HomeMy WebLinkAbout11-15 Renewal 2018 Swan Point MarinaPermit Class
RENEWAL
Permit Number
11-15
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Swan Point Marina c/o Mark Lewis 112 McVicar Street, Sneads Ferry, NC 28460
Authorizing development in Onslow County at Stump Sound, 123 Page Street, Sneads
Ferry , as requested in the permittee's application dated letter dated 8/2/18.
This permit, issued on September 6.2018 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original of Permit No. 1 I-15, which was issued on 01/27/15,
and copies of all documents shall be readily available on site when a Division representative inspects
the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
RECE
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
SEP 0 7 201
DCM-MHD C
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
L l L ,
Braxton . Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Swan Point Marina
ADDITIONAL, CONDITIONS
Maintenance Clause
A
Permit No.11-15
Page 2 of 2
3) The Division of Coastal Management will be notified in writing at least two (2) weeks in advance of any
maintenance work authorized by this permit and that notification include:
a. The number of the original permit
b. A statement that no dimensional changes are proposed
c. A copy of the original permit plan(s) with cross -hatching indicating the area to be maintained
and the.area to be used for dredge spoil, and the estimated amount of material to be removed
d. The date of plan revision and the permittee's signature shown anew on the original plan
NOTE: A permit renewal application processing fee of $100 was received by DCM for. this project.
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
MEMORANDUM
NORTH CAROLINA
Env4*otunwdW Qaaaty
TO: Courtney Spears
Assistant Major Permits Coordinator, WiRO
FROM: Shaun Simpson SC
DCM Permit SuppoM WiRO
THRU: Debra Wilson Oy J
DCM, District Manager, WiRO
DATE: August 30, 2018
SUBJECT: • Major Permit Renewal Request: State Permit No. 11-1 S
Swan Point Marina, Onslow County
Mr. Mark Lewis is requesting the renewal of State Permit No. 11-15, originally issued on January 27,
2015, and due to expire on December 31, 2018. The enclosed letter notes that current economic conditions
enable the continued construction of the seawall and walkway, and completion of the dredge portion of the
project.
This Office has no objection to the renewal of State Permit No. 11-15. Mr. Lewis has submitted a check
(no. 1134) in the fee amount of $100.
Enclosures
cc: MHC files
Liz Hair, USACE
Robb Mairs, DWR
D Q'
RECEIVED
SEP 0 7 2018
North Carolina Department of Environmental Quality I Division of Coastal Management DCM-MHD CITY
Wilmington Office 1 127 Cardinal Drtve Extension I Wilmington, North Carolina 29405
910.796.7215
08/02/2018
To Whom it may concern,
I am writing to you today in reference to our CAMA maintenance permit that will be
expiring on 12/31/2018. 1 would like to extend the permit due to not completing all the tasks that
needed to be done. The permit number is 11-15. The check and copy of the permit will be
included in this envelope. If you have any questions, please contact me at 910-520-5298.
Thank you
Mark
From: Jason Thompson Imailto:Idt5151977@yahoo.com]
Sent: Monday, August 20, 2018 11:55 AM
To: Dail, Jason <lason.dail(ancdenr.aov>
Subject: [External] Re: Swan Point Marina Renewal
RECEIVED
41JG ()62018
0CM WILMINGTON, NC
Here is an update of what needs to be done now that the economy has improved.
We need to finish the seawall, start dredging and finish the walkway.
Thanks,
Jason Thompson
RECEIVED
SEP 0 7 2018
DCM-MHD CITY
Permit CIAss Permit Number
NEW 11-15
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and DECEIVED
Coastal Resources Commission
ermtft SEP 0 7 2018
for ')CM-MAHO CIT
. X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Swan Point Marina c/o Mark Lewis,112 McVicar Street, Saeads Ferry, NC 28460
Authorizing development in Onslow County at Stump Sound, 123 Page Street, Sneads
as requested in the petmittee's application dated 10 4114 including the
attached wor g lan drawings (3). 1 of 3 dated 4/12/11, 2 of 3 dated 10/24/14 and 3 of 3 dated 10/14/14
This permit, issued on Jannary 27, 2015 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to rates, rmptlsonment or CtVil action; or may Cause the permit to be null and Vold.
Dockine Facility
1) Unless specifically altered herein, this permit authorizes the docks, piers and other structures and
uses that are expressly and specifically set forth in the attached permit application and workplan
drawings. No other structure, whether floating or stationary, shall become a permanent part of this
docking facility without permit modification. No non -water dependent uses of structures shall be
conducted on, in or over public trust waters without permit modification.
2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the pemuttee is responsible. This prohibition shall be applied and enforced
throughout the entire existence of the permitted structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this perm, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
�s
raxton C. Davis, Director
bi vision of Coastal Management
This perl`9t'�Ai�d"rons are hereby �tE i V E D
AUG 06 2018 DCM NALMiNGTM N
DCM WILMINrrnni air, JAN 2 7 Hula
Signature of Pennittee
Mark Lewis Permit # 11-15
Page 2 of 4
ADDITIONAL CONDITIONS
3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
4) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
5) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
7) This permit does not authorize any additional boat slips in association with this docking facility.
Bulkhead
8) The alignment of the permittee bulkhead shall be staked by the permittee and approved on site by a
Division of Coastal Management representative prior to initiation of construction.
9) No portion of the bulkhead shall be located more than 5' waterward of the existing dilapidated bulkhead.
10) The bulkhead shall be constructed prior to any backfilling activities.
11) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not
authorized.
12) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
13) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles,
or other suitable materials approved by Division personnel.
14) All backfill material shall be clean and free of any pollutants except in trace quantities.
Excavation
SEP 0718
15) No excavation shall take place outside the area indicated on the attached workplan drawingPCM-MHD
16) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the deptll.ofp
excavation exceed the depth of the connecting waters. = t c t V E I
'Dck� '4'i!I VilNGT0i
RECEIVED
T.W..dW. VbC4. VYJO+ANN\N.�'Yh)MOOTMtrPM)N-`^'�iNY�v`bYnYYiYrvY. FrYJN.N4h nY�.WNJh4%W`Y+HYn"M4`J'w'SJi�Jf��� �r /�'.�qi%+.�`rytY(4WAHV000OiQOOPM!`fA'•'N
DCM WILMINGTON, NC
Mark Lewis
ADDMONAL
Permit # 11-15
Page 3 of 4
17) In order to protect juvenile finfish resources, no excavation shall be permitted between April 1 and
September 30 of any year without prior approval of the Division of Coastal Management and the US
Army Corps of Engineers.
18) The temporary placement of double handling of excavated materials within waters or vegetated wetlands
is not authorized.
Spoil Dispes
19) All excavated materials shall be confined above normal high water level and landward of regularly or
irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of
solids into any wetlands or surrounding waters.
20) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the
initiation of any dredge activities.
Sedimentation and Erosion Control
21) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
22) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed
immediately landward of the bulkhead cap immediately following completion of backfilling activities.
Maintenance Clause
23) The Division of Coastal Management will he notified in writing at least two (2) weeks in advance of any
maintenance work authorized by this permit and that notification include:
a. The number of the original permit
b. A statement that no dimensional changes are proposed
c. A copy of the original permit plan(s) with cross -hatching indicating the area to be maintained
and the area to be used for dredge.spoil, and the estimated amount of material to be removed.
d. The date of plan revision and the permittee's signature shown anew on the original plan
General
24) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration. Fi cC E i V E D
RECEIVED RECEIVED OCM '01'LiviINGTON,
DCM-MHD CITY DCM WILMINGTON, NC
Mark Lewis
Permit # 11-15
Page 4 of 4
ADDITIONAL CONDITIONS
25) In order to further protect the endangered West Indian Manatee, rrichechus manatus, the applicant must
implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all
requirements therein. The guidelines can be found at http://www.fws.gov/nc-
es/mammal/manatee_guidelines.pdf.
26) No vegetated wetlands shall be excavated or filled, even temporarily, without permit modification.
27) No open water areas shall be excavated or filled, even temporarily, outside of the areas indicated on the
attached workplan drawings.
29) This permit shall not be assigned, transferred, sold, or otherwise disposed of to. a third party without the
written approval of the Division of Coastal Management.
29) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level
NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
90-0267.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2014-02301, which was issued on 1/23/15.
NOTE: This marina was originally permitted under CAMA Major Permit #30-90
RECEIVED
AUG 06 Z018
DCM WILMINGTON, NC
�P;1 `aV1+ PAINGTON, 11C
RECEIVED 34N 2 7 2Gi5
DCM-MHD CITY
Date
Date
Check From
Name of
Vendor
Check
Check
Permit
Rtt. #
Received
Deposited
Permit Holder
Number
amount
Number/Comments
8/13/2018
JDT Marine, LLC
Swan Point Marina
BB&T
1134
$100.00
renewal fee #11-15, 123
SS rct. 6116
Page Street, Sneads Ferry
ONCo
}
LU
>
o
n
U
W
U
W
o
n
LiJ
cn
=
2
r2
