Corps of Engineers prior to commencement. If you have any questions regarding the Corps of Engineers regulatory program, please contact William Wescott a1 Regulatory Project Manager Date: 08/06/2013 MAY E 7 2015 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORM, ETC., MUST BE " """ cnv ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. From: Wescott, William G SAW [William.G.Wescott@usace.army.mil] Sent: Tuesday, August 06, 2013 11:02 AM To: tobin@gotricounty.com Subject: RV Park Toby, The 'No Permit Required' tearsheet to place fill in the borrow pit has been completed and should be going in the mail today. I talked with Raleigh Bland. I told him that you have a very clear break from uplands to wetlands on the creek side of the borrow pit. you are proposing the elevated boardwalk/pier to start on uplands and that you were not proposing any fill in wetlands. William RECEIVED MAY 271r,'x 1 1, 191809Pc753 I amuar amrr yp aacaaoa aornac to 025' sISA Q RAlNOR, Amex. z ts• .'rots flit PEGIGlPPi1M RE41SiEP Sf GEEDS ��Nilyi Ott„IFIIM fat F gA IBM Pie 7B6 aM 53.755 MY w 86 wM STW so IN 116TAIW I MINIM i3r11 INM rirr 100100 The properly basin conveyed ism the primary residence of a Grantor. TAX PARCEL 07-029903 REVE\7-E STANWS: S 400.00 STALE OF NORTH CAROLINA COUNTY OF BEALTORT WARRANTY DEED THIS DEED, made and entered into tluis the day of February, 2013 by and . ben eon JOHN TANKARD 1ONES, and wife, NARY ETTA OONES, 260 Yeatesville, Road. Bach. North CaroUna 27W& hereinafter refined to as GRANTORS; to T J'S LAND DEITLOPN(E\T. LL-C, PO Boa 125, Pantego, North Carolina 27860 hercinafler refined ; at GRA\TEE. WITNESSETH: Thee tht said Caawmrs im muvdaaticaof the sum of TEN DOLLARS ($10.00) amd other Baod and %,ahab;e consideration to them m hand paid by said Grantee, the races[[ e` mach is hereby al r iedged, have bargained and sold, and by these presents, do bwg= sell and can e) unto the said Grantee, its suaessors and assigns, the fo3o -% plwcel or tract of land to the State of North Carolina, County of Beaufort, Bath Torsi and more particularly described as follows: Bez g that 46.47 acres, more or less, sbown on that map of survey entitled -P:opetr of John Tankard Jones" by Hood Richardson PA, dated July 13, 2007 ad recot it Pie Cabinet H at Slide 2-1 of the Beaufort County Registry. 7hs beag the earns property conveyed to the Grantors by deed dated Deeember 199E and recorded in book 1120 at Page 31 of the Beaufort County Registry. SLBJECT TO THE FOLLOWING RESTRICTIONS FOR AND DURING THE LZETLNCES OF THE GRANTORS: :. T h:s property cannot be used for a trailer park, but may be used for a rp50riooa: whirs (RV) park; lad 2. T:s proper:y o . be used for strip mining; however the Grantee may dig upoc d" property for its own use. TO HAVE AND TO HOLD the aforesaid tract or parcel of land and all privileges and apsuasVrces thercun:o belonging unto the said Grantee, its successors and assigns far w ZcGEIVED 0121vt IJ•'• [1809PC753 The Cuaotors cosmart with the Grantee that they are sexed in fee simple of the imd abuse described and ba%v good right and tide to convey