Loading...
HomeMy WebLinkAbout76-15 Seagate Office ParkPermit Class Permit Number NEW 76-15 T-� STATE OF NORTH' CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission COPY Vrrmit for X Major Development in an Area of Environmental Concern RECEIVE pursuant to NCGS I I3A-118 — Excavation and/or filling pursuant to NCGS 113-229 NOV 3 0 2015 Issued to Seagate Office Park c/o Bradv Semmel.1310 Airlie Road. Wilmington, NC 2Q3 M- M H D C Authorizing development in New Hanover County at adi. to AIW W. 1310/1312 Airlie Road Wilmington as requested in the permittee's application dated 1/14/15including The _ attached workplan drawings (5). all dated 1/14/15 This permit, issued on July 10, 7015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Unless specifically altered herein, this permit authorizes the reconfiguration of the existing docking facility and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the dockingfacility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. QA714akietil Sigifature of Permittee page 2 of 3 Seagate Office Park c/o Brady Semmel + ADDITIONAL CONDITIONS navigable ermittee to prevent the full and free use by the Public of all 3) No attemptthe shall be made by P rmance with the terms waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in Cp°f he abandons the and conditions of this permit. The permittee is not relieved of this requirement Permitted activity without having it transferred to a third patty' or proposed Federal project, and the e o the authorized strucisting ture or work, .the � 5) This permit does not authorize the interference with any the United States in public Pe1'mittee shall not be entitled to compensation for dam ag by which may be caused from existing or future operations undertaken interest. signals prescribed by the U.S. lights or si um, permanent 6) The l�rniittee shall install and maintain at his expense any signal darkness or on the authorized facilities.ible during hAt a ours of Coast Guard through regulation or otherwise, it more t reflectors shall be attached to the structure in order to Make inclernent weather. association with thus docking 7 This Permit does not authorize any additional f° al boat slips o facility. General wires the b the United States req es that, if future operatio a Y by this permit, or if in the 8) The per ni-ttee understands and agrestructure theor work authorized or work shall cause j removal relocation, or other alteratio0 r.oe Armyf authorized representative, said structureee Will be required, upon oPin c)n of the S Tectionot thfiee navigation of the na`ngable waters, he st ucjural work or o. shall be urireasonable obstru to of North Carolina No claim due notice from the Corps of Engineers, to remove, relocate such removal or ea without expense to the United States or Cac on account of airy used thereby, and States or the state of North made against the racily, without permit 9) No ve e ated wetlaaids or open water areas shall be excavated or filled, even tempo mo diFicai o4 used of to a third party Without the I transferred, sold, or otherwise disposed 10) This paiit shall not be assign Management. oval of the Division of Coastalrepresentative of the Division prior to �'�ritten a� 11) ' = pe a and/or his or her contractor shall meet with a rep project 'tion. 1 1 Seagate Office Park c/o Brady Semmel XV Permit #76-15 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or, local permits, approvals, or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (9 1 10).796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high 'water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 15-0204. NOTE: The U.S. Army, Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2015-00584,,which-was issued on 3/27/15. NOTE: An application processing fee of $250 was received by DCM for this project. Permit Class NEW Permit Number 76-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Seagate Office Park c/o Brady Sentinel, 1310 Airlie Road, Wilmington, NC 28403 Authorizing development in New Hanover County at adi. to AIWW, 1310/1312 Airlie Road, Wilmington as requested in the permittee's application dated 1'114115. including the attached worknlan drawings (5), all dated 1/14/15 This permit, issued on .holy 10, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Unless specifically altered herein, this permit authorizes the reconfiguration of the existing docking facility and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees at your project is consistent with the North Carolina Coastal •nagement Program. Signed by the authority of the Secretary of. DENR and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature ofPermittee Seagate Office Park c/o Brady Semmel Permit #7645 Page 2 of 3 ADDITIONAL CONDITIONS 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit does not authorize any additional formalized boat slips in association with this docking facility. General 8) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or. work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 9) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, without permit modification. 10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. Seagate Office Park c/o Brady Semmel Permit #7645 Page 2 of 3 ADDITIONAL CONDITIONS ¢ 3), No attempt shall be made by the permittee to prevent the full and free use by the public of allnavigable waters at or adjacent to the authorized work. _ 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and. conditions of this permit. The permittee is not_ relieved of this requirement if he abandons the permitted activity without having it transferred to a "third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to he authorized structure or work, -or injury which maybe caused from existing or future operations undertaken- by the United States in the public interest. 6) The permittee`shall'install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on theauthorizedfacilities. At a minimum, permanent reflectors shall be attached to the 'structure in order;to make'it more visible during hours of :darkness or inclement weather: 7) This permit does not authorize any additional formalized boat slips in association with this docking facility. General,,.. a 8) The.permittee understands and agrees that, if future operations, by the United :States requires the $.-- removal, relocation„or other, alteration, of the structure'or, work authorized by thispennit, or if in the ' opinion of the Secretary of the Army or his authorized representative, said structure.or work shall cause unreasonable obstruction to free navigation of the navigable waters, the perrnittee will be required, upon due notice from the Corps of Engineers, to remove; relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or -alteration.,_ 9) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, without permit modification. 10) This perihit shall not be assigned, transferred,sold, or otherwise disposed of to a third parry without the written approval of the Division of Coastal Management. 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. Seagate Office Park c/o Brady Semmel Permit #76-15 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 15-0204. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2015-00584, which was issued on 3/27/15. NOTE: An application processing fee of $250 was received by DCM for this project. NICE MF-1 APPLICATION for Major Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information _ __--- — — Business Name Project Name (if applicable) le L Applicant 1: First Name MI Last Name Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names fisted. Mailing Address l la � � %�� PO Box City lv�1�1, State /V ZIP a Country 1454 Phone No. /b -4)b -36 ext. FAX No. Street Address (d different from above) City State ZIP Email C"(I e Alh,c4pm 2. AgerWContractor Information Business Name G/"tl�Ij�tti'i ////r ltfs(i L Agent/ Contractor 1: First Name 461 I Last Name 1 x)d Agent/ Contractor 2: First Name MI Last Name Mailing Address PO BoL 80 Cit14,61j 3IW� A� �1KM'lJ State ZIP Phone No. 1 Phone No. 2 910 -a`-4 -3/0- ext. ext. FAX No. Contractor t $6- ash 306� Street Address (if different from above) City State ZIP Email et� G M14�cuM <Form continues on back> DCM WILMINGTON, NC JAN 1 6 2015 Form 06M MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be ulbple) Street Address State Rd. it N 13,11a� IlWiieN Subdivision Name City State Zip 011jk, WM C RBY03 Phone No. of .(s) (d many, attach additional page with list) aSd -306,- 4W* �i9lFa , a. In which NC river basin is the project located? b. Name of bodd of water nearest to proposed project G Y c. Is t water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. Natural ❑Manmade ❑Unknown fi I,v't & /fC.. wn �the e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list planning jurisdiction or city limit the proposed N(Yes []NO work falls within. WAln .0 v i 4. Site Descdption a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 3,9131 13JOL26631011= c. Size of individual lot(s) d. Approximate elevation of Act above NM (normal high water) or NWL (normal water level) '// / (If many lot sizes, please attach additional page with a list) ❑NHW or ®NWL e. Vegetation on tract a 4 wio f. Man-made features and uses now on tract opict &id n6 41111k d h g.Identify and describe the existing land uses adjacent to the proposed project site. h. How does oral government zone the tract? i. Is the roposed project consistent with the applicable zoning? (Alta zoning compliance certificate, N app icable) []No❑NA �. as J. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes VIN k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes K#4o ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does b involve a ❑Yes fL&o ❑NA National Register listed or eligible property? RECEIVED <Form continues on next page> DCM WILMINGTON, NC JAN 1 6 2015 Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit I m. (i) Are there wetlands on the site? ❑Yes MNo (ii) Are there coastal wetlands on the site? ❑Yes L(No (iii) If yes to either (i) or (if) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. o. Describe existing drinking water supply source. p. Describe existing storm water management or treatment systems. , 41Lf&le NaGF 5. Activities and Impacts a. Will the project be for commercial, public, or private use? / ommercial ❑Public/Government RIVV22 PrivatelGennnwety b. Give a brief descripfion of purpose, use, and daily operations of the project when complete. o. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. ������ �,/��tL �� ; � � Sr�il�ro �► Silk d. List all development activities you propose. �iNfGrn M e3� 4/1+L�tO uFl�/4yXsh.� �f �I�o2l}l. /Zc�//ttis 3� sr��yGy)n�,vlt4JI-"lel~yisTi�%/6'�irYLar f7o�li!!uo %�N9ctFS�XSb�j)dflE e. Are the proposed activities maintenance of an existing project, new work, or both? I. What is the approximate total disturbed land area resulting from the proposed project? ❑Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public acoessway or other area ❑Yes UINo ❑NA that the public has established use of? In, Describe location and type of existing and proposed discharges to waters of the state. IV 0WC I. Will wastewater or stormwater be discharged into a wetland? ❑Yes MNo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑ ❑NA j. Is there any mitigation proposed? ❑Yes SNo ❑NA If yes, attach a mitigation proposal. RECEIVED <Form continues on back> DCM WILMINGTON, NC JAN1n2015 Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional hifonnattion In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. '1 Name �j flt�C //�1�h-&Ar% xi Ap4lii*��� �t Phone Nol�1n„��.a �Sr Addressl70B,6/A&W, alliki'h �l MC VOW I Name fIpft MA76446 Phone NolA)- - Address ,JXl ,v Name /Ad IaXlJaG�! Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pernittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. to Enter on Land I understand that any permit issued in response to this application will allow only the development The project will be subject to the conditions and restrictions contained in the permit. I certify that i am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further cert5r that the information provided in this application is truthful to the best of Iny knowledge. Date J//y` • (k() Print Name il-d gr LA_) Signature 10 /w Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ppCM MP-3 Upland Development CM MP-4 Structures Information RECEIVED DCM WILMINGTON, NC JAN 1 6 2015 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACIUTY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: []Commercial ❑Public/Govemment Private/Comawnity c. (i) Dock(s) and/or pier(s) (ii)Number / -�jlJ/lily PUT,�) N (iii)Length (iv) Width (v) Floating Yes ❑N e. (i) Are Platforms included? ❑Yes 4No If yes: (il) Number (iii) Length (IV) Width (v) Floating ❑Yes []No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed (ii) Number of slips existing i. Check the proposed type of siring: ❑ Land kart and access channel OpIpen water; dredging for basin and/or channel en water; no dredging required ❑Other; please describe: k. Typical boat length: m. (i) Will the facility have tie pilings?(�� �r ❑Yes ❑No /�"��� If (ii) If yes number of tie pilings? plop" ❑This section not applicable b. (i) Will the f be open to the general public? ❑Yes No 0 r L�flMb d. (i) Are Finger Piers included? Yes ❑ If yes: (h)Number Length / N (iv)Width Qv) VYes (v) Floating ❑No r019C- %WMAJLV I. (i) Are Boatltlis included? ❑Yes No If yes: (ii) Number (III) Length _ (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips") only, number of slips: ❑ Dry storage; number of boats: _ V❑ at ramp(s); number of boat ramps: Ottherr,, please describe: RD / j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). 1/ 1. (i) Will the le '1' be open to the general public? ❑Yes No RECEIVED DCM WILMINGTON, NC JAN 1 6 2015 rtrvised, 12,27'06 I DOCKING FACIUTYWARINA OPERATIONS ' M T his section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpoub Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED m. Is the marmatdocking facility proposed within a primary or secondary nursery area? DCM WILMINGTON, NC ❑Yes ❑No JAN 1 6 20i5 >.,v. is 27 oe n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marinaidocking facility located within or within close proximity to any shellfish leases? []Yes [:)No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. a. (1) Is the boathouse structure(s): []Commercial ❑PublicJGovemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dnpline dimensions. 14. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) r / It Vrhis section not applicable a. (i) Number (ii) Length (iii) Width _ & BREAKWATER (e.g., wood, sheetpile, etc.) /H L(This section riot applicable a. Length c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Average distance from NHW, NWL, or wetlands not applicable e b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED DCM WILMINGTON, NC JAN 1 6 2015 a. Proximity of structures) to adjacent riparian property lines 0t/%i';bQLJ /giL)Tr117-N0t& Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body r V/ e. (i) Will naviga onal aids be required as a result of the project? ❑Yes No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. pi2eCKV /1-DiAz��ti 1b SwcnF t �d'Tb Nn2Tri d. Water de pt at waterward end of structure at NLW or NWL � LY 18. OTHER ❑This section not applicable a. Give complete description: Rri lbtw /=Yltiini �tS� �%I=1N�)uC L7lliTin� .5�>`/6' I,-bAnJW'l)A Ned iftin fit /-YM)nl VASb A-Johrin6 /JiUl, /V/Jo-"-'-1vlr Date Project Name Applicant Silinature RECEIVED DCM WILMINGTON, NC JAN 1 6 2015 n rvised: 12. 27'06 it .� PARK 4' ^... .oew � .� w"Nu��C ea �•� C qy fi,lMlfll I/ n 46��'ryrySiHANNEL a ARK Wrightsville� Beach r y ;wldjo/d dfiwg hwt T ;spy f' 41/40- Jo�°5 ..1P.., P. "by d YYPmA4 �gg4��151 � 47� i m° t �yyh 4� 5ol6ee6 PA % -&n, �Lmjoef /314/171j�'� G�,l�i►�1-�i� ,�3Yv3 &�m�roo2 itn riz -rON l F f Sy P q, tls SL►D t P �/ j SuP 71 5uP fuD 5uD J U• s �l 3 j6 z Elf /)-,�45f#C�, 5�off/ RECEIVEC< :DCM WILMINGTON. N FEB 1?2015 �-//A)vfij Ple/mol'D D645 I •1J C�i�e) ,ilk n �n��.• �n yts yilbf.i �t�Y(n! R'rA itt6p fa r r Su'p � 5ti� Sup �� StrP ytl� M3reu St;1 ? RECEIVED DCM WILMINGTON, NC FED i ? 2015 �r pm�i�n , fm D _P NK m =m m� m p { m m z Wa z 0 z m0 n Hb O W F m N V V O N y 3T mx O s n o 7C 3 N tm» F&S Marine Contraetors, Inc. Complete Marine Construction Services For Over 37 years! CAPT. ED FLYNN--}— DURWOOD SYKES Piers, Floating Docks, il Pilings, Bulkheads, Boat Lifts, House Pilings, Repairs P.O. Box 868 Phone/Fax: (910) 256-3062 Wrightsville Beach, NC 28480 email: e8y@msn.com -) are Uri �lok r/U, fig Air I j Md 0 0 �rn �0 rp �zo — /iXIllAll' to Sh S�46#e 01--=icd poaL ly"&� /31D1l3ld allows J 800F. FAGS IWTQ4.00,1sSTaL- 'Pos/ t,�Ka�fSVtLI.. ' i7. T5.o 145.0. ii. TIN, 13r `l , P 4", c u lKu b l� I (� w4 rr t�(,w(-r `omrr UNIT !3w 5 4 ( �. ��- 5 / kuaTEr - WAV JD FA Z o ,n o 9 � U 0 Dochod 13a$lii 1 STATE OF NORTH CAROLINA BEFORE THE CHAIRMAN COASTAL RESOURCES COMMISSION COUNTY OF NEW HANOVER CMT- IN THE MATTER OF THE THIRD PARTY RECOMMENDATION OF THE HEARING REQUEST BY DIVISION OF COASTAL STEPHEN M. VALENTINE MANAGEMENT I. BACKGROUND [Jill will fill in] Under the CAMA, a third party may file a contested case hearing petition to challenge the granting or denial of a CAMA permit to someone else only if the Coastal Resources Commission (CRC or Commission) first determines that a contested case hearing is appropriate. N.C.G.S. §113A-121.1(b) provides that along with being timely filed, the determination as to whether a hearing is appropriate should be based upon a consideration of whether the petitioner: 1. Has alleged that the decision is contrary to a statute or rule; 2. Is directly affected by the decision; and 3. Has alleged facts or made legal arguments that demonstrate that the hearing request is not frivolous. The CRC has delegated the authority to its Chairman to determine whether a third party request for a hearing should be granted or denied. Rule 15A NCAC 7J .0301(b). A third party whose hearing request is granted may file a contested case hearing petition with the Office of Administrative Hearings. N.C.G.S. § 113A-121.1(b). A third party whose hearing request is denied may seekjudicial review. Id. II. FACTS [Jill will work on these using Permit File and with staff imput] Pagel of 4 III. DCM'S RECOMMENDATIONS --- - _ . ---- --- 4. Has the Petitioner Alleged that the--Declsron is Contrargto aStatute or Rule? NO. -_ _ In order to prevail in a third party hearing request, a petitioner must first allege that the agency has made a decision that is contrary to astatute or rule. N_C.G.S_§_113A-121.1(b)(1); Petitioner alleges that because it is an adjacent ripariagpmper_ty- owner, the Permit for the dock .- - - v-..-- - - -- — -- ---- ---- -. and.pier require.Dockside LLC's consent_Staff _maintains that the authorized development fully complies with the CRC's riparian access rule _15A—NCAC. 7H .0208(b)(6)(I). The authorized development is located ,from the riparian line of division which exceeds le.15' minimum setback. Furthermore, based upon multiple visits to the site by Staff, it is the position of Staff - - --- ----.- -—- - -- --— - -- - ihat,, as -required under- 15A NCAC_ .07H.02—08(a)(2)(G),_ the constructed facility does_not jeopardize the use of adjacent waters for navigation_ or for other public trust rights in public mist areas_ including estuarine waters. Theref_ore,_ itisStaffs position that riparian acces is o , Petitioner's: property has not been adversely_impacted by the docking facility authorized by the minor modification to CAIvIA permrt #_ Accordingly Staff disagrees that Petitioner meets the burden of demonstrating: [fiat he will be directly-affectedby the permit decision. N.C.G.S. § 113A-M.l(b)(2). - - - - ---------------------------------------- B. Is the Petitioner Directly Affected by the Decision? Yes. Petitioners contend that "Dockside WB Investments, Inc. is directly adjacent to the Petititoner's [sic] proposed project, which directly affects and impedes the waters of Wrightsville i Sound lying between the corporate jurisdictions of City of Wilminton and the Town of Wrightsville Beach and directly adjacent to the Petitioenr's riparian corridor and waters. Based upon CAMA rules, Petitoiner's additional written consent to these improvements by Seagate Offfice Park UOA and/or Brady Semmel is regired. This consent has not beenobtained from the Page 2 of 4 Comment [hug 11: I don't agree that this should be a "No". The appeal alleges that there is a requirement under our rules for a riparian nparow waiver. The fact that we don't agree with his assertion does not mean that he has not "alleged that the decision is contrary to statute or mle". Additionally, the appeal incorporates by reference a letterol`MV15. This letter also alleges u violation o1`711.0601. therefore, I suggest that this item be changed to a "yes" end simply reference the alleged violations circle. The arguments that we make in the current version of No. I could then be moved to Petitioner." (See Petitioners' Petitioner p. 2) 4 -S set forth abov-e_Staff `s position is that Petitoncr's=permissiont is not required in_this_instance because the permitted-development�is -` - - - --'---- — —'—---- ---- _ ------ wlthin the riparian setback;_however, Staff does no[ contest that Petitioner nrpybe..direotly 'affected by the decision per the standard of N.C.G.S. § 1.13A-12 L 1(b)_ Mt _ _ Comment [hugz]: This may change depending on what we do with current No. 1 C. Has the Petitioner demonstrated that the Hearing Request is not Frivolous? No. Staff contends that Petitioner has failed to demonstrate that the hearing request is not I frivolous as required by N.C.G.S. § I13A-121.1(b)(3). Petitioner's pnmaryargument is that that the permitted dock [Robb -here is where Braxton wants you to address the 7H .0208 issues like not impeding navigation, not beyond %4 width of water_body, not extending -into channel Please feel free to edit my, work in answer to question -A as well: ?etitioner's contention about 7H .0601-MikeyThis is where Braxton wants you to address the issues_ Asyouu can see�from the March 12, 2015 objection letter, much of the Petitioner's argument isabdutlocalzoning: -------------------------------------- The Petitioner contends thatthc permit %vas issued in error due to the current use- of the eaistine - structure (residential) being inconsistent with the local zoning which resitricts the use of the existing The Petitioner cites the Coastal Resources Commission's administrative rule 15A NCAC 7H 0601 No Violation Of Any Rule as the reason why the permit should not have been issued given the above inconsistency between the local zoning and use of the existing structure 15A NCAC 7H 0601 is codification of in administrative rule 1 & 113A-120(a)8 and & 113A-(bl)(4) of the Coastal Area Management Act (LAMA). However & 113A-1 18(a) of CAMA also states that "After the date designated by the Secretary pursuant to G S 113A-125. every person before undertaking anv development in any area of environmental Page 3 of 4 ' I would also add is inconsistent with any enforceable local policies or artlessness. If the local gout raises such an issue. during the permit review, the CAMA permit generally can not be issued until these issues are resolved. In this case; the local govt provided us a .statement of"This agency has no comment on the proposed development" Therefore, there was no evidence support inconsistency with 7FtOWL 'Comment[hug4]: We should also point out that Shanklin's objection in this area was based upon use of the exisiting building/structme, and not part of the property that was the subject ofour permit. Our permit was just for a reconfig ofthe existing docking facility with no addition of slips.' Therefore, even if there was a violation of local wring requirements relating to the existing building, it would not likely have any bearing on our permit review for a docking concern shall obtain (in addition to any other required State or local permit) a permit pursuant to_ Formatted: Font. Bold the provisions of this Part" While the issuance of the CAMA permit is not in violation of any of the Commission's administrative rules. it does not absolve the Petitioner from seekingother ther permits including those required locally necessary to complete their project This is true for any . CAMA permit. IV. CONCLUSION , In conclusion, Staff maintains that Petitioner has not met the criteria justifying a ' contested case hearing. For the reasons stated herein, the DCM Staff, through its undersigned attorney, recommends that Petitioner's Third Party Hearing Request be DENIED by the Chairman. Page 4 of 4 I*A DENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary July 21, 2015 SeaGate Office Park c/o Brady Semmel 1310 Airlie Rd. Wilmington, N.C. 28403 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, 7ua4sV. Huggettio Major Permits and Consistency Manager N.C. Division of Coastal Management 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity/Affirmative Action Employer JUL-28-2015 15:55 From:KEN SHANKLIN 9102511773 To:12522473330 P.1/12 SHANKLIN & NICHOLS, LLP ATTORNEYS AT LAW 2 ( 4 MARKET STRerT Po5T OFFICE BOX 1347 WILMINGTON. NORTH CAROLINA 28402.1 347 TELEPHONE (910) 762-9400 • TELEFAX (910) 251.1773 E-MAIL; SHANKLAW@EARTHLINK.NET KENNETH A. SHANKLIN' ABp•AO CIZ�CV S0EWAUST IN RWLFgpFCMY LAw-pESIOENn•L BVe^�N665, CCNMEflC1LL/Wp InoySrvgLTv/.N6ACTIONS Braxton Davis. Director Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 VIA TELEFAX #252-247-3330 AND FEDERAL EXPRESS #7741 5432 3930 Attorney General's Office Environmental Division 9001 Mail Service Center Raleigh, NC 27699-9001 VIA TELEFAX 17919-716-6767 MATTHEW A. NICHOLS" •*AtZO ADiyIam IN NEW YokR July 28, 2015 Ms, Debbie Wilson Wilmington District Manager N.C. Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405 VIA TELEFAX #910-395.3964 Seagate Office Park c/o Brady Semmel 1310 Airlie Road Wilmington, NC 28403 VIA U.S. FIRST CLASS MAID, Re: Permitee/Landowner — Seagate Office Park Subject Property — 1310/1312 Airlie Road, Wilmington, NC Permit No. 76-15 Petitioners — Dockside WB Investments, LLC Our File No, 2015005.1 Dear Sirs/Madams: Attached please find a copy of CAMA Third Party Hearing Request Form (DC" Form S), along with Exhibit A — Reaponse to 3 Questions on Hearing Request Form, Exhibit A-1 — Copy of the Petitioner's Objection Letter and Exhibit A-2 — Copy of the Permit for the above referenced matter. If there is a filing fee required, please advise and we will send you a check. 4enVery trul yours, neth A. Shanklin KAS/nac Enclosures cc: Mr. Doug Leech Dockside WB Investments, LLC JUL-28-2015 15:55 From:KEN SHRNKLIN 9102511773 To:12522473330 P.2/12 CAMA THIRD PARTY HEARING REQUEST FORM DCM FORM 5 j DCM FILE No: PETITIONER'S NAME DOCKSIDE WB INVESTMENTS LLC COUNTY WHERE THE DEVELOPMENT IS PROPOSED NEW HANOVER PLEASE TAKE NOTE that the undersigned, a person affected by the decision of (check one): a Local Permit Officer acting on a CAMA Minor Development Permit application; or X the Division of Coastal Management acting on a CAMA Permit application hereby requests permission from the Coastal Resources Commission (CRC) to file an appeal pursuant to N.C.G.S. § 113A-121.1(b) and 15A N.C.A.C. 07J .0301. (Please attach a copy of the permit, If you cannot obtain a copy of the permit, please provide the name of the permiltee, the project location, and the permit number.) Requests are reviewed and determined by the chairman of the CRC to determine whether a hearing should be granted. 15A N.C.A.C. 07J ,0301(b). Approval of a Third Party Hearing Request allows apetitioner to file a contested case petition with the Office of Administrative Hearings within twenty (20) days of receipt of the CRC's Order. N.C.G.S. § 113A-121.1(b). Denial of a Third Party Hearing Request is a final agency decision which may be appealed to Superior Court under N.C.G.S. § 113A-121.I(b) and Chapter 150B, Article 4. For this application to be complete, the Petitioner must address each of the three factors listed below. The CRC's chairman's decision to grant a hearing will be based on whether the Petitioner: (1) Has alleged that the decision is contrary to a statute or rule (N.C.G.S. § 113A-121.1(b)(01; (Please cite the statute or regulation allegedly violated by the permit decision.) (2) Is directly affected by the decision [N.C.G.S. § 113A-121.1(b)(2)); and (Please describe how you are directly affected by the permit decision, Persons directly affected by a decision often include, but are not limited to, owners of real properly in the vicinity of the proposed development who can show that it is likely to have a. significant adverse effect on the value and enjoyment of their properly, or persons who can demonstrate a history ofsub.siantial use ofpublic resources in the area directly affected by the development.) (3) Has alleged facts or made legal arguments that demonstrate that the request for the bearing is not frivolous, [N.C.G:S,-§-1-13A=12FI'(b)(3))-r(Suinmarize the evidence and arguments you would present at a hearing in supporl ofyour appeal explaining why the permit was improperly issued.) Please answer these questions on a separate piece of paper and attach it to this form, JUL-28-2015 15:55 From:KEN SHANKLIN 9102511773 To:12522473330 P..3/12 The Commission notes that there are some opinions of the ,Slate liar which indicate that non -attorneys may not represent others at quasi-judicial proceedings such as this Third party Nearing Request before the Commission. These opinions note that the practice of non -lawyer professionals„ such as engineers, surveyors or contractors, representing others in quasi-judicial proceedings through written argument may be -considered the practice of law, Before you proceed with this hearing request, you may wish seek the advice <f counsel before having a non lawyer represent your interests through preparation of this Petition. DELIVERY OF THIS HEARING REQUEST This request must be received by the Division of Coastal Management.(UCM) within twenty (20) days of the date of the disputed.permit decision. N,C.G.S'.,§ 1.13Ad2-1.1(b). Failure to do so constitutes waiver of the right to request a hearing. A copy of this request must also be sent to the Attorney General's Office, Environmental Division, 15A N.C.A C, 07J :0301'(b). , Contact Information for DCM: By mail, express mail or hand delivery: Director Division of Coastal Management 400 Commerce Avenue Morehead' City, NC 28557 By Fax: (252) 247-3330 By Email. Check DCM website for the email address of the current DCM Director www.necoastalmanagenient.net Contact Information for Attorney General's Office: By U:S. mail: Environmental Division 9001 Mail Service Center Raleigh, NC 27699-9001 By express mail: Environmental Division 114 W. Edenton Street Raleigh, NC 27603 By Fax: (919) 716.6767 Pesponses to the above factors, the and sign ereby requests a third party or Attorney Date —e neth A. Shanklin. Shanklin & Nichols. LLP Printed Name of Petitioner or Attorney P,0, Box 1347 Mailing Address shanklawAcarthlink neL Email address of Petitioner or Attorney ( 910 ) 762.9400 Telephoge number of Petitioner or Attorney Wilmington NC 28402 ( 9.10) 251-1773 City State Zip . 1 ax i1Limbcr-Of Petitioner.or-Attorney— Updated: February 2011 JUL-28-2015 15:55 From:KEN SHRNKLIN 9102511773 To:12522473330 P.4/12 CERTIFICATE OF SERVICF I hereby certify that this Third Party Hearing Request has been served on the State agencies and others named below by depositing copies of it with the United States Postal Service with sufficient postage for delivery by first class mail, Federal Express and/or facsimile to the named agencies and individuals. Original served on: and a copy served on: Braxton Davis, Director Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 VIA TELEFAX #252-247-3330 and VIA FEDERAL EXPRESS Attorney General's Office Environmental Division 9001 Mail Service Center Raleigh, NC 27699-9001 VIA TELEFAX 9919-716-6767 Ms. Debbie Wilson Wilmington District Manager N.C. Division of Coastal Management 127 Cardinal. Drive Ext. Wilmington, NC 28405 VIA TELEFAX #910-395-3964 Seagate Office Park c/o Brady Sentinel 1310 Airlie Road , Wilmington, NC 2f `�Q This the 0� 0 dray of July 2015. Matthew A. Nichols #23403 SHRNKLIN & NICHOLS, LLP Attorneys for Petitioners, Derek M wife, Louise M. Winstanly 214 Market Street P.O. Box 1347 Wilmington, NC 28402 'telephone: (910) 762-9400 Telefax: (910)-251-1773 E-mail: sJianklaw@eartblink.net W instanly and JUL-28-2015 1S:SS From:KEN SHRNKLIN 9102511773 To:12522473330 P.5/12 EXHIBIT "A" TO THIRD PARTY HEARING REQUEST OF CAMA PERMIT DECISION KENNETH A. SHANKLIN MATTHEW A. NICHOLS ATTORNEYSFOR DOCKSIDE WB INVESTEMENTS, LLC, PETITIONER PERMITTEE: SEAGATE OFFICE PARK c/o BRADY SEMMEL LANDOWNER: SEAGATE OFFICE PARK SUBJECT PROPERTY: 131011312 Airlie Road Wilmington, NC 28403 PERMIT NUMBER: 76-15 RESPONSE TO 3 QUESTIONS ON HEARING REQUEST FORM: (1) Has alleged that the decision is contrary to statute or rule IN.C.G.S. § 113A- 121.1(b)(I)I; (Please cite the statute or regulation allegedly violated by the permit decision.) Response: Petitioner alleges that the decision is contrary to the Coastal Area Management Act and N.C. Gen. Stat. § 113A-121.1(b)(1); and hereby incorporate by reference Petitioner's objections set forth in a letter from Shanklin & Nichols, LLP to Braxton C. Davis, Director, NC DENR — Division of Coastal Management, bearing a date of March 12. 2015. A copy of this letter is attached hereto and marked as Exhibit A-1. The proposed modifications to the dockage and pier for Seagate Officc Park UOA anal/or Brady Semmel require an additional consent of the riparian property owner, Dockside WB Investments, Inc., which will not be forthcoming because of the objections of Petitioner Dockside WB Investments, Inc. (2) Is directly affected by the decision IN.C.G.S. § 113A-121.1(b)(2)I; and (Please describe how you are directly affected by the permit decision. Persons directly affected by a decision often. include, but are not limited to, owners rtf real property in the vicinity of the proposed development who can .chow that it is likely to have a significant adverse affect on the value and enjoyment of their property, or persons who can demonstrate a history of substantial use of public resources in the area directly affected by the development.) Response: Dockside WB Investments, Inc, is directly adjacent to the Petitioner's proposed project, which directly affects and impedes the waters of Wrightsville Sound lying JUL-i�tl-Mti 15:55 From:KEN SHANKLIN 9102511773 To:12522473330 P.6/12 between the corporate jurisdictions of City of Wilmington and the Town of Wrightsville Beach and directly adjacent to the Petitioners riparian corridor and waters. Based upon CAMA Rules, Petitioner's additional written consent to these improvements by Seagate Office Park UOA and/or Brady Semmel is required. This consent has not been obtained from the Petitioner. (3) Has alleged facts or made legal arguments that demonstrate that the request for the hearing is not frivolous [N.C.G.S. § 113A-171.1(b)(3)1. (Summarize the evidence and arguments you would present at a hearing in support of your appeal explaining why The permit was improperly issued.) Response: Petitioners allege that the decision is contrary to the Coastal Area Management Act and N.C. Gen. Stat. § 113A-121.1(b)(1); and hereby incorporate by reference Petitioner's previous objections and emails to DCM and the City of Wilmington noting Petitioner's objections to the subject Permit No. 76-15 issued to Seagate Office Park. 2 JUL-29-2015 15:56 From:KEN SHANKLIN 9102511773 To:12522473330 P.7/12 EXHIBIT SHANKLIN & NICHOLS, LLP A ATTORNEYS AT LAW 214 MARKETS7REET POST OFFlGE Box 1347 WILMINGTON. NORTH CAROLINA 28402.1347 TELEPHONE (910) 762.9400 • TELeFAx (910) 251.1773 E-MAIL: SHANKLAWOXARTHUNK.NET KENNEM A. SHANKLIN• MATTHCW A. NICHOLS•• •OFEN 1.0kw-Rv5•ecuuet In OOMM6iKI,LLAN0INOV'oTAIALTMN6ACTONb ••pL[o AOu.CvgoIn NLw yOM March 12, 2015 VIA HAND I)EIJWRX Mr. Braxton C. Davis, Director NC DENR — Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Re: OBJECTION TO CAMA MAJOR PERMIT APPLICATION BY ADJACENT RIPARIAN PROPERTY OWNER Applicant: Seagate Office Park UOA and/or Brady Semmel, for property located at 1310/1312 Airlie Road, Wilmington, New Hanover County, NC Opponent: Dockside WE Investments, LLC (1308 Airlie Road) Our Re Na. 2015005 Dear Mr. Davis: We represent Dockside WB Investments, LLC--the above -referenced opponent and owner of riparian property immediately south of and adjacent to the property which is the subject of the LAMA Major Permit Application being objected to herein. Recently, our client received notice regarding an Application for a CAMA Major Development Permit (the "Application"), for property located at 1310/1312 Airlie Road, Wilmington, N.C.' by the Seagate Office Park UOA at 1310 Airlie Road, The Application addresses a proposed relocation of a pier and other improvements (the "Project"), By way of an initial response to the Application, my client strongly objects to the Application and proposed project and desires to have this objection deemed timely and considered in any deliberation on the matter and the Application. We are still investigating the issues raised by this Application and Will Supplement this objection in due course. r Based upon a review of the Application dated January 14, 2015, it is unclear to us who the applicant is. The "Business Name" listed on the first page of the Application states: "Seagate Aidie Office Parr'. The word "Seagate" is crossed through. Applicant 1 on page I is listed as Brady Semmel. The application is signed by neither, and is signed by Ed Ryan as agent. JUL-28-2015 15:56 From:KEN SHRNKLIN 9102511773 To:12522473330 P.8/12 Mr. Braxton C. Davis, Director NC DENR — Division of Coastal Management March 12, 2015 Pap -2- However, initially, my client does not waive any of Its riparian rights vested under Statutory or Common Law of the State of North Carolina, and secondly does nW waive any of the riparian rights accruing to my client by virtue of applicable Rules and Regulations adopted by the Coastal Resources Co+. miFaion (the "CRC") and NCDENR-DCM and the Common Law of this State. Moreover, my client objects to any extension of the existing pier structures into the public waters of Wrightsville Sound toward the corporate limits of the Town of Wrightsville Beach ("Town'7. By copy of this letter, we are putting the Town and the City of Wilmington ("City") on Notice of our objections. My client has significant concerns with the adverse impact that the proposed Application will have to my client's well -established commercial use as a waterfront restaurant and marina. The Dockside Restaurant remains one of the very few restaurants in all of Wilmington where customers can arrive by boat and have a place to dock their boat or other watercraft while they dine. The boat slips at the Dockside Restaurant are designated for restaurant customer use, and the boat slips and the safety and ease of navigability of the Dockside marina in general are a paramount concern to my client and are critical to the Dockside Restaurant, which relies heavily on its water-dapeadent structures and boating customers for its commercial viability. We would also note, that based upon our preliminary review, the subject property is zoned CB (Community District) Zoning District by the City of Wilmington under Wilmington Land Development Code ('LDC) § 1.8-194 and the Wilmington Official Zoning Map. The Application lists that the property is zoned commercial, which is also consistent with the development's toame ("Seagate Office Park") and the Declaration creating unit ownership (condominium) for this property under Chapter 47A of the North Carolina General Statutes, recorded on December 31, 1985, in Book 1313 at Page 1287, New Hanover County, and amendments thereto, which Declaration appears to restrict the property to commercial use (See Article V., Use Restrictions, Section A) ("Each unit is hereby restricted to the business use by the owner hereof, ... "). The First Amendment to the Declaration recorded on July 18, 1997, in Book 2212 at Page 456 of the New Hanover County Registry, also states in Section 1 that "Seagate Office Park is a commercial use condominium ...." At a recent Public Hearing in the City of Wilmington, Dr. Semmel stated that he Is a residen of the subject property, which we understand is his primary residence. The Wilmington LDC allows residential uses only in limited instances in the CB District, and only then under prescribed conditions, generally either as part of an approved Commercial District Mixed Use ("CDMU") project under Wilmington LDC § 18-257, of as a qualifying residential unit contained within a principal use under Wilmington LDC § 18.299. See Wilmington LDC § 18-194(c). We are not aware of any approvals by the City of Wilmington for this property as a CDMU project in a CB District under Wilmington LDC § 18-257. We are also not aware of circumstances that would qualify this property as a residential unit contained within a principal use under WRtaimgton LDC § 18-299, but an analysis of this would require a fairly JUL-28-2015 15:56 From:KEN SHRNKLIN 9102511773 To:12522973330 P.9/12 Mr. Braxton C. Davis, Director NC DENR — Division of Coastal Management March 12, 2015 Page -3- detailed site inventory to determine if the 50% floor area ratio is not exceeded, wbetber there is sufficient off-street parking, whether there is additional open space provided on the property, and other criteria under Wilmington LDC § 18-299. It is our understanding that other persons are residing in other units within the Seagate Office Park. As you know, this is important because, among other reasoas,.North Carolina Administrative Code, Title 15A. Environment and Natural Resources, Chapter 07. COASTAL MANAGEMENT, Subchapter H. STATE GUIDELINES FOR AREAS OF ENVIRONMENTAL CONCERN, provides in relevant part as follows: § 0711.0601. NO VIOLATION OF ANY RULE No development shall be allowed in any AEC which would result in a contravention or violation of any rules, regulations, or laws of the State of North Carolina or of local government in wbich the development takes place. Rule 07H .0601. Accordingly, we object to the Application on these grounds as well, and by copy of this letter to the City of Wilmington, we are requesting that the City of Wilmington Code Enforcement inquire into the zoning compliance status of the subject property for a residential use in a CB Zoning District. We reserve the right to supplement this objection depending upon the outcome of City Code Enforcement's inquiry. We note also that even if the residential use of this property is deemed to be a valid nonconforming use, my client would continue to object to the Application on the ground of a potentially impermissible expansion or modification of a nonconforming use. Additionally, the application lists the proposed use as "private" rather than "commercial". No zoning compliance certificate is attached to the Application. At your convenience, we would appreciate the opportunity to meet with you or Ms. Debbie Wilson to address the findings of our investigation of this pier structure associated with Seagate Office Park, which is a commercial structure and use and not a residential use. With best regards, I remain KAS/nac cc: Ms. Debbie Wilson, District Manager Seagate Office Park Unit Owners Association, Inc. Brady 1. Semmel, M.D. Town of Wrightsville Beach City of Wilmington Code Enforcement JUL-2e-2015 15:56 From:KEN SHRNKLIN 9102511773 To:12522473330 P.10/12 •R•••..........r..�. �.•::,'«N�.«.r.v.'n. .`^:'<..V:. .....0>'Yee.'.'.ti(�'+kJofg4<.'»a»syMIM!4M:n,. n�'i1..M�Y}!%�.iJ.fLT PermC'• lass.... NEW Permit Number 76-15 t STATE OF NORTH CAROLINA 7 FDepartment of Environment and Natural Resources EXHIBIT s and Coastal Resources Commission A -} cZ Vermit for X Major Development in an Area of Enviroamental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Sea ate Office Park c/o Brady Semme) 1310 Alrlie Road Wilmington, NC 28403 Authorizing development in New anover County at_adi. to AIWW, I310/1312 Airlie Road Wilmlt1gIon , as requested in the permittee's application dated 1/14/I 5 � cn ludl�g the attached workman drawings (5)all dated 1/14/15, This permit, issued on —. July 10 701s_ is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below, Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and vold. Doeldrig rsteility 1) Unless specifically altered herein, this permit authorizes the reconfiguration of the existing docking facility and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non water dependent uses of structures shall be. conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this Permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission, Jam This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All wotlt must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Braxton C. Davis, Director Division of Coastal Management This pennit and its conditions are hereby accepted. Signature of Permitter J'T:YviJ0.'!rT:t/I,r't V<L,M,vr'. i.,'K«n,,n. �.• :A.-�...� .. n.....�....vv.:'.a;.:.a�.....u...�..'.: u... n...... :.. ......�... JUL-28-2015 15:57 From:KEN SHANKLIN 9102511773 ,To:12522473330 P.11/12 Seagate Office Park c/o Brady Somme[ ADDITIONAL CONDITIONS Permit #76-15 Page 2 of 3 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. ' 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shell install and maintain at his expense any signal lights or signals prescribed by the U.S, Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit does not authorize any additional formalized boat slips in association with this docking facility. General 8) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 9) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, without permit modification. 10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 11) the permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. JUL-28;2015 15:57 From:KEN SHRNKLIN 9102SI1773 To:12522473330 P.12/12 .......... .. ...... . . . 'f Seagate Office Park c/o Brady Semmel Permit 076-15 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional slate, federal or local permits, approvals or authorizations that may be required. OTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 15-0204. NOTE; The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2015-00584, which was issued on 3/27/15. NOTE; An application processing fee of $250 was received by DCM for this project. Bennett, Ronda From: Coats, Heather Sent: Tuesday, November 03, 2015 12:30 PM To: Bennett, Ronda Subject: RE: Holding and Semmel Permits Ronda, Brady Semmel's contractor said the best mailing address for Dr. Semmel is 1422 Commonwealth Drive, Wilmington, 28403. I've sent an electronic copy- but do you think we should resend a hard copy with a copy of the letter? Thanks! Hope you'rte having a nice (although another rainy!) day! Heather Coats Assistant Major Permits Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7424 office. h e at h e r. c o a is Ca) n cd e n r. a ov 127 Cardinal Drive Extension Wilmington, NC 28405 �rNothtng Compares...,. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bennett, Ronda Sent: Thursday, October 29, 2015 3:01 PM To: Coats, Heather <heather.coats@ncdenr.gov> Subject: RE: Holding and Semmel Permits In checking the files it was sent to Brady Semmel of Sea Gate Office Park on July 21, 2015 at 1310 Airlie Rd. Wilmington. 28403. We never rec'd a signed copy back. Is the address the correct mailing address? Ronda C. Bennett *E-Mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.* a ;1 Department of Environmental Quality I Office Manager "I Bennett, Ronda ddd (252) 808-2808.Ext 206Work mnda.benht tt@ncdenr.gov ` NC Divisionpf.Coastal Management 1400 Commerce Avenue Morehead Citv:North.Carolina 28557 1%, L; <f—�Nothing Compares„,. Please visit www.nccoastalmanagement.net to subscribe to Coastal Management's quarterly newsletter, the CAMAgram. From: Coats, Heather Sent: Thursday, October 29, 2015 2:37 PM To: Bennett, Ronda <ronda.bennettPncdenr.gov> Subject: FW: Holding and Semmel Permits Hi Ronda, It seems the permit for Seagate Office Park wasn't sent to the permittee or his agent (see emails below). Do you recall if you received the original permit and a distribution sheet to send out to everyone or have any record of it? I believe Doug would have given it to you since he was working on that one. And we received a WiRO copy, so it seems it went out to some extent... Thanks! Heather Heather Coats Assistant Major Permits Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7424 office heather. coatsO.ncdenr.aov 127 Cardinal Drive Extension Wilmington, NC 28405 KT<:—'Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. l4 From: Mairs, Robb L Sent: Wednesday, October 28, 2015 9:34 AM To: Ed Flynn <efly@msn.com> Cc: Coats, Heather <heather.coats@ncdenr.eov> Subject: RE: Holding and Semmel Permits Ed, We have processed the renewal request for Mr. Holding's permit, so hopefully we will have it reissued soon. As discussed, we are onboard with your latest proposal under a letter of refinement once this permit is reissued. We are not sure about why you or Mr. Semmel did not receive a copy of the permit when issued, but we will look into it. As discussed, this was during the transition when Jonathan Howell and Daniel Govoni with the Major Permits Section moved into new positions, so Doug Huggett was very shorthanded. Also, this permit was appealed so there was a lot of effort from staff through the assistance of our attorney to defend our decision to issue the permit. As you are aware, the 3rd party appeal was denied. Attached is a copy of Mr. Semmel's permit and we look into having the original sent to the applicant for his signature. Thanks for your patience. Robb Mairs Field Representative Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7423 office robb.mairs(d)ncdenr.00v 127 Cardinal Drive Extension Wilmington, NC 28405 Kz- -5"�'Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Ed Flynn [mailto:eflvC@msn.com] Sent: Wednesday, October 21, 2015 9:01 AM To: Mairs, Robb L <robb.mairsC@ncdenr.gov> Subject: Robb, Just a follow on status of Semmel permit and Holding renewal. Thanks, Ed K-� Environmental Quality November 3, 2015 Seagate Office Park c/o Brady Semmel 1422 Commonwealth Drive Wilmington, N.C. 28403 Dear Sir or Madam: PAT MCCRORY Governor DONALD R. VAN DER VAART Semrary The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggett Major Permits and Consistency Manager N.C. Division of Coastal Management Nothing Compares 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 An Equal Opportunity 1 Affirmative Action Employer— Made in part by recycled paper DCM Coordinator: k1tA-C V- ki Permit #• DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Was ' _ i ingto US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Ctum61 Cultural Resources: enee Gledhill -Ear Public Water Supply: iane Williams ) ARO) Marine Fisheries: NC DOT: en Pace Shellfish Sanitation: attt Fowler State Property: m Walton' Water Quality: en Hi ins (Ralei John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 Scott Vinson-Stormwater Wilmington: Joanne Steenhuis-401 Chad Coburn - 401 Linda Lewis - Stormwater Wildlife Resources: Maria Dunn (WAROL_ �f LPO: Fax Distribution: Permitee #: Agent 2. 3. 4. 5. 6. A DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Seagate Office Park Unit Owners Association, Inc. c/o Brady J. Semmel LOCATION OF PROJECT SITE: 1310-1312 Airlie Road, in Wilmington, New Hanover County. Photo Index - 2006: 22-7424 I, 14-15 State Plane Coordinates- X: 2358093 Latitude: 34'12'57.11" N INVESTIGATION TYPE: CAMA 2000: 22-273 J, 15 1996: 22-255 J, 13 Y:171679 Longitude: 77048'56.06"W ROVER FILE 0-081315A INVESTIGATIVE PROCEDURE: Dates of Site Visit — 8/13/2014 Was Applicant Present — Yes and agent PROCESSING PROCEDURE: Application Received — 2/11/2015 (completed) Office — Wilmington SITE DESCRIPTION: (A) Local Land Use Plan — City of Wilmington/New Hanover County Land Classification From LUP - Conservation (B) AEC(s) Involved: EW, PTA (C) Water Dependent: Yes (D) Intended Use: Residential (E) Wastewater Treatment: Existing — CFPUA Planned — N/A (F) Type of Structures: Existing — Condominium building, bulkhead, floating docks, timber breakwater, and mooring pilings Planned — Reconfigure existing slips within shared docking facility Source - N/A (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Coastal Wetlands B Open water 325 s . ft. (C) Other (Highground redevelopment) (D) Total Area Disturbed: 325 sq. ft. (0.007 acres) (E) Primary Nursery Area: No (F) Water Classification: SB Open: No PROJECT SUMMARY: The applicant proposes to reconfigure existing boat slips within shared docking facility. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Seagate Office Park Unit Owners Association COUNTY: New Hanover PROJECT NAME: Seagate Office Park Docking Facility Reconfiguration LOCATION OF PROJECT: 1310-1312AirlieRd, adjacent to theAIWW, in Wilmington DATE APPLICATION RECEIVED COMPLETE BY FIELD: 2-11-15 FIELD RECOMMENDATION: Attached: YES CONSISTENCY DETERMINATION: Attached: n/a FIELD REPRESENTATIVE: Mairs /1 r' DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE REC'D: 2-20-15 ADJ. RIP. PROP NOTICES REC'D: APPLICATION ASSIGNED TO: . L 6—u d C) 75 DAY DEADLINE: 4J Z� ( , MAIL OUT DATE: 2-18-15 FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE DENY To Be Forwarded: n/a To Be Forwarded: n/a DISTRICT OFFICE: WILMINGTON FEE REC'D: $250 END OF NOTICE DATE: 3-13-15 DEED REC'D: ON: 150 DAY DEADLINE: STATE DUE DATE: 3-13-15 FED COMMENTS REC'D: AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Z23, i S ✓ Coastal Management - LUP Consistency Division of Community Assistance Land Quality Section (DEMLR) �- 5 / S ✓ Division of Water Resources (401) Storm Water Management (DEMLR) State Property Office 3 1 i-15 Division of Archives & History 3- I D 15 Division of Environmental Health % 21-1 Sr Division of Highways 3- �Ct _ 13, Wildlife Resources Commission 3-13-/5- Local Permit Office Division of Marine Fisheries / DCM 1- I S ✓ Corps of Engineers Wil 40a NCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Governor February 18, 2015 Division of Coastal Management MEMORANDUM: TO: FROM: SUBJECT: Applicant: Tim Walton Dept of Administration State Property Office Donald R. van der Vaart Secretary RECEIVED FEB IL 9 2011 DOA STATE PROPERTY OFFICE Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) CAMA Application Review Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. This agency has no objection to the project as proposed. his agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE I -,): - 1 Aal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.ncooastaimanaaement.net RECEwD MAR 17 7n14 DC"-MHp Ciro An Equal Opportunity 1Afirmadve Action Employer NCDENR North Carolina Department of Environment and Pat McCrory Governor March 11, 2015 Mr, Brady Semmel Se ate Office Park LOA 1310 Airiie Road Wilmington, NC 28403 Subject: EXEMPTION Stormwater Project No. SW8150217 Seagate Boat Slip Project New Hanover County Dear Mr. Semmel: Natural Resources Donald van der Vaart Secretary The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources received a copy of the CAMA Major Permit Application for the subject project on February 18, 2015. Staff review of the plans and specifications has determined that the development activities proposed at this time will not pose a threat to surface water quality from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing a water quality threat from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000, the stormwater rules. By copy of this letter, we are informing you that this project will not require a stormwater management permit. If the subject project disturbs one acre or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an NPDES permit for stormwater discharge from projects meeting these criteria. All temporary built -upon area associated with the construction of the project must be removed within 30 days of completion of the project, or when it is no longer needed, whichever occurs first. If you have any questions or need additional information concerning this matter please contact Linda Lewis at (910) 796-7215, or e-mail her at linda.lewis@ncdenr.gov. Sincerely, or Tracy E. vis, P.E.,' Director Division of Energy, Mineral, and Land Resources GDS/ad: GAWQ\Shared\Stormwater\Permits & Projects\2015 \150217 Exemption\2015 03 permit 150217 cc: Ed Flynn; F & S Marine Contractors, Inc. New Hanover County Building Inspections Jonathan Howell, DCM Shaun Simpson/Robb Mairs-DCMNVIRO RECEIVED Wilmington Regional Office Stormwater File MAR 19 2015 DCM-MHD CITY Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405• (910) 796-7215 / Fax: (910) 350-2004 DISTRICT 3 NCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Governor February 18, 2015 Division of Coastal Management MEMORANDUM: FEB 2 3 2015, RECEIVED Donald R. van der Vaart Secretary TO: Anthony Law NC DOT New Hanover Co. FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA Application Review Applicant: Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: —This agency has no objection to the project as proposed. ---'This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED I — DATE N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www,nccoastalmanagement.net RECEIVED MAR 19 20b De_r-rwnP ctty An Equal Oppodunity 1 Afirmabve Action Employer NCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Governor February 18, 2015 Donald R. van der Vaart Secretary Division of Coastal Management MEMORANDUM: N FEB 18 2015 TO: Georgette Scott Stormwater Section DEMLR - WiRO FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA Application Review Applicant: Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED��r -330 �cJ�f DATE ' RECEIVED MAR 0 5 10b N.C. Division of coastal Management r r a 127 Cardinal Ddve Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Empbyer NCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Donald R. van der Vaart Governor Secretary February 18, 2015 Division of Coastal Management MEMORANDUM: F� �,VE By � zo15 TO: Dan Sams District Manager DEMLR - WiRO FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA Application Review Applicant: Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE �zo l�� J iE�EIVED MAR 0 F 70% N.C. Division of Coastal Management 96r 4woto r rry 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmafive Action Employer NCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Governor February 18, 2015 Division of Coastal Management MEMORANDUM: FROM SUBJECT: Applicant: Diane Williams Environmental Engineer Public Water Supply Donald R. van der Vaart Secretary 1 F69 18 15 Ro' P blz ater ub�/o pa sou Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) CAMA Application Review Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: _X This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED y{(',Q-d (. Ljy DATE �1�/ /l s RECEIVED MAR 0 5 2015 N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 DFM-MMB erry Phone: 910-796-72151 FAX: 910-395-3964Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Afirma6ve Acton Employer Q00W� RECEIVEDEEB 1 g 211175 _,..._'fir NCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Governor February 18, 2015 Division of Coastal Management MEMORANDUM: TO: Linda Painter LPO New Hanover County Donald R. van der Vaart Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA Application Review Applicant: Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. XThis agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agenc objects to the project for reasons described in the attached comments. SIGNED DATE a S� RECEIVED N.C. Division of Coastal Management MAR 0 8 20i3 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.ncooastalmanagement.net a,y An Equal Oppodunity 1 Afinnadve Adon Employer NCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Governor February 18, 2015 Division of Coastal Management MEMORANDUM: TO: Shannon Jenkins NC DMF Shellfish Sanitation Section Donald R. van der Vaart Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA Application Review Applicant: Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. G This agency has no comment on the proposed project. W , This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SG.a�rooN fc,vlir-v5 SIGNED DATE RECEIVED N.C. Division of Coastal Management FEB 2 7 201� 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910,395-3964Internet: www,nocoastaimanagement.net DCM-MHD CCTV An Equal opportunity 1 AfimmaliN Adon Employer CCDENR North Carolina Department of Environment and Natural Resource Pat McCrory Governor Donald R. van der Vaart Secretary February' 18, 2015 RECEIVED Division of Coastal Management FED 19 2015 MEMORANDUM: DCM-Fisheries TO: Shane Staples wazo Fisheries Resource Specialist DCM - WaRO FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA Application Review Applicant: Seagate Office Park UOA Project Location: 1310-1312 Airlie Rd., adjacent to the AIWW, in Wilmington, New Hanover County Proposed Project: to reconfigure existing boat slips within a shared docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above byMarch 13, 2015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested.. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 6 � DATE z7f/S N.C. Division of Coastal Management 127 Cardinal Drive Ext., wlmington, NC 26405 Phone:910-796-72151 FAX: 910-395-3964 Internet: www riccoastalmanaoement.net M Equal OppaAunlly IAfflaadva Adlon Employer Howell, Jonathan From: Crumbley, Tyler SAW <Tyler.Crumbley@usace.army.mil> Sent: Friday, March 27, 2015 9:03 AM To: efly@msn.com Cc: Howell, Jonathan; Mairs, Robb L; Coburn, Chad; Crumbley, Tyler SAW; Dahl, Kyle J SAW Subject: SAW-2015-00584 / Seagate Office Park UOA / Dock Reconfiguration / New Hanover Attachments: GP78-0056signed.pdf Dear Mr. Ed Flynn (Agent for Mr. Brady Semmel), Through coordination with the North Carolina Division of Coastal Management we have learned of your request to reconfigure an existing docking facility for the Seagate Office Park UOA located at 1310 and 1312 Airlie Rd. along the AIWW in Wilmington, New Hanover County, North Carolina. Coordinates: 34.245906 N,-77.815505 W. Your project has been assigned the Action ID: SAW-2015-00584. Please reference this for any future correspondence. On January 1, 2011, we renewed general permit No. 197800056, (copy attached), that authorizes the maintenance, repair, construction and installation of piers, docks, boathouses and boat shelters, mooring piles, dolphins, jetties and breakwater structures in navigable waters of the United States in the State of North Carolina pursuant to Section 10 of the Rivers and Harbors Act of 1899. Your work is authorized provided it is accomplished in strict accordance with your submitted plans, the enclosed general conditions, and the following special conditions: 1. All work authorized by this permit must be performed in strict compliance with the submitted plans and the plans received on 23 February, 2015, which are a part of this permit. Please read the attached permit to prevent an unintentional violation of Federal law. As this Department of the Army regional general permit does not relieve you of the responsibility to obtain any other required approvals, you should contact appropriate State and local agencies before beginning work. All special conditions and all applicable general and regional conditions must be strictly adhered to in order for this authorization to remain valid. The expiration date of this permit is 31 December, 2016. This electronic copy is your official Department of the Army authorization; no paper copy will be mailed. Tyler Crumbley Project Manager U.S Army Corps of Engineers -Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax: 910-251-4025 email: tyler.crumbley@usace.armv.mil "The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: htto://regulatory.usacesurvey.com/" Al"WMAL, MCDENR-' Nart-h- Carolina Q.Opartnnent.plf EnViron-ment and Natural Resource Pat MdGrbty. ObvIernor, Februaiy 18, 20.15, Division of Coastal Management MEMORANDUM: TO: Mafkak Dunn NQWRIC 'WaRO I WiRO. Donald R, yan der VOW. Skret* .FROM: Jonatthan Howell, NO IjE.Nk-.QOM Assistant Major Permits Coordinator 4.00 Comme'ece'Avenue, Morehead -City, NC,28557 (Cqqrlpr 1142;,09) :SUBJECT: CAMA Application Review, Applicant: SeadatO Office Pa&UOA Project Locgtidfi:• '1310-1312 Airlie Rd., adjacent to the A I IWW, in I Wiffnirtgt oo,, New Hanover County ProposeddPr9jecti t6,r6coqtijutL-:existin.g'b68t.