HomeMy WebLinkAbout143-15EMERGENCY Sunset Motorsports LLCi
.` Permit Class'
EMERGENCY
Permit Number
143-15
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermt"t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Sunset Motorsports LLC 1350 Hickman Rd NW Calabash NC 28467
Authorizing development in Brunswick County at adi. to Old Sound Creek, at 24 Causeway
Drive Ocean Isle Beach , as requested in the permittee's application dated ' 12/3/15 (MP-1) and 12/2/15
(MP-2) incl attached workplan drawing Cl dated 12/4/15
This permit, issued on December 15, 2015 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
ie subject to tines, imprisonment or civil action; or may cause me permit to oe nuu ano vow.
Bulkhead
1) The bulkhead shall not extend waterward more than 4 feet from the base of the existing deteriorated
bulkhead wall in front of the existing building, and no more than 2 feet waterward from the base of
the existing deteriorated bulkhead wall in front of the existing parking lot at the time of construction.
2) The alignment of the authorized bulkhead shall be staked by a representative of the Division of
Coastal Management within a maximum of 30 days prior to the start of construction,
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Braxton7C Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Sunset Motorsports, LLC Permit lio. 143-15
Page 2 of 3
ADDITIONAL CONDITIONS
3) Due to the fragile nature of the existing failing bulkhead, the permittee shall implement all appropriate
measures to ensure that the construction of the new bulkhead does not lead to further failure of the existing
bulkhead.
4) No backfill material shall be placed within 30 feet of the normal high water line, except that which will
be used to backfill the area behind the permitted bulkhead.
5) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not
authorized.
6) The bulkhead shall be constructed prior to any backfilling activities.
7) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure.
8) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or
other suitable materials approved by Division personnel.
9) All backfill material shall be clean and free of any pollutants except in trace quantities.
10) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
Sedimentation and Erosion Control
11) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, etc.).
13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed
immediately landward of the bulkhead cap immediately following completion of backfilling activities.
General
14) No vegetated wetlands shall be excavated or filled, even temporarily, outside of the area depicted on the
attached workplan drawings.
15) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
' Sunset Motorsports, LLC Permit No.143-15
Page 3 of 3
ADDITIONAL CONDITIONS
16) Should there be a need to cross existing Coastal Wetlands in order to access the project site, the
permittee shall implement appropriate measures to ensure that damage to the Coastal Wetlands is
minimized and avoided.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required,, including but not limited to any required
authorizations from the N.C. Division of Water Resources or the U.S. Army Corps of Engineers.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-721 5 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
DESIGN NARRATIVE
1. EXISTING CONDITIONS:
The site at 24 Causeway Drive in Ocean Isle Beach consists of two adjacent lots on the
Eastern Channel. The existing shoreline stabilization structure has failed and is in the
process of collapsing. Both of the lots are zoned commercial the approximate areas are as
follows: 6,420 SF (257DH01206) and 6,050 (257DH01210). The elevation of the
property ranges from 4 feet to 10 feet NAVD88.
The project is located in a VE High Hazard Flood Area.
The current condition of the wooden bulkhead at this location requires emergency
stabilization to protect the property as well as structures on the property.
2. PROPOSED DEVELOPMENT:
The emergency stabilization will include installing 20 foot pilings on 5 foot centers, 4
feet water ward of the existing bulkhead. The proposed bulkhead is must be place 4 feet
water ward of the existing bulkhead because the existing bulkhead is bulging as much as
3 feet in some locations, and due to the close proximity of the building, the wall cannot
be pulled back. After the pilings are in place new 6-inch X 6-inch whalers will be
installed. Helical anchors will be installed and attached to the new piling, then attached to
the existing bulkhead and braced to the new pilings. At this time the vinyl sheeting can be
put in place and necessary backfilling may occur.
The new bulkhead will be approximately the same height as current bulkhead. After fill is
place between the existing and the new bulkhead the ground surface will be vegetated.
Material from the Ike Williamson permitted sand mine on Hale Swamp Road is expected
to be required for fill material in addition to the existing material. The bulkhead will be
constructed structurally tight to keep material on site. The purpose of the proposed
bulkhead is to protect and stabilize the shore because the existing bulkhead is no longer
stabilizing the embankment.
F1r--- ✓EIVED
DCM WILMINGTON, NO
DEC o 4 2015
vl �
19M Mr-1
APPLICATION for
NOW Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1 PnmaryApp6cant/Landowner%nforma6on �' ;r �
-(if�
,h
Business Name
Project Proj c me applicable)
Name
Sunset Motorsports, Llc
Century 21
Applicant 1: First Name
MI
Last Name
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
Stale
1350 Hickman Road NW
Calabash
NC
ZIP
Country
Phone No.
FAX No.
28467
USA
910 - 287 - 3051 ext.
N/A -
-
. Street Address (6different from above)
7
City
State
ZIP
Email
2
F'Ageit/Conbaetorinfonrlationry
Business Name
Cape Fear Engineering
Agent/ Contractor 1: First Name
MI
Last Name
Elizabeth
M
Nelson
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box -
City
State
151 Poole Rd Suite 100
Belville
NC
ZIP
Phone No. 1
Phone No. 2
28451
910 - 383 -1044 ext.
ext.
FAX No.
Contractor #
910 383 1045
Street Address (if different from above)
City
State
ZIP
Email
elizabeth.nelson@capefearengineering.com
<Form continues on back> RECEIVED RECEIVED
DCM WILMINGTON, NCDCM WILMINGTON, NC
252-808-2808 :: 11-888-4RCOAST :: www. necoasta l management. net
fvv
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
_3 Pio�ect Loca$on - -
County (can be multiple)
Street Address
State Rd. #
Brunswick
24 Causeway Drive
Subdivision Name
City
State
zip
N/A
Ocean Isle Beach
NC
28469 -
Phone No.
Lot No.(s) (rfmany, attach additional page with list)
ext.
N/A, I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Lumber River
0�5bvw& ci-wu
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Atlantic Intracoastal Waterway
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
Town of Ocean Isle Beach
;4 Site !)eScnp4on�' 13j• r n."1 r' °M'f [� t '
t �.s
!. r
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.) '
100 LF
12,470
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high wateo or
6,420 SF, 6,050 SF,
NWL (normal water leveo
(If many lot sizes, please attach additional page with a list)
10.0 ®NHW or ❑NWL
e. Vegetation on tract '
Upland Grass and Coastal Marsh Grass
f. Man-made features and uses now on tract
Commercial Use, Bulkhead, Building and Parking Area
g. Identify and describe the existing land uses adiacent to the proposed project site.
Commercial
h. How does local government zone the tract?
1. Is the proposed project consistent with the applicable zoning?
C-2, Commercial Buisness District
(Attach zoning compliance certificate, if applicable)
®Yes ❑No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Fonn continues on next page> RECEIVED
DCM WILMINGTON, NC
DEC 0 4 2015
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net
Form DCM MP-1 (Page 3 of4)
APPLICATION for
Major Development Permit
m. (1) Are there wetlands on the site? ®Yes []No
(ii) Are there coastal wetlands on the site? ®Yes ❑No
(III) If yes to either (1) or (II) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Municipal Sewer, Ocean Isle Beach
o. Describe existing drinking water supply source.
Town of Ocean Isle Beach
p. Describe existing storm water management or treatment systems.
The existing stormwater is carded offsite by sheet flow and no other systems are necessary
5 �IcbfiLes and/mpacts , `:
r
a. Will the project be for commercial, public, or private use?
®Commercial ❑Public/Government
a
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
Commercial use and shoreline stabilization
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Bulkhead will be constructed structurally tight before fill material is placed. Excavator will be used for construction. All
equipment will be stored on site.
d. List all development activities you propose.
Construction of new bulkhead in front of existing bulkhead. Existing bulkhead to remain.
e. Are the proposed activities maintenance of an existing project, new work, or both?
Both
f. What Is the approximate total disturbed land area resulting from the proposed project?
400 ®Sq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public accessway or other area
❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Stormwater will sheet flow
L Will wastewater or stonmwater be discharged into a wetland?
[]Yes []No ®NA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes []No ®NA
j. Is there any mitigation proposed?
[]Yes ®No ❑NA
If yes, attach a mitigation proposal.
RECEIVED
<Form continues on back> DCM WILMINGTON, NC
DEC 0 4 2015
252-808-2808 :: 1-888-41111 :: www.necoastalmanagement.net
V^
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6 Additional /reformation
to addrbon to thjs completed appkcatitin form (MR-1) the folloMng items below 6appfig' a must be submdted m order farthe apphcabon
package to,be complete�:;Jtems (a) =;(t) are always applicable to.any major Beveloprrment applmatiori Please consult the apphca6pn k,
mshuctron booklet on how td'properlg y pmpare the iewred items below -
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that Is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
y,Name Vrgma Alma Wilhamsonl'rustee and OIB Holdings LLC ' e "' yk Phone No
s _
Address 2 Causeway Dmra, Ocean Isle Beapti' NC 26469 r: .i
Name Sloane Realty of Ocean Isle Beach, Debbie Smith Phone No.
Address 16 Causeway Rd, Ocean Isle Beach, NC 28469
_ .-.-
� Name � � - -'r Phone No ; 1
€ Address y
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pennittee, and issuing dates.
General permit for bulkhead and boat ramps N01 filed with NCDENR
h. Signed consultant or agent authorization form, if applicable.
1. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge
Date l�-� 43 �I S Print Name .514Zt&"W1 lV4SN��f{G�iJ%
Y
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
❑DCM MP-4 Structures Information RECEIVE®
DCM WILMINGTON, NC
DEC 0 4 2015
252-808.2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
w�_
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL)
stabilization
Length
Width
Avg. Existing
Depth
Final Project
z
NA -NA
Depth
v
a.
cubic yards.
or
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB _
OWL ❑None
(ii) Describe the purpose of the excavation in these areas:
2 '.DISPOSAL OP DCCAVATED MATERIAL r
a. Location of disposal area.
c. (I) Do you claim title to disposal area?
[]Yes []No ❑NA
(ii) If no, attach a letter granting permission from the owner
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
[]CW [_]SAV ❑SB
OWL []None
(ii) Describe the purpose of disposal in these areas:
be excavated.
d. High -ground excavation in cubic yards.
b. Dimensions of disposal area.
d. (i) Will a disposal area be available for future maintenance?
❑Yes []No ❑NA
(ii) If yes, where?
f. (1) Does the disposal include any area in the water?
[]Yes ❑No ❑NA
(i) If yes, how much water area is affected?
RECEIVED
DCM WILMINGTON, NC
DEC 0 4 2016
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06
Form DCM MP-2 (Excavation and Fill, Page 2 of 2)
3 ,SHORECINESTABIUZATIQN4 ': >
L]T►irssectionnotapplrcable;
,"
`use
4'
(If devefopmentrs a,wood gran MP 4 S6ucfines)
,'_
f ?
a.
Tvoe of shoreline stabilization:
b. Length: 10
®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other. _ Width: 1'
c. Average distance waterward of NHW or NWL: 4' d. Maximum distance waterward of NHW or NWL: 4'
e. Type of stabilization material
Wood/Vinyl
g. Number of square feet of rill to be placed below water level.
Bulkhead backfill 400 Riprap 0
Breakwater/Sill 0 Other 0
I. Source of fill material.
Ike Williamson Sand Mine on Hale Swamp Road
a.
If yes,
(ii) Amount of material to be placed in the water
(Ili) Dimensions of fill area
(iv) Purpose of fill
a. How will excavated or fill material be kept on site and erosion
controlled?
Bulkhead to be constructed structurally tight, before backfilling
c. (1) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what Type and how they will be implemented.
n/a
f. (i) Has there been shoreline erosion during preceding 12
months?
[]Yes ®No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
WA
h. Type of fill material.
Clean sand / dirt
b. (1) Will fill material be placed in coastal wetlands/marsh (GVV),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV _ ❑SB
❑WL []None
(i) Describe the purpose of the fill in these areas:
b. What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
Excavator
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes ®No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
n/a
DCM WILMINGTON, NC
252.808.2808 :: 1.88B-4RCOAST :: www.necoastaimananement.net revised: 12/26/06
DCM Coordinator: e-C.,)ry-S Permit#:
MAILING DISTRIBUTION SHEET
Permitee: kko-Ip,C5 27-1K L�L-!' -
DCM Field Offices
Elizabeth City (with revised work plan drawings)
Morehead City
Washington
C�
US ACOE Offices:
Washington:
Raleigh Bland
William Westcott (NC DOT)
Bill Biddlecome (NC DOT)
Wilmington:
Liz Hare
Cultural Resources:
�ene�Gledhill-Earl
Public Water Supply:
rane Williams O)
Joey White (WARD)
DCM/
Shane Staples
Fisheries Specialist
-h=99
NC DOT:
Pa
DMF/
Shellfish Sanitation:
State Property:
Water Resources:
Washington:
Wilmington:
DEMLR
Washington:
Wilmington:
Wildlife Resources:
LPO:
Fax Distribution:
Patti Fowler
on e
Karen Higgins (Raleigh)
John Hennessy (NC DOT)
Anthony Scarbraugh-401
Joanne Steenhuis - 401
�d"Cov O
Scott Vinson-Stormwater
q!!!gLette 3cott- Storm—;0ater
Permitee
Agent #:_
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
1) APPLICANT: Sunset Motorsports, LLC dba McClure Realty COUNTY: Brunswick
PROJECT NAME: Emergency Bulkhead Permit
LOCATION OF PROJECT: 24 Causeway Dr., adjacent to Old Sound Creek IAIWW, in Ocean Isle Beach
DATE APPLICATION RECEIVED COMPLETE BY FIELD:12-4-15
FIELD RECOMMENDATION: Attached: YES
CONSISTENCY DETERMINATION: Attached: n/a
FIELD REPRESENTATIVE: Snider r
DISTRICT MANAGER REVIEW:
B) DATE RECEIVED BY MAJOR PERMITS UNIT:
PUBLIC NOTICE REC'D: N/A
ADJ. RIP. PROP NOTICES REC'D:
APPLICATION ASSIGNED TO:
C) 75 DAY DEADLINE: 2ti(b tM� -
MAIL OUT DATE:12-8-15
FEDERAL DUE DATE:
To Be Forwarded: n/a
To Be Forwarded: n/a
DISTRICT OFFICE: WILMINGTON
FEE REC'D: $400,/#214/p
END OF NOTICE FATE: N/A
DEED REC'D:
ON:
150 DAY DEADLINE:
STATE DUE DATE:
FED COMMENTS REC'D:
PERMIT FINAL ACTION: ISSUE DENY DRAFT ON
AGENCY
DATE
COMMENTS
RETURNED
OBJECTIONS:
YES NO
NOTES
Coastal Management- Regional Representative
Coastal Management- LUP Consistency
Division of Community Assistance
Land Quality Section (DEMLR)
Division of Water Resources (401)
Storm Water Management (DEMLR)
State Property Office
Division of Archives & History
Division of Environmental Health
Division of Highways
Wildlife Resources Commission
Local Permit Office
Division of Marine Fisheries / DCM
Corps of Engineers
MAJOR PERMIT FEE SCHEDULE
DCM %
DWQ %
Development Type
Fee
14300160143510009316256253
2430016024351000952341
I. Private, non-commercial development that does
not involve the filling or excavation of any
wetlands or open water areas:
$250
100%
$250
0%
$0
II. Public or commercial development that does
not involve the filling or excavation of any
wetlands or open water areas:
$400
100%
$400
0%
$0
III. For development that involves the filling
and/or excavation of up to 1 acre of wetlands
and/or open water areas, determine if A,B, C,
or D below applies:
III(A). Private, non-commercial development, if
General Water Quality Certification No. 3490
See attached can be applied:
$250
100%
$250
0%
$0
III(B). Public or commercial development, if
General Water Quality Certification No. 3490
See attached can be applied:
$400
100%
$400
0%
$0
III(C). If General Water Quality Certification No.
3490 (see attached) could be applied, but DCM
staff determined that additional review and written
DWQ concurrence is needed because of
concerns related to water quality or aquatic life:
$400
60%
$240
40%
$160
III(D). If General Water Quality Certification No.
3490 see attached cannot be a lied:
$400
60%
$240
40%
$160
IV. Development that involves the filling and/or
excavation of more than one acre of wetlands
-and/or open water areas:
$475
60%
$285
40%
$190
DENR CAMA
Date
Received
11/12/2015
Jill 015
11/122015
11/122015
Daily Check
Date
Deposits
of
11/13/15
11/13/15
11/13/15
11113I75
Log for WIRO
Check From (Name)
Allied Marne Contractors LLC
Richardson Construction
Carolina Marine Construction Inc
Clements Marine Construction Inc
City of Wilmington
Etluardo San Miguel
Chores a Linda Honda
Carolina Coast Contracting.
Coastal Land Design
Allied Marine Contractors LLC
Chad" Riggs 8 Assoc.
Name of Permit Holder
Scott Tucker
Brian Hermann
Federal Point Yacht Club
Ray Slto
same
same
same
470 Anderson. LLC
James Taggart
Hays Lambert
Michael & Becky Steed
Vendor
B of A
BB 8T
First Bank
First Citizens Bank
BofA
PNC Bank
Navy Federal Credit Union
B a A
B of A
B of A
First Citizens Bank
First Citizens Bank
N0M Slate Bank
First Citizens Bank
First Chime Bank
BB aT
BB a
Wells Fargo Bank
First Federal
Coastal Bank antl Trust
BB &T
CraaCom Bank
BB 8T
Coming Federal Credlt Union
Wells Fargo Bank MO
BB 8T
CreaCom Bank
USAA Fed I Savings Bank
Wells Fargo Bank
B of A
B of A
Wells Fargo
First Citizens Bank
BB 8.T
Crescom Berk
Wells Fargo Bank
NoM State Benk
First Citizens Bank
PNC Bank
B of A
NBSC Syrwvus Benk
First Caizena Bank
BB 87
Check
Number
7809
6162
9922
3957
924120
1007
4012
7000
5123
7996
14263
14255
1563
14264
1103
742787
18168
5918342D955
9640
992
1367
2303
1000
1238
17-269805108
11712
2195
2889
3571
4004
4008
1147
Bel
1750
4085
20559
3389
13958
4021
8049
1667
198
Check
amount Permit NumbalCommerntr
E200.00 GP 88192D
$200.00 GP 661870
$400.00 major fee, 910 Basin Road, CS NHCo
$250.00 major fee, 452 Caueswey Dr, WB NHCo
E100.00 renewal tee, MP 81-12
$600.00 GP 66197D
$600.00 GP 551150
E100.00 mina fee, 179 Topsail Roan, NTB Ons.Co
E700.00 minor fee, 230 N. Anderson Blvd. TB PN
E200.00 GP 88215D
$100.00 minor fee, 135 Soundview, Hampot PN
$100.00 mina fee, 111 Pennuda Wynd NTB One
$100.00 1 minor fee, 4110 Island Dr. NTB One
E1D0.00 minor foe, 814 Hampton,corry Cir NTB On
$538.00 NOV 15-18D, $250. $250, E38
5400.00 GP 852190
E200.00 GP 86218D
$200.00 GP 86217D
E400.00 GP 66218D
E100.00 mina fee, S. Lloyd Lt 19 The PeninsulaSC/P
$600.00 GP 66170D
$200.00 GP 66172D
E400.00 GP 8
E200.00 GP 88=1) 220D
E2DO.DO GP S8221D
$400.00 GP 66173D
$400.00 GP 66174D
transfer fee, MP 4-05
E100.01 trans
E250.00 major tee, 914 Santa Maria Ave, Wilm NHCo
$600.00 GP 66190D
E2DO.00 GP 66114D
$100.00 mod fee, MP 47-07
$100.00 mina fee, 1 .67 New River Inlet Rd, NTB On
$800.00 GP 66222D @E200
GP 66223D QE400
E100.00 minor fee, Caswell Beach 15-06
i250.uu major fee, 712 Waynick BNtl WB NHCo
E700.o0'minor fee, 840 Hampton Colony Cit. NTB On a
E25000_major fee, 2309 Middle Sound Loop Rd NHS
E1000a mod fee, MP 132-96
E200.00_GP 68214D
E700.00 renewal fee, MP 06-10
00_ minor fee, Lot 22 Atkinson Rd Surf City PN
E400. 0 major fee, 24 Causeway Dr. 10B BR
Receiptw
M not. 4tnlloeated
TM rcl 0 441 D
TM rot. 0440D
RM rct 0381 D
RM roL 0379D
RMrc10380D
JD rc[ 1054D
JD not. 1 !
JD rot 1056D
JD1057D
JD roG 1058D
JD rcl 1083D
JD ra 1062D
JD not, 1061D
JD rot 1058D
TM rcl 0435D
Jill 015
11l722015
Jill 015
11/132015
11/13I2015
11116=15
11115=15
11/13/15
11/13/15
11/13/15
11/16/15
11/18/15
11/16/15
11/17/15
11116/2015
11/1WMJ5
11/15/2015
11116=15
11/17/2015
11/17/2015
11/17/2015
11/17/2015
11/172015
11202015
11/20/2015
11/20/2015
112012015
1112 015
11/2 015
11/17/15
11/17115
11/17/15
11/17/15
11/17/15
11/17/15
11/17/15
11/17/15
11/17/15
112M15
11/24/15
11124/15
11/24/15
1124/15
1124/15
Charles Riggs 6 Assoc.
St Moritz HOA Inc
Charles Riggs 8 Assoc.
Sunset Dock Assoc
County of Brunswick
Benjamin Spence Albright
Money Order from Brandon Grimes
Southeastem Co_estal Canstwctla i Co
Lee Thornton
HS Con_sWction LLC
Holden Docks 6 Bulkheads
Frederick H. Kart
Logan Marine LLC
Money Order from Dixon Broadfoot
Mike Milligan Painting
Sandy Feet, LLC
same
Dennis & Mary Backer (Basked)
seine
same
same
Chds Lutledoah
Robbie Brooks
Lee Thornton
Richard James
Michael Huskey
same
SEL Property Investors LLC
Burman Broadfoot
George Garalis
HS rcL 09980
HS rot 0894D
JD not. 1084D
JD rot 1055D
JD not 1106D
HS ML 0988 D
HS not. 1DDOD
0
HS rot D
RM rot 0382D
TM ry10407DD
a.
HS rot 1277D
RM rot 0364D
RM M 0383D
11r2 15
11242015
11242015
11/2 015
11252015
11/90I2015
11/302015
11/30/2015
12/12015
12I12015
122/2015
12/3I2015
12I42015
12/42015
12l42015
1?l72015
12f72015
1124115
1125/15
1125115
1211116
12 /1H5
121/15
12/1/15
12/1115
1214115
12/4/15
1214/15
12/4/15
1214115
Maritime Coastal Constna5ion LLC
Jill and Matthew Robinson
Pippin Marine Construction LLC
Antinon Construction Inc
Antinori Construction Inc
Deyo and Associatescoon LLC
Ocean Blue Pools and Spas of NC
David C. Winne, Jr
Custom Island Homes by Kan Kh er LLC
Coastal Marine Piers and Bulkheads LLC
Carolina Sport Court LLC
Clements Marine Construction Inc
Coastal Construction 6 Consulting LLC
Allied Marine Contractors LLC
Seawatch at Sunset Harbor LLC
Charles Riggs 6 Assoc.
Sunset Group Inc
Robert McCormack
same
Larry Warshaw
Caroline Brinkley
Glen Baxter
same representing NC Stets Part Authority
AI Weston
Timothy Chase
Jeff Carter
Max Kohler
Larry Funderburk
Michael Moss
Anthony Patterson
Anchor Bentl
Marvin Rozear
Coastal Communities Inc.
Gail Copland
Sunael Mo[orsporta LLC
JD not. IM70
JD rot 1068D
RM Mt 0385D
JD rcL 10690
RM not 0385D
TM roL 0442D
RM rct 03870
JD not 1070D
HS rot. 1278D
RM not 03BBD
JD rct 1071 D
HS rot 1279D
JD dot 1282D
HS rot 1280D
LIN
0
Recommendations for State Permit —Sunset Motorsports d.b.a. McClure Realty
It is the staffs recommendation that the applicant's proposal to install approximately 108 linear feet of
bulkhead with approximately 400 square feet of coastal wetland fill and connecting to the existing adjacent
bulkhead appears to be CONSISTENT with the Rules of 15 NCAC 71-1.0205 (d) Use Standards for Coastal
Wetlands, Rules of 15 NCAC 71-1.0206 (d) Use Standards for Estuarine Waters, Rules of 15 NCAC 7H.0207 (d)
Use Standards for Public Trust Areas and Rules,of 15 NCAC 71-1.0208 (b)(7) Use Standards for Bulkheads. In
order to reduce impacts to coastal wetlands, the permit could be conditioned that the bulkhead alignment be
staked and approved by a DCM Representative prior to the initiation of construction. As proposed, this office
has no objections to the proposed project and any permit issued should include the standard permit
conditions for bulkheads.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: Sunset Motorsports, LLC dba McClure Realty
2. LOCATION OF PROJECT SITE: 24 Causeway Drive, Ocean Isle Beach, Brunswick County
Photo Index - 2006: 1-6155, M-7, 8 2000: 1-8, L-8 1995: 1-8, M-4
State Plane Coordinates - X: 2170623.184 Y:51423.284
Lat: 33°53'23.8,V N Long: 78°26'16.36"W
3. INVESTIGATION TYPE: CAMA/D&F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —
Was Applicant Present —
5. PROCESSING PROCEDURE: Application Received—12/04/15
Office - Wilmington
6. SITE DESCRIPTION:
(A)
Local Land Use Plan —Town of Ocean Isle Beach
Land Classification From LUP— Commercial (C-2)
(B)
AEC(s) Involved: ES, CW, EW
(C)
Water Dependent: Yes
(D)
Intended Use: Private
(E)
Wastewater Treatment:Existing — Municipal
Planned - None
(F)
Type of Structures: Existing —Commercial building, parking lot and bulkhead
Planned -108 linear feet of new bulkhead
(G)
Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands (Coastal)
High Marsh
Low marsh
400 sq. ft.