the same; that the same is La and dear of all liens and encumbrances, except ad valorem taxes for the cturrcm year, ji and tbom :esricioas stated about, and they will forcer warrant and defend the title to I dw same apunst all IaufU claims and demands wbatsoever. IN RTf\'EISS %lMtEOF, the Grantogtlive bweuato set their hands and affixed 41sw teals this the dar and .e: rust above y4uq(L (SEAL) 4 M— v � { STATE Oe 14MTH CAROLINA :! COLNTY OF BEAT;FORT L a 1 Notsry Publie, of the aforesaid Countyand State, (do bneLr carify dw JOHN TANKARD JONES and MARY ETTA ZONES personally i 'betaa me this day and acknowledged the due execution of the foregoing Deed. wrrN-Ess my hand ad vomial sed, this the % ? day of Febnaary, 2013 1' Nx Ccooimmt Fxvm:IJ ii NOTARY PUBLIC i 9ECf,NO OGN 0t 0 Gyr r.•) I rx u Ir�xax-ram PUR DUrAII. . !r M YRwIXpl M1�Me l�W10T WMI YMi AI X]pW. MAI[II WL �x LIlVAmo !• CI10lMK I r WL N[IIAIO YMME GXN[ PWX LLLyA,LO !' GMIIXO coXmu uRux Ias— ! Ir� T NOON, u \ f f nmL a THIS. Lao xm amR Au b NLL� ., .. 1 NEW PIER LO GITUD NAL F CROSS SECTIO TO 1 t NO svu 4 1 ,Tx o+ vx e 9 z tY6 � `•. 1 111 ,rx BRRw © .AIlL J x In In NNX l SrM ,Y �V Nl 11 ERN` �, ixap / 4g yG _-JP✓-�'� ° L --_ BYx erx p1 \ ,.Yx T xV N O NBW DION P@B. CON[RM. afx V A aA9xawsPrcRo9NlRo� 1e \ '-' b � -: �� ,.--. X.ex ll{p3f'tl W,R� o Pom r,mNntrn . - 6St'Af10NBATUM:IRdgloN xA 01 x,.l �' ,wl:xxo.mwwwuwu�.e¢rAeovebavm.mrouuwolm _— pI WSfUNUIlF9 NORNU.WA1110.1]NB ap IRMAOMAIiwwwVW. AO.N MD»]6lWIHOYTU IXI16bID Amx.vbLa nle.wnmrvveiO.lBI.1H0 PolBawuID 4NbE ]b BCUIt ] II lwclwvm m:v.nox wxmxnn.v,.oem. °T laM}NN.IRW.PoW9PoIE I.]ABINOV6WAIN4'1®P]IOWLR (5.01)xD xwmevmnxewwuv�x pQn,l W naNmcavxbm Nr 08vAlION 8IMW ATT ACRES •. b°�� B pRrsx®DavATTa+ I HIGH GROUND 9]32 DISNRBffi! m«I.m..n¢as�nnw'o.,muv.ulalm mTPmi® I I CAM•1 /RO! W6ILAND9 12.93 NOT DI9'iVRBED ,..lx.n.sxrn.:rnrowvumalaemuovBbamvn.mxnmv A.81w.rasArasvnaaR°AD) iDT.U. 787'i ww,oxllvswvv.l. lAecm. x"R�rvo n o:nm"®.Lx.v+°'a+m:x,lumwmoeramvwa `--6-- WN'RIURIPIO waBnlePurA!°vBeernsv.,xemvv Q' P1N01®WNNIiR NYNRMAPSdAMWiiXel4Pslpe IlW 100 0 l00 000 900 6W.lWlx pou�lffi ae.v,a Rr. ® TAR-PAIAAO AIDARUN BUFl+WI°WQYIW3]! ORAP�O enu. - Rq xOrc'Iw�xw�Bn,wx.lnxwcavAMww¢rai w' 14 Ix01Sm. m L0.lTUA4fYuni u.e ` (r, PILING DETAIL v TYPICAL \\ \ x� 4� x g� x� QYJ It 4O� x(4p7 \ x x lAP7 r4°� �x,. !�' y OPMPNI.Wo G\ /...1� x(4.7 !A TY9 QDV•tB09•P 'f>'9k(B.ET �'3 4'Y W oa.IpW'c° ,.Y PAM £ m m• x x asuTa OIflFPS P BTURa ° D ORt IDIOIIDi IS70RQ w IN PERSON °v R SroPI9E AEDEPIpN YENJE � & PATRI OR10E REBTROOM -� BORROW CM EWE ROOM• SHCNFIIS SIIORIFR9 _I r , r gflORIGC b' C I STAGE mm x !I!!L I' . g •rr. � A xALI) A f I(x(ts7 x(Yl7 BIIBb N1'e l< •,f/� q 4` n ^ 4 � ` °°• � O \' �i >L4N I" xl nve�O.O•or�(a'1 ��, ��,•°°c I±S _ J SOD O vooJoace°• Q CAMA PEa�°.;eH��;.O lYPIGLCA1fR418 RfIKMAxl PAATD TOBIN J. RTRRLGN. a9-BU-081, Bvlt V - x BELtem Bpyl« b:u e0ee1 �Iaeln« rsm0 04m en"': I�el NsboO V'v PROPERTY OF: TJIS LAND DEVELOPMENT, LLC uTX —.1 8 70" cbvm NORTH CAROUNA ''s B l I-. 1°B' WRVb WTE NOVEWBER aa, xp 2 ± 1015 iNul� (yN RECEIVED MAY 2 7 2015 uh;uutiynk }.u,.: