HomeMy WebLinkAbout11-15 Swan Point Marina_. _..........._.._._......__...m.-,.-M.,.-:.,_.�...�,-.-., Permit Class Permit Number
NEW 11-15
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
At, M a"t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Swan Point Marina c/o Mark Lewis, 112 McVicar Street. Sneads Ferrv. NC 28460
Authorizing development in Onslow County at Stump Sound, 123 Page Street, Sneads
Ferry , as requested in the permittee's application dated 10/24/14 including the
attached worknlan drawings (3) 1 of 3 dated 4/12/11 2 of 3 dated 10/24/14 and 3 of 3 dated 10/14/14
This permit, issued on Janunry 27 2015
is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Dockina Facility
1) Unless specifically altered herein, this permit authorizes the docks, piers and other structures and
uses that are expressly and specifically set forth in the attached permit application and workplan
drawings. No other structure, whether floating or stationary, shall become a permanent part of this
docking facility without permit modification. No non -water dependent uses of structures shall be
conducted on, in or over public trust waters without permit modification.
2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced
throughout the entire existence of the permitted structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
a raxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature ofPermittee
Mark Lewis Permit # 11-15'
Page 2 of 4
ADDITIONAL CONDITIONS
3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
4) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
5) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
7) This permit does not authorize any additional boat slips in association with this docking facility.
Bulkhead
8) The alignment of the permittee bulkhead shall be staked by the permittee and approved on site by a
Division of Coastal Management representative prior to initiation of construction.
9) No portion of the bulkhead shall be located more than 5' waterward of the existing dilapidated bulkhead.
10) The bulkhead shall be constructed prior to any backfrlling activities.
11) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not
authorized.
12) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
13) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles,
or other suitable materials approved by Division personnel.
14) All backfill material shall be clean and free of any pollutants except in trace quantities.
Excavation
15) No excavation shall take place outside the area indicated on the attached workplan drawings.
16) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the depth of
excavation exceed the depth of the connecting waters.
Mark Lewis
ADDITIONAL, CONDITIONS
Permit # 11-15
Page 3 of 4
17) In order to protect juvenile finfish resources, no excavation shall be permitted between April 1 and
September 30 of any year without prior approval of the Division of Coastal Management and the US
Army Corps of Engineers.
18) The temporary placement of double handling of excavated materials within waters or vegetated wetlands
is not authorized.
Spoil Disposal
19) All excavated materials shall be confined above normal high water level and landward of regularly or
irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of
solids into any wetlands or surrounding waters.
20) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the
initiation of any dredge activities.
Sedimentation and Erosion Control
21) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
22) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed
immediately landward of the bulkhead cap immediately following completion of backfilling activities.
Maintenance Clause
23) The Division of Coastal Management will be notified in writing at least two (2) weeks in advance of any
maintenance work authorized by this permit and that notification include:
a. The number of the original permit
b. A statement that no dimensional changes are proposed
c. A copy of the original permit plan(s) with cross -hatching indicating the area to be maintained
and the area to be used for dredge spoil, and the estimated amount of material to be removed.
d. The date of plan revision and the permittee's signature shown anew on the original plan
General
24) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
Mark Lewis
ADDITIONAL CONDITIONS
Permit # 11-15 '
Page 4 of 4
25) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all
requirements therein. The guidelines can be found at http://www.fws.gov/ne-
es/mammal/manatee_guidelines.pdf.
26) No vegetated wetlands shall be excavated or filled, even temporarily, without permit modification.
27) No open water areas shall be excavated or filled, even temporarily, outside of the areas indicated on the
attached workplan drawings.
28) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
29) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
90-0267.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2014-02301, which was issued on 1/23/15.
NOTE: This marina was originally permitted under CAMA Major Permit #30-90
NCO Mr-1
APPLICATION for
Major Development Permit
(last mvlwid 12/27MS)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicand Landowner Information
Business Name
Project Name (if applicable)
Applicant 1: First Name
N1'_h [
MI
fast Name
L ew.,
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Bar
City
Stet
V
ZIP
Z� LJ%e
Country ,A7
It)/1
Phone No.
�l0 ,i22'it 04
FAX No.
Seed Address (if different from above)
Clly
Stall
ZIP
Email
2. AgerWiContract" Inf"matlon
Business Nam
�lo`r 1/ 1w.1T
/V11 l/ i
Agent/ Contractor 1: First Name
MI
Last Name
T/,uM Ivy
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
Side
ZIP
Phone No. 1
Phone No. 2
2 f `J"
'Ito -Y"
-7ST ti et.
ext.
FAX No.
Cantraclor i
Street Address (of different from above)
I City
I State
ZIP
EmeN 7
/
<Form contimm on becb
DCM WILMINGTON, NC
0 C T 2 9 2014
252.SDS-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.n,:
RECEIVED
NOV 19 2014
DCM-MHD CITY
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be mutiple)
Street Address
State Rd. t
61.i/_ I
/2 / /' h
Subdivision Name
City
Stale
Zip
2sVic -
Phone No.
Lot No.(s) (if many, attach additional page with list)
Lj 16 - / t •, Y ext.
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
vv/. G',.
c. Is� !he water body identilled in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
pNaturai ❑Manmade ❑Unknown
Jd W pl/ -
e. Is proposed work within city limits or planning jurisdiction?
J. If applicable, list the planning junsdictiwh or city limit the proposed
Yes No
❑u
work fags withi.
0,11 7,
4. Site Description
a.
Total length of shoreline on the tract (t.)
b. Size of entire tract (sq.R.)
3v 77-7 ' /,../ 2 11-If /,.../
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If many At sizes, please attach additional page with a list)
❑NHW or ❑NWL
e.
Vegetation on tract
f. Man-made features and uses now on tract
NnJ../�Y J /o' , / M .,n..
1Y✓ <,nJ f :.y. -., �� J
g,
Identify and describe the existing land uses adjacent to the proposed
project site.
"e5,).1../ /. t1. ,,.// ,",
/ti
h.
How does local govemmenl zone the tract?
I.
Is the proposed project consistent with the applicable zoning?
(A8a zoning compliance certificate, if applicable)
es []NO ❑NA
j.
Is the proposed activity pan of an urban waterfront redevelopment proposal? ❑Yes []NO
k.
Hasa professional archaeological assessment been done for the track? It yes, attache copy. ❑Yes []No NA
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a Oyes ONO
National Register listed or eligible property?
<Fotm continues on next page> RECEIVED
DCM WILMINGTON, NC
OCT 2 9 2014
252.808-2808 :: I.888.4RCOAST :: www.necoastaimanagement.nef
RECEIVED
NnV 19 2014
DCM-vIHD CITY
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site?
❑No
1Yea
(ii) Are there coastal wetlands on the site?
E Yes ❑No
(iii) If yes to either (I) or (ii) above, has a delineation been conducted?
❑Yes M1No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
f<r-�>',c
o. Describe existing drinking water supply source.
!-..,i,, w"J<.-
p. Describe existing storm water rang or treatment systems.
IM'
j(.f s /rw
5. Activities and Impacts
a.
Will the project be for commercial, public, or private use?
BCommercial ❑Public/Govemment
❑PrfvatelCommunity
b.
Give a brief description of purpose, use, and daily operations of the project when complete.
N1,,,, w -
c.
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
d.
List all development activities you propose.
�.J- �� ,". '.,i�<.� ,;��
�Itiwl�
e.
Are the pro osed activities maintenanceof an existing}�roject, new work, or both?
I.
What is the approximate total disturbed land area resulting from the proposed project?
❑Sq.FI or []Acres
g.
Nil the proposed project encroach on any public easement, public accessway or other area
[]Yes Eff4o ❑NA
that the public has established use of?
h.
Describe location and type of existing and proposed discharges to waters of the state.
sid,
L
Will wastewater or stormweter be discharged into a wetland?
[]Yes 2NO ❑NA
If yes, will this discharged water be of the some salinity as the receiving water?
❑Yes []No [DNA
j.
Is there any mitigation proposed?
[]Yes ❑No
If yes, attach a mitigation proposal.
<Fotm continues on back> RECEIVED
DCM WILMINGTON, NC
252.808.2808 .. 1-888.411COAST .. www.nccoastalmanagemer�
PECENED
NOV 19 2014
DCM-MHD CITY
Form DCM MP-1 (Page 4 of 4) APPLICATION for
Major Development Permit
6. AddldonalInformation
In addition to this completed application tomr, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (n are ahvays applicable to any major development application. Please consult the application
shuction booklet on how to properly prepare the required items below.
a. A project narative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already co m fete? If p u author ed work, Beady indicate o maps, plats, cawing to distinguish
between work completed and proposed. It E Il 1
c. A slte Of oration map that is sufficiently detailed tog idle agerky personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under w the applicant Claim the to the alleded
e. The appropriate application fee. Check or money order made payable TEN
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Phone No.
Name . y &� � r(�` J.
Address `�% 0, /act %9 ( r.. .J. F-�y PC 2r'Y�e 'Pla,
Name :..n „ c ci rr�� Phone No.
Address �07 f�. /nc.. �h �r.'�y '1dY(V rifle-• 727-7o:T
r
Name Phone N0.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permillee, and issuing dates.
3 /S �i a
h. Signed consultant or agent authorization form, if applicable.
I. Wetland delineation, If necessary.
j. A signed AEC hazard notice for projects in nfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves penditure
of pudic funds or use of public lands, attach a statement documenft compliance with the North Carolina Environmental Policy Act. ,,
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certly that t information provided in this application is truthful to the best of my knowledge.
Date 1 2 1 ry Print Name zWAyLid wrI /%Ls4_ dG e.0o,
RECEIVED
Signature Aalld ,�e NOV 19 1014
Please indicate application attachments pertaining to your proposed project. DCM-MHD CITY
❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
❑ DCM MP-4 Structures Information RECEIVED
DCM WILMINGTON, NC
0 C T 2 9 2014
252-808-2808 ,. 1-888-4RCOAST .- www.nccoastaimanagement.net
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL)
stabilization
Una
32 S'
Width
3 S
Avg. Existing
I/ f i r Nl
f
NA
NA
Depth
Final Project
6 f /
NA
NA
Depth
e Nr
11. EXCAVATION ❑This section not applicable
a. Amount of material to be excavated from below NH W or N WL in
cubic yards.
Q% /0
a of material to be excavated.
c. (1) Does the area to be excavated Include coastal wedandstmarsh d. High -ground excavation in cubic yards.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the N/A
number of square feet affected,
❑CW ❑SAV ❑SS _
❑WL ❑None
(ii) Describe the purpose of the excavation in these areas.
2 DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable
a. Location of disposal/area. b. Dimensions of disposal area.
1#, 4 9' _ 1 .+ s. /c S') Y SU
c. (1) Do you claim title to disposal area? d. (1) YN disposal area be available for future maintenance?
[]Yes []No ❑NA Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner. (III If yes, where?
e. (i) Does the disposal area include any coastal wetlands/marsh I.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WI-)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
(i) Describe the purpose of disposal in these areas:
, i<
(i) Does the dissP l include any area in the water?
[]Ye C'7No ❑NA
(ii) If yes, how much water area is affected?
RECEIVED
DCM WILMINGTON, NC
OCT 2 9 2014
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net PEgRM: 1226 06
NnV 19 2014
DCM-MHD CITY
3. SHOREUNE STABILMATM
(N development is a wood gran, we MP-4 - Sbuctures)
a. of shoreline stabi tzafion:
TBulkhead ❑Riprap ❑Breakwater/Sig f-lpther:
c. Average distance waterward of NHW or NWL.
e. Type of stabilization%atenal:
!. / L -"/
El This section not applicable
b. Length:—'�, •...... -
V*": _
d. Maximum distance wa*rwatd of NHW or NVJL:
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No [3NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
g. Number of square feet of fill to be placed below water level. h Type off fill material. J
Bulkhead backfill 2b ; i Riprap _ C
Breakwater/Sill __ Other — —.
I . Source of fin material, /
7
4 OTHER FILLACTIVITIES
(Excluding Shoreline Stabilization)
a. (I) NO fill material be brought to the site? ❑Yes ❑No
It yes,
(ii) Amount of material to be placed in the water _
(i i) Dimensions of fill area _
(iv) Purpose of fill
5. GENERAL
a. How will excavated/or N arterial be kept on sp/e and erosion
c. (i) Wrll naviga�onat aids be required as a result of the project?
[]Yes=No ❑NA
(n) If yes, explain what type and how they will be implemented.
Date
Project Name
,..COAST
section not applicable
b. (i) NMI fill material be placed in coastal wetlandslmarsh (CW),
submerged aquatic vegetation (SAV), shell bottom (SB), of
Other wetlands (NA)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB _
❑NQ ❑None
(ii) Describe the purpose of the fill in these areas:
What type of construction equipment will be used (eg.,
baddroe, or hydraulic dredge)?
d. (1) Vogl wetlands beCmsed in transporting equipment to project
site? ❑Yes r]No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts. RECENED
N()V
Applicant Name
Applicant Signature ff
EUEIVED
DCM WILMINGTON, NC
P Vised: 'f 2'26,06
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. I) Is the docking facility/marina:
❑Commercial ❑Public/Govemment ❑Private/Commui
a (i) Dock(s) and/or piers)
(ii) Number
(iii) Length _
IN) Wdth 1!
(v) Floating ❑Yes 20
e. (i) Are Platforms included? dYes ❑No
If yes:
(ii) Number _
(iii) Length 6 J
IN) Width 0 �
(v) Floating ❑t7 Yes No
Note Rooled areas are calculated from driphne dimensions.
g_ (i) Number of slips proposed
Z
Ill Number of slips existing
—94(
i. Check the proposed type of siting:
❑�LLand cut and access channel
YJO/pen water; dredging for basin and/or channel
❑Open water; no dredging required
❑Other; please describe:
k_ Typical boat length: 3f It
m. (i) WII the facility have tie pilings?
❑Yes 3 o
fill If yes number of tie pilings?
❑This section not applicable
b. (i) Will me facility be open to the general public?
.L—T ./es ❑NO
d. (i) Are Finger Piers included? []Yes L7No
If yes:
III) Number
(iii) Length _
(iv) Width
(v) Floating ❑Yes []No
f. (i) Are Boatlifts included? ❑Yes Bho
If yes
(ii) Number
(iii) Length
IN) Width
h. Check all the types of services to be provided.
L7 Full service, including travel lift and/or mil, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
❑ Dockage ('wet slips') only, number of slips:
❑ Dry storage, number of boats:
❑ Boat ramp(s), number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boa sail boats, mixed types).
n1 cur c�
RECEIVED
NOV 19 1014
DCM-MHO CITY
I. (i) WII th,p4cility be open to the general public?
LfYes ❑No
RECEIVED
DCM WILMINGTON, NC
OCT 2 9 2014
252-808-2808 :: 1.888-aRCOAST :: www.nccoastalmana4ement.nei revised: 12/27/06
Form DCM MP-4 (Structures, Page 2 of 4)
2. DOCKING FACILITY/MARINA OPERATIONS p'Phis section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: _; Location'
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How, will overboard discharge of sewage from boats be controlled?
e. (I) Give the location and number of "No Sewage Discharge" signs proposed.
(if) Give the location and number of'Pumpout Available' signs proposed.
f. Describe the special design, If applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
In Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the manna policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing? RECEIVED
I. If this project is an expansion of an existing manna, what types of services are currently provided?
DCM-MHD CITY
R E=QE;IVF=6l
DCM WILMINGTON, NC
OCT 2 9 2014
252-808-2808 :: 1.888-4RCOA5T :: www.nccoastaimananement.net revised: 12/27106
Form DCM MP-4 (Structures, Page 3 of 4)
in. Is the madnal�ocking facility proposed within a primary or secondary nursery area?
[]Yet o
n. Is the marina/ ocking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes Xc
o. Is the marina/docking facility proposed within or adjacent to coastal wetlandsimamh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SS _
❑WL ❑None
p. Is the proposed manna/docking facility located within or within close proximity to any shellfish leases? ❑Yes E40
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered Ins) 21his section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑PublictGovemment ❑Pnvate/Community
(ti) Number
(III) Length
(w) Width
Note: Roofed areas are calculated from dnpline dimensions.
4. GROIN (e.g., wood, sheetpue, etc. If a rock groin, use MP-2, Excavation and Fill.) Erfhis section not applicable
a. (I) Number _
(a) Length —
(III) WidBt
15. BREAKWATER (e.g., wood, sheelpile, etc.) IfThis section not applicable
a. Length _
c. Maximum distance beyond NHW, NWL or wetlands
b. Average distance from NHW, NWL, or wetlands
16. MOORING PILINGS and BUOYS Brhia section not applicable
a. Is the sbuclum(s):
❑Commercial ❑Public/Govemment ❑Pdvate/Community
C. Distance to be placed beyond shoreline _
Note This should be measured from marsh edge, if present.
e. Arc of the swing _
b. Number
d. Descnplion of buoy (color, inscription, size, anchor, etc.)
RECENED
RECEIVED'
NOV 19 2014 DCM WILMINGTON, NC
DCM-MHD CITY OCT 2 9 2014
25'.:. 1-888-4RCOAST :: www.nccoastahman.. revised: 12127/06
7. GENERAL
a. Pro 'rrkty of structure(s) to adjacent riparian property lines
fwN
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width Qf water body
3UD VA-
e (i) Will navpat' at aids be required as a result of the project?
0Yes 40 DNA
(ii) If yes, explain what type and tow they will be implemented.
b. Proximityof structures) to adjacent docking lacilfties.
d. Water depth at waterward end of structure at NLW or NW4
j � I -.i �" � L✓
8- OTHER C1This section not applicable
a. Give complete description.
(+ItM/rY
DBtIB
Project Name
�4Ar� �f✓• t / �� Ic rN Ir�ti�
Applicant Nance 41
Applicant Signature
RECEIVED
NOV 19 1014
DCM-MHD CITY
RECEIVED
DCM MMINGTON, NC
OCT 2 9 2014
t�
,,,.,r Swan Point Marina CEIVE
jIi,,m JVILMINGTi 19
Disclaimer—OnslowCounty provides this GIS data as a public service. NO WARRANTY for the availability or accuracy is provided.
Printed.Oct 14, 2014
RECENED
Nnv 10 2014
ISM
h16U 6 G 1J0
ON `NOi9NIWIIM W00
d
J
S
c
CL
y
14
an
N
rYt—c:clvtu=
OCM WILMINGTON, PIC-
0CT 2 9 2014
"t-
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
November 19, 2018
Regulatory Division
Action ID No. SAW-2014-02301 and State Permit No. 11-15
Swan Point Marina
Arm.: Mr. Mark Lewis
112 McVicar Street
Sneads Ferry, North Carolina 28460
Dear Mr. Lewis:
Through coordination with the North Carolina Division of Coastal Management, we have
learned of your request to renew the work associated with your Department of the Army (DA)
permit that was originally issued on January 29, 2015. This permit authorized you to replace 850
linear feet of vinyl bulkhead waterward of the existing, deteriorating bulkhead, to add a fixed
walkway platform over open water along the northern side of the new bulkhead, and to conduct
maintenance dredging within existing slips adjacent to Stump Sound at the Swan Point Marina,
Sneads Ferry, Onslow County, North Carolina.
Your proposal continues to be consistent with the provisions and objectives of general
permit 198000291 (copy enclosed). The permit is hereby renewed. It is understood that all
conditions of your permit conditions remain applicable and that the expiration date of your DA
permit is December 31, 2021.
Please read the enclosed permit to prevent an unintentional violation of Federal law. As
this Department of the Army regional general permit does not relieve you of the responsibility to
obtain any other required approvals, you should contact appropriate State and local agencies
before beginning work.
Thank you for your time and cooperation. If you have questions, please contact Liz Hair,
of the Wilmington Regulatory Field Office, telephone: (910) 251-4049.
Sincerely,
Liz Hair, Project Manager
Wilmington Regulatory Field CEIVED
RECEIVED NOV 21 2018
NOV 2 S 2018 DCM WILMINGTON, NC
DCM-MHD CITY
-2-
Enclosure:
GP 291 conditions
Electronic Copy Furnished (without enclosures):
NCDEQ/DCM; Ms. Courtney Spears
NCDEQ/DWR; Mr. Robb Mairs
NCDEQ/DWR; Ms. Karen Higgins
NCDEQ/DCM: Mr. Greg Bodner
NCDEQ/DCM: Ms. Heather Coats
NC®ENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
January 27, 2015
Swan Point Marina
c/o Mark Lewis
142 McVicar Street
Sneads Ferry, N.C. 28460
Dear Sir or Madam:
Donald R. van der Vaart
Secretary
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where
applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -
colored form) is retained by you and it must be available on site when the project is inspected for
compliance. Please sign both the original and the copy and return the copy to this office in the enclosed
envelope. Signing the permit and proceeding means you have waived your right of appeal described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS
113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B
with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-
2698 within twenty (20) days of this decision on your permit. You should also be aware that another
qualified party may submit an objection to the issuance of this permit within twenty (20) days.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work
must be carried out in accordance with your application. Modifications, time extensions, and future
maintenance requires additional approval. Please read your permit carefully prior to starting work and review
all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to
be sure that he fully understands all permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we
request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if
questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact
Department personnel at any time for assistance. By working in accordance with the permit, you will be
helping to protect our vitally important coastal resources.
Sincerely,
slow
V �J :
Douglas V. Huggett
Major Permits and Consistency Manager
Enclosure
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastaimanagement.net
An Equal Opportunity/Affirmative Action Employer
DEPARTMENT OF THE ARMY
WILMINdTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
UPLYTO
ATCENF[ON OF.
January 22, 2015
Regulatory Division
Action ID No. SAW-2014-02301
Mr. Doug Huggett
Division of Coastal Management
North Carolina Department of
Environment and Natural Resources
400 Commerce Avenue
Morehead City, North Carolina 2$557-3421
Dear Mr. Huggett:
Reference the application of Mark Lewis Crewboats, Inc. (Swan Point Marina), to replace
850 linear feet of vinyl bulkhead waterward of the existing, deteriorating bulkhead, to add a fixed
walkway platform over open water along the northern side of the new bulkhead, and to conduct
maintenance dredging within existing slips adjacent to Stump Sound at the Swan Point Marina,
Sneads Ferry, Onslow County, North Carolina.
The Federal agencies have completed review of the proposal as presented by the
application and your field investigation report.
We recommend that the following conditions be included in the State authorization:
1. In order to further protect the endangered West Indian Manatee, Trichechus manatus,
the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and
strictly adhere to all requirements therein. The guidelines can be found at
ham://www.fws.gov/nc-es/mammal/manatee ¢uidelines.pdf.
2. Dredging is not authorized between April 1 and September 30 of any year.
3. The permittee must install and maintain, at his expense, any signal lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities.
For further information, the permitt.ee should contact the U.S. Coast Guard Marine Safety Office
at (910) 772-2191. .
RECEIVED
1AN 2 6 MIS
❑oM Ww5 CIW
-2-
4. All work authorized by this permit must be performed in strict compliance with the
attached plans, which are a part of this permit. Any modification to these plans must be approved
by the US Army Corps of Engineers (USACE) prior to implementation.
5. The docks and piers extending over wetlands will be elevated sufficiently (a
minimum of 3 feet) above the wetland substrate to prevent total shading of vegetation, substrate,
or other elements of the aquatic environment.
6. The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized, or
if, in the opinion of the Secretary of the Army or his authorized representative, said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove,
relocate, or alter the structural work or obstructions caused thereby, without expense to the
United States. No claim shall be made against the United States on account of any such removal,
relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE
Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910-
3282 at least two weeks prior to beginning work and upon completion of work.
7. Approval of the structure is based on determinations that there would be no
obstruction to navigation. The structure may be damaged by wave wash from passing vessels.
Issuance of this permit should not be construed, as relieving the permittee of taking proper steps
to insure the structure and moored boats will not be damaged by wave wash.
8. The authorized structure and associated activity must not interfere with the public's
right to free navigation on all navigable waters of the United States. No attempt will be made by
the permittee to prevent the full and free use by the public of all navigable waters at or adjacent
to the authorized work for reason other than safety.
9. Except as specified in the plans attached to this permit, no excavation, fill or
mechanized land -clearing activities shall take place at any time in the construction or
maintenance of this project, in such a manner as to impair normal flows and circulation patterns
within waters or wetlands or to reduce the reach of waters or wetlands.
10. Except as authorized by this permit or any USACE approved modification to this
permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in
the construction or maintenance of this project, within waters or wetlands. This permit does not
authorize temporary placement or double handling of excavated or fill material within waters or
wetlands outside the permitted area. This prohibition applies to all borrow and fill activities
connected with this project. RECEIVED
JAN 2 6 20b
DCKA- AOM bIPZ
-3-
11. All mechanized equipment will be regularly inspected and maintained to prevent
contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic
materials. In the event of a spill of petroleum products or any other hazardous waste, the
permittee shall immediately report it to the N.C. Division of Water Quality at (919) 733-5083,
Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous
Substances Control Act will be followed.
12. Unless otherwise authorized by this permit, all fill material placed in waters or
wetlands shall be generated from an upland source and will be clean and free of any pollutants
except in trace quantities. Metal products, organic materials (including debris from land clearing
activities), or unsightly debris will not be used.
13. If the permittee discovers any previously unknown historic or archeological remains
while accomplishing the authorized work, he will immediately notify the Wilmington District
Engineer who will initiate the required coordination procedures.
14. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide
each of its contractors and/or agents• associated with the construction or maintenance of this
project with a copy of this permit. A copy of this permit, including all conditions, shall be
available at the project site during construction and maintenance of this project.
15. The permittee shall employ all sedimentation and erosion control measures necessary
to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit
area. This shall include, but is not limited to, the immediate installation of silt fencing or similar
appropriate devices around all areas subject to soil disturbance or the movement of earthen fill,
and the immediate stabilization of all disturbed areas. Additionally, the project must remain in
full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statutes Chapter 113A Article 4).
16. The activity will be conducted in such a manner as to prevent a significant increase in
turbidity outside the area of construction or construction -related discharge. Increases such that
the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by
the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all
saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not
considered significant.
17. The permittee, upon receipt of a notice of revocation of this permit or upon its
expiration before completion of the work will, without expense to the United States and in such
time and manner as the Secretary of the Army or his authorized representative may direct, restore
the water or wetland to its pre -project condition. RECEIVED
JAN 2 6 2015
CPne hm nl 4 bHY
ME
18. Violations of these conditions or violations of Section 404 of the Clean Water Act or
Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District
U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation.
Questions or comments may be addressed to Mr. Tyler Crumbley, Wilmington Field
Office, Regulatory Division, telephone (910) 251-4170.
Sincerely,
Tyler C``rumbley, Project Manager
Wilmington Regulatory Field Office
Copies Furnished:
Ms. Karen Higgins
Division of Water Quality
North Carolina Department of
Environment and Natural Resources
1650 Mail Service Center
Raleigh, North Carolina 27699-1650
Mr. Jonathan Howell
Division of Coastal Management
North Carolina Department of
Environment and Natural Resources
400 Commerce Avenue
Morehead City, North Carolina 28557-3421
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mr. Fritz Rohde
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort, North Carolina 28516
RECEIVED
JAN 2 6 1015
yka W/'WACiF� blh4
-5-
Mr. Pace Wilber
National Marine Fisheries Service
Habitat Conservation Division
219 Fort Johnson Road
Charleston, South Carolina 29412-9110
Todd Allen Bowers
US EPA Region 4 Life Scientist
Water Protection Division
61 Forsyth Street, SW
Atlanta, Georgia 30303-8960
BOSN3/Joseph M. Edge
United States Coast Guard
Sector North Carolina Waterways Management
2301 E. Fort Macon Road
Atlantic Beach, North Carolina 28512
Ms. Debra Wilson
Division of Coastal Management
North Carolina Department of
Environment and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Ms. Joanne Steenhuis
Division of Water Resources
North Carolina Department of
Environment and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
RECEIVED
JAN 89 9r -
DCM Coordinator: / Permit #:
— ,
MAILING DISTRIBUTION SHEET
DCM Field Offices
Elizabeth City
Morehead City
Ay.
Washington
US ACOE Offices:
(with revised work plan drawings)
Washington:
�BlanjdWilmington:
_
Cultural Resources:
Renee Gledhill -Early or ( vironm ntal:review@ncdcr g vovo
Public Water Supply:
D' ne J. Williams (WIRO)
0
NC DOT:
en P
Shellfish Sanitation:
State Property:
un Walton
Water Resources:
I wren Hi s- Ral '
John Hennessy (NC DOT)
Washington: Anthony Scarborough
Wilmington: J anne St ennuis — 40
Chad Coburn - 401
Linda Lewis - Stormwater
Wildlife Resources: is Duttn-(WARO)
LPO:
Fax Distribution: Permitee
Agent #:.
N.C. DIVISION OF COASTAL MANAGEMENT
AGENT AUTHORIZATION FORM
Date 10 /7 /1 H
Nam{eof Property Owner Applying for Permit:
A^/ C., A /! W.-'
Mailing Address:
�n t�CS f;-fy 'V,�v�
I certify that I have authorized (agent) to act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity) ,
at (my property located at) 1 Z 3
This certification is valid thru (date) J N, • 2 r -� z u f S
Property Owner Signature
Date
RECEIVED
NOV 18 2014
DCM-IHD CITY
RECEIVED
DCM WILMINGTON, NC
OCT 2 9 2014
��A
NCDEE R
North Carolina Department of Environment and Natural Resources
Pat McCrory,
Governor
John E. Skvada, III
Secretary
November 17, 2014
Advertising@stamewsonline.com
2 Pages
Star News
Legal Advertisement Section
Post Office Box 840
Wilmington, North Carolina 28402
Re: Swan Point Marina Major Public Notice
Kyle & Heather: Please publish the attached Notice in the Wednesday, November 19, 2014 issue.
The State Office of Budget & Management requires an original Affidavit of Publication prior to
payment for newspaper advertising.
Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Divison of Coastal
Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by Credit Card
(number on file with Elsa Lawrence, Ref acct # 796-7215). Please send a copy of the credit card receipt to me.
Thank you for your assistance in this matter. If you should have any questions, please contact me at our
Wilmington office.
Sincerely,
Shaun K. Simpson
Permit & Customer
Division of Coastal
cc: WiRO
Jonathan Howell - MHC DCM
Tyler Crumbley - USACE
Michele Walker- DCM
RECENED
NOV 19 2014
DCM-MHD CITY
N. C. Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910-796-7215 \ FAX: 910.395.3964 Internet: www,ncoDastalmanagement.net
An Equal Oppoduriy \ Affinnafive Action Empbyer
NOTICE OF FILING OF
APPLICATION FOR CAMA MAJOR
DEVELOPMENT PERMIT
The Department of Environment and Natural Resources hereby gives public notice as required by NCGS
113A-119(b) that the following application was submitted for a development permit in an Area of
Environmental Concern as designated under the CAMA. According to said application, On November 1, 2014,
Mark Lewis Crewboats, LLC proposed to replace an existing bulkhead and conduct maintenance
excavation at Swan Point Marina, 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onslow
County. A copy of the application may be examined or copied at the office of Tara MacPherson, N.C. Dept. of
Environment & Natural Resources, Div. of Coastal Management, 127 Cardinal Drive Ext., Wilmington, North
Carolina 28405, (910-796-7425) during normal business hours.
Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce
Avenue, Morehead City, NC 28557-3421, prior to December 3, 2014 will be considered in making the permit
decision. Later comments will be accepted and considered up to the time of permit decision. Project
modification may occur based on review and comment by the public and state and federal agencies. Notice of
the permit decision in these matters will be provided upon written request.
RECEIVED
NOY 19 P14
DCW terra Qmv
MAJOR PERMIT FEE SCHEDULE
M rk Lewis Crewboats, Inc. / $250 / Onslow Co.
,,uRAI Pf 1gfje7,u.)
DCM %
DWQ %
Development Ta
Fee
14300160143510009316256253
2430016024351000952341
I. Private, noncommercial development that does
of involve the filling or excavation of any
wetlands or open water areas:
$250
100%
$250
0%
$0
II. Public or commercial development that does
of involve the filling or excavation of any
wetlands or open water areas:
$400
100%
$400
0%
$0
III. For development that involves the filling
and/or excavation of up to 1 acre of wetlands
and/or open water areas, determine if A,B, C,
r D below applies:
III(A). Private, non-commercial development, if
General Water Quality Certification No. 3490
See attached can be applied:
$250
100%
$250
0%
$0
III(B). Public or commercial development, if
General Water Quality Certification No. 3490
See attached can be lied:
$400
100%
$400
0%
$0
III(C). If General Water Quality Certification No.
90 (see attached) could be applied, but DCM
taff determined that additional review and written
)WQ concurrence is needed because of
oncems related to water quality or aquatic life:
$400
60%
$240
40%
$160
III(D). If General Water Quality Certification No.
90 see attached cannot be applied:
$400
60%
$240
40%
$160
V. Development that involves the filling and/or
xcavation of more than one acre of wetlands
nd/or open water areas:
$475
60%
$285
40% ($190
RECEIVED
NOV 19 gnu
DCM-MHD CITY
RECEIVED
NOV a 1
rxl►d 404h F. ..-
Date
Received
Check From (Name)
Name ofPermh Holder
Vendor
Check
Number
Check amount
Permit Number/Comments
10/17/2014 MoneyGram/Brandon Grimes
Wells Fargo Bank
59098505697
_
$400.00
10/17/2014 Western Union Money Order/Brandon Grimes Paul FomwaldWells
Fargo Bank
17-081677370
$200.00 GP 64097D ($8001ota)
10/17/2014 Western Union Money Order/Brandon Grmes
Wells Fargo Bank
17-068990188
$200 00
1011712014 Allied Marine Contractors LLC
Daniel WinfeM
B of A
6873
$200 00 GP @346 Admirals Court, Bolivia
_
10/172014 Samuel W or Tracy Clary
same
_
SunTrusl
4142
$100 00 mod. Fee, 16407
10/17/2014 John Allen Odham III, Nancy Odham
_ _
Jahn Gray Hunter, Jr.
_
PNC Bank
_
946
$100 00 minor fee, 406 N Shore Drive, SC
10/17/2014 Holden Dock 8 Bulkheads
Simpson
IFirst Community Bank
5928
E200 00 GP 61640D
10/20/2014 Overbeck Marine Construction Inc
Bill Wagoner
SunTrust -
4347
$200 00 GP 84099D
_ _
10/21/2014 Merril or Louis LeMoine
_ _
same
BofA _
_
143
E20000 GPorfee
10/22/201a Eugene Haley BElizabeth Haley
same
BofA _
_ 525000 ma/or fee, Haley NHCo
_ _
10/22/2014 TTEREVE Enterpnses, Inc
_ _
same
BB&T
_7594
1081
S47500 majorfee, Tffireva OnsCo
IOIW2014 Southeastern Coastal Construction Co
_ _
Wendell Murphy, Jr
First Federal
9289
-
00 GP 212 Seacrest Drive, WB i
70/22/2014 Allied Marine ContractorsLLC
Marvin Rozear
_ _ _
B of A
6940
_$200
$200 00 GP 1283 Corcus Porry Rd., Hampstead
10/23/2014 F and S Marine Contractors Inc
- _ _.. - - _ -
James Petrilla
_ _ —. -
PNC Bank
_ _
—
4101
S400.00 GP for #4 Sunset Street, WB
_
70/23/2o1a Logan Marine LLC
Mathews Family Properties
Coming Federal Credit Uni
1110
E200.00 GP 85008D I
10/23/2014 Eastern Builders of the Carolinas, Inc
Jeffrey and Veronica
First Citizens Bank
4032
$100.00 minor fee, 4180 Island Drive, NITS
10/24/2014 J. Cutler and B. Cutler -
_Delaney
Turtle Harbour HOA
B of A -
5720
$100.00 MP renewal, #640.0_
10/24/2014 Swannsborough yacht Club Inc
Bobby Denning
_
SoundBank _
18928
$200.00_GP 65604D
10/24/2014 McKim 8 Creed_
SewmPoint
Vantage South Bank
177510
$200.00 renewal and mod. Fees, 78-97
10/24/2014 Steen Moss
same
NC SECU
1433
_
5600 ao GP164076D
_
10/24/2014 William G. MCRBImy
_ _ _
Parks
_
First CommunityBank
7939
_
$200 00 GP 64075D
_
1027/2014 Mark Leans Crew Boats Inc. dba Old Town
Marine ,Swan Point Manna
PNC Bank
1959
$250 00 ma or fee, Swan Point Marina, On..
�'
10/271201141 Coastal Earth Works Inc
Barbara Hulek_Zucker
First Bank _
4173
$400.00 GP 65010D 9
_ _
10/28/2014 Potent -Smith Properties, LLC
_ _ _'
Henderson
Wells Fargo Bank
7053
$400.00 major fee, E. Beach Dr. Oak Island
_ _ -
10/28/2014 Jern D. Edwards and Karen C. Edwards
_ _ _. — _
same
_
First Citizens Bank
6531
_ ___
$400.00 GP 64034D
10/29/2014 Town of Topsail Beach
same
_
First Citizens Bank
002W8
E20000 GP 65011D
10/30/2014 Southeastern Coastal Construction Cc
_ _ _
Murphey _ -_ _
_
First Fe_dere_I _ _ _
9283 _
5200.00 GP 65013D_ _
10/31/2014 Allied Marine Contractors LLC
Glenn Halloday
B oFA
6919
$400.00 GP 64035D
10/31/2014 Backwater Marne Construction Inc.
_ Knight, Wintlhem, Bre_awep _
BBBT _ _
1694 _ _
$600.00 GPs 640770, 64078D, 84079D _
11/3/2014 Town of Surf City
same
First Citizens Bank
062221
$100.00 renewal request, 190-05
t 1/3/20t4 Dale E. and CynNia M. Joslin
same
B of A
9000
GP for 800 #B Canal Dr., CB
11/4/2014 Stacey Hamm and Kevin M. Hamm
_
same
_
PNC Bank
__$200.00
655.
$200.00 GP 65016D
1V4/20t4Pippin ManneConstruction, LLC
Scott Sullivan
-
Wells Fargo Bank
3179
E20000 GP 65015D
11/4/2014Wrightsville Beach Manna
;Sam Clary/Wnghtsvitle Beach Manna
Wachovia
2331
$100.00 MP renewal, #173-00
_
11/5/2014 F and S Marine Contractors Inc
.Brock and Scott
PNC Bank
4113
$200 00 GP 85012D
1 VS/20t4 Connaway, Marina Construction, Inc
B of A
8862
00 lots 11 8 1.2 Pensacola/ PN Co.
11/6/20t4 Pleasure Island P_a_rtners,_LLC
_
Stewart Pittman for Pleasure Island Partners, LLC
_
Bank of the Ozarks
2008
_$200
$400.00 major fee, Pleasure Island Partners, LLC
_
11/6/2014 Mantech LLC -
iPaul M. Wile_s
Bof A_
1845
$20000 GP65017D
11t7/2014 Gary and Lynne Greene
_
Dockside
Wells Fargo Bank
4272
_
$400.00 major fee, Dockside, NHCo
111'7/2014 Cannaway Marine Construction, Inc
Michael Seinffibski ing 8 John Ko
B of A
6867
$200.00 lots 2 8 4 The Peninsula�SC
_ _
11!//2014 Inlet View Bar 7 Grill
_ _ _
'Shallotte Point Phase II
_ _ _
B8&7
2549
$100 00 mod. Fee 18508
11/10/2014 Mark Lewis Crew Boats Inc diOld Town
Marina Swan Point Manna
_
PNC Bank
_ _
19871
$150 00 Ck#2 + #1959 for major fee Swan Print Manna, Ons.
Onslow County Property Records Site http://property.onslowcountym.gov/Forms/ lrintDatalet.aspx?pin=l...
Parcel ID: 153133 Map #: 778A-6.5 Tax Year: 2014
Luc: Waterfront ICW Class: Vacant NBHD: LEWIS ACRES/SWAN POINT
RD
LEWIS MARK & DEBRA PAGE 5T
Parcel
Parcel
153133
Tax Year
2014
Property Addess
PAGE ST
Unit Desc
Unit *
NBHD
3146 - LEWIS ACRES/SWAN POINT RD
Class
Vacant
Land Use Code
11 - Waterfront ICW
Living Units
Mapping Acres
.92
CAMA Acres
.92
Location
Fronting
Zoning
CB -CB
Map *
778A-6.5
PIN Number
429914333496
Total Cards
1
Record Type
R
Legal
Legal Description TR 2 LEWIS & FULCHER PROPERTY
Township 114 - STUMP SOUND
City Code 00 - UNINCORPORATED ONSLOW
Jurisdiction 1400 - STUMP SOUND UNINCORPORATED
Plat Book-Page/Subd 62-020
Owner Details
Owner 1
LEWIS MARK & DEBRA
Owner 2
CustomerID
132828000
Address
112 MCVICAR ST
SNEADS FERRY, NC
28460
Mailing Address
% Ownership
Nature of Ownership
-
RECEIVED
Nnv 19 MR
DCtM Wtw 93ft
RECEIVED
DCM WILMINGTON, NC
OCT 2 9 2014
1 of 1
10/13/2014 12:18 PM
1�CDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
November 17, 2014
Mark Lewis Crewboats Inc.
c/o Mr. Jason Thompson
444 Everett Drive
Sneads Ferry, NC 28460
Dear Mr. Thompson:
John E. Skvarla, III
Secretary
The Division of Coastal Management hereby acknowledges that on November 1, 2014 we received your completed application, acting
as agent for Mark Lewis Crewboats, Inc., whereby you are requesting State approval for the development of Swan Point Marina
located at 123 Page Street, adjacent to Stump Sound/New River, in Sneads Ferry, Pender County. The projected deadline for making
a decision on your permit application is January 17, 2015. An additional 75-day review period is provided by law when such time is
necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should
consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However,
an additional letter will be provided on or about the 75th day.
If this agency does not render a permit decision within 70 days from November 1, 2014 you may request a meeting with the Director of
the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five
working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will
find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this
notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the
notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where
a private road would lead one into your property. Failure to post this notice could result in an incomplete application.
An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal
agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or
comments from reviewing agencies.
Sincerely,
9
, pot, Tara MacPherson
Field Specialist
cc: Jonathan Howell, DCM
Tyler Crumbley, USACOE
Sue McLaughlin, Onslow County
RECENED
NOV 18 2014
DCM-ii.IIiD Cry
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910-796.7216 \ FAX: 910-3963964 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Empbyer
IT
NOTI(01017i �_�
CAMA PERMIT
APPLIED F R
f ROJECT:
ce
County
COMMENTS ACCEPTED THROUGH December- er ? 701 A
APPLICANT:
ar ewe ,ine.
Attn: Jason I hompswn-
444
John everett
�� ►t -�: t• �y za � ��� : t•�t:L ia�
FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW:
NC Div- of Coastal Management
127 Cardinal Drive Ext.
1Nilm+ ng one NC 28405
Tara MacPherson, Field Specialist
910-796-7425
_74
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME Swan Point Marina c/o Jason Thompson
2. LOCATION OF PROJECT SITE: 123 Page Street, adjacent to Stump Sound, in Sneads Ferry, Onslow
County.
Photo Index - 2006: 29-6571 F,G,H-15-17 2000: 29-399 Q,R-7-101995: 29-387 P,Q,R-18-21
State Plane Coordinates - X: 2493661 Y: 293377
Latitude: 34°32'41.17"N Longitude: 77021'38.77"W
3. INVESTIGATION TYPE: CAMA / D & F ROVER FILE # 0-110110A
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 9/18/14 & 11/13/14
Was Applicant Present — Yes
5. PROCESSING PROCEDURE: Application Received — 10/29/14, Complete-11/1/14
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Onslow County
Land Classification From LUP - Community Growth Area/Conservation
(B) AEC(s) Involved: EW, PTA, ES
(C) Water Dependent: Yes
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing — County Sewer
Planned - N/A
(F) Type of Structures: Existing — Marina facility with travel lift, floating docks and bulkhead
Planned — Vinyl bulkhead replacement and fixed platform walkway on
north side of the property, maintenance excavation within existing footprint
Source - N/A
(G) Estimated Annual Rate of Erosion: N/A Source — N/A
HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED THE
(A) Coastal Wetlands
(B) Open water
11,375 sq. ft.
2,900 sq. ft.
2,160 sq. ft.
shaded
(C) Other(Highground)
2500 sq. ft.
(Spoil Disposal)
(D) Total Area Disturbed: 18,935 sq. ft. (0.43 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: The applicant proposes to construct 850 linear feet of vinyl bulkhead
waterward of the existing deteriorating bulkhead, add a fixed platform (walkway) over open water along
the north side of the new bulkhead and conduct maintenance dredging within existing slips.
RECEWD
NOY 19 1014
DCM-MHD CITY
Swan Point Marina
Page 2
9. PROJECT DESCRIPTION:
The project site is located at 123 Page Street, adjacent to Stump Sound/New River, in Sneads Ferry,
Onslow County. To locate the project site from the WiRO take US-17 N for approximately 29 miles and
turn right on NC-172. Travel approximately 6 miles and turn right onto Sneads Ferry Road and then
travel approximately 1 mile and turn right onto Peru Road. Swan Point Road is at the end of Peru Road
to the right. Turn left off of Swan Point Road onto Page Street and the property will be located on your
left.
The property is adjacent to Stump Sound/New River to the north and east and to residential properties
on the west and south sides. Highground development on the project site includes a Marina
Store/Storage building, decking, associated parking, boat storage, gravel drive, community marina and
bulkhead. Upland vegetation consists of sparse lawn grass and almost the entire lot is gravel. The lot
is approximately 1.65 acres in size and has an average elevation of approximately 4 feet above mean
sea level. The entire project site has 960 linear feet of shoreline frontage all of which is stabilized by an
aging bulkhead. The applicant has received numerous maintenance excavation permits in the past, but
does not currently have an active State Permit. The original marina property was developed prior to
CAMA regulations. State Permit No. 30-90 was issued to Swan Point Marina on February 23, 1990 for
a travel lift and excavation in the existing marina basin. This permit expired on December 31, 1993.
General Permit No. 43295 was issued on January 9, 2006 and General Permit No. 59166 was issued
on March 8, 2012 for maintenance excavation. The applicant states that there are 54 existing slips due
to the size of the vessels at this marina facility. According to the April 26, 2011 field data report from the
Division of Shellfish Sanitation the existing marina has the potential for up to 73 slips.
Swan Point Marina consists of Two Tracts that have been combined to form one property. There is an
existing 4800 sq. ft. storage building/marina store on Tract 1 with a wooden deck. Two wooden piers
extend to the east from Tract 1, each measuring approximately 215 ft. in length by 6 ft. in width. The
southernmost pier has existing boatlifts along the northern side. Tract 2 contains a concrete pad with
wooden ramps for the existing travel lift. There is a gravel access area that extends waterward to the
east of Tract 2 measuring approximately 320 ft. in length by 25 ft. in width. The entire gravel access
area is stabilized with an existing bulkhead and there are existing boatlifts on the southern side. The
gravel access area terminates in an access pier measuring 30 ft. in length by 6 ft. in width and a T-
head measuring 150 ft. in length by 6 in width. The existing bulkhead on the north side of the property
meets Normal High Water (NHW). There is rip rap and debris water ward of the bulkhead below NHW
along this entire 400 ft. section. The remaining 560 linear feet of bulkhead within the marina also meets
NHW. No coastal wetlands were observed adjacent to the stabilized shoreline.
The Onslow County Land Use Plan classifies adjacent waters and high ground area of project site as
Community Growth Area/Conservation. There are no known archaeological sites located in the project
vicinity. The waters of Stump Sound/New River are classified SA by the Division of Water Quality. They
are NOT designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fgk"" and they
are CLOSED to the harvest of shellfish.
NOY 19 2014
10. PROPOSED PROJECT:
DCM-W0CrfY
The applicant proposes to construct 850 linear feet of vinyl bulkhead water ward of the existing
deteriorating bulkhead, add a fixed platform (walkway) over open water along the north side of the new
bulkhead and conduct maintenance dredging within the existing marina basin. The applicant states that
on the northern side of the property the proposed new 400 ft. section of vinyl bulkhead would be
constructed approximately 5 ft. water ward of the existing wall. The applicant states this alignment is
Swan Point Marina
Page 3
necessary to avoid existing debris that is located waterward of the deteriorating bulkhead. The
remaining 450 linear feet of new proposed bulkhead would be located approximately 2 ft. waterward of
the existing wall (See drawing dated received October 29, 2014). The applicant is also proposing a
fixed platform (walkway) measuring approximately 360 ft. in length by 6 ft. in width that would extend
waterward along the entire northern section of bulkhead to the property line. No additional slips are
proposed in this location. The waterbody in this area of Stump Sound/New River measures
approximately 650' in width
According to the application package the applicant proposes maintenance dredging (bucket to barge) of
approximately 1053 cubic yards of material around existing designated slips within the marina footprint.
The proposed excavation area is located on the south side of the existing gravel access area and
measures approximately 325 ft. in length by 35 ft. in width. The existing average water depth in this
location is -4 ft. at Normal Low Water (NLW). The applicant is proposing excavation to a final depth of -
6 ft. at NLW. The dredged material will be placed upland area located on the property measuring
approximately 50 ft. in length by 50 ft. in width. The proposed spoils site would be located on a parcel
owned by the applicant to the west and would be stabilized with silt fencing. No changes are proposed
to the upland portion of the project site.
11. ANTICIPATED IMPACTS:
The proposed new vinyl bulkhead would result in the filling of 3,730 sq. ft. of Estuarine Waters/Public Trust
Area. Minor increases in turbidity should be expected during construction. The proposed fixed platform
(walkway) would incorporate approximately 2,160 sq. ft. of open water within the applicants area of riparian
access and within % of the width of the waterbody. The proposed maintenance dredging would disturb
approximately 11,375 sq. ft. of previously excavated shallow bottom area. Approximately 2,500 sq. ft of high
ground would be filled at the spoil site on an adjacent property owned by the applicant within the 75 ft.
Estuarine Shoreline Area outside of the Estuarine Shoreline 30 ft. buffer . The proposed maintenance
excavation within the existing boat basin is in the same footprint as previously authorized maintenance
events. Minor increases in turbidity should be expected during the dredging event; however no long term
adverse impacts are anticipated. Sedimentation and erosion control structures would be installed to prevent
transport of material off the property.
RECEIVED
NOV 19 1014
DCM-MHO CITY
Submitted by: Tara MacPherson Date: 11/13/14 Office: Wilmington
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
1) APPLICANT: Mark Lewis Crewboats, Inc. COUNTY: Onslow
PROJECT NAME: Swan Point Marina Bulkhead and Dredge Project
LOCATION OF PROJECT:123 Page Creek, adjacent to Stump Sound, in Sneads Ferry
DATE APPLICATION RECEIVED COMPLETE BY FIELD:11-1-14
FIELD RECOMMENDATION: Attached: YES
CONSISTENCY DETERMINATION: Attached: n/a
FIELD REPRESENTATIVE: MacPherson
DISTRICT MANAGER REVIEW: J' a- 9- e%--
B) DATE RECEIVED BY MAJOR PERMITS UNIT:
PUBLIC NOTICE RECD: 11-19-14
ADJ. RIP. PROP NOTICES RECD�:(�
1- APPLICATION ASSIGNED TO: uyi 1
C) 75 DAY DEADLINE: Tly� '
MAIL OUT DATE:11-17-14
FEDERAL DUE DATE:
PERMIT FINAL ACTION: ISSUE DENY,
To Be Forwarded: n/a
To Be Forwarded: n/a
DISTRICT OFFICE: WILMINGTON
FEE RECD: 400
END OF NOTICE DATE: 12-3-14
DEED RECp:I
ON:_ 111t11
150 DAY DEADLINE:
STATE DUE DATE: 12-3-14
FED COMMENTS RECD:
AGENCY
DATE
COMMENTS
RETURNED
OBJECTIONS:
YES NO
NOTES
Coastal Management - Regional Representativepp-let-
1
✓
Coastal Management - LUP Consistency
Division of Community Assistance
Land Quality Section (DEMLR)
-Z -
Division of Water Resources (401)
iz _ t - 1
✓
Storm Water Management (DEMLR)
12-2 ly
State Property Office
13-3-14
✓
Division of Archives & History
1y _ 1_ 14
✓
Division of Environmental Health
1 Z _, -1 y
✓
N G s ; ;
Division of Highways
11.15-]y
1/
Wildlife Resources Commission
to _ ts_ 14
Local Permit Office
- ys- i y
Division of Marine Fisheries / DCM
Z 0-1 S
Corps of Engineers
/-�3 /J
✓
�,/q- p2 3 of
16
ITIMA
NC0DENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Mark Lewis Crewboats, Inc.
John E, Skvarla, III
Secretary
December 18, 2014
. , a DWR Project # 1990 0267
q iI Onsiow County
x3f "a"9 is
Attn: Mark
112 MCVi ar St's31'S?'4'6 a
Sneads Ferry, NC 28460 r ri ,t zv
Subject Property: Swan Point Marina, Sneads Ferry
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Lewis:
You have our approval, in accordance with the attached conditions and those listed below to
replace existing bulkheads and fill 3,730 sq ft of estuarine waters, construct a fix walkway and
maintenance dredge within existing footprint, as described in your CAMA application dated
November 17, 2014, and received by the Division of Water Resources (Division) on November 17,
2014. After reviewing your application, we have decided that the impacts are covered by General
Water Quality Certification Number 3900 (GC 3900). This Certification allows you to use the
General Permit No. 198000291 permit when issued by the US Army Corps of Engineers and the
CAMA Major Permit when issued by the Division of Coastal Management. In addition, you should
obtain or otherwise comply with any other required federal, state or local permits before you go
ahead with your project Including (but not limited to) Erosion and Sediment Control, Non -
discharge, Water Supply Watershed, and stormwater regulations. Also, this approval to proceed
with your proposed impacts or to conduct impacts to waters as depicted in your application
shall expire upon expiration of the 404 or CAMA Permit.
This approval requires you to follow the conditions listed in the attached certification and any
additional conditions listed on the following pages.
The Additional Conditions of the Certification are:
1. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification. If you
change your project, you must notify the Division and you may be required to submit a new
application package with the appropriate fee.
2. The approved plans and specifications for this project are incorporated by reference and are
an enforceable part of the permit.
127 Cardinal Drive Ext., Wilmington, North Carolina 28405
Phone: 910-796.72151 Internet: www.ncdenr.gov
An Equal Oppodunily 1 AffumaWe Action Employer- Made in pat by recycled paper
Mark Lewis Crewboats, Inc.
Attn: Mark Lewis
DWR Permit p 90 0267 V2
December 18, 2014
Page 2 of 4
3. Any final construction plans for this project must include or reference the application and
plans approved by the Division under this authorization letter and certification. The applicant
will also be required to evaluate all acquired permits to assure that they are consistent and all
relative impacts are accounted for and shown on the construction plans. [15A NCAC 02H
.0502 (b) and 15A NCAC 02H .0506 (4)] The applicant shall require his contractors (and/or
agents) to comply with all of the terms of this Certification, and shall provide each of its
contractors (and/or agents) a copy of this Certification.
4. Turbidity Standard
The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as
described in 15 A NCAC 26..0221. Appropriate sediment and erosion control practices
must be used to meet this standard. Turbidity curtains shall be used as appropriate.
Please notify this Office If any turbidity Issues arise at 910.796.7215
5. This General Certification shall expire on the same day as the expiration date of the
corresponding General Permit. The conditions in effect on the date of issuance of the
Certification for a specific project shall remain in effect for the life of the project, regardless
of the expiration of this Certification.
6. The applicant/permitee and their authorized agents shall conduct all activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with 303(d) of the Clean Water Act), and any other appropriate requirements
of State and Federal law. If the Division determines that such standards or laws are not
being met, including failure to sustain a designated or achieved use, or that State or
Federal law is being violated, or that further conditions are necessary to assure
compliance, than the Division may reevaluate and modify this General Water Quality
Certification.
All mechanized equipment operated near surface waters or wetlands will be regularly
inspected and maintained to prevent contamination of waters and wetlands from fuels,
lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a
hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the
Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional
Office at 910.796.7215 and after hours and on weekends call (800) 858-0368.
Management of such spills shall comply with provisions of the North Carolina Oil Pollution
and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC
02R .0200 (3)(f), and GS 143 Article 21A].
Mark Lewis Crewboats, Inc.
Attn: Mark Lewis
DWR Permit# 900267 V2
December 18, 2014
Page 3 of 4
8. Fueling, lubrication and general equipment maintenance should not take place within 50
feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H
.0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)].
9. This certification grants permission to the director, an authorized representative of the
Director, or DENR staff, upon the presentation of proper credentials, to enter the property
during normal business hours 15A NCAC 02H.0502(e).
10. Swan Marina according to Shellfish Sanitation has 57 slips. Additional dockage of vessels
other than the existing slips will require re-evaluation by DWR of the use of the facility.
Handrails or other devices, including signage, should be used to discourage use of any dock
space other than the 57 designated slips. [15A NCAC 07H .1205]
11. This marina project may not cause any additional closure of shellfishing waters by Shellfish
Sanitation as this would be considered a violation of 15A NCAC 02B.201(f) and 15A NCAC
02B.0221(1). [15A NCAC 02B.201(f) and 15A NCAC 02B.0221(1)].
12. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant and/or authorized
agent is required to return a completed certificate of completion form to the NCDENR DWR
401 and Buffers Unit North Carolina Division of Water Resources,1617 Mail Service Center,
Raleigh, NC, 27699 within ten days of project completion. The certification of completion is
available at: http://Portal.ncdenr.org/web/wa/swp/ws/401/certsandpermits/apply/forms).
Violations of any condition herein set forth may result in revocation of this Certification and may
result In criminal and/or civil penalties. The authorization to proceed with your proposed impacts
or to conduct impacts to waters as depicted in your application and as authorized by this
Certification shall expire upon expiration of the 404 or CAMA Permit.
This approval and its conditions are final and binding unless contested.
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing
a written petition for an administrative hearing to the Office of Administrative Hearings (hereby
known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by
calling the OAH Clerk's Office at (919) 431-3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A
petition is considered filed when the original and one (1) copy along with any applicable OAH filing
fee is received in the OAH during normal office hours (Monday through Friday between 8:00 am
and 5:00 pm, excluding official state holidays).
Mark Lewis Crewboats, Inc.
Attn: Mark Lewis
DWR Permit 0 90 0267 V2
December 18, 2014
Page 4 of 4
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the
petition along with any applicable OAH filing fee is received by the OAH within five (5) business
days following the faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DENR:
Lacy Presnell, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division of Water Resources under Section 401 of the Clean
Water Act. If you have any questions, please telephone Jennifer Burdette in the Central Office in
Raleigh at 919.807.6364 or Jennifer. BurdetteOncdenr.eov Joanne Steenhuis in the DWR
Wilmington Regional Office at 910.796.7306 or Joanne.Steenhuis@ncdenr.gov.
Sincerely, `
Jim Gregson, Regional Super
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDENR
Enclosures: GC 3900
cc: Jason Thompson — Contractor —electronic copy
Tyler Crumbley - USACE Wilmington Regulatory Field Office— electronic copy
Tara MacPherson —DCM Wilmington
Jennifer Burdette —Wetlands and Buffer Unit
Jonathan Howell - DCM Morehead City —electronic copy
WiRO
AiA
NC®ENR + I\GV fi 2014
ortl l Carolina Department of"Environment and Natural R Irces:_
P esou__
Pat McCrory rIS1Ur•, . 4.QbnrE✓?S$
Govemor-----r -;,
November 17, 2014 " 1(]
zl.l- -•
Division of Coastal Management )�:Zy /y
MEMORANDUM:,
TO: Renee Gledhill -Early
Dept. of Cultural Resources
Archives:&.History
FROM: Jonathan`Howell,''NC DENR-DCM Assistant Major.Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 71-12=09)
SUBJECT: CAMA / Dredge &-Fill,Application Review
Applicant: Mark Lewis Crewboats, Inc.,(Swan Point Marina)
Project Location:. 123 Page St., adjacent to�Stump Sound, in'Sneads Ferry, onlsow'County
Proposed Projecf: replacement otexisting bulkhead; construction of a fixed,walkway and
maintenance, excavation'within".existing slips
Please indicate below your agency's'positton or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project,,:contact Tara MacPherson at
(910)796-7425.when appropriate, in depth comments with supporting' data.is:requested
REPLY: This agency has no objection to the project as proposed
This agency has no.commenCon,the proposed project.
This agency: approves:athe, project only'if the recommended changes
are incorporated.;See attached.
This agency°objects to•the project for reasons'described in the attached comments.
SIGNED. &L
� DATE
N.C., Divlsron of Coastal IAanagemenl
127 Cardinal Drive Ekt.; wllmmyton, NC 2&405
Pdone:910395-3%4 Inte
91O=799.72151 FAX! met: Lmi.nccoastatmanavement net
Art 6•.uujrc ;,¢�;,ta4,r:rutivC(:liM £:np�,; Nov 2 1 2014
MWENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
November 17, 2014
Division of Coastal Management
MEMORANDUM:
TO: Mark Zeigler
WiRO
Division of Community Assistance
John E. Skvarla, III
Secretary
FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA/ Dredge & Fill Application Review
Applicant: Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onlsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please Indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED _ DATE
N.C. Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NO 28405
Phone: 910.796-72151 FAX: 910.395-3964 Internet: www.ncooaslaimanagement.net
An Equal OpponuniylAfiinnative Action Employer
X l
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
November 17, 2014
John E. Skvarla, III
Division of Coastal Management
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Shannon Jenkins
NH DEH
Shellfish Sanitation Section
Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09)
CAMA / Dredge & Fill Application Review
Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onlsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested
REPLY: This agency has no objection to the project as proposed. LL166,60
441
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED Toe DATE 1Z & 14
p ��r ! V . tRECEIVED
DEC 171"'4
N.C. Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405 DCNlJW4 ,C)TW
Phone: 910-796-7215 \ FAX: 910-395.3964 Internet: www.nccoastalmanaoement net
An Equal Opponuniry \ Affirmative Action Employer
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
December 5, 2014
MEMORANDOM
TO:
From:
Through:
SUBJECT:
Applicant:
John E. Skvarla, III
Secretary
Jonathan Howell, NC DENR-DCM Assistant Major Permits
Coordinator
400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09)
Jeremy Humphrey,
Environmental Health Program Specialist
Shannon Jenkins,
Environmental Program Supervisor
CAMA / Dredge & Fill Application Review
Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onslow
County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
In accordance with 15A NCAC 18A. 0911 MARINAS: DOCKING
FACILITIES: OTHER MOORING AREAS, a closure of open
shellfishing waters can be avoided if the following conditions are
achieved. The proposed fixed platform (walkway) to be located
waterward of the new bulkhead should not be used for the docking of
boats. It is requested, the platform be void of cleats or other
attachment points that would encourage the docking of vessels.
Additionally, there should be no modification to existing structures or
the construction of new structures within the project site that would
increase the total number of slips at the marina. This includes both of
the tracts that make up Swan Point Marina.
RECEIVED
DEC 1 7 ""
1601 Mail Service Center, Raleigh, North Carolina 27699-1601
Phone: 919-707-8600 1 Internet: www.ncdenr.gov DCM-MHD UP
An Equal Opportunity 1 Afirmative Action Employer— Made in part by recycled paper
e�� NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
November 17, 2014
c-" 14. II.ZI .o2
Division of Coastal Management
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Maria Dunn
NCWRC
WaRO / WiRO
John E. Skvarla, III
Secretary
NOV 2014
V*4.t
Cora;�;y� ron
Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, INC 28557 (Courier 11-12-09)
CAMA / Dredge & Fill Application Review
Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, On/sow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE I? g 2z,14Z
RECEIVEC
DEC 15 7^-i
N.C. Division of Coastal Management
127 Cardinal Drive Ext., Wilmington. NC 28405 DCM-MhD Cr
Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastaimanagement.net
An Equal Opponunity 1AHinnabve Action Employer
kTXyWA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
November 17, 2014
Division of Coastal Management
MEMORANDUM:
John E. Skvada, III
Secretary
TO: Sue McLaughlin
LPO
Onslow County
FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA / Dredge & Fill Application Review
Applicant: Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onlsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: 4— This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE cz�) %, \
RECEIVED
N.C. Division of Coastal Management NOV 2 b 1014
127 Cardinal Drive Ext., Wilmington, NC 28405 t sf" Vv --opH NHS
Phone: 910.796.72151 FAX: 910-395.3964 Internet: www.necoastalmanagement.net
An Equal Opponunily \ Al innative Acbm EmOoyer
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvarla, III
Governor Secretary
RECEIVED
November 17, 2014
DEC 0 2 1014
Division of Coastal Management DCM-rolHMi_-" 1011
MEMORANDUM: A0v
TO: Dan Sams By.
District Manager
DEMUR - WiRO
FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA / Dredge & Fill Application Review
Applicant: Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St, adjacent to Stump Sound, in Sneads Ferry, Onlsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE k]OV 2/
N.C. Division of Coastal Management
127 Cardinal Drive Ext, Wilmington, NC 28405
Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www rIccoastalmanaaement.net
An Equal Opportunity l Affirmative Action Employer
+,A r
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
November 17, 2014
Division of Coastal Management
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Diane Williams
Environmental Engineer
Public Water Supply
NOV 17 P014
DI�.t
WIRO P D katWa ee s Ppce
John E. Skvarla, III
Secretary
RECEIVED
DEC 0 210H
Dona-nrNryarr.
Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, INC 28557 (Courier 11-12-09)
CAMA / Dredge & Fill Application Review
Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onlsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
1
N.C. Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910-796.72151 FAX: 910-3953964 Internet: www.necoastalmanaoement.net
An Equal OpppWniry 1 Atlamative Acton Employer
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
November 17, 2014 RECEIVED
DEC o 2 2014
Division of Coastal Management DCM-MHOCITY
MEMORANDUM:
TO: Georgette Scott
Stormwater Section
DEMLR - WiRO
ECE���
µ0V it 20
John E. Skvarla, III
Secretary
FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA / Dredge & Fill Application Review
Applicant: Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onlsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: /This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNEJaf C DATE
N.C. Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910.7W7215 \ FAX: 910-395.3964 Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affinatve Acton Empbyer
Nov.25, 2014 2:20PM NC Dept of Transportation No. 5791,� P. 1
Fl-WA lL Imr'AG to r{
DFJ' l l-2t• t�
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvaria, III
Governor D19RICT 1 Secretary
NOV z 4 2014
November 17, 2014
Division of Coastal Manaaement
MEMORANDUM:
TO: Robert Vause
NC DOT
Onslow County
FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, NC 26557 (Courier 11-12-09)
SUBJECT: CAMA/ Dredge & Fill Application Review
Applicant: Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, OnIsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED 67 $A� /' DATE 1 �174�
N.C. Division of Coastal Management
127 Cardinal Drive EK. Wilmington, NC 26405
Phone: 910-796-72151 FAX: 91 M953964 Internal: www.nocoastalmanaaemenl.nal
An Equal OppoAuA7 IAlfina4re AcUm Eft ftv
ARECEIVED
�'�
— — �� DEC o A 7014
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvarla, III
Governor Secretary
November 17, 2014 RECEIVED
Division of Coastal Management NOV 2 0 2014
MEMORANDUM: DOA
STATE PROPERTY
TO: Tim Walton OFFICE
Dept of Administration
State Property Office
FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA / Dredge & Fill Application Review
Applicant: Mark Lewis Crewboats, Inc. (Swan Point Marina)
Project Location: 123 Page St., adjacent to Stump Sound, in Sneads Ferry, Onlsow County
Proposed Project: replacement of existing bulkhead, construction of a fixed walkway and
maintenance excavation within existing slips
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by December 3, 2014.
If you have any questions regarding the proposed project, contact Tara MacPherson at
(910)796-7425 when appropriate, in depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
I� ���Kkll
r u)a� ��a��`1.—This agency has no comment on the proposed project.
`amc 11 � This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE J� I
i
N.C. Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910-796.7215 \ FAX: 910-395-3964Internet: www.nocoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer
Recommendations for State Permit — Swan Point Marina
The proposed vinyl bulkhead appears to be CONSISTENT with 15A NCAC 07H .0208 (b)(7). It is
recommended that a permit be issued to authorize the construction of a new vinyl bulkhead waterward of an
existing deteriorating bulkhead. It is our opinion that the proposed alignment does not create any significant
adverse impacts to the resource due to the presence of existing debris and rip rap.
The proposed fixed platform (walkway) appear to be CONSISTENT with 15 NCAC 07H.0208 (b)(6). This office
has no objection to the proposed work provided that it is consistent with all other state and federal permitting
requirements. The proposed excavation within the area within the existing marina basin appears to be
CONSISTENT with15 NCAC 07H.0208 (b)(1). It is the opinion of this office that the area for the proposed
excavation is located in an area that has been historically impacted and in continuous use for docking and
navigational purposes. This office has no objection to the proposed work provided that it is consistent with all
other state and federal permitting requirements.