(B) Non -Vegetated Wetlands
Open Water
(C) Other
1,000 sq. ft.
uplands
(D) Total Area Disturbed: 2,000 sq. ft. (>0.01 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: The applicant is requesting an emergency permit to install approximately 108 linear feet of
vinyl bulkhead and fill approximately 400 square feet of coastal wetlands.
N
M
Sunset Motorsports d.b.a. McClure Realty
Page Two
9. PROJECT DESCRIPTION
The applicant's property is located at 24 Causeway Drive, adjacent to Old Sound Creek in the Town of
Ocean Isle Beach, Brunswick County. Directions from Highway 17 south of Shallotte:, travel south on
US Highway 17 to Ocean Isle Beach Road SW. Turn left onto Ocean Isle Beach Road SW and travel
approximately 4 miles to the Ocean Isle Beach high rise bridge. Cross the bridge. The project site will
be the first building and parking area on the right side of the road, 24 Causeway Drive.
The project site is a creek front lot that it comprised of two (2) parcels, each measuring approximately
50 feet in width by approximately 115 feet in depth. The elevation of the high ground area of the lot
averages approximately 5 feet above normal high water (NHW). High ground vegetation consists of
minimal lawn grasses, woody shrubs, and landscape vegetation. The majority of the high ground of the
project site consists of impervious surfaces such as roof and parking surfaces. The shoreline of the
property has been stabilized with a timber bulkhead. The existing bulkhead is showings signs of
imminent failure, the timber support pilings have begun to split and the sheeting on the existing wall
has begun to bulge. This failure can likely be attributed to recent excessive rainfall amounts and a
build-up of hydrostatic pressure behind the wall (see attached letter from engineer Elizabeth Nelson).
The existing commercial structure is approximately 1-2 feet from the bulkhead. Coastal Wetlands,
consisting of Smooth Cordgrass (Spartina alterniflora) are present water ward of the bulkhead and
measure approximately 15-20 feet in width. Normal High Water is present along the face of the
bulkhead. The project site is bordered to the north by a Town Park, to the east by Causeway Drive, by
a parking lot and commercial structure to the south and Old Sound Creek to the west. No known
archaeological sites are within the project vicinity.
The Ocean Isle Beach Land Use Plan classifies the adjacent waters as Conservation, and the adjacent
high ground portion of the project area as Commercial. The waters of the Old Sound Creek are
classified SA by the Division of Water Quality and are NOT designated as a Primary Nursery Area (PNA)
by the N.C. Division of Marine Fisheries. They are CLOSED to the harvest of shellfish.
10. PROPOSED PROJECT:
The applicant is requesting an emergency permit to install approximately 108 linear feet of bulkhead
and fill approximately 400 sq. ft. of coastal wetlands. The bulkhead backfill would consist of
approximately 400 square feet of coastal wetlands, primarily Smooth Cord Grass (Spartina alterniflora),
located below Normal High Water (NHW). As proposed, the bulkhead would be installed, on average,
4 feet water ward of the existing bulkhead. As proposed, the bulkhead alignment would be located 4
feet outboard of the adjacent bulkheads and would measure approximately 108 feet in length. The
existing timber bulkhead would remain in place due to the proximity of the existing building. Land
disturbance associated with the bulkhead construction would be minimal based on the use of a helical
anchor system installed thru the proposed bulkhead.
Sunset Motorsports d.b.a. McClure Realty
Page Two
11. ANTICIPATED IMPACTS
The proposed new bulkhead construction with associated backfill and tie back/anchor system would
result in the filling of approximately 400 square feet of Coastal Wetlands and Estuarine Waters Areas of
Environmental Concern. The bulkhead backfill would consist of approximately 400 square feet of
coastal wetlands, primarily Smooth Cord Grass (Sportino olterniflora), located below NHW. The
proposed bulkhead construction would result in the minimal high ground land disturbance.
Submitted by: Holley Snider Date: December 8, 2015 Office: Wilmington
Permit Glass
EMERGENCY
Permit Number
143-15
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Sunset Motorsports LLC 1350 Hickman Rd NW Calabash, NC 28467
Authorizing development in Brunswick County at adi. to Old Sound Creek, at 24 Causeway
Drive Ocean Isle Beach , as requested in the permittee's application dated 12/3/15(MP-1) and 12/2/15
(MP-2) incl attached workplan drawing C 1 dated 12/4/15
This permit, issued on December 15, 2015 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Bulkhead
1) The bulkhead shall not extend waterward more than 4 feet from the base of the existing deteriorated
bulkhead wall in front of the existing building, and no more than 2 feet waterward from the base of
the existing deteriorated bulkhead wall in front of the existing parking lot at the time of construction.
2) The alignment of the authorized bulkhead shall be staked by a representative of the Division of
Coastal Management within a maximum of 30 days prior to the start of construction.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the. permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
V �jLvl
BraxtorOC Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Sunset Motorsports, LLC Permit No. 143-15 '
Page 2 of 3
ADDITIONAL CONDITIONS
3) Due to the fragile nature of the existing failing bulkhead, the permittee shall implement all appropriate
measures to ensure that the construction of the new bulkhead does not lead to further failure of the existing
bulkhead.
4) No backfill material shall be placed within 30 feet of the normal high water line, except that which will
'be used to backfill the area behind the permitted bulkhead.
5) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not
authorized.
6) The bulkhead shall be constructed prior to any backfilling activities.
7) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure.
8) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or
other suitable materials approved by Division personnel.
9) All backfill material shall be clean and free of any pollutants except in trace quantities.
10) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
Sedimentation and Erosion Control
11) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, etc.).
13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any, phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed
immediately landward of the bulkhead cap immediately following completion of backfrlling activities.
General
14) No vegetated wetlands shall be excavated or filled, even temporarily, outside of the area depicted on the
'attached workplan drawings.
15) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
SunsetMotorsports, LLC Permit No. 143-15
Page 3 of 3
ADDITIONAL CONDITIONS
16) Should there be a need to cross existing Coastal Wetlands in order to access the project site, the
perm ittee shall implement appropriate measures to ensure that damage to the Coastal Wetlands is
minimized and avoided.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required,, including but not limited to any required
authorizations from the N.C. Division of Water Resources or the U.S. Army Corps of Engineers.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
I
DESIGN NARRATIVE
1. EXISTING CONDITIONS:
The site at 24 Causeway Drive in Ocean Isle Beach consists of two adjacent lots on the
Eastern Channel. The existing shoreline stabilization structure has failed and is in the
process of collapsing. Both of the lots are zoned commercial the approximate areas are as
follows: 6,420 SF (257DH01206) and 6,050 (257DH01210). The elevation of the
property ranges from 4 feet to 10 feet NAVD88.
The project is located in a VE High Hazard Flood Area.
The current condition of the wooden bulkhead at this location requires emergency
stabilization to protect the property as well as structures on the property.
The emergency stabilization will include installing 20 foot pilings on 5 foot centers, 4
feet water ward of the existing bulkhead. The proposed bulkhead is must be place 4 feet
water ward of the existing bulkhead because the existing bulkhead is bulging as much as
3 feet in some locations, and due to the close proximity of the building, the wall cannot
be pulled back. After the pilings are in place new 6-inch X 6-inch whalers will be
installed. Helical anchors will be installed and attached to the new piling, then attached to
the existing bulkhead and braced to the new pilings. At this time the vinyl sheeting can be
put in place and necessary backfilling may occur.
The new bulkhead will be approximately the same height as current bulkhead. After fill is
place between the existing and the new bulkhead the ground surface will be vegetated.
Material from the Ike Williamson permitted sand mine on Hale Swamp Road is expected
to be required for fill material in addition to the existing material. The bulkhead will be
constructed structurally tight to keep material on site. The purpose of the proposed
bulkhead is to protect and stabilize the shore because the existing bulkhead is no longer
stabilizing the embankment.
RECEIVED
DCM WILMINGTON, NC
DEC 0 4 2015
9CM MP-1
APPLICATION for
Major Development Permit
(last revised 12 27'06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. PrimaryApplicand Landowner Information
Business Name
Sunset Motorsports, Llc
Project Name (if applicable)
Century 21
Applicant 1: First Name
MI
Last Name
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
1350 Hickman Road NW
PO Box
City
Calabash
state
NC
ZIP
28467
Country
USA
Phone No.
910 - 287 - 3051 ext.
FAX No.
N/A - -
Street Address (if different from above)
City
State
ZIP
Email
2. AgwWContractor Information
Business Name
Cape Fear Engineering
Agent/ Contractor 1: First Name
MI
Last Name
Elizabeth
M
Nelson
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
151 Poole Rd Suite 100
Belville
NC
ZIP
Phone No. 1
Phone No. 2
28451
910 - 383 -1044 ext.
ext.
FAX No.
Contractor #
910 383 1045
Street Address (if different from above)
City
State
ZIP
Email
elizabeth.nelson@capefearengineering.com
<Form continues on back> RECEIVED RECEIVED
0C,M WILMINGTON, NCDCM WILMINGTON, NC
iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillilillillillillillillilliillIaI i i I i I I rI I I I I I 1 . I raj ,�
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net
Nz-
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Brunswick
24 Causeway Drive
Subdivision Name
City
State
Zip
N/A
Ocean Isle Beach
NC
28469 -
Phone No.
Lot No.(s) (d many, attach additional page with list)
ext.
N/A, I ,
a. In which NC river basin is the project located?
It. Name of body of water nearest to proposed project"'
Lumber River
"Eaateln-6bawwF- s
tqw& i w
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Atlantic Intracoastal Waterway
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No
work falls within.
Town of Ocean Isle Beach
4X S& t1?GW*6M
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
100 LF
12,470
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
6,420 SF, 6,050 SF,
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
10.0 ONHW or ❑NWL
e.
Vegetation on trail
Upland Grass and Coastal Marsh Grass
f.
Man-made features and uses now on tract
Commercial Use, Bulkhead, Building and Parking Area
g.
Identity and describe the existing land uses adlaoent to the proposed project site.
Commercial
h.
How does local government zone the tract?
1. Is the proposed project consistent with the applicable zoning?
C-2, Commercial Buisness District
(Attach zoning compliance certificate, lt applicable)
®Yes ❑No ❑NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
1.
Is the proposed project located in a National Registered Historic District or does lt involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page> RECEIVED
DCM WILMINGTON, NO
C 0 4 2015
252-808-2808 :: 1-888-4RCOAST :: www. nccoastal management. net
im
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (1) Are there wetlands on the site? ®Yes []No
(ii) Are there coastal wetlands on the site? SYes ❑No
(III) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes SNo
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Municipal Sewer, Ocean Isle Beach
o. Describe existing drinking water supply source.
Town of Ocean Isle Beach
p. Describe existing stone water management or treatment systems.
The existing stormwater is carried offsite by sheet flow and no other systems are necessary
& Activities and Impacts
a.
Will the project be for commercial, public, or private use?
SCommercial ❑PublictGovemmem
❑Private/Community,
b.
Give a brief description of purpose, use, and daily operations of the project when complete.
Commercial use and shoreline stabilization
c.
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Bulkhead will be constructed structurally tight before fill material is placed. Excavator will be used for construction. All
equipment will be stored on site.
d.
List all development activities you propose.
Construction of new bulkhead in front of existing bulkhead. Existing bulkhead to remain.
e.
Are the proposed activities maintenance of an existing project, new work, or both?
Both
I.
What is the approximate total disturbed land area resulting from the proposed project?
400 SSq.Ft or ❑Acres
g.
Will the proposed project encroach on any public easement, public accessway or other area
❑Yes SNo ❑NA
that the public has established use of?
h.
Describe location and type of existing and proposed discharges to waters of the state.
Stormwater will sheet flow
i.
Will wastewater or stomtwater be discharged into a wetland?
❑Yes []No SNA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes []No SNA
j.
Is there any mitigation proposed?
❑Yes SNo ❑NA
If yes, attach a mitigation proposal.
RECEIVED
<Form continues on back> DCM WILMINGTON, NC
DEC 0 4 2015
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
31
6. Additionallnformation
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (1) are always applicable to any major development application. Please consult the application
instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Virgina Alma Williamson Tmstee and OIB Holdings LLC Phone No.
Address 2 Causeway Drive, Ocean Isle Beach, NC 28469
Name Sloane Realty of Ocean Isle Beach, Debbie Smith Phone No.
Address 16 Causeway Rd, Ocean Isle Beach, NC 28469
Nerrte Plane No.
/lddress
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
General permit for bulkhead and boat ramps NOI filed with NCDENR
It. Signed consultant or agent authorization form, if applicable.
I. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
it. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land ___1
I understand that any permit issued in response to this application will allow only the
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date l3-f , Print Name E47AA&V71 E4S�ACCA 7_
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
❑DCM MP-4 Structures Information
RECEIVED
DCM WILMINGTON, NC
n F C 042015
252-808-2808 .. 1-888-4RCOAST ., www.nccoastaimanagement.net
tr-
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-t. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rook Groin Rock
(excluding
(NLW or
Breakwater
shoreline
NWLT
stabilization
Length
Width
Avg. Existing
Depth
NA
NA
Final Project
Depth
NA
NA
1. EXCAVATION ®This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
(i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the excavation in these areas:
d. High -ground excavation in cubic yards.
2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
c. (i) Do you claim title to disposal area?
❑Yes ❑No DNA
(it) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlandstmarsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of disposal in these areas:
d. (i) Will a disposal area be available for future maintenance?
❑Yes ❑No DNA
III) If yes, where?
(i) Does the disposal include any area in the water?
[-]Yes ❑No ❑NA
(ii) If yes, how much water area is affected?
RECEIVED
DCM WILMINGTON, NC
DEC 0 4 2015
252-808-2808 :: 1-888-4RCOA5T :: www. nccoa stalmanagement. net revised: 12/26/06
F'orlll DCM MP-2 (Excavation and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION ❑This section not applicable
(If development is a wood groin, use W-4 — Stnrchwes)
a. Type of shoreline stabilization: b. Length: 10
®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: 1'
c. Average distance watelward of NHW or NWL: 4' d. Maximum distance waterward of NHW or NWL. 4'
e. Type of stabilization material:
WoodNinyl
g. Number of square feet of fill to be placed below water level.
Bulkhead badrfill 4400 Riprap Q
Breakwater/Sill 0 Other 0
I. Source of fill material.
Ike Williamson Sand Mine on Hale Swamp Road
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ONO ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
N/A
h. Type of fill material.
Clean sand / dirt
4. OTHER FILL ACTIMES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes []No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW),
If yes,
III) Amount of material to be placed in the water
(III) Dimensions of fill area
(iv) Purpose of fill
a. How will excavated or fill material be kept on site and erosion
controlled?
Bulkhead to be constructed structurally tight, before backfilling
c. (i) Will navigational aids be required as a result of the project?
❑Yes ONO ❑NA
(ii) If yes, explain what type and how they will be implemented.
n/a
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV _ ❑SB
❑WL []None
(ii) Describe the purpose of the fill in these areas:
b. What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
Excavator
d. (i) Will wetlands be crossed in transporting equipment to project
site? []Yes ONO []NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
n/a
December 2, 2015 Gregory S. Gore / Elizabeth Nelson Agent
Date Applicant Name
Applican gn ture
Project Name RECEIVED
` A WILMINGTON, NC
252-808-2808 :: t-888-4RCOAST:: www.nccoastalmanaaement.net revised: 12/26/06
Coastal Management
ENVIRONMENTAL OUALITV
December 17, 2015
Sunset Motorsports, LLC
1350 Hickman Rd. NW
Calabash, N.C. 28467
Dear Sir or Madam:
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
BRAXTON DAVIS
Dlrech,r
The enclosed permit constitutes authorization under the Coastal Area Management Act, and
where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The
original (buff -colored form) is retained by you and it must be available on site when the project is
inspected for compliance. Please sign both the original and the copy and return the copy to this office in
the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal
described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS
113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter
150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714,
(919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that
another qualified party may submit an objection to the issuance of this permit within twenty (20) days.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work
must be carried out in accordance with your application. Modifications, time extensions, and future
maintenance requires additional approval. Please read your permit carefully prior to starting work and
review all project plans, as approved. If you are having the work done by a contractor, it would be to your
benefit to be sure that he fully understands all permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we
request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if
questions arise concerning permit conditions, environmental safeguards, or problem areas, you may
contact Department personnel at any time for assistance. By working in accordance with the permit, you
will be helping to protect our vitally important coastal resources.
Enclosure
Sincerely,
4 O I/ lAW-
Douglas V. Haggett
Major Permits and Consistency Manager
N.C. Division of Coastal Management
Nothing Compares_
State of North Carolina I Environmental Quality I Coastal Management
400 Commerce Avenue I Morehead City, NC 28557
252-808-2808
N.C. DIVISION OF COASTAL MANAGEMENT
AGENT AUTHORIZATION FORM
Date December 2, 2015
Name of Property Owner Applying for Permit:
Sunset Motorsports, LLC
Mailing Address:
I certify that I have authorized (agent) ELIZABETH M NELSON, PE to act on my
CAPE FEAR ENGINEERING
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity) BULKHEAD REPAIR ,
at (my property located at) 24 Causeway Drive, Ocean Isle Beach, NC 28469
This certification is valid thru (date) 12/31/16
GrePory S. Gore. Managino Member X'2-3- 15
Owner
Date
RECEIVED
DCM WILMINGTON, NC
DEC 0 4 2015
tt c
Ill�l ick CillilllllNC Register s paW f a
erursuick Lanty, NC ReglaNr of Heeds page { of a
er"A R. Cleanses Ragiater of heeds
12-05-2012 15: 25:02.0a0 0runuiek County, NC
NC REVENUE STPW Pass," (aa26a59)
PRaer:pr /� . I pGCQ
3Tntal� nt u , o
Gks a
Refund
ofadpnat
r70:cmrntmiFas vJlsmrAal eyal�yl
r:: � ...ladlfisc3n.nt to nYn✓dx.�ar�iM,
SPECIAL WARRANTY DE
-'P a4,7 DHo 11-10
STATE OF NORTH CAROLINA ParcEq # F- D(-0V4(r
COUNTY OF BRUNSWICK Revenue Stamps$ a� % CO—
(yA
THIS DEED, made this 7 day of December, 2012, by and between Security Savings Bank, SSB, a North
Carolina banking corporation, P. O. Box 10069, Southport, North Carolina 28461, hereinafter whether one or more, referred
toas "GRANTOR;' and Sunset Motorsports, LLC. 1350 Hickman Road NW, Calabash, North Carolina 28467, hereinafter,
whether one or more, referred :o as "GRANTEE'
WITNESSETH'
THAT the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby
acknowledged, has and by these presents sloes grant, bargain, sell and convey unto the Grantee in fee simple all of these
certain lots or parcels of land situated m Brunswick County, North Carolina, more particularly described as follows.
SEE Exhibit A attached hereto and incorporated herein by reference.
For back reference see Book 3319 Page 880 of the Brunswick County Registry.
This property does not include the primary residence of the Granter.
This deed prepared by Michael R. Isenberg, a licensed North Carolina attorney.
Delinquent (at", if any, to be paid by the closing attorney to the Brunswick County
Tax Collector upon disbursement arclosing proceeds.
Prepared by Michael R. Isenberg, Attorney at Law
P. O. Box 11028, Southport, NC 28461
WftxA Opinion on Title
RECEIVED
DCM WILMINGTON, NC
DEC 0 4 2015
c.k" g�r�.t.� oB3343 P10eds 06 , 3'
TO HAVE AND TO HOLD said Ids or parcels of land, and all privileges and appurtenances thereto belonging,
to the Grantee in fee simple.
AND the Grantor covenants with the Grantee that Grantor has done nothing to impair such btle as Grantor
received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through
Grantor.
IN WITNESS WHEREOF, the Grantor, by authority duly given, has hereunto executed this deed the day and
year first above written.
Seour-. � Savings Bank, 6
(SEAL)
By Its -
STATE OF NORTH CAROLINA
COUNTY OF BRUNSWICK
I, P a Notary Public in and for the state and county aforesaid, do hereby certify
that Eof 4 cersonaly came before me this day and acknowledged that he is the
EXPO. 9/ Security Savings Bank, SSB, a banking corporation, and that by authority duly given and as the act
Of the corporation, he voluntany signed the foregoing instrument in its name on its behalf as its act and deed.
WRNESS my hand and official seal this the 4 day of December, 2012.
"5"
ISiFrye��` . 25 rf �f Notary Public
a 4 pTAk}. p My commission expires:
a � �aCA4 L7
,'bu`` zY
M:•
RECEIVED
DCM WILMINGTON, NC
DEC o 4 2015
IIII�IinIIIUIIIIIIiIIINllu1111 ai z � CCU a�umulck C..ty, Nc gegas tar of needs page 3 of 3
Exhibit A
TRACT ONE: Beginning at an iron pipe in the westerly edge of N.C. Highway 904 (,said
beginning point being located north 18 degrees 12 minutes west 350.65 fret from the northwest
comer of the intersection of the noAherly boundary of Third Street and the westerly boundary of
Highway 904 as sbown on a map recorded in Map Book 5 at page 143 of the Brunswick County,
North Carolina Registry); and rowing thence south 76 degrees 15 minutes west 125 feet to a
stake; and naming thence north 18 degrees 12 minutes west parallel with Highway 904 50 feet to
a stake; and running thence north 76 degrees 15 minutes east 125 feet to a stake in the edge of
Highway 904; and running thence with the edge of Highway 904 south 18 degrees 12 minutes
east 50 feet to the beginning comer.
TRACT TWO: BEGINNING at an iron pipe that is located north 18 degrees 11' west 350.65 feet
from the northwest corner of the intersection of Third Street and Hwy 904 according to a map
recorded in Map Book 5 at Page 143 of the Brunswick County Registry; said comer being in the
western edge of Hwy 904; thence south 76 degrees 15' west for a distance of 125 feet to a stake;
thence north IS degrees 12' west for a distance of 100 feet to a stake; tbence north 76 degrees 15'
east fora distance of 125 feet to a state in the edge of Hwy 904; thence south 18 degrees t I - cast
for a distance of 100 feet with the edge of the road to the beginning comer. SAVE AND
EXCEPT that property conveyed to RH. McClure by Homer 1. Johnston et ux by deed recorded
in Book 520 at Page 264.
RECEIVED
DCM WILMINGTON, NC
DEC 0 4 2015
Snider, Holley
From: Huggett, Doug
Sent: Sunday, November 22, 2015 9:05 PM
To: Davis, Braxton C
Cc: Wilson, Debra; Snider, Holley; Coats, Heather, Huggett, Doug
Subject: FW: OIB Bulkhead failure
Attachments: 2015-11-19 Century2lBulkHead.pdf, mclurejpg; mclure2 - Copyjpg; mclure3jpg
Braxton,
Please see the attached correspondence from a property owner at Ocean Isle Beach. The property owner has provided
evidence concerning the possible imminent failure of a bulkhead on the property. Furthermore, due to the proximity of
the building on the lot to the bulkhead, bulkhead failure will likely cause significant damage to the structure, with a high
potential that the structure could be rendered uninhabitable. The Wilmington DCM staff and I both therefore suggest
that the Division implement the emergency permit procedures found under Coastal Area Management Act (§113A-118)
and the State Dredge and Fill Law (§113-229). The emergency provisions of both of these Acts are included below for
reference.
If the Department agrees that an emergency permit is appropriate in this situation, the following deviations from the
standard permit would apply:
1) The public notice provisions of the Coastal Area Management Act and the State Dredge and Fill Law will be
suspended;
2) The adjacent property owner notification process will be suspended;
3) The normal agency coordination process is suspended, although as time allows, DCM will coordinate quickly
with relevant agencies (especially DWR and the USACE) as necessary
Should these emergency permit procedures be authorized, DCM should be able to issue a permit within a matter of
days. The Wilmington staff is currently working with the applicant to prepare the necessary items for a permit
application package that would satisfy the emergency permit requirements, and my staff and I will treat this matter as a
top priority. I would also like to point out that a similar circumstance happened to a property immediately adjacent to
this one 3-4 years ago, and an emergency permit was issued in that case.
I am available to discuss this matter further should you have any additional questions or need any additional
information.
Thanks
Doug
Coastal Area Management Act
§ 113A-118. Permit required.