§Iips.Withinr,jshared .docking Mciiiik -Piease indicate below 'your agpncy!,s. position or viewpoint on!the propos ed ps?.d projectP.Pd r0um this form to Jonathan Howell. at the;6d-d.re.ss:;above by-90-c-h 11.2015. If you have any questions reg I ardin rg, thpproposed project, contact Robb Mairs at (9,10)796-,7423 when appropriate; in,deptlii comments with supporting data ais requested - REPLY: This agency has no objection to the projedf as proposed. —/-This agency, has go, comment o . n the proposed project. Thisagency areihcorpiorz This -agency of the project only. if -the recommended chahge§ to the, project for reasons described in the attached: comments. , 4 , I , ntemitwww I n6astafmanagemenfnel tinp)oyep NCDENR North Carolfha Department of Environment and Natural Pat McCrory Governor February 18,.2015 Division of Coastal Management MEMORANDUM: , Z i Jp1s `-"Donald R. van der Vaart Secretary TO: Reriee Gledhill -Early Dept. of Cultural Resources Archives & History 3lglt� �c FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead.City, NC 28557 (Courier, 11-12-08)- SUBJECT: CAMA Application Review Applicant: Seagate:Of ice. Park UOA Project Location: 13:10713121Ak ie Rd., adjacent to, the AIWW, in'Wdmington, New Hanover County Proposed Project: to reconfigure existing.608t slips within a shared'docking facility Please indicatebelow your. agency's position.or viewpointon the proposed project and: return this form to Jonathan Howell at the address above by March 13, 2615 If you have any questions regarding,the proposed project, contactRobb.Mairs at (910)796-7423 when appropriate, in depth.comments with. supporting data is requested., REPLY: This agency has no objection to the project as proposed. j This agency has no comment on the proposed project. This agency approves of the project only if fhe.recommended changes are"incorporateii. Seeattached.. This agency objects to the project for reasons described in the attached comments. SIGNED ZQJ-W DATE 8 •16 .16 N.C. DAs can of Coaslal Matagarnot 127 Carl rtal lhlve EttL, N ;mington, NO 28405 Fhone:610-796-72151FAX:91(�3? �RMln;entl.vrmixcoastalmanmement.net AnEru,fgtevtw3yl{'Fl:aciuva:;cGi%;E?a57r: Recommendations for State Permit — Seagate Office Park c/o Brady J. Semmel 2/1712015 It is the.staffs recommendation that the proposal to reconfigure the existing docking facility is CONSISTENT with the Rules of 15 NCAC 7H.0207 (d) Use Standards for Public Trust Areas and with the use standards set forth in NCAC 07H .0208(b)(6), including the %width rule; the USACE AI WV setback requirement and the adjacent 15' riparian corridor setback requirement and would continue to provide docking space for up to seven (7) vessels. This office has no objection to the proposed work, provided it is consistent with all other state and federal permitting requirements. Any permit issued should include the following conditions: This permit authorizes only the docks, piers, and other structures and uses located in or over the waterthat are expressly and specifically set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of the structure without permit modification. No non -water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 2. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 3. The authorized structure and associated activity must not cause an unacceptable interference with navigation and shall not exceed the established pierhead line. 4. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. 5. In order to protect water quality, runoff from the construction must not visibly increase the amount of suspended sediments in adjacent waters. 6. This permit does not authorize the interference with any existing or proposed Federal project, and, the permittee will not be entitled to compensation for damage to the authorized structure orwork, or injurywhich may be caused from existing or future operations undertaken by the United States in the public interest. 7. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the project without having the permit transferred to a third -party. 8. This permit continues to authorizes a maximum of seven (7) boat slips. At no time shall more than seven (7) vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. 9. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or 'authorization which may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at 91.0-796-7215 prior to the commencement of any such activity for this determination. NOTE: The permittee is cautioned that this permit does not authorize the placement of tie piles in association with the docking facility. Furthermore, due to the proximity of the AIWW, boats utilizing the docking facility will be subject to frequent wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the structure and the safety of moored boats. The permittee shall not hold the State of North Carolina or the United States liable for any damage to the structure or moored boats. Seagate Office Park c/o Brady J. Semmel Page 2 9. PROJECT DESCRIPTION: The project site is located at 1310-1312 Airlie Road in Wilmington, New Hanover County. To locate the project site from the WiRO take US Hwy 74/76 towards Wrightsville Beach. Turn right onto Airlie Road just before the drawbridge to Wrightsville Beach and travel approximately 0.1 mile until you reach the property of interest, which will be located on the left. The property is located at the confluence of the AIWW and Motts Channel within Greenville Sound. The property is approximately 0.19 acres in size, which is located on the east side of Airlie Road and has an average elevation of approximately 5 feet above normal high water (NHW). Highground development on the project site includes a five (5) unit condominium buildings uncovered decking, timber bulkhead and a floating dock system, which currently accommodates up to seven (7) slips. The entire project site has approximately 133 linear feet of shoreline frontage stabilized by a timber bulkhead. Upland vegetation consists of ornamental landscaping. There are currently no coastal wetlands along the property. The previous owner (J.B. Gerald) obtained State Permit No. 84-84 in 1984, which authorized the excavation of the existing boat basin and the placement of fill onto the property for the construction of an office building and the construction of a docking facility. State Permit No. 84-84 was modified in 1985 forthe construction of a new bulkhead. An access ramp leads from the highground on the southern end of the property onto an existing floating dock, measuring approximately 102' in length by 6' in width, which runs parallel to the existing bulkhead. There are four (4) floating finger piers extending towards the AIWW from this main floating dock. Two (2) measuring approximately 31' in length by 4.5' in width located on the northern end, one measuring approximately 16' in length by 4.5' in width located in the center portion and one measuring approximately 50' in length by 5' in width located on the southern end, which includes another floating dock, measuring approximately 16' in length by 5' in width located on the landward end of this floating dock, creating an "L-shaped" configuration. The existing docking facility currently accommodates up to seven (7) vessels within water depth of approximately -60' @ normal low water (NLW). There is an existing timber breakwater, measuring approximately 60' in length, which extends perpendicular from the shoreline at the southern property boundary and shared riparian line. The adjacent riparian property to the south is a commercial restaurant business (dba Dockside Restaurant), which maintains a floating dock system currently accommodating approximately 22 transient vessels. There is an existing docking facility serving the property owner to the north (M. Lopez), which crosses the northern riparian line (See Sheets 1 through 3 of 5 and Project Narrative). The New Hanover County and the City of Wilmington 2006 Joint Land Use Plan classifies adjacent waters and high ground area of project site as Conservation. There are no known archaeological sites located in the project vicinity. The waters of the AIWW and Motts Channel.are classified SB by the Division of Water Resources. They are NOT designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries and they are CLOSED to the harvest of shellfish. PROPOSED PROJECT: The applicant proposes to reconfigure existing boat slips within shared docking facility. The application states that the existing floating dock, measuring approximately 50' in length by 5' in width would be moved approximately 4' towards the north and the existing floating dock, measuring approximately 16' in width by 4.5' in width would be relocated to the waterward end of this floating dock with final dimensions of 64.4' in length by 5' in width. The application states the new configuration would continue to accommodate slip #1 and #2 of the shared docking facility within water depths of approximately -6.0'@ NLW) (See Sheets 4 and 5 of 6 and Project Narrative). Seagate Office Park c/o Brady J. Semmel Page 3 10. ANTICIPATED IMPACTS: The proposed new floating dock configuration would incorporate approximately 325 sq. ft. of additional Public Trust Area and Estuarine Waters; however, this too is currently usurped by the existing floating dock system. The new configuration would continue to accommodate up to seven (7) vessels within water depths of approximately -6.0' @ NLW. The proposed new docking facility would extend approximately 70' into a waterbody measuring approximately 470' across and would not encroach into the USACE AIWW setback requirement nor the adjacent 15' riparian corridor setback requirement. It should be noted that portions of the reconfigured floating dock would not encroach into the 15' riparian corridor setback requirement; however, existing portion, measuring approximately 16' in length by 5' in width to remain does encroach. It does not appear the proposed reconfiguration would hinder the navigation of the established adjacent docking facilities. Minor increases in4urbidity should be expected during construction. Submitted by: Robb Mairs Date: 2/17/2015 Office: Wilmington NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvada, III Governor Director Secretary AGENT AUTHORIZATION FORM Date: 3/ /-1 Name of Property Owner Applying for Permit: Name of thor. ed Agent for this project: �p�1Y �7 SE•a.�r6c I�CG t IV Owner's Mailing Address: /-�6 ,�//LIE 2G•¢� 4 ('910)2%M Phone Number f 9/6) low -SF'7 7 Phone Number( 1 I certify that I have authorized the agent listed above to act on my behalf, for the purpose of applying all CAMA Permits necessary to install or construct the following (activity): For my property located at This certification is valid thru Owner Date 127 Cardinal Drive EM., Wilmington, NC 26405 Phone'. 910-796-72151 FAX: 910-395-3964 Internet: www.nocoastalmanagement.net An Equal Opportunity 1 Afimutti" Action Employer G One NorthCarci ina Natural R;ECEI DCM WILMINGTON, NC JAN 16 2015 /.t�,'TV. F1 REBECCA P. SMITH REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET Filed For Registration: Book: Document No.: NC REAL ESTATE EXCISE TAX: Recorder: WILMINGTON, NC 28401 12/19/2007 04:32:29 PM RE 5262 Page: 243-246 2007059746 DEED 4 PGS $20.00 $2,700.00 SCOTT, NANCY A State of North Carolina, County of New Hanover YELLOW PROBATE SHEET IS A VITAL PART OF YOUR RECORDED DOCUMENT. PLEASE RETAIN WITH ORIGINAL DOCUMENT AND SUBMIT FOR RE-RECORDING. *2007059746" 2007059746 RECEIVED DCM WILMINGTON, NC JAN 1 6 2015 400 0 PREPARED BY: STEVEN F. SIEGEL STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I 2007059746 IIIII IIIII IIIII Iilll IIIII Iill illl 3FOR REOISIRRTION REGISTER OF DEED' REBECCA P SMITH NEW HANOVER COUNTY. NC 2007 DEC 19 04:32:29 PM W5262 PG:243-246 FEE:$20.00 NC REV STRMP:$2,700.00 INSINOT # 200iI9SR Tax ID No.: R05718-008-001-001 WARRANTY DEED THIS DEED, made this day of December, 2007, by MICHAEL E. LOPEZ and wife, JULIE Y. LOPEZ, of 1320 AIRLIE ROAD, #310, WILMINGTON, NC 28403, GRANTOR, to BRADY SEMMEL and wife, DANA SEMMEL, of 1310 AIRLIE ROAD, WILMINGTON, NC 28403, GRANTEE; �— WITNESSETH: That said Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has bargained and sold, and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot, tract, or parcel of land situated in the County of NEW HANOVER and State of North Carolina, and more particularly described as follows: BEING A UNIT OWNERSHIP IN REAL PROPERTY, UNDER AND PURSUANT TO CHAPTER 47A OF THE NORTH CAROLINA GENERAL STATUTES, ENTITLED "UNIT OWNERSHIP ACT" AND BEING MORE SPECIFICALLY DESCRIBED AS ALL OF UNIT 1 SEAGATE OFFICE PARK, A CONDOMINIUM PROJECT SITUATED UPON REAL PROPERTY LOCATED IN NEW HANOVER, NORTH CAROLINA, AS SUCH REAL PROPERTY IS DESCRIBED IN THE DECLARATION CREATING UNIT OWNERSHIP OF PROPERTY UNDER THE PROVISIONS OF CHAPTER 47A OF THE GENERAL STATUTES OF THE STATE OF NORTH CAROLINA, REFERRED TO HEREINBELOW; AS ADOPTED BY DECLARATION OF ADOPTION, DATED AUGUST 28, 1987 AND RECORDED SEPTEMBER 1, 1987 IN BOOK 1388, PAGE 1789 IN THE OFFICE OF THE REGISTER OF DEEDS OF NEW HANOVER COUNTY, NORTH CAROLINA; SUCH UNIT BEING MORE SEPCIFICALLY DESCRIBED BY REFERENCE TO AND SHOWN UPON THAT SET OF PLANS OF SEAGATE OFFICE PARK, WHICH IS EXHIBIT "C" TO THE DECLARATION, WHICH IS RECORDED IN BOOK 1313, BEGINNING AT PAGE 1287, IN THE OFFICE OF THE REGISTER OF DEEDS OF NEW HANOVER COUNTY, NORTH CAROLINA, REFERENCE TO WHICH IS HEREBY MADE FOR A MORE rHECEIVED 0CM WILMINGTON, NC r Fr-Z STE. L JAN 1 6 2015 COMPLETE DESCRIPTION THEREOF; SAID PLANS ALSO BEING RECORDED IN CONDOMINIUM PLAT BOOK 7, BEGINNING AT PAGE 210 IN SAID OFFICE; SUCH UNIT ALSO BEING MORE SPECIFICATLLY DEFINED IN THE DECLARATION, TOGETHER WITH ALL APPURTENANCES THERETO BELONGING, INCLUDING, BUT NOT LIMITED TO, THE UNDIVIDED FRACTIONAL INTEREST IN THE COMMON AREAS AND FACILITIES OF SEAGATE OFFICE PARK, APPURTENANT TO THE UNIT AS THE SAME IS ESTABLISED