Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
77-15 Roughton, Billy
Permit Class NEW Permit Number 77-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Billy Roughton, PO Box 1877, NC 27948 Authorizing development in Dare County adi. to the Croatan Sound, at 130 D Victor Meekins Road. Manteo as requested in the permittee's application dated 3/24/15 (MP-1) and 4/28/15 (MP-2), including the attached workman drawings (2), 1 dated 511115 and 1 dated 5/4/15 This permit, issued on July 15, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ne suolect to tines, imprisonment or civil action; or may cause me permit to oe nuu ana voia. Shoreline Stabilization 1) The authorized bulkhead shall adhere to the alignment depicted on the attached workplan drawings and shall be constructed in a straight line between the corners of the two adjacent bulkheads. 2) The alignment of the permitted bulkhead shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. POW/ y Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Billy Roughton Permit #' 7-15 " Page 2 of 3 ADDITIONAL CONDITIONS 3) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation landward of the authorized alignment is permitted except for that which may be required for the construction of the bulkhead wall and deadmen cables, etc. 5) All back611 material shall be clean and free of any pollutants except in trace quantities. Sedimentation and Erosion Control 6) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 7) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 8) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense. to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 9) The pernuttee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. Billy Roughton Permit # 77-15 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. SAW- 2015-01233. NOTE: An application processing fee of $400 was received by DCM for this project. NARRATIVE- CAMA Major Permitting Isabel Lennon Warren, Tract A March 24, 2015 The project is located on the north end of Roanoke Island at 130 D. Victor Meekins Road (SR 1115) in unincorporated Dare County, North Carolina. For reference, the property is located at 35.91987°N and-75.70908°W. The subject property is a 3.87 and contains an old dilapidated house as well as a smaller cottage and three barn structures. The majority of the property is wooded. This property is on the Croatan Sound and is suffering from a high erosion rate. There is a steep erosion escarpment with several recently downed trees. The adjacent properties on both sides contain shoreline stabilization bulkheads. The bulkhead to the north was constructed within the last two years and the bulkhead to the south also appears to have been recently built with shoreline reclamation. Due to the presence of a steep erosion escarpment, rapid erosion is occurring. This erosion not only occurs during storm events, but also from higher than normal wind tide events. The site plan indicates the existing NWL, the approximate NWL from 2012 and the erosion escarpment. The purpose of this proposed work is to stabilize a rapidly eroding section of shoreline. Since this section of shoreline is in between bulkheaded and stabilized properties and the erosion rates are rapid in this area, the shoreline loss of the subject property is exasperated. The intention is to tie into the corners of the existing bulkheads that appear to have been constructed recently based on physical observation and aerial photo review. The proposed alignment is a straight line (376 linear feet) as shown on the site plan. The area waterward of NWL to be reclaimed is a very shallow bare sand area that is less than 0.5 ft deep. This area does not support SAV due the high energy regime that does not allow root system to take hold. The height of the bulkhead will match the existing bulkhead corners on each side. Backfill for the bulkhead will come from an off -site approved borrow pit. Grading associated with backfill will consist of a graded and vegetated slope that will tie into the top of the existing erosion escarpment. RECEIVED MAY 18 10b DCM MP-1 APP - Q 2015 i APPLICATION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant(Landowner Information Business Name Project Name (it applicable) Isabel Lennon Warren, Tract A Applicant 1: First Name Billy MI Last Name Roughton Applicant 2: First Name MI Last Name If additional applicants, please attach an addiional pages) with names listed. Mailing Address PO Box 1877 City Kill Devil Hills State NC ZIP 27948 Country USA Phone No. 252-441-4988 ext. FAX No. Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Quible & Associates, P.C. Agent/ Contractor 1: First Name MI Last Name Brian D Rubino Agent/ Contractor 2: First Name MI Last Name Mailing Address PC Box City State P.O. Drawer 870 i Kitty Hawk NC ZIP Phone No. 1 Phone No. 2 27949 252.261 -3300 ext. 240 ext. FAX No. Contractor # 252 261 1260 Street Address (if different from above) City State ZIP 8466 Caratoke Highway Powells Point NC 27966 - Email brubino®quible.com RECEIVED MAY 18 10b <Form continues on back> IrlI+AM kMLW!-N1Y 252.808-2808 :: 1-888-4RCOAST :: www.nccoAs1N;rn.-.naqement.net Form QCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. Ifj Dare 130 D. Vicor Meekins Road (V'I a r)' 1115 Subdivision Name City State Zip Isabel Lennon Warren Manteo NC 27954 - Phone No. Lot No.(s) (If many, attach additional page with list) ext. one parcel #25226000, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Croatan Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade []Unknown Croatan Sound e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Dare County Unincorcorated 4. Site Description a. Total length of shoreline on the tract (ft.) /t b. Size of entire tract (sq.ft.) 440 ft l • 168,583 sq.ft. (3.87 acres) c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NIA, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) avg loft ❑NHW or ®NWL e. Vegetation on tract upland- Quercus virginiana, Juniperus virginiana, Quercus alba, Morelia cerifera, Pinus spp. f. Man-made features and uses now on tract I main house, 1 cottage, 3 bam structures. All structures are dilapidated and will be razed or rehabilitated. g. Identity and describe the existing land uses ad acent to the proposed project site. residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R-1 Residential (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> MAY 18 2015 W"10110 to" 252-808.2808 .. 1-888-4RCOAS`r .. www.ncc,iastaimanagetnent.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? []Yes ®No III) Are there coastal wetlands on the site? []Yes ®No (iii) If yes to either (1) or (ii) above, has a delineation been conducted? []Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. On -site septic treatment system o. Describe existing drinking water supply source. Dare County Water Distribution System p. Describe existing stone water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government OPrivate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of this proposed work is to stabilize a rapidly eroding section of shoreline. There is an erosion escarpment that is collapsing. This section of shoreline is in between bulkheaded and stabilized properties. The intention is to tie into the comers of the existing bulkheads that appear to have been constructed recently based on physical observation and aerial photo review. The proposed alignment is a straight line (376 linear feet). See site plan and photos. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Back hoe, vibratory hammer, vinyl sheeting, dump truck. Equipment and materials will be stored on site. d. List all development activities you propose. Shoreline stabilization bulkhead, backfill and grading to tie into the existing top of bank. e. Are the proposed activities maintenance of an existing project, new work, or both? new f. What is the approximate total disturbed land area resulting from the proposed project? 