Any permit issued should include the following conditions:
The alignment of the authorized bulkhead must be staked by a representative of the Division of Coastal
Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction
within 30 days, or erosion of the shoreline by adverse weather conditions will require the alignment to be
restaked by DCM within a maximum of 30 days prior to the new expected start of coQ?tbn.
2. The bulkhead must be constructed prior to any backfilling activities. NOV 10 1014
3. The bulkhead must be structurally tight so as to prevent seepage of backfill material00#60"M structure.
4. The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other
suitable materials approved by department personnel.
5. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic
materials, or unsightly debris will not be used.
6. All backfill material will be obtained from a high ground source and confined behind the permitted bulkhead.
No backfill material is to be placed within 30 feet of the normal high water line, except that which will be
used to backfill the area behind the permitted bulkhead.
8. In order to protect water quality, runoff from the construction must not visibly increase the amount
of suspended sediments in adjacent waters.
9. This permit authorizes only the docks, piers, and other structures and uses located in or over the water
that are expressly and specifically set forth in the permit application. No other structures, whether
floating or stationary, may become a permanent part of the structure without permit modification. No
non -water dependent uses of structures may be conducted on, in, or over public trust waters without
permit modification.
10. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
11. The authorized structure and associated activity must not cause an unacceptable interference with
navigation and shall not exceed the established pierhead line.
12. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the
U.S. Coast Guard, through regulations or otherwise, on authorized facilities.
Recommendations for State Permit - Swan Point Marina
Paget
13. In order to protect juvenile shrimp and finfish populations, no excavation or filling will be permitted between
April 1 and September 30 of any year without the prior approval of the Division of Coastal Management, in
conjunction with the Division of Marine Fisheries.
14. Excavation shall not exceed -6.0' below MLW.
15. The temporary placement or double -handling of excavated or fill materials within waters or vegetated
wetlands is not authorized.
16. All unconsolidated material resulting from associated grading and dredge spoil placement shall be retained
on site by effective sedimentation and erosion control measures and shall be confined to the area above
mean high water and landward of any regularly or irregularly flooded marsh behind adequate retaining
structures. Prior to any land -disturbing activities, a barrier line of filter cloth must be installed between
the land disturbing activity and the adjacent marsh or water areas, until such time as the area has
been properly stabilized with a vegetative cover.
17. All spoil material shall be placed at least 30' from mean high water.
18. The disturbed areas will be properly graded and provided with ground cover sufficient to restrain erosion within
thirty (30) working days of project completion.
19. The spoil area shall be inspected prior to beginning work by a DCM Representative.
20. In order to protect water quality, runoff from the construction must not visibly increase the amount of
suspended sediments in adjacent waters.
21. The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any
maintenance work authorized by this permit, and such notification shall include:
A. The number of the original permit.
B. A statement that no dimensional changes are proposed.
C. A copy of the original permit plans with cross -hatching indicating the area to be maintained,
the area to be used for spoil disposal, and the estimated amount of material to be removed.
The location, design and holding capacity of the spoil disposal site must be approved by a
representative of the Division prior to the initiation of any maintenance dredging activities.
D. The date of map revision and the permittee's signature shown anew on the original plans
22. This permit does not authorize the interference with any existing or proposed Federal project, and, the
permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which
may be caused from existing or future operations undertaken by the United States in the public interest.
23. The permittee will maintain the authorized work in good condition and in conformance with the terms and
conditions of this permit. The permittee is not relieved of this requirement if he abandons the project without
having the permit transferred to a third -party.
24. Future development on the permittee's property may require a modification of this permit. Contact a
representative of this Division at (910) 796-7215 prior to commencement of any such activity for this
determination.
RECENED
NOV 19 2014
DCM-MHD CITY
Recommendations for State Permit — Swan Point Marina
Page 3
25. The construction of the proposed project shall be in compliance with all local, State and Federal
regulations and associated permit conditions.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or
authorizations that may be required.
NOTE: The permittee shall be required to install and maintain a proper sedimentation and erosion control
structure to prevent sediment run-off to the adjacent waters or marsh.
RECEIVED
NOV 19 2014
DCM-MHD CITY
Howell, Jonathan
From: Crumbley, Tyler SAW <Tyler.Crumbley@usace.army. mil>
Sent: Friday, January 23, 2015 2:40 PM
To: Howell, Jonathan
Subject: Recommended conditions for SAW 2014-02301 Swan Point Marina
The Federal agencies have completed review of the proposal as presented by the application and your field investigation
report.
We recommend that the following conditions be included in the State authorization:
1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The
guidelines can be found at http://www.fws.gov/nc-es/mammal/manatee_guidelines.pdf.
2. Dredging is not authorized between April 1 and September 30 of any year.
3. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast
Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact
the U.S. Coast Guard Marine Safety Office at (910) 772-2191.
4. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a
part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior
to implementation.
5. The docks and piers extending over wetlands will be elevated sufficiently (a minimum of 3 feet) above the
wetland substrate to prevent total shading of vegetation, substrate, or other elements of the aquatic environment.
6. The permittee understands and agrees that, if future operations by the United States require the removal,
relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the
Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free
navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of
Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the
United States. No claim shall be made against the United States on account of any such removal, relocation, or
alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West
HWY- RM 7316, Silver Spring, MD 20910-3282 at least two weeks prior to beginning work and upon completion of work.
7. Approval of the structure is based on determinations that there would be no obstruction to navigation. The
structure may be damaged by wave wash from passing vessels. Issuance of this permit should not be construed, as
relieving the permittee of taking proper steps to insure the structure and moored boats will not be damaged by wave
wash.
S. The authorized structure and associated activity must not interfere with the public's right to free navigation on
all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by
the public of all navigable waters at or adjacent to the authorized work for reason other than safety.
9. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities
shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal
flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands.
10. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or
mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within
waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill
material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities
connected with this project.
11. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and
wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or
any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Quality at (919) 733-
5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control
Act will be followed.
12. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from
an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic
materials (including debris from land clearing activities), or unsightly debris will not be used.
13. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the
authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination
procedures.
14. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit
in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated
with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all
conditions, shall be available at the project site during construction and maintenance of this project.
15. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in
sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to,
the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the
movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain
in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes
Chapter 113A Article 4).
16. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area
of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less
in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25
NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not
considered significant.
17. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of
the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his
authorized representative may direct, restore the water or wetland to its pre -project condition.
18. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and
Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the
permittee's discovery of the violation.
Questions or comments may be addressed to Mr. Tyler Crumbley, Wilmington Field Office, Regulatory Division,
telephone (910) 251-4170.
Tyler Crumbley
Project Manager
U.S Army Corps of Engineers -Wilmington District Wilmington Regulatory Field Office
69 Darlington Avenue
Wilmington, NC 28403
Phone: 910-251-4170
Fax:910-251-4025
email: tyler.crumbley@usace.army.mil
"The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at: http:Hregulatory.usacesurvey.com/"
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to r,,, Y L e w• s s
(Nam of Property Owner)
property located at j 23 ��"9e J - SAC- �s Ff -- r Nc 2FYC a
(Address, Lo Block, Road, etc.)
on I„ff fo.ry<� in Aeo-dr 'r,,,, ,N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
cation.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing development /mu/st Hit in description below/or attach a site drawing)
�eP� c.nf el"J; /of iA ht< / el )en of S1 f h�, / 4,
Ik ea a J1, J �r� L✓e��wa� A.. l�
rhAl� Ifn 4ll(e NIc 4C cf , v o, 1'X, f
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
n . / I do wish to waive the 15' setback requirement.
U " ) I do not wish to waive the 15' setback requirement.
(Property Owner Information)
Signature
Mh� 4
Print or Type Name
t t zIr-
''i g Address,,,, WC 2F Y C o
ds ram,
CttyrStafe2ip
Ciro_ f7,0- rasF J OTSiSl4�re/N:� .f..,
Telephg�ne umber/email address
Alp 1 t y
Date
*Valid for one calendar year after signature*
(Adjacent Property Owner Information)
1Zz�mo &L
Si ature *
Ttm A_ l ui GNrds
Dale*
f , 4
RECENED
NOV 18 2014
DCM-MHD CITY
(Revised Aug. 2014)
RECEIVED
DCM WILMINGTON, NC
OCT 2 9 2014 %� 3
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to 1 w, h C � w. , 's
(Name of Property Owner)
property located at (� 3 �"J` f f -
(Address, Lot,,,Ploc Road etc.)
T.. <..
on <.,.,I -I ,in Ica s t:<..y ,N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
� I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing deve lopmeM must ffil
ustNil in de)sedpNon bellow or attach a site drawing)
P�ten
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
�S I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
//(yyP��rop��gqerty Owner Information)
s
Signature /
Print or Type Name
l 12 lk it ".., ft _
Maif g Addresses
/vf 2PY.
city/stal.e p
`fro-(z 0-,3_
Telep ng/ Numberl email address
to�/r c/Y
Date
*Valid for one calendar year after signature'
SlgnQ1re
'0 /!J V.
/ \ t/C• 1 L
MailingBddFessds 7� -,Yr/ d1 c
city/staatte/lzip /� ' 3� -7,191 G
Telephone Numbe d adze S.
Date*
RECENEI�?evised Aug. 2014)
NOV 1920N RECEIVED
DCM WILMINGTON, NC
DCM-1 W CW
OCT 2 9 2014
To whom it may concern,
We are proposing to repair the bulk head on the north and south side of Swan Point Marina.
Also, we wanted to dredge where the wet slips are next to the bulk head and we will be putting the soil
on top of the hill surrounded by silk fence. In addition, we are going to extend five feet for the road
leading to the t-dock and on the north side of Swan Point Marina we will be putting in a six foot
walkway. Please see drawing for all repair and walkway addition.
Thanks
Mark
PECENED
Nnv 19 2w
DCM-MHD CITY
,::tEGE1VED
OCM Wjt.MING-MN, NC
0C1 %92014