IN THE DECLARATION; AND TOGETHER WITH AND SUBJECT TO ALL RIGHTS, PRIVELEGES, EASEMENTS, OBLIGATIONS, RESTRICTIONS, COVENANTS AND CONDITIONS APPLICABLE AND APPURTENANT TO SUCH UNIT, SPECIFICALLY, AND TO UNIT OWNERSHIP IN SEAGATE OFFICE PARK, IN GENERAL, AS THE SAME ARE STATED IN THE DECLARATION, REFERRED TO HEREINABOVE. BY RECEIPT OF THIS DEED, THE GRANTEE ACKNOWLEDGES THAT THE OWNER OF PROPERTY ADJOINING SEAGATE OFFICE PARK ON THE NORTH HAS CONSTRUCTED A PIER AND DOCKING STRUCTURES PART OF WHICH LIE IN THE WATERS BETWEEN SEAGATE OFFICE PARK AND THE CHANNEL OF THE INTRACOASTAL WATERWAY; THAT THESE STRUCTURES DO NOT ENCROACH INTO THE AREA SHOWN ON THE BOUNDARY OF SEAGATE OFFICE PARK DOCKING FACILITIES ON A MAP RECORDED IN BOOK 1313, PAGE 1313 OF THE NEW HANOVER COUNTY REGISTRY; THAT THESE STRUCTURES, INCLUDING BULKHEADS, WERE BUILT WITH THE APPROVAL OR ACQUIESCENCE OF SEAGATE OFFICE PARK UNIT OWNERS, INC.; AND THAT THE OWNER OF THE PROPERTY ADJOINING SEAGATE OFFICE PARK ON THE NORTH HAS THE RIGHT TO REPAIR AND MAINTAIN THESE STRUCTURES IN THEIR PRESENT LOCATION. THE GRANTEE, ITS SUCCESSORS AND ASSIGNS, AGREE TO TAKE ANY ACTION OR GRANT ANY APPROVAL, BOTH INDIVIDUALLY AND AS A MEMBER OF THE SEAGATE OFFICE PARK UNIT OWNERS, INC., NECESSARY TO ALLOW THE OWNER OF THE PROPERTY ADJOINING SEAGATE OFFICE PARK ON THE NORTH TO REPAIR AND MAINTAIN ITS PEIR, DOCKING FACILITIES AND BULKHEADS IN THEIR PRESENT LOCATION AND CONFIGURATION AS DEPICTED ON PERMIT NO. 160-98 ISSUED ON 12/22/98 INCLUDING ALL SUBSEQUENTLY ISSUED MODIFICATIONS AND RENEWALS ISSUED UNDER PERMIT NUMBER 160-98 TO MICHAEL E. LOPEZ PURSUANT TO THE NORTH CAROLINA COASTAL AREA MANAGEMENT ACT. TO HAVE AND TO HOLD the aforesaid lot, tract, or parcel of land, and all privileges and appurtenances thereto belonging to the said Grantee in fee simple; subject, however, to the exceptions, reservations and conditions herein referred to. And the Grantor covenants with the Grantee, that Grantor is seized of said premises in fee and has the right to convey in fee simple; that the title is marketable and free and clear of all encumbrances; and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: (a) subject to County and Local Zoning Ordinances; (b) subject to standard easements for utilities; (c) restrictive covenants of record, if any; --_i EIVED DCM WILMINGTON, NC JAN 1 6 2015 (d) taxes for current year. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. IN WITNESS WHEREOF, the said Grantor has hereunto set his hand and seal, or if corporate, has caused this instrument to be signed in its corporate name by its duly authorized officers and its seal to be hereunto affixed by authority of its Board of Directors, the day and year first above written. (SEAL) MICHAEL E. LOPEZ (SEAL) L Y. LO E STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I, I - ud'c k � s a , a Notary Public of the County and State aforesaid, do hereby certify that NhCHAEL E. LOPEZ and JULIE Y. LOPEZ, personally came before me this day and acknowledged the execution of the foregoing instrument. Witness my hand and official seal, this day of December, 2007. 2 NOTARY PUBLIC My Commission Expires: (Notarial Seal) RYAN T. RHODENHISER NOTARY PUBLIC STATE OF NORTH CAROLINA NEW HANOVER COUNTY COMMISSION EXPIRES JULY 25, 2011 DCM WILMINGTON, NC JAN 16 2015 CDCM North Carolina Department of Environment and Natural Pat McCrory Governor February 17, 2015 Mr. Ed Flynn c/o F & S Marine Contractors, Inc. P.O. Box 868 Wrightsville Beach, North Carolina 28480 Dear Mr. Flynn: Resources Donald R. van der Vaart Secretary The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for Seagate Office Park Unit Owners Association, Inc. c/o Brady Semmel, for the proposed development located at 1310-1318 Airle Road, adjacent to Greenville Sound/AIW W, in Wilmington, New Hanover County. It was received as complete on February 11, 2015, and appears to be adequate for processing at this time. The projected deadline for making a decision is April 27, 2015. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from February 11, 2015, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it. can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. A field report has been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review, the agencies may contact you directly. Sincerely, , Robb L. Mairs Field Representative Wilmington District Office N.C. Division of Coastal Management cc: Jonathan Howell, DCM Tyler Crumbley, USACE Linda Painter, NH Co. Brady Semmel-Applicant N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-7W72151 FAX: 910395-3964Internet: www.nocoastalmanagement.net An Equal OpporNnity 1 AamaBve Action Employer NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that the following applications were submitted for development permits in Areas of Environmental Concern as designated under the CAMA in Wilmington, New Hanover County, to reconfigure existing docking facilities: On February 11, 2015, Seagate Office Park UOA, 1310-1312 Airlle Rd., adjacent to the AIWW; and on February 12, 2015, Kevin Thomas at 8737 Bald Eagle Lane, adjacent to Futch Creek. A copy of these applications can be examined or copied at the offices of Robb Mairs (Seagate) or Holley Snider (Thomas), N.C. Dept. of Environment & Natural Resources, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-7215) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to March 13, 2015 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. AmLVAW.A�01mfmm-�® A.\JnjM1:-=I-0='=aI- mp Seagate Office Park Unit Owners Association, Inc. 1310-1318 Airlie Road Wilmington, NC 28403 Braxton Davis Director, Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Dear Mr. Davis, The Seagate Office Park Unit Owners Association has authorized the modification of the finger piers that are deeded to the condos located at 1310 and 1312 Airlie Road. Both of these condo units are owned by Brady J. Semmel and Dana A. Evans-Semmel. President, Seagate Office Park Unit Owners Association, Inc. RECEIVED DCM WILMINGTON, NC JAN 16 2615 F d S Marine Contractors, Inc. P.O Box 868 Capt. Ed Flynn Wrightsville Beach, N.C. 28480 Durwood Sykes Phone/Fax 910-256-3062 email:efly@msn.com -e���" �2a Cg- � 1z"N ,►%vim IJJ�i2G�✓iI S -� 04.1 5,:�Wrxe j ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Art'cle Addressed to: oft,yApll or G✓ilrt~�r� 1 J I1C ����3 A. Signature X ❑ Agent /l�7 ❑ Addre B,16'ece er�d by (Pnnfed Name) . h.A%4 W D. Is delivery address different from Item 17 LJ Yes If YES, enter delivery address below: ❑ No RECEIVED DCM WILMINGTON, NO MAR 0 4 2015 3. a ce Type Certified Mail* ❑ Priority Mall Express" RECENEO ❑ Registered ❑ Return Receipt for Merchandise p g 10i5 ❑ Insured Mail ❑ Collect on Delivery MAR 4. Restricted Delivery? (Extra Fee) ❑ Yes �g�n;1AHP 6!tt 2. Article Number (transfer from service/abeo 7014 1200 0001 2826 9485 Ps Form 3811, July 2013 Domestic Return Receipt Complete Marine Construction Service For Over 35 Years Piers - Bulkheads - Floating Docks - Boatlifts - Pilings - Repairs REXEIVED MAR 0 4 2015 DCM WILM NIGTON, NC MAR 0 4 2015 Q NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor July 10, 2015 Kenneth Shanklin PO Box 1347 Wilmington, NC 28402-1347 Dear Mr. Shanklin, Donald R. van der Vaart Secretary Thank you for your letters concerning the Coastal Area Management Act (CAMA) major permit request submitted by the Seagate Office Park c/o Brady Semmel requesting authorization to reconfigure a docking facility at 1310 and 1312 Airlie Road, Wilmington, New Hanover County. The Division appreciates your concerns about the proposed project. The Coastal Area Management Act permit review process involves a coordinated state and federal review of each permit application, with all review agency comments considered by the Division before final action is taken on a permit application. In this case, no inconsistencies with the Coastal Area Management Act were identified as a result of this review. Consequently,, the Division has issued a Major Permit No. 76-15 for the proposed activity. A copy of the permit is being provided to you for your information. If you wish to object to the actions taken on this permit application, you may request an appeal of this decision within twenty (20) days of the permit decision. If you would like copies of the appropriate appeal forms or should you like to discuss the specifies of the process, please contact me by telephone at (808) 252-2808, or by email at Jonathan.Howell@ncdenr.gov. Sincerely, Jonathan R. Howell Asst. Major Permits Coordinator 1601 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-8600 1 Internet: www,ncdenr.gov An Equal opportunity 1 Afirmalive Action Employer— Made in part by recycled paper M Bennett, Ronda From: Bennett, Ronda Sent: Tuesday, July 21, 2015 11:26 AM To: 'kshanklin@shanklaw.com'; 'ncopper@shanklaw.com' Subject: Sea Gate Office Park Major Permit #77-15 Attachments: D00072115-07212015112015.pdf Attached. Thanks. Your message is ready to be sent with the following file or link attachments: D00072115-07212015112015.pdf Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled. Bennett, Ronda From: Bennett, Ronda Sent: Tuesday, July 21, 2015 11:31 AM To: 'kshanklin@shanklaw.com' Subject: FW: Sea Gate Office Park Major Permit #77-15 Attachments: Bennett Ronda.vcf; D00072115-07212015112015.pdf Mr. Shanklin, My attempt to send this to Mr. Copper failed as it was rejected. He may need to check his junk folder. If not there, can you see that he gets a copy? Thanks. Ronda C. Bennett *E-Mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.* Please visit www.nccoastalmanaaement.net to subscribe to Coastal Management's quarterly newsletter, the CAMAgram. -----Original Message ----- From: Bennett, Ronda Sent: Tuesday, July 21, 2015 11:26 AM To: 'kshanklin@shanklaw.com'; 'ncopper@shanklaw.com' Subject: Sea Gate Office Park Major Permit #77-15 Attached. Thanks. Your message is ready to be sent with the following file or link attachments: D00072115-07212015112015.pdf Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled. Bennett, Ronda From: Microsoft Outlook To: kshanklin@shanklaw.com Sent: Tuesday, July 21, 2015 11:27 AM Subject: Relayed: Sea Gate Office Park Major Permit #77-15 Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: kshanklin0shanklaw com Lshanklin(cbshanklaw.com) Subject: Sea Gate Office Park Major Permit #77-15 Bennett, Ronda From: Microsoft Outlook To: ncopper@shanklaw.com Sent: Tuesday, July 21, 2015 11:27 AM Subject: Undeliverable: Sea Gate Office Park Major Permit #77-15 spamkillerl.i40hosting.net rejected your message to the following email addresses: nc000erCalshanklaw.com (ncopperCalshanklaw.com) A problem occurred while delivering your message to this email address. Try sending your message again. If the problem continues, please contact your email admin. spamkiller1.140hosting.net gave this error: cuda_nsu 5.1.1 User unknown Diagnostic information for administrators: Generating server: BY2PR09MB0261.namprd09.prod.outlook.com nc000erCalsha nklaw.com Spam ki I le r 1. i40 hosti ng. net Remote Server returned '550 cuda nsu 5.1.1 User unknown' Original message headers: Received: from BY2PR09MB0261.namprd09.prod.outlook.com (10.160.122.27) by BY2PR09MB0261.namprdo9.prod.outlook.com (10.160.122.27) with Microsoft SMTP Server (TLS) id 15.1.219.17; Tue, 21 Jul 2015 15:26:22 +0000 Received: from BY2PR09MB0261.namprd09.prod.outlook.com ([10.160.122.27]) by BY2PR09MB0261.namprd09.prod.outlook.com ([10.160.122.27]) with mapi id 15.01.0219.018; Tue, 21 Jul 2015 15:26:22 +0000 From: "Bennett, Ronda" <ronda.bennett@ncdenr.gov> To: "kshanklin@shanklaw.com" <kshanklin@shanklaw. <ncopper@shanklaw.com> Subject: Sea Gate Office Park Major Permit #77-15 com>, "ncopper@shanklaw.com" Thread -Topic: Sea Gate Office Park Major Permit #77-15 Thread -Index: AdDDyZYvzFIbx3MoS10VDHChDA48eA== Return -Receipt -To: <ronda.bennett@ncdenr.gov> Date: Tue, 21 Jul 2015 15:26:22 +0000 Message-ID: <BY2PR09MB0261124B91951FECDl0E896680840@BY2PR09MB0261.namprd09.prod.outlook.com> Accept -Language: en -US Content -Language: en -US X-MS-Has-Attach: yes X-MS-TNEF-Correlator: authentication -results: shanklaw.com; dkim=none (message not signed) header.d=none; F d 5 Marine Contractors, Inc. P.O Box 868 Capt. Ed Flynn Wrightsville Beach, N.C. 28480 Durwood Sykes Phone/fax 910-256-3062 emad:eflyPmsn.com 14 7anuary 2015 NCDENR Wilmington, N.C, S�aga� The enclosed CAMA Major Permit application for A*t4 Vffice Park c% Dr. Brady Semmel, 131011312 Airlie Road, Wilmington, N.C. 28403, proposes to relocate an existing 5'x50' floating dock four feet north of its existing location, remove an existing 55(16' floating finger dock and relocate to the end of the existing 5'v50' dock and replace the guide pilings. No addition to the existing facility are proposed and no additional slips are proposed. The proposed dock renovations are only to provide easier dockage for the applicants' vessel. Complete Marine Construction Service For Over 35 Years Piers - Bulkheads - Floating Docks - Boatlifts - Pilings - Repairs DCM WI M NIGTONN,, NCRECEI I- JAN 16 2015 JAN 16 2015 DENR CAMA Daily Check Log for WIRO Date Received Check From (Name) Name of Permit Holder Chock Vendor Number Check amount I Permit Number/Comments Refund/Reallocated 1/i512015 Intel View Ber 8 Grill Antrnon Construction, Inc -_ - .