(f) The Secretary may issue special emergency permits under this Article. These permits may only be issued in those
extraordinary situations in which life or structural property is in imminent danger as a result of storms, sudden failure of
man-made structures, or similar occurrence. These permits may carry any conditions necessary to protect the public
interest, consistent with the emergency situation and the impact of the proposed development. If an application for an
emergency permit includes work beyond that necessary to reduce imminent dangers to life or property, the emergency
W6
permit shall be limited to that development reasonably necessary to reduce the imminent danger; all further
development shall be considered under ordinary permit procedures. This emergency permit authority of the Secretary
shall extend.to all development in areas of environmental concern, whether major or minor development, and the
mandatory notice provisions of G.S. 113A-119(b) shall not apply to these emergency permits. To the extent feasible,
these emergency permits shall be coordinated with any emergency permits required under G.S. 113-229(e1).
State Dredge and Fill Law
§ 113-229. Permits to dredge or fill in or about estuarine waters or State-owned lakes.
(e1) The Secretary is empowered to issue special emergency dredge or fill permits upon application. Emergency
permits may be issued only when life or structural property is in imminent danger as a result of rapid recent erosion or
sudden failure of a man-made structure. The Coastal Resources Commission may elaborate by rule upon what
conditions the Secretary may issue a special emergency dredge or fill permit. The Secretary may condition the
emergency permit upon any reasonable conditions, consistent with the emergency situation, he feels are necessary to
reasonably protect the public interest. Where an application for a special emergency permit includes work beyond
which the Secretary, in his discretion, feels necessary to reduce imminent dangers to life or property he shall issue the
emergency permit only for that part of the proposed work necessary to reasonably reduce the imminent danger. All
further work must be applied for by application for an ordinary dredge or fill permit. The Secretary shall deny an
application for a special dredge or fill permit upon a finding that the detriment to the public which would occur on
issuance of the permit measured by the five factors in G.S.113-229(e) clearly outweighs the detriment to the applicant if
such permit application should be denied.
Doug Huggett
Manager, Major Permits and Federal Consistency Section
North Carolina Division of Coastal Management
doug.huggett@ncdenr.gov
(252) 808-2808 ext. 212
From: Wilson, Debra
Sent: Friday, November 20, 2015 8:48 AM
To: Huggett, Doug <doug.huggett@ncdenr.gov>
Subject: OIB Bulkhead failure
Hey Doug, Is this letter acceptable for the emergency permit request or do we need more info?
Debbie Wilson, District Manager
NC Division of Coastal Management
127 Cardinal Drive Ext.
Wilmington, NC 28405
(910) 796-7266 Fax: (910) 395-3964 debra.wilsonQncdenr.gov
M.� (Nothing Compares..._
Project Narrative
For
Century 21
24 Causeway Drive
Ocean Isle Beach, North Carolina
Prepared for
Sunset Motorsports, LLC
December 2, 2015
Prepared by
Cape Fear Engineering, Inc.
151 Poole Road, Suite 100
Belville, NC 28451
(910)383-1044
NC License No. C-1621
i 1E�—EiVEO
DCM WILMINGTON, NC
DEC 042015
CAPE FEAR
ENGINEERING
151 Poole Road, SuRe 100
BeNille, NC 28451
TEL (910) 383-1044
FAX (910) 383-1045
www.capefearengineering.com
To: NCDEQ - DCM
Attn: Holley Snider
RECEIVED
GEC 0 4 1015
Transmittal
Date: December 4, 2015
File: 875-200 "38"
Subject: CAMA Major
Sunset Motorsports, LLC
24 Causeway Drive
Ocean Isle Beach, NC
❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval
❑ Sent via Mail ❑ Sent via Courier
Quantity
Drawing No.
Description
1
Application
CAMA Major Permits Application, DCM MP-1, DCM MP-2
1
Copy
Project Narrative
1
Copy
Property Deed
1
1 Original
Check In The Amount Of $400 For Required Application Fee, #_
1
Copies
Agent Authorization
2
Copies
Site Plans, Sheet C-1
REMARKS Per NCDEQ DCM, since the project is an emergency bulkhead repair, adjacent property notifications are
not required
CC:
File 875-200 - "38"
Cape Fear Engineering, Inc.
Signed:
lizabeth M. Nelson, PE
Received
Date:
-',vED
DCM WILUNGTON, NC
P:W751875-200 Sammy Vamam Gm aXaMuy 21TAMA1201612-01Transmittal CA Mapr.d. DEC 0 4 Z015
N
a
Coastal Management
ENVIRONMENTAL OUALITV
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
PAT MCCRORY
Govemor
DONALD R. VAN DER VAART
Secretary
BRAXTON DAVIS
Director
December 8, 2015 RECEIVEDMIDDENR/M
DEC 0 8 2015
Chad Coburn
NCDEQ-DWR 401 Section Water Quality Regional
Operations Section
Heather Coats, Assistant Major Permits Coordinator Wilmington Regional Office
NCDEQ — Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(o)ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
CAMA / Dredge & Fill Application Review
Sunset Motorsports, LLC
24 Causeway Dr., adjacent to Old Sound Creek/AIM,, in Ocean
Isle Beach, Brunswick County
to obtain an emergency permit to install a vinyl bulkhead and fill
approx. 400 sq ft of coastal wetlands
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Heather Coats at the address above by December 16, 2015. If you
have any questions regarding the proposed project, contact Holley Snider at (910)796-7270
when appropriate, in-depth comments with supporting data is requested.
/ (J �-e�,` w � j4" t 3 f 17 I S—c c c..
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
SIGNED
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
DATE
Nothing Compares!
l'�il��a�ls
RECEIVED
DCM WILMINGTON, NC
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
910-796-7215
DEC 18 2015,
Water Resources
ENVIRONMENTAL QUALITY
December 17, 2015
Sunset Motorsports, LLC
Mr. Greg Gore
1350 Hickman Road NW
Calabash NC 28467
PAT MCCRORY
a�
DONALD R. VAN DER VAART
Sr," ,,
S. JAY ZIMMERMAN
(lifi[!Ol'
DWQ Project # 15-1302
Brunswick County
Subject Property: Century 21— 24 Causeway Drive, Ocean Isle Beach
NO WRITTEN CONCURRENCE NEEDED
Dear Mr. Gore,
You have our approval, in accordance with the attached conditions to impact 0.009 acres (400 square
feet) of 404 wetlands to install a new bulkhead as described in your application received by the N.C.
Division of Water Resources (DWR) on December 17, 2015. After reviewing your application, we
have decided that the impacts are below the threshold for written authorization as long as all
conditions of General Water Quality Certification Number 3883 (GC3883) is met. This certification
may also be viewed on our website at httP://portaI.ncdenr.orgLweb/wA /sn/ws/40 I /certsandpermits.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 211.0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
Conditions of Certification:
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to return
the attached Certificate of Completion to the 401/Wetlands Unit, North Carolina Division of
Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714.
DCM WILM NIGTON, NC
State of North Carolina I EnvironnnentalQuality IWater Resenrcea DEC 18 2015
1611 Mail service Center I Raleigh, North Carolina 27699-1611
919 707 9000
24 Causeway Drive — Ocean Isle Beach
Brunswick County
2015-1302
This certification and its conditions are final and binding unless you ask for a hearing.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification shall expire upon expiration of the 404 or CAMA Permit.
This letter completes the review of the Division of Water Resources under Section 401 of the
Clean Water Act. If you have any questions, please telephone Karen Higgins in the Central
Office in Raleigh at 919-807-6301 or Chad Coburn in the DWR Wilmington Regional Office at
910-796-7215.
Sincerely,
Chad Coburn
Senior Environmental Specialist
Wilmington Regional Office
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosures: GC3883
Certificate of Completion
cc: Elizabeth Nelson — Cape Fear Engineering, 151 Poole Road, Belville, NC 28451
Debbie Wilson — DCM Wilmington
Tyler Crumbley — USACE Wilmington Field Office
WiRO
RECEIVED
DCM WILMINGTON, NC
DEC 18 2015
Water Resources
ENVIRONMENTAL OUAL!TT
DWR Project No:
Applicant:
Project Name:
PAT MCCRORY
DONALD R. VAN DER VAART
S. JAY ZIMMERMAN
401 Water Quality Certification Issued Date:
County:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicants Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
if this project was designed by a Certified Professional
Date:
I, as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature:
Date:
RECEIVED
DCM WILMINGTON. NC
State of North Carolina I Environmental Quality I Water Resources DEC 18 2015
1611 Mail service Center I Raleigh, Nonh Carolina 27699-1611
919 707 9000
RECEIVED
DCM WILM NGTON, NC
DEC 18 2015
1
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action ID: SAW-2015-02564 County: Brunswick USGS Quad: NC -Ocean isle Beach
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Sunset Motorsvorts, LLC/ McClure Realty
Address: 1350 Hickman Road NW
Calabash, NC 28467
Telephone No.: 910-796-7270
Agent: Cape Fear Engineering
Attn: Elizabeth Nelson
151 Poole Road Suite 1.00
Belville, NC 28451
Phone 910-383-1044
Fax 910-383-1045
Size (acres) 0.29 Nearest Town Ocean Isle Beach
Nearest Waterway Old Sound Creek Basin Lumber River
USGS HUC Coastal Carolina 03040208 Coordinates Latitude. 33.88987
Longitude:-78.43788
Size and location of property (water body, road name/number, town, etc.): The project site is located at
24 Causeway Drive, adjacent to Old Sound Creak in the town of Ocean Isle Beach, Brunswick
County, North Carolina. Coordinates are: 33.88987 N,-78.43788 W
Description of projects area and activity:
The Droicet consists of permanent fill impacts to 0.009 acres of coastal wetlands for emereene
bulkhead installation on a currently failing bulkhead. The impacts will occur approximately 4 feet
waterward of the existinL bulkhead and would measure approximately 108 feet in length and same
height as the existing failing structure. Must be built as described in the construction plans dated
12/3/2015.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
® Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 3. Maintenance.