22,000 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No existing, however, it is possible that there will be minor runoff into wetland areas or public trust (Croatan Sound). The stormwater management plan does not direct runoff into the wetlands or public trust. i. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA J. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. RECEIVED MAY 18 1015 <Form continues on back> P00" me OR+r 252-808-2803 .. 1-888-4RCOAST .. www.nc-.ciusialaipiagement.net Form QCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required Items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Mary S. Fearing Prone No. Address P.O. Box 1048, Mantao, NC 27954 Name Rex Meekins Phone No. Address P.O. Box 661, Manteo, NC 27964 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, If applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. lithe project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 3T�%d1s Print Name �Ci�n i�b ^ o Q' ewe>Asfoc. PkC Il6E^� Signature Please indicate application attachments pertaining to your proposed project. N.. RECEIVED SDCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development MAY 1$ 2015 ❑DCM MP-4 Structures Information fMr»ra PITY 252-808.2808 :: 1.888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental Information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project Depth NA NA Y. EXCAVATION ® This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged square vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None QI) Describe the purpose of the excavation In these areas: d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicabie a. Location of disposal area. b. Dimensions of disposal area. c. (1) Do you claim title to disposal area? d. (1) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (if) If no, attach a letter granting permission from the owner. Qi) If yes, where? (1) Does the disposal area include any coastal wetlandsimarsh f. (1) Does the disposal Include any area In the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ❑No ❑NA or other wellands (WL)? If any boxes are checked, provide the number of square feet affected. (11) If yes, how much water area is affected? ❑CW ❑SAV ❑SB _ OWL ❑None (11) Describe the purpose of disposal in these areas: RECEIVED MAY 18 2015 ,mMr-m l,(ifftr 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmananement.net revised: 12126/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) APR 2 8 2015 I 3. SHORELINE STABILIZATION I ❑ This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 376 ft -- _ ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: _ Width: ]f c. Average distance waterward of NHW or NWL: 33 It d. Maximum distance waterward of NHW or NWL 60 It e. Type of stabilization material: wood and vinyl bulkhead g. Number of square feet of fill to be placed below water level. Bulkhead backfill 12.408 sa.ff. Riprap _ Breakwater/Sill Other_ i. Source of fill material. off -site approved borrow pit f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (11) If yes, state amount of erosion and source of erosion amount Information. 20-24 It (visual Inspection, aerial photo Investigation, recent bank collapse and downed trees) h. Type of fill material. sand -dominated 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No DNA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (if) Amount of material to be placed in the water (lit) Dimensions of fill area _ (iv) Purpose or fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Site will promptly be seeded after bulkhead construction and associated grading. The bulkhead will reduce shoreline erosion c. (i) WIII navt ational aids be required as a result of the project? d. ❑Yes ANo ❑NA (if) If yes, explain what type and how they will be Implemented. submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV _ ❑SB OWL ❑None (II) Describe the purpose of the fill In these areas: What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Backhoe, vibratory hammer, dump truck (1) Will wetlands be crossed in transporting equipment to proWEIVED site? ❑Yes ®No ❑NA (11) If yes, explain steps that will be taken to avoid or minim** 18 20n environmental impacts. 6m,om-"mw 600 Date G"s 2b ch} irir ' rA�-Jt..T APPI nt Narr$ , w ( „bk 9Al.ioc . , P. C . �a.btl Ltn..o.. u/crrrn � re.ck A CC�/V`^� Project Name - Applicant gnature 252-808-2808 :: 1-888.4RCOAST :: www.occoastalmanasement.net revised: 12126i06 MAY - 4 2015 car, ;7 '- _"T E _,: I _ 47't TOP OF 5,* rE-ARPMENT PROPOSED IfA"t BULKHEAD-\ TOP O 5.7' — SECTION B-8 N TS 65'i PROPOSED TOP OF BULKHEA 39'! !/QY TOP O 5.7' FINISH EX--- ,o..m,.m. P07T04 OF PROPOSED ESCARPMENT SECTION A —A N TS PRELIMINARY FOR CAMgICEIVED PERMITTING 18 2M ONLY ocM4pm?-0 PROJECT OUIBCOPYRIGHT ASSOCIATES, P.C. ASSOCI TES, LAMA MAJOR PLAN DETAILS P05051.2 THIS DOCUMENT IS THE PROPERTY OF O&ASSOCIATES, P.C. ANY uible SINCE 1959 STA162MV ! SUSAN WHITE t BILLY AOUGHPON PRAWN BY ION OF THIS DOCUMENT IS ALTERATION PROHIBITED. ���p�� ^'T ...p , ry9. p,, & Associates P.C. JMH IF THIS DOCUMENT IS NOT SIGNED AND SEALED BY A LICENSED PROFESSIONAL THEN THIS DOCUMENT SHALL BE LT ABEL LENNO WARREN 72AC A s ENGINEERING * CONSULTING * PLANNING ENVIRONMENTAL SCIENCES * SURVEYING CHECKED BY NAGS HEAD TOWNSHIP DARE COUNTY BDR CONSIDERED PRELIMINARY, NOT A CERTIFIED U ED FORM AND SHALL NOT BE USED FOR CONSTRUCTION, ROANOKE ISLAND NORTH CAROLINA NC Licenseg: C-0208 PO Drawer 870, 2Hawk, 27949 0 NOT TO SCALE - DATE RECORDATION, SALES OR LAND Phone: (252) 491-814747 CONVEYANCES, UNLESS OTHERWISE Fax: (252) 46 05/04/15 NOTED. GRAPHIC SCALE IN FEET 1'- NTS E-Mail: adminishatoror9qOquiuiblecom Gr MC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 12, 2015 Mr. Billy Roughton Post Office Box 1877 Kill Devil Hills, NC 27948 Donald R. van der Vaart Secretary DWR # 15-0493 Dare County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Project: Isabel Lennon Warren, Track A Pasquotank River Basin, Croatan Sound [PAS 51, 30-20-(1); SB] Dear Mr. Roughton: You have our approval for the impacts listed below for the purpose described in your application signed and dated April 28, 2014, and received by the Division of Water Resources (Division) on May 19, 2015. The impacts described in your application are covered by General - Water- Quality- Certification Number(s) 3900 (GC3900). This Certification(s)- is- issued in conjunction with the LAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USAGE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or LAMA Permit. This approval requires you to follow the conditions listed in the enclosed certification or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. Mrishn of Water Resources- Water Ouaily Regional Operations Section- Weshmgon Regional Office 943 WashNton Square mall, Washinglon, NC 27889 Phone:152-946-Ml t FAX, 252-975-3716 Internet. hiip.rlportal ncdenror9tweb1wg1ws An Equal opportunity! AHuma5ve Acton Employer Mr. Billy Roughton Isabel Lennon Warren, Track A June 12, 2015 Page 2 of 3 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream Site 1 (linear feet) 404/401 Wetlands Site 1 (acres) (acres) Coastal Wetlands Site 1 (acres) (acres) Open Waters Site 1 0.129 (acres) Fill (acres) Buffers —Zone 1 Site 1 (square feet) (square feet) Buffers —Zone 2 Site 1 (square feet) (square feet) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certifications) and is responsible for complying with all conditions. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty(60) calendar days. A petition form may be obtained from the OAH at htta://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original Mr. Billy Roughton Isabel Lennon Warren, Track A June 12, 2015 Page 3 of 3 and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, N C 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Roberto Scheller by phone at 252-948-3940 if you have any questions or concerns. Sincerely, Robert Tankard % Assistant Regional Supervisor Division of Water Resources Enclosures: GC 3900 Certification of Completion cc: Brian Rubino, Quible & Associates, P,C,, email: brubino@quible.com Josh Pelletier, USACE, Washington Regulatory Field Office Karen Higgins, Central Office Laserfiche File J N Permit Class Permit Number NEW a © ( J 77-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and 2 Coastal Resources Commission n L� @ Q jvi 0 nut uu AUG 0 for OE R X Major Development in an Area of Enviro OURCES pursuant to NCGS 113A-118 _ PERMIrnN X _ Excavation and/or filling pursuant to NCGS 113-229 Issued to Billy Roughton, PO Box 1877, NC 27948 Authorizing development in Dare County adi. to the Croatan Sound. at 130 D Victor Meekins Road. Manteo , as requested in the permittee's application dated 3/24/15 (MR-1) and 4/28/15 (MP-2), including the attached workman drawings (2) 1 dated 511115 and 1 dated 5/4/15 This permit, issued on July 15- 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may no suoiect to nnes, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization 1) The authorized bulkhead shall adhere to the alignment depicted on the attached workplan drawings and shall be constructed in a straight line between the comers of the two adjacent bulkheads. 2) The alignment of the permitted bulkhead shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. (See attached sheets for Additional Conditions) This permit action may be appealed by thee-permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 -Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Y Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Bitty Roughton Permit # 77-15 Page 2 of 3 ADDITIONAL CONDITIONS 3) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation landward of the authorized alignment is permitted except for that which may be required for the construction of the bulkhead wall and deadmen cables, etc. 5) All backfill material shall be clean and free of any pollutants except in trace quantities. Sedimentation and Erosion Control 6) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 7) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfdling activities. General 8) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 9) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. J IIL Billy Roughton Permit # 77-15 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 fet:t of the normal water level. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. SAW- 2015-01233. NOTE: An application processing fee of $400 was received by DCM for this project. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: Billy Roughton County: Dare LOCATION OF PROJECT: 130 D Victor Meekins Road in Manteo, on the Croatan Sound DATE APPLICATION RECEIVED COMPLETE BY FIELD REP: 05/05/15 FIELD RECOMMENDATION: Attached: NO To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Kelly Russell DISTRICT OFFICE: Elizabeth City DISTRICT MANAGER REVIEW: Date: B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $ 400 (100%) PUBLIC NOTICE REC'D: Advertise: 05/17/15 END OF NOTICE DATE: Comments due: 06/06/15 ADJ. RIP. PROP NOTICES REC'D- DEED REC'D: APPLICATION ASSIGNED TO: ON: IS C) 75 DAY DEADLINE: 07/19/15 MAIL OUT DATE: Circulation: 05/13/15 FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE 150 DAY DEADLINE: STATE DUE DATE: Comments due: 06/03/15 FED COMMENTS REC'D: DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency Division of Community Assistance ZG Land Quality Section Division of Water Quality Storm Water Management (DWQ) State Property Office Division of Archives & History Division of Environmental Health Division of Highways Wildlife Resources Commission Local Permit Office E EIVED Division of Marine Fisheries 2015 Corps of Engineers �(� — 0 1.7 e�� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Governor June 2, 2015 Donald R. van der Vaart Secretary MEMORANDUM: To: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City, NC 28557 From: Dyk Luben, P.E., Regional Engineer, PWSS/WaRO Subject: CAMA/DREDGE & FILL Permit Application Review Applicant: Billy Roughton Project Location: 130 D Victor Meekins Road in Manteo, Dare Co. Proposed Project: Bulkhead REPLY: This office has no objection to the project as proposed. SIGNED X_ This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. Public Water Supply Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-64811 FAX: 252-948-00401Internet: www.ncwater.orglpws/ An Equal Opportunity 1 Afinnative Action Employer DATE ro� RECEWD JUN 0 B 105 ®7�i RI EE R North Carolina Department of Environment and Natural Resources Pat McCrory RECEIVED/NcoeNR/MoPonald R. van der Vaart Governor Secretary May 13, 2015 MAY 19 2015 MEMORANDUM Water Quality Regional Operations section Washington Regional 011110e TO: Robert Tankard, Environmental Engineer DWR - Water Quality, Aquifer Protection Section, WaRO FROM: Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review RECEIVED Applicant: Billy Roughton MAY 2 8 201 p'"C'y I-Ity Project Location: 130 D Victor Meekins Road in Manteo, Dare County Proposed Project: Bulkhead Please indicate below your agency's position or viewpoint on the proposed roJ t and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City. NC 2855(fax: 252-247-33301. If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATES 1367 US 17 South, Elizabeth City, INC 27909 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: hftp•//oortal.nedenr.org/web/cnVdcm-home An Equal Opportunity 1 Affirmative Action Employer w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 MEMORANDUM TO: 19�tII]U � SUBJECT: Applicant: Project Location: Proposed Project: Donald R. van der Vaart Secretary Lee Padrick Division of Community Assistance Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management CAMA/DREDGE & FILL Permit Application Review Billy Roughton 130 D Victor Meekins Road in Manteo, Dare County Bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. �/ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. RECEIVED SIGNED DATE MAY 2 8 1015 pi,'o-uaniA 6" 1367 US 17 South, Elizabeth City, INC 27909 Phone: 252-264-39011 FAX: 252-2643723 ; Internet: htto:/loortal.nodenr.orc[/web/cm/dcm-home An Equal opportunity 1 Affirmative Action Employer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 MEMORANDUM TO: Tim Walton, Manager State Property Office FROM: Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management Donald R. van der Vaart Secretary RECEIVED MAY 15 2015 DOA STATE PROPERTY OFFICE SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Billy Roughton Project Location: 130 D Victor Meekins Road in Manteo, Dare County Proposed Project: Bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. �lA ` REPLY: T"hisoffice ce has no objection to the project as proposed. ro;a OnJ`��@ILA has no comment on the proposed project. \\ This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. RECEVED SIGNED 1[\Q(I t N XVV -a _ I JUN O 1 1015 DATE J 1367 US 17 South, Elizabeth city, NC 27909 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: htto://oortal.nodenr.org/web/cm/dcm-home An Equal opportunity 1 Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Billy Roughton 2. LOCATION OF PROJECT SITE: 130 D Victor Meekins Rd, Manteo, Dare County on the Croatan Sound Photo Index —2000: 181-2170 (0,14) 1995: 181-1870 (J,19) State Plane Coordinates - X: 2974108 Y: 805740 3. INVESTIGATION TYPE: CAMA, D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — Feb. 24, 2015 Was Applicant Present - no 5. PROCESSING PROCEDURE: Application Received Complete — May 5, 2015 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Dare County Land Classification From LUP — Conservation, transitional (B) AEC(s) Involved: ES, EW, PTA (C) Water Dependent: es (D) Intended U . private' (E) Wastewate ent: Existing - private septic system Planned - none (F) Type of Structures: Existing - single family residence and accessory structures .