—..-. _ - Certfietl check from Frenuxo 2emte _ - The Point LLC BBBT 28301 _ - — _— --_- . — -- -- _ _- Radon B of A 3438 Sunset Beach Holdings II LLC B08T /Pint Colonial Branch - SOO6B72855 Holdings Brady Semmel - _ _ PNC. Bank _ — 4268 $700 001ren"al fee MP 185-08 $200 00 543 Chadwick — 1/75/2015 1/15/2015 1/18/2015 _ 5700 00 Vensfer lee MP 42-OS trsnse, $250 00 major fee Aulre Rd, NHCo F end S Manna Contractors Inc f 311 MAJOR PERMIT FEE SCHEDULE Semmel / $250 / New Hanover County DCM % DWQ % Development Ta Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 II. Public or commercial development that does not involve the filling or excavation of any etlands or open water areas: $400 100% $400 0% $0 III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, r D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $250 100% $250 0% $0 III(B). Public or commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $400 100% $400 0% $0 III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 1 60% $240 40% $160 III(D). If General Water Quality Certification No. 90 see attached cannot be applied: $400 60% $240 40% $160 IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60% $285 40% $190 QMA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Donald R. van der Vaart Secretary February 18, 2015 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Major Public Notice Combo: • Seagate Office Park UOA • Kevin Thomas Kyle & Heather: Please publish the attached Notice in the Friday, February 20, 2015 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Divison of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by Credit Card (number on file with Elsa Lawrence, Ref acct # 796-7215). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. Sincerely, Shaun K. n Permitting Support & C er Assistance Division of Coastal Management cc: WiRO Jonathan Howell - MHC DCM Tyler Crumbley - USACE Michele Walker- DCM N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www,nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer Huggett, Doug From: Coburn, Chad Sent: Friday, July 10, 2015 4:37 PM To: Huggett, Doug Subject: Seagate Office Park - New Hanover Attachments: 1310-1312 Airlie Rd.pdf Doug, Jonathan just called and asked me to forward a copy of the 401 for the above project to you. If you need anything else let me know. Have a great weekend! Chad Chad Coburn, Senior Environmental Specialist NC Division of Water Resources Water Quality Regional Operations Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910-796-7379 email: chad.coburn@ncdenr.aov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary March 20, 2015 DWQ Project # 15-0204 New Hanover County Seagate Office Park Mr. Brady Semmel 1310 Airlie Road Wilmington NC 28403 Subject Property: 1310/1312 Airlie Road — Wilmington NO WRITTEN CONCURRENCE NEEDED Dear Mr. Semmel, You have our approval, in accordance with the attached conditions to reconfigure existing boat slips within an existing shared docking facility as described in your application received by the N.C. Division of Water Resources (DWR) on February 20, 2015. After reviewing your application, we have decided that the impacts are below the threshold for written authorization as long as all conditions of General Water Quality Certification Number 3883 (GC3883) are met. This certification may also be viewed on our website at http://portal.ncdenr.orgLweb/wA/swp /ws/401 /certsandpermits. This Certification allows you to use the Regional General #197800056 Permit when issued by the US Army Corps of Engineers. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. Conditions of Certification: 1. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached Certificate of Completion to the 401/Wetlands Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to -the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. 1617 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-86001Internet: www.ncdenr.gov, An Equal Oppodunily IAlfiongve Action Employer- Made m part by recycled paper 2 Seagate Office Park New Hanover County 2015-0204 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Karen Higgins in the Central Office in Raleigh at 919-807-6301 or Chad Coburn in the DWR Wilmington Regional Office at 910-796- 7215. Sincerely, . L -ell Chad Coburn Senior Environmental Specialist Wilmington Regional Office Water Quality Regional Operations Section Division of Water Resources, NCDENR nGC�[E0WI D V� MAR 2 6 2015 DENR -WATER RESOURCES 401 9 BUFFER PERMITTING Enclosures: GC3883 Certificate of Completion cc: Ed Flynn — F & S Marine Contractors, Inc., P.O. Box 868, Wrightsville Beach, NC 28480 Jonathan Howell — DCM Morehead City Robb Mairs — DCM WiRO Tyler Crumbley — USACE Wilmington Field Office 401 & Buffer Permitting Unit — FILE COPY WiRO Certification of Completion D WR Project No.: Applicant: _ Project Name: Date of Issuance of Wetland Permit: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: , hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date SHANKLIN & NICHOLS, LLP ATTORNEYS AT LAW 214 MARKET STREET POST OFFICE BOX 1347 WILMINGTON, NORTH CAROLINA 28402-1347 TELEPHONE (91 O) 762.9400 • TELEFAX (91 O) 251.1773 E-MAIL; SHANKLAW@EARTHLINK.NET KENNETH A. SHANKLIN BOARD CERTIFIED SPECIALIST IN REAL PROPERTY LAW - RESIDENTIAL BUSINESS. COMMERCIALAND NDUSTRIALTRANSA ONS March 12, 2015 VIA HAND DELIVERY Mr. Braxton C. Davis, Director NC DENR — Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 MATTHEW A. NICHOLS" *!ALSO ADMNTED IN NEW YORK Re: OBJECTION TO CAMA MAJOR PERMIT APPLICATION BY ADJACENT RIPARIAN PROPERTY OWNER RECEIVED MAR 16 201 WQPW MHB elTY Applicant: Seagate Office Park UOA and/or Brady Semmel, for property located at 1310/1312 Airlie Road, Wilmington, New Hanover County, NC Opponent: Dockside WB Investments, LLC (1308 Airlie Road) Our File No. 2015005 Dear Mr. Davis: We represent Dockside WB Investments, LLC—the above -referenced opponent and owner of riparian property immediately south of and adjacent to the property which is the subject of the CAMA Major Permit Application being objected to herein. Recently, our client received notice regarding an Application for a CAMA Major Development Permit (the "Application"), for property located at 1310/1312 Airlie Road, Wilmington, N.C.' by the Seagate Office Park UOA at 1310 Airlie Road, The Application addresses a proposed relocation of a pier and other improvements (the "Project'). By way of an initial response to the Application, my client strongly objects to the Application and proposed project and desires to have this objection deemed timely and considered in any deliberation on the matter and the Application. We are still investigating the issues raised by this Application and will supplement this objection in due course. 1 Based upon a review of the Application dated January 14, 2015, it is unclear to us who the applicant is. The "Business Name" listed on the first page of the Application states: "Seagate Airlie Office Park". The word "Seagate" is crossed through. Applicant 1 on page 1 is listed as Brady Semmel. The application is signed by neither, and is signed by Ed Flynn as agent. Mr. Braxton C. Davis, Director NC DENR — Division of Coastal Management March 12, 2015 Page -2- RECEIVED MAR 16 208 Wtom-l", .JTY However, initially, my client does not waive any of its riparian rights vested under Statutory or Common Law of the State of North Carolina, and secondly does not waive any of the riparian rights accruing to my client by virtue of applicable Rules and Regulations adopted by the Coastal Resources Commission (the "CRC") and NCDENR-DCM and the Common Law of this State. Moreover, my client objects to any extension of the existing pier structures into the public waters of Wrightsville Sound toward the corporate limits of the Town of Wrightsville Beach ('Town'). By copy of this letter, we are putting the Town and the City of Wilmington ("City") on Notice of our objections. My client has significant concerns with the adverse impact that the proposed Application will have to my client's well -established commercial use as a waterfront restaurant and marina. The Dockside Restaurant remains one of the very few restaurants in all of Wilmington where customers can arrive by boat and have a place to dock their boat or other watercraft while they dine. The boat slips at the Dockside Restaurant are designated for restaurant customer use, and the boat slips and the safety and ease of navigability of the Dockside marina in general are a paramount concern to my client and are critical to the Dockside Restaurant, which relies heavily on its water -dependent structures and boating customers for its commercial viability. We would also note, that based upon our preliminary review, the subject property is zoned CB (Community District) Zoning District by the City of Wilmington under Wilmington Land Development Code ("LDC") § 18-194 and the Wilmington Official Zoning Map. The Application lists that the property is zoned commercial, which is also consistent with the development's name ("Seagate Office Park") and the Declaration creating unit ownership (condominium) for this property under Chapter 47A of the North Carolina General Statutes, recorded on December 31, 1985, in Book 1313 at Page 1287, New Hanover County, and amendments thereto, which Declaration appears to restrict the property to commercial use (See Article V., Use Restrictions, Section A) ("Each unit is hereby restricted to the business use by the owner hereof, ...."). The First Amendment to the Declaration recorded on July 18,1997, in Book 2212 at Page 456 of the New Hanover County Registry, also states in Section 1 that "Seagate Office Park is a commercial use condominium ...." At a recent Public Hearing in the City of Wilmington, Dr. Semmel stated that he is a resident of the subject property, which we understand is his primary residence. The Wilmington LDC allows residential uses only in limited instances in the CB District, and only then under prescribed conditions, generally either as part of an approved Commercial District Mixed Use ("CDMU") project under Wilmington LDC § 18-257, or as a qualifying residential unit contained within a principal use under Wilmington LDC § 18-299. See Wilmington LDC § 18-194(c). We are not aware of any approvals by the City of Wilmington for this property as a CDMU project in a CB District under Wilmington LDC § 18-257. We are also not aware of circumstances that would qualify this property as a residential unit contained within a principal use under Wilmington LDC § 18-299, but an analysis of this would require a fairly Mr. Braxton C. Davis, Director NC DENR — Division of Coastal Management March 12, 2015 Page -3- RECEIVED MAR t 6 2015 0CM-MHO CITY detailed site inventory to determine if the 50% floor area ratio is not exceeded, whether there is sufficient off-street parking, whether there is additional open space provided on the property, and other criteria under Wilmington LDC § 18-299. It is our understanding that other persons are residing in other units within the Seagate Office Park. As you know, this is important because, among other reasons, North Carolina Administrative Code, Title 15A. Environment and Natural Resources, Chapter 07. COASTAL MANAGEMENT, Subchapter H. STATE GUIDELINES FOR AREAS OF ENVIRONMENTAL CONCERN, provides in relevant part as follows: § 07H .0601. NO VIOLATION OF ANY RULE No development shall be allowed in any AEC which would result in a contravention or violation of any rules, regulations, or laws of the State of North Carolina or of local government in which the development takes place. Rule 07H .0601. Accordingly, we object to the Application on these grounds as well, and by copy of this letter to the City of Wilmington, we are requesting that the City of Wilmington Code Enforcement inquire into the zoning compliance status of the subject property for a residential use in a CB Zoning District. We reserve the right to supplement this objection depending upon the outcome of City Code Enforcement's inquiry. We note also that even if the residential use of this property is deemed to be a valid nonconforming use, my client would continue to object to the Application on the ground of a potentially impermissible expansion or modification of a nonconforming use. Additionally, the application lists the proposed use as "private" rather than "commercial". No zoning compliance certificate is attached to the Application. At your convenience, we would appreciate the opportunity to meet with you or Ms. Debbie Wilson to address the findings of our investigation of this pier structure associated with Seagate Office Park, which is a commercial structure and use and not a residential use. With best regards, I remain KAS/nac cc: Ms. Debbie Wilson, District Manager Seagate Office Park Unit Owners Association, Inc. Brady J. Semmel, M.D. Town of Wrightsville Beach City of Wilmington Code Enforcement