Additional Remarks and/or Special Permit Conditions:
SEE ATTACHED NWP GENERAL and REGIONAL SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with
the attached conditions, and your submitted information in the application dated December 3 2015. Any
violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop
work order, a restoration order and/or appropriate legal action. RECEIVE[)
DCM WILMINGTON, NC
DEC 2 12015
This verification will remain valid until the expiration date identified below unless the nationwide authorization is
modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization
is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it
complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or
is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of
the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to
commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within
twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary
authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality
Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine
Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management
Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City,
NC, at (252) 808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other
required Federal, State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of
Engineers regulatory program, please contact Tyler Crumbley at 910-251-4170.
Corps Regulatory Official Tyler Crumbley �yl�j _ _ Date: 12/21/2015
Expiration Date of Verification: 18 March, 2017
Determination of Jurisdiction:
A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above
described project area. This preliminary determination is not an appealable action under the Regulatory
Program Administrative Appeal Process ( Reference 33 CFR Part 331).
B. N There are Navigable Waters of the United States within the above described project area subject to the
permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act.
Unless there is a change in the law or our published regulations, this determination may be relied upon for a
period not to exceed five years from the date of this notification.
C. N There are waters of the US and/or wetlands within the above described project area subject to the permit
requirements of Section 404 of the Clean Water Act (C WA)(33 USC § 1344). Unless there is a change in the
law or our published regulations, this determination may be relied upon for a period not to exceed five years
from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action.
Please reference jurisdictional determination issued—. Action ID
a. Basis of Jurisdictional Determination: The site contains wetlands that meet the criteria of the 1987
Corps Delineation Manual and regional supplement. Wetlands are adjacent to the Intracoastal
waterway, which is Section 10 Navigable. This area exhibits a High Tide Line as indicated by physical
markings on structures and is part of the Old Sound Creek.
Corps Regulatory Official: __Tyler Crumble ✓.
Issue Date: 12/21/2015 Expiration Date: 12/21/2020
SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC.,
MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE.
Copy Furnished: Electronically
Heather Coats; NCDEQ, DCM
Holley Snider; NCDEQ, DCM
Chad Coburn; NCDEQ, DWR
Elizabeth Nelson; Cape Fear Engineering
Permit Number: SAW-2015-02564
Permit Type: NW 3
Name of County: Brunswick
Name of Permittee: Sunset Motorsports, LLC
Date of Issuance: 21 December, 2015
Project Manager: Tyler Crumbley
Upon completion of the activity authorized by this permit and any mitigation required by the
permit, sign this certification and return it to the following address:
U.S. Army Corps of Engineers
Attention: CESAW-RG
69 Darlington Avenue
Wilmington, North Carolina 28403-1343
Please note that your permitted activity is subject to a compliance inspection by an U.S. Army
Corps of Engineers representative. If you fail to comply with this permit you are subject to
permit suspension, modification, or revocation.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and conditions of the said permit, and required mitigation was
completed in accordance with the pennit conditions.
Signature of Permittee
Date
- — 30' CAMA SETBACK
— - — - — 75CAMA AEC LINE
MLW - MEAN LOW WATER
MHW - MEAN HIGH WATER
TAX PARCEL NU113629
SWSET MOTORSPORTS, LLC
I350 HKNCJAN ROAD NW
CALABASH NO 28467
r •rf.
TYPICAL BULKHEAD
NOT TO SCALE
U111L __
11L
\ SIL
IL 11.
WAL
TE NEW XISTNSTINGG
TO E11.
BUJGEAD .....
MEAN HG14
WATER AT FACE
OF BULKHEAD
S73' 39'
D
o
S73. 46'
I
1\ \
\\ VIQGINIA ALMA WILLIAMS
TRUSTEE AND \
\QB HOLDINGS, LLC
DB 3332-996
EXISTING FENCE
ALONG BACK
OF WL EED EXISTING
i \\PpPpLT
NG LOT
L { \
L \
1 \ B jLD N �
1
� I \
\
6
\ �75 CAME
AEC LIFE
30' CAMA \�
1 SETBACK
I_L_I \
U\
S TIE NEW WALL SLOANE REALTY OF
,
_�- To EXLSTwG \ OCEAN ISLE BEACH, INC
BULKI .AD \DB 1091-259
SIL �
EDasnNG
IL 11 BLL.b'EAO \ .
�Aw� \
SIL RECEIVED
DCM WILMINGTON,
SIL w_ DEC 0 a 2015
•11 y
LDCx11DN MAP
?On®
L BASE MAP OMM FROM
BRU,bY= OOLNWY GO DATA
A
I MM M MMN Na= - DOI
•
Dsaavnax
WAY
Dire
Sbf mnm
CAPE FEAR
ENGINEERING
f5f Pmk xi.51+ii f00:l3eM9e, xG 18451
CENTURY 21
III (8f0) 383-f004; FAX(8f0)9&RfOCS
mp•Ieerafy�9swn
KGIICEx5EiQ1Glf
F^0� mauD
�.•": tiv xmm
WiE: mme fe
nMDafo: D�
24 CAUSEWAY DIVE
OCEAN ISLE BEACH
NORTH CAROLINA
CAMA MAJOR PERMIT
BULKI-EAD REPAR
nof¢r•e� am luv
875-2( C-I
EXISTING BULKW-AD
GRASS/MARSHUNE
30 CAMA SETBACK
75' CAMA AEC LLE
MLW -MEAN LOW WATER
A4-IW - MEAN HGH WATER
i:zQo�-_j-K• .1���
- • •_ BLS= t
"11 - •,•._, . .
8
BOL
12' V
SHEATI
C C • •' •.
4 • 1} -••
ffi"",CAAo
•f•.
24 CAUSEWAY DRIVE
OCEAN ISLE BEACk INC 28469
COMMERCIAL. CENTURY 2
NOT TO SCALE
11L
y
L 11
\ 11L
JIL
W
W_
L JI
TIE NEW WALL ,•_
TO EXISTING
MEAN HIGH
WATER AT FACE
OF BUJ4-EAD
S73' 39' 20.
1
�G
A
Sw
c^ PROPOSED
BUJ6-EAD
S73' 46'
` TRUSTEE AND WILLIAMS \
\OIB HOLDINGS, LLC
DB 3332-996
i
\
OSTNG FENCE
ALONG BACK
OF BU_KI-EAD EXIST'T
\\FApRK�ING LOT
\\ co, QAI
y-
\ EXIS71�
1 \
c a au
Na .2n
Im-p-11)F
\
75' CAMA
AEC LINE
\
1
1
/-30'CAMA
SETBACK
\
'IL
TIENEW WALL SLOANE REALTY OF
TO EXISTING \ OCEAN ISLE BEACH, INC
1091-259
\
w
BLua-EAD
\DB
11L
3�
\
EXISTING
y
L 1
BU.KI-EAD
\
SIL RECEIVED\
DCM WILMINGTON, f
L -' DEC 0 4 2015
� N ;
A
in 10 mm Ncm - 001 Elf1
ME#V.
OESMP7M OAIE —Z
.`2 - iEsq(R
mil_pgm a
R
........
33?q�NE gF`
h4/NNiN
CAFE FEAR
ENGINEERING
m R,ol ses,ou; vaxry,o) xs,as
CENTURY 21
NGlK£NSEfG1R1
anc �' As fAn®
G! ' A 0lC 16
11AOiAt: fl•I
24 CAUSEWAY DRIVE
OCEAN ISLE BEACH
NORTH CAROLNA
CAMA MAJOR PERW
6UJC1-EAD REPAR
.�., a
875-200 C-1