-.,---� Planned - bulkhead (G) Estimated Annual Rate of rosion 20 ft Source - applicant 7. HABITAT DESCRIPTION: AREA DREDGED FILLED SHADE 5,640 sq. ft. (A) Estuarine Shoreline (B) EW, PTA 12,408 sq. ft. (C) Other RECEIVED JUN 01 1015 (D) Total Area Disturbed: 18,048 sq. ft. (0.41 acres) (E) Primary Nursery Area: no (F) Water Classification: SC Open: no p� 8. PROJECT SUMMARY: The applicant proposes to construct a new vinyl bulkhead an average of 33 ft waterward of normal water level (NWL). Field Investigation Report Page 2 Project Setting The proposed project is located at 130 D Victor Meekins Rd (SR 1115) on Roanoke Island in Dare County. The property is located adjacent to the Croatan Sound. The size of the property is approximately 168,583 sq ft (3.87 acres) and is approximately 10 ft above normal water level (NWL). Manmade features associated with the property includeQpgzaO residential structure, a cottage, and three small barn structures that are all in poor repair. The property is vegetated ainly wi pical wild yard grasses. There are no recent permits on file associated with this property and there are no known sites of archaeological significance on the property. The property has approximately 440 linear feet of shoreline and no delineated wetlands on the site. The southern portion of the shoreline consists of a sandy beach area and the northern portion has experienced higher erosion and is a high wooded bluff. The adjacent property to the south has a concrete bulkhead and several vinyl groins and the property to the south has a wooden bulkhead with several vinyl groins. The Roanoke Sound is classified as SC in this area and is closed to shellfish harvesting. The water depths at the proposed bulkhead alignment are approximately 6 inches. The water bottom is sandy loam in this area and there were no submerged aquatic vegetation (SAV) observed in the area. Development Proposal The applicant proposes to construct 376 linear feet of new vinyl bulkhead and fill behind the proposed bulkhead. The proposed bulkhead alignment is at an average of approximately 33 ft waterward of NWL with a maximum distance of 60 ft from NWL. This bulkhead alignment is proposed at this location to line up with existing adjacent bulkheads. The applicant has noted in his application that since the adjacent properties have constructed bulkheads and due to recent severe storms his property has been experiencing an accelerated erosion rate. The sand for the fill material would be hauled in from an upland source. Anticipated Impacts The proposed project would result in the filling of 12,408 sq it of Estuarine Waters Public Trust Area of Environmental Concern and 5,640 sq ft of Estuarine Shoreline, also 229 cubic yards of fill material would be placed below NWL. Temporary water turbidity would occur in the project area. Submitted by: Kelly Russell Date: 5/5/15 NARRATIVE- CAMA Major Permitting Isabel Lennon Warren, Tract A March 24, 2015 The project is located on the north end of Roanoke Island at 130 D. Victor Meekins Road (SR 1115) in unincorporated Dare County, North Carolina. For reference, the property is located at 35.91987°N and-75.709080W. The subject property is a 3.87 and contains an old dilapidated house as well as a smaller cottage and three bam structures. The majority of the property is wooded. This property is on the Croatan Sound and is suffering from a high erosion rate. There is a steep erosion escarpment with several recently downed trees. The adjacent properties on both sides contain shoreline stabilization bulkheads. The bulkhead to the north was constructed within the last two years and the bulkhead to the south also appears to have been recently built with shoreline reclamation. Due to the presence of a steep erosion escarpment, rapid erosion is occurring. This erosion not only occurs during storm events, but also from higher than normal wind tide events. The site plan indicates the existing NWL, the approximate NWL from 2012 and the erosion escarpment. The purpose of this proposed work is to stabilize a rapidly eroding section of shoreline. Since this section of shoreline is in between bulkheaded and stabilized properties and the erosion rates are rapid in this area, the shoreline loss of the subject property is exasperated. The intention is to tie into the corners of the existing bulkheads that appear to have been constructed recently based on physical observation and aerial photo review. The proposed alignment is a straight line (376 linear feet) as shown on the site plan. The area waterward of NWL to be reclaimed is a very shallow bare sand area that is less than 0.5 ft deep. This area does not support SAV due the high energy regime that does not allow root system to take hold. The height of the bulkhead will match the existing bulkhead corners on each side. Backfill for the bulkhead will come from an off -site approved borrow pit. Grading associated with backfill will consist of a graded and vegetated slope that will tie into the top of the existing erosion escarpment. RECEIVED JUN 01 2015 DCM MP-1 APR - g 2015 APPLICATION for - Major Development PermitM—.00 (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicantl Landowner Information Business Name Project Name (if applicable) Isabel Lennon Warren, Tract A Applicant 1: First Name Billy MI Last Name Roughton Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 1877 City Kill Devil Hills State NC ZIP 27948 Country USA Phone No. 252 - 441 - 4988 ext. FAX No. Street Address (if different from above) City State ZIP Email 2. Agent(Contractor Information Business Name Quible & Associates, P.C. Agent/ Contractor 1: First Name MI Last Name Brian D Rubino Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State P.O. Drawer 870 Kitty Hawk NC ZIP Phone No. 1 Phone No. 2 27949 252.261 -3300 ext. 240 ext. FAX No. Contractor 8 252 261 1260 Street Address (d different from above) City State ZIP 8466 Caratoke Highway Powells Point NC 27966 - Email RECEIVED brubino@quible.com <Form continues on back> SUN U I Z015 N4 W'4WnU bur. 252-808.2808 :: 1.888-4RCOAST :: www.nceos;stalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Dare 130 D. Vicor Meekins Road (�'r _+0 C 1115 Subdivision Name City State Zip Isabel Lennon Warren Manteo NC 27954 - Phone No. Lot No.(s) (d many, attach additional page with list) ext. one parcel #25226000, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Croatan Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Croatan Sound e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Dare County Unincorcorated 4. Site Description a. Total length of shoreline on the tract (ft.) n b. Size of entire tract (sq.ft.) 440 ft 168,583 sci t. (3.87 acres) c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A, I I NWL (normal water level) (if many lot sizes, please attach additional page with a list) avg 10 ft ❑NHW or ®NW L e. Vegetation on tract upland- Quercus virginiana, Juniperus Virginians, Quercus alba, Morelia cerifera, Pinus spp. I. Man-made features and uses now on tract I main house, 1 cottage, 3 barn structures. All structures are dilapidated and will be razed or rehabilitated. g. Identify and describe the existing land uses adfacent to the proposed project site. residential h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? R-1 Residential (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes IIZNo ❑NA It yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA RECEIVED National Register listed or eligible property? JUN 01 1015 <Form continues on next page> �4 aemH�6 252-808-2808 .. 1.888-4RCOAST .. www.nc co 21 starmanagernent. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? []Yes ®No (it) Are there coastal wetlands on the site? []Yes ®No (ill) If yes to either (I) or (ii) above, has a delineation been conducted? []Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. On -site septic treatment system o. Describe existing drinking water supply source. Dare County Water Distribution System p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of this proposed work is to stabilize a rapidly eroding section of shoreline. There is an erosion escarpment that is collapsing. This section of shoreline is in between bulkheaded and stabilized properties. The intention is to tie into the corners of the existing bulkheads that appear to have been constructed recently based on physical observation and aerial photo review. The proposed alignment is a straight line (376 linear feet). See site plan and photos. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where It is to be stored. Back hoe, vibratory hammer, vinyl sheeting, dump truck. Equipment and materials will be stored on site. d. List all development activities you propose. Shoreline stabilization bulkhead, backfill and grading to tie into the existing top of bank. e. Are the proposed activities maintenance of an existing project, new work, or both? new I. What is the approximate total disturbed land area resulting from the proposed project? 22,000 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No existing, however, it is possible that there will be minor runoff into wetland areas or public trust (Croatan Sound). The stormwater management plan does not direct runoff into the wetlands or public trust. I. Will wastewater or stormwater be discharged into a wetland? []Yes ONo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> JUN 01 2015 bt:;"4kAHhl tFiY 252-808-2808 .. 1-888.4RCOAST .. www.nccoa3i;Almanagement.net L Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, If applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Mary S. Fearing Phone No. Address P.O. Box 1048, Manteo, NC 27954 Name Rex Meskins Phone No. Address P.O. Box 661, Manteo, NC 27954 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. I. Welland delineation, If necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1.10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date ZiTJ2d15 Print Name ?2(ion cz^k-i^O Qw)At>AStoc. p,:C Signature t Please indicate application attachments pertaining to your proposed project. r-- ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts j A RECEIVib r) ❑DCM MP 3 U 1 d Develo ment p an p -- - JUN O 12015 ❑DCM MP-4 Structures Information -P,2 .. _.____E. b4Nr•4MnH bilw 252-808-2808 :: 1-888.4RCOAST :: www.nccoastaimanagement.net Form DCM MP-2 APR 2 8 2015 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 11. EXCAVATION ®This section not applicable .� I a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (1) Does the area to be excavated include coastal wetiands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (II) Describe the purpose of the excavation In these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a area. d. High -ground excavation in cubic yards. area. ®This section not applicable c. (1) Do you claim title to disposal area? d. (I) Will a disposal area be available for future maintenance? Dyes ❑No ❑NA ❑Yes ❑No ❑NA (if) If no, attach a letter granting permission from the owner. (if) If yes, where? e. (t) Does the disposal area include any coastal wetlands/marsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (W L)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (II) Descdbe the purpose of disposal in these areas: (1) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (II) If yes, how much water area Is affected? RECEIVED JUN 01 2015 N4 Aa-UMW r.." 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmonagement.net revised: 12/26106 Form 1i MP-2 (Excavation and Fill, Page 2 of 3) APR 2 8 2015 3. (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ®Bulkhead ❑niprep ❑Breakwater/Sill ❑Other; c. Average distance waterward of NHW or 1 33 ft e. Type of stabilization material: wood and vinyl bulkhead g. Number of square feet of fill to be placed below water level. Bulkhead backfill 12,408 soft. Riprap Breakwater/Sill_ Other_ I. Source of fill material. off -site approved borrow pit This section not applic.' b. Length: 376 tt _ ... Width: I it - d. Maximum distance waterward of NHW or 1 80 it f. (1) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (II) If yes, state amount of erosion and source of erosion amount Information. 20-24 it (visual inspection, aerial photo Investigation, recent bank collapse and downed trees) It. Type of fill material. sand -dominated 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) I a. (i) Will fill material be brought to the site? []Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or ii Amount of material to be laced in the water _ other wetlands (WL)? If any boxes are checked, provide the ( 1 P number of square feet affected. (III) Dimensions of fill area _ ❑CW ❑SAV _ ❑SB (iv) Purpose of fill OWL ❑None (11) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Site will promptly be seeded after bulkhead construction and associated grading. The bulkhead will reduce shoreline erosion c. (I) Will navigational aids be required as a result of the project? []Yes i ❑NA (II) If yes, explain what type and how they will be implemented. It. What type of constructlon equipment will be used (e.g., dragllne, backhoe, or hydraulic dredge)? Backhoe, vibratory hammer, dump truck d. (1) WIII wetlands be crossed in transporting equipment "FAD site? []Yes ®No []NA (II) If yes, explain steps that will be taken to avoid or rdnimlze, ZO,� environmental impacts. SUN 0 1 -><�S�:-6tf /7 Dace 6.��y 2....5>,t�.. 6r;�.. 1`w!%ne , Ai Applicant Nam Qt.�bk 8 A1wc , t p. C . .lSsbe,l L(y�..on warrv. iTrt�+ A project Name Applicant Signature.,,;}, 2S2-808-2808 :: 1 888-4RCOAST :: wvvw.nccoastalmanaaement.net revised: 12/26/06 T �cteliyaa TOP ® 5.7' SECTION B-B N TS 85't SECTION A -A NITS MAY - 4 2015 r-- --_i:T f Ciw I F+ TCP CF /-ESCARPMENT //.4Y RECEIVED OF JUN 01 2015 PRELIMINARY FOR CAMA PERMITTING ONLY PROJECT COPYRIGHTASSOCTSS QUIBLE ASSOCIATES, P.C. CAMA MAJOR PLAN DETAES PDSD51.2 THIS DOCUMENT IS THE PROPERTY OF SINCE 1959 STAMMD t SMN WME & BILLY toual CNT QUIBLE @ ASSOCIATES, P.C. ANY uible DRAWN BY ALTERATION OF THIS DOCUMENT IS PROHIBITED. e + P.C.JMH �C'�'a r IF THIS DOCUMENT SI NOT SIGNED AND SEALED BY A LICENSED PROFESSIONAL THEN THIS DOCUMENT SHALL BE MABEL LBNNON WARREN TRACT A ` i `e'g� ENGINEERING - CONSULTING • PLANNING ENVIRONMENTAL SCIENCES s SURVEYING CHECKED BY NAGS HEAD TOWNSHIP DARE COUNTY BDR CONSIDERED PRELIMINARY, NOT A CERTIFIEDROANOKE BEU DOCUMENTSHALL NOT FOR CONSTRUCTION, BE URUCTION, ISLAND NORTH CAROLINA NC License : C-0208 PO Drawer 870, Hawk, 27969 0 NOT TO SCALE DATE RECORDATION, SALES OR LAND Phone: (252) 52) 691-8167 CONVEYANCES, UNLESS OTHERWISE Fax: (252) 66 05/0I/15 NOTED. GRAPHIC SCALE IN FEET 1n= NTS E-Moil: aeministr.for0qclorORuible.com DARE REAL ESTATE COUNT TRANSFER n./' TRAN^S'�F[ERR TAX LTa 13-1 _ $ Iv J Land Transfer S Land BOOK 19(jt3 PAGE b'J`J k4) 700001557'IlIilRluululBlluNI11MIINllllllll CAROLINA GENERAL WARRANTY DEED sfer# 0%41) —1`i Parcel Identifier No. 025226000 & 025226007 Mail/Box to: Grantee This instrument was prepared by: A)*ead P. Pipkin, Attorney Brief description for the Index: Isabel Tja'ocn Homeplace Tract THIS DEED made this _day of June��A, by and between GRANTOR STANFORD M. WHITE, and wife, SUSAN B. WHITE, A 1/54 undivided interest P.O. Box 1447 Nags Head, NC 27959 GRANIbri BILLY G. ROUGHTON P. O; Box 1877 Kill Devil Hills, NC 27948 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, ferninine or neuter as required by context and W ITNESSETH, that the Grantor, for a valuable consideration paid by the Gr e, the receipt o) undivided interestreby in fe edged, has that by these presents does grant, bargain, sell and convey unto the Grantee a one- fourth (1/54) undivided interest in fee simple in that certain lot or parcel of land situated on the northwest side of Roanoke Island in Ogs Head Township, Dare County, North Carolina and more particularly described as follows: , x See Exhibit A gECENED NC Bar Association Forth No. 3 C 1976, Revised 0111/2010 L/ JUN 01 ruN 0UV Primed by Agreement with the NC Bar Association �y da(et! April 27, 2006, recorded June 5, 2006 in Book 1688, Page 221, Dare County Registry and by a deed from Mary Carolyn O'k( , unmarried, dated December 21, 2001, recorded December 27, 2001 id Book 1407, Page 9, Dare County Registry. See' - also, �oLd with Restrictive Covenants to Grantor and others fromMalcolmK. Fearing, III and others, recorded in Book 1752, Page 116, DaEtCounty Registry, and deeds to Isabel Lennon Warren recorded in Deed Book 83, Page 332, and Deed Book 83, Page 334,D untyRegistry. A map showitohe property described in Exhibit A, captioned "Plat Survey for Isabel Lennon Warren' is recorded in Plat Cabinet B, Slide 112, Dar0ounty Registry and a map of the Sunnyview Subdivision sitowing Lot G, which is within the bounds of the map recorded in Plat ((alinet B, Slide 112 and is conveyed by this deed, is recorded in Plat Cabinet C, Slide 183D Dare County Registry. None of the prope rein conveyed includes the primary residence of the Grantor. TO HAVE AND TO D the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee a one/fifty-fourth (1/54) vided interest in fee simple pertaining to Tracts A, B & C as described in Exhibit A. And the Grantor covenan th the Grantee, that Grantor is seized of the premises in fee simple a onelfifty-fourth (1/54) undivided interest, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whouisoever, other than the following exceptions: Covenants, easements, right of way agreements and any other reservations applicable thereto of record in Dare County Registry. All zoning ordinances and other 1 gulations applicable thereto. Ad valorem property taxes subseque 2014. IN WITNESS WHEREOF, the Grantor ply executed the foregoing as ofthe day and year first above written. '-`print/Name.: STANFORD�MM... WWHHrM A � ' v7111' (SEALI Pt n Type Name: SUSAN B. WHITE 1. State of North Carolhla - County/C "f cif_ e ms_ I, the undersigned Notary Public of the County and State- resaid, cdttify that Stanford M. White awe, personally appeared before me this day and acknowledged the I ecutioil of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this 3 �" y of Tti Y , 2014. My Commission Expires: (Affix Seal) BtAKYALOM idOTAB+rf Irll9LLC DAi1El, NC Bar Association Form No. 3 01976, Revised 01/1/2010 Printed by Agreement with the NC Bar Ass iatloo lI [3gritrcwg fY1�Guc *n Notary Public `Notary's Printed or Typed Name C• 16 0 �y 4Vtrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this the day of J_3 12014, MyConNQssion Expires: LD "oZCt'AO l O �l. MwIL PUBLIC �0 � )Gr -G 1� 1. U!1 uc �n� ,Notary Public Notary's Printed or Typed Name �O RECEIVED JUN 01 2M (1ping Tracts A, B and C as shown on that certain plat or map entitled "Plat Survey for Isabel + Lv&n Warred', prepared by Jasper W. Hass'ell, Registered Land Surveyor, dated August 13, 1982_knd duly recorded in Plat Cabinet B, Slide 112, Public Registry of Dare County, North Cardiirla, together with a one/fifty-fourth (1/54) undivided interest in the rights of way of State Road and 1116. It being Sh�A?tent of Grantor to convey to Grantee with this Deed a one/fifty-fourth (1/54) undivided inst in Lot G of Sunnyview Subdivision as shown on the map recorded in Plat Cabinet C, Sli'Q 83D, Dare County Registry,and a one/fifty-fourth (1/54) undivided interest in Areas A and B as shown on the map captioned "Boundary Agreement — Survey — Isabel Lennon Warren & Fearing Tracts," Plat Cabinet H, Slide 66, Dar&,County Registry, notwithstanding that these tracts have now been subdivided from, the parcels shown on the map recorded in Plat Cabinet B, Slide 112,t6are County Registry. Less and Except: First Excepted Parcel: That certain tract or parcel of e�ld,described in Deed Bo6k 1350, Page 216 of the Dare County Registry. Second Excepted Parcels: Being Lots A, B, C, D, E, F, H, I and6f the Sunnyview Subdivision as shown on that certain plat or map entitled "Plat of "Sunnyvic� Nags Head Township, Roanoke Island, Dare County, North Carolina, Surveyed 6/30/92 and N92", prepared by William S. Jones, Jr., Registered Land Surveyor, dated April 15, 1993 anWyly recorded in Plat Cabinet C, Slide 183D, Public Registry of Dare County, North Carolina. Third Excepted Parcels: All of that property conveyed in a deed with restrictive ovenants from Grantor to Malcom K. Fearing, III, and others, recorded in Book 1752, page 115., Dare County Registry (being Area C as shown on a map recorded in Plat Cabinet H, Slide 66 Dare County Registry, together with a certain interest in the rights of way of State Road 1115 1116). Additional Ezceotion: The claimed lappage of about 1,000 square feet by the k.ner the Gaylord Tract affecting the southeast corner of Area A as shown on the'map recorded in � et H, Slide 66, Dare County Registry. 4810-6178-1737, v. 1 �X f�� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 22, 2015 Mr. Billy Roughton PO Box 1877 Kill Devil Hills, NC 27948 Subject: EXEMPTION from Stormwater Management Permit Regulations CAMA Major- Dredge & Fill / Bulkhead / Pier Billy Roughton Vinyl Bulkhead and backfUl StormwaterProject No. SW7150515 Dear Mr. Roughton: Don Van der Vaart Secretary The Washington Regional Office received a copy of your CAMA Major application for the new vinyl bulkhead and backfill at the propertylocated at 130 D Victor Meekins Road in the Town of Manteo, Dare County, NC on May 20, 2015. Staff review of the plans and specifications has determined that the project, as proposed, consists of activities that will not pose surface water quality threats from stormwater runoff since no new impervious area is proposed. The Director has determined that projects that are reviewed and approved by the Division as not posing water quality threats from stormwater runoff should not.be.subject to the stormwater management permitting requirements of 15A NCAC 2H.1000. For this reason, we are informing you by way of this letter that your project will not require a State Stormwater management permit at this time. The stormwater rules require the Division to permit the common plan of development, therefore, any future development on the property, regardless of whether a SEC plan or CAMA Major permit is also required, will require a Stormwater Management Permit application and permit issuance from the Division of Energy, Mineral, and Land Resources prior to any construction. Any construction on the subject site, prior to, receipt of the required permit, will constitute a violation of ISA NCAC 2IL1000 and may result in appropriate enforcement actions by this Office. Please keep in mind that this determination does not affect your legal requirements to obtain other permits which may be required by the Division of Water Resources, the Division of Land Resources, Coastal Area Management Act or any other Federal, State or Local Government. Please reference the Stormwater Project Number above on all correspondence. If you have any questions or need additional information concerning this matter, please contact me at (252) 946-6481. Sincerely, Samir Dumpor, PE Environmental Engineer cc: Daniel Govoni, ACM - Morehead Washington Regional Office Division of Energy, Mineral, and Land Resources. Land Quality Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-Mil FAX: 252-9753716 Internet hho://nodal.nodenr.orgtwablirlland-oualk An Equal Opportunity 1 Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper NCDEWR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 MEMORANDUM TO: I �11R06 E SUBJECT: Applicant: Project Location: Proposed Project: Donald R. van der Vaart Secretary Samir Dumpor, Environmental Engineer II DWR - Water Quality — Coastal Stormwater Permits, WaRO Daniel Govoni .n.p Assistant Major Permits Coordinator RECE Division of Coastal Management CAMA/DREDGE & FILL Permit Application Review MAY 2 0 2015 Billy Boughton 1 °� 4, 130 D Victor Meekins Road in Manteo, Dare County Bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED —� 1 DATE C - 2Z `(5 1367 US 17 South, Elizabeth City, NC 27909 Phone; 252-2643901 \ FAX, 262-264-3723; Internet hfto:t/oortal.ncdenr.oratwebtamldcm-home An Equal Opporrunity lAt iinnatNe Acton Employer N NCDENR North Carolina Department of Environment and Natural Pat McCrory Governor May 13, 2015 MEMORANDUM TO: Renee Gledhill -Early NC Department of"CulturalResources, FROM Darnel Govoni Assistant Major Permits Coordinator Division of Coastal Management Donald R. van der Vaart Secretary SUBJECT: CAMA/DREDGEK FILL Permit Applieation Review Applicant: Billy Roughton Project Location: 130 D Victor Vleekins. Road in IvIameo; Clare County Proposed Project: Bulkhead �" ;��Clrx/erwd: fdY S=zf-15 Please indicate below your agency's position or viewpoint on the proposed project and return this fora, by 06/03/15 to 400 Commerce Avenue Morehead City NC 28557 (fax: 252-247-3330). If you have any questions, regarding_ the proposed project, ,please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with:supporting data arc requested. REPLY: ` This office.has no objection to the project as proposed. r This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. SIGNED XLk �' DATE 1357 Us 17 soutp, sizatett city, Nc 27955 PWwe: 252.2l t-3,_R01 � FAX 264w264•37231 h1%M : h1, t 9rgVz1 ncdeir ora w cfi f� MEquat OW_;uuniyi AlSnninvs AcGnn Ewp!gtr M 2qG1S 10p1 �1 � � 5 1'ICBE R, North Carolina Department of Environment and Natural Resources Pat McCrory Governor MEMORANDUM: TO: Daniel Govoni, DCM Assistant Major Permit Coordinator Doug Huggett, DCM Major Permits Coordinator FROM: Shane Staples, DCM Fisheries Resource Specialist SUBJECT: Billy Roughton, Manteo DATE: 6/3/15 Donald R, van der Vaart Secretary A North Carolina Division of Coastal Management (DCM) Fisheries Resource Specialist has reviewed the subject permit application for proposed actidns that impact fish and fish habitats. The applicant proposes to construct a bulkhead and backfill along a shoreline on the Croatan Sound that would connect with the neighboring properties existing bulkheads. The proposed bulkhead would be approximately 376 linear feet and result in the over 18,000 square feet of fill of which over 5,600 square feet is estuarine water. While the proposed project would connect existing bulkheads the amount of fill does seem excessive and will affect a large area of shallow bottom habitat directly by filling it. If the alignment of the proposed bulkhead were changed to more closely follow normal water level the shallow bottom habitat affected by this project could be reduced. Contact Shane Staples at (252) 948-3950 orshane.staoles0r cdenr.eov with further questions or concerns. 1601 Mall Service Center, Ralelgh, North Carolina 27699-1601 Phone: 919-707-MOD \ Internet: www.nedenr.gov An Equal OppoM1unib 1Af urn0eAcbon En*yer—Made in parr by recycled paper NCDE dR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 MEMORANDUM TO: 1191 UT_0 Applicant: Project Location: Proposed Project: Donald R. van der Vaart Secretary RECEIVED Shane Staples, Fisheries Resource Specialist MAY 9, 0 2015 Division of Coastal Management, WaRO DCM-FrahatieB Daniel Govoni WARO Assistant Major Permits Coordinator Division of Coastal Management CAMA/DREDGE & FILL Permit Application Review Billy Roughton 130 D Victor Meekins Road in Manteo, Dare County Bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If ydii have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED ow ' DATE 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264.39011 FAX 252-264,3723 ; Internet htto:/loortal.ncdenr.omhveh/cmldcm-home An Equal Opportunity\ Aarmative Action Employer June 8, 2015 Regulatory Division I:i$ i GTii �7 � 6�.Y:\ �i6►TII ri�IJ �►TG7G', Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Huggett: Reference the application of Mr. Billy Roughton to construct a 376 linear foot bulkhead an average of 33ft waterward of the NWL, adjacent to the Croatan Sound, at 130 D Victor Meekins Road, in Manteo, Dare County NC. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. 3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 4. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 5. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 6. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 7. The permittee shall advise the Corps in writing at least two weeks prior to beginning the work authorized by this permit and again upon completion of the work authorized by this permit. 8. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 9. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 10. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 11. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Mr. Josh Pelletier, Washington Field Office, Regulatory Division, telephone (910) 251-4605. Sincerely, Josh Pelletier Regulatory Project Manager Copies Furnished: Mr. Ian McMillan North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Fritz Rhode National Marine Fisheries Service Habitat Conservation Service 101 Pivers Island Road Beaufort, North Carolina 28516 Mr. Jeffrey Garnett Wetlands and Marine Regulatory Section Water Protection Division -Region IV U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Frank Jennings, District Manager Elizabeth City Field Office North Carolina Division of Coastal Management RIVER North Carolina Department of Environment and Natural Resources Pat McCrory Governor MEMORANDUM TO: Daniel Govoni, DCM Assistant Major Permits Coordinator Division of CoaZIR anagement FROM: Charlan Owens District Planner Division of Coastal Management Donald R. van der Vaart Secretary SUBJECT: Major Permit Request by Billy Roughton to install 376 linear feet of vinyl bulkhead and associated fill on the Croatan Sound at 130 D Victor Meekins Road (SR 1115) on Roanoke Island, Dare County. DATE: May 19, 2015 Consistency Determination: The request is consistent with/not in conflict with the Dare County 2009 Land Use Plan certified by the CRC on February 24, 2011. Overview: The 3.87 acre subject property has approximately 440 linear feet of shoreline along the Croatan Sound to the west. The site is approximately 10 feet above Normal Water Level (NWL). The property is vegetated with pine trees and typical wild yard grasses. There are no delineated wetlands on the site. The northern shoreline has a high wooded bluff while the southern shoreline is a sandy beach. The property is primarily located outside of the floodzone, With AE (EL 7) floodzone along the shoreline. Existing site improvements consist of a residential structure, a cottage, and three (3) barn structures that are all in disrepair. The shoreline is in a natural state with no improvements. Installation of 376 linear feet of vinyl bulkhead with associated fill is proposed. The bulkhead will be aligned an average of 33 feet and a maximum of 60 feet waterward of NWL and tie into adjacent bulkhead on either side. Fill sand will be placed behind the bulkhead. The Croatan Sound in this area is classified as SA;HQW and is open to shellfrshing. No Submerged Aquatic Vegetation (SAV) was observed in the project area. There are no known sites of archaeological significance on the property. Anticipated impacts resulting from this project are expected to include: the filling of .28 acre of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC) and 5,640 sq. ft. of Estuarine Shoreline AEC. 1367 US 17 South, Elizabeth City, NC 27909 Phone:252.26439011 FAX: 252-2643723 ; Internet: www.n=astalmenagement.net An Equal Opporiunity 1AftaftAcdon Employer —Made in pmlbyreWled paper North Carolina Department of Environment and Natural Resources MEMORANDUM Division of Coastal Management Page 2 of 4 Basis for Determination: The Dare County Land Classification Map identifies the property as "Community Residential". All CAMA Areas of Environmental Concern (AECs) are designated as "Conservation" as indicated on Page 217. A glossary of key words is provided on Page 140. Defined terms include: Advocate: to promote or encourage Encourage: to favor or foster (also see support Recognize: to show awareness of an issue or condition Shall: mandatory, not optional; a more formal term for "will' Should: preferred or recommended but not mandatory in all cases Support: to foster; may imply financial support The following LUP policies may be applicable to this request: Land Use Compatibility: Archaeological/Historic Resources Policy LUC #15, Page 159. "The Dare County Board of Commissioners supports the protection of structures, lands, and artifacts that have been identified by the NC Department of Cultural Resources, Division of Archives and History, as archaeologically or historically significant. On a case -by -case basis individual protection/management strategies should be implemented to ensure archaeological and/or historical resources are not destroyed." Natural Hazards: Estuarine Systems Policy NH #2, Page 180. "Estuarine shoreline development should continue to be managed to protect and preserve the natural resources of the estuarine waters and the estuarine shoreline. The appropriate tools for this are the existing CAMA permit program and the Areas of Environmental Concems (AECs) designated under the CAMA program..." 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-39011 FAX: 252-260723 ; Internet: www.ncamtalmanagementnet An Equal opp unitylAr maiNeAdlon Employer —Made in part by recycled paper North Carolina Department of Environment and Natural Resources Division of Coastal Management Implementation Strategy, Page 180. "1. Rely on existing CAMA AEC regulations to address development activities along the ocean beaches, estuarine shoreline, and other public trust areas in unincorporated Dare County..." Policy NH#3, Page 180 and Policy WQ#10, Page 192. MEMORANDUM Page 3 of 4 "Dare County supports the installation and maintenance of estuarine bulkheads. Offshore breakwaters, slopes, rip -rap, and voluntary setbacks are appropriate alternatives for property owners for addressing estuarine shoreline management in lieu of estuarine bulkheads where these other techniques may be equally effective in abating a shoreline erosion problem." Implementation Strategy: 1. Oppose efforts to eliminate the use of estuarine bulkheads or other efforts designed to prioritize or amend the current State regulations on their installation and maintenance. (2010-2015) Flood Hazards Policy NH #5, Page 181. "Dare County supports, as minimum standards, the administration and enforcement of all applicable floodplain management regulations and the National Flood Insurance Program..." Water Quality: Water Quality Policy WQ #2, Page 188. "Development projects shall be designed and constructed to minimize detrimental impacts on surface water quality, groundwater quality, and air quality. Structures should be designed to fit the natural topographic conditions and vegetation versus modifications to natural conditions to accommodate structures." 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: www.n=astalmanagement.net An Equal Oppodunily %AfllmurUw Adbn Employer —Made in pad by recycled paper North Carolina Department of Environment and Natural Resources Division of Coastal Management Stormwater Policy WQ #5, Page 190. "Efforts to manage stormwater runoff should be based on local conditions and natural features. Properties immediately adjacent to SA classified waters should be developed consistent with the dimensional standards and lot coverage limitations of the Dare County Zoning Ordinance.. Vegetative buffers and other low —impact development methods identified by the UNC Coastal Studies Institute are appropriate tools to address stormwater runoff adjacent to SA waters." Fisheries Resources Policy WQ #11, Page 193. "Dare County recognizes the importance of our surrounding waters that serve as habitats for the area's abundant fisheries resources. The continued productivity of Dare County's fisheries shall be fostered through restoration and protection of the unique ecosystems upon which they depend..." 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-26439011 FAX; 252-2643723; Internet: wwanccoastalmanagement.net An Equal epponun ty 1 Aam s&eAdlon Employer -Made in part by M*W paper MEMORANDUM Page 4 of 4 Copy CAAltcD To KDK NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Donald R. van der Vaart Governor Secretary MEMORANDUM TO: Doug Huggett, Major Permits Coordinator THROUGH: Frank A. Jennings, III, District ManagerIVY FROM: Kelly Russell, Field Representative 0-1 DATE: July 15, 2015 SUBJECT: Billy Roughton Major Permit Recommendations The applicant proposes to construct a new bulkhead along 376 ft of shoreline an average of 33 ft waterward of NWL and at a maximum of 60 ft waterward of NWL and fill in behind the bulkhead. The site of the proposed development is at 130 D Victor Meekins Rd. Manteo, Dare County. The development proposal involves the Public Trust Area (PTA), Estuarine Waters (EW) and Estuarine Shoreline (ES) Areas of Environmental Concern (AEC). I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to this project and my findings are as follows: 07H.0206 Estuarine Waters (c) Management Objective. To conserve and manage the important features of estuarine waters so as to safeguard and perpetuate their biological, social, aesthetic, and economic values; to coordinate and establish a management system capable of conserving and utilizing estuarine waters so as to maximize their benefits to man and the estuarine and ocean system. (d) Use Standards. Suitable land/water uses shall be those consistent with the management objectives in this Rule. Highest priority of use shall be allocated to the conservation of estuarine waters and their vital components. Second priority of estuarine waters use shall be given to those types of development activities that require water access and use which cannot function elsewhere such as simple access channels; structures to prevent erosion; navigation channels; boat docks, marinas, piers, wharfs, and mooring pilings. In every instance, the particular RECEIVED location, use, and design characteristics shall be in accord with the general use standards for JUL Z p 1015 coastal wetlands, estuarine waters, and public trust areas described in Rule 07H.0208. W40*"u 9" Consistent: The applicant proposes to construct a bulkhead to prevent erosion. Billy Roughton Major Permit Recommendations July 15,2015 Page 2 07H.0207 Public Trust Areas (c) Management Objective. To protect public rights for navigation and recreation and to conserve and manage the public trust areas so as to safeguard and perpetuate their biological, economic and aesthetic value. (d) Use Standards. Acceptable uses shall be those consistent with the management objectives in Paragraph (c) of this Rule. In the absence of overriding public benefit, any use which jeopardizes the capability of the waters to be used by the public for navigation or other public trust rights which the public may be found to have in these areas shall not be allowed. The development of navigational channels or drainage ditches, the use of bulkheads to prevent erosion, and the building of piers, wharfs, or marinas are examples of uses that may be acceptable within public trust areas, provided that such uses shall not be detrimental to the public trust rights and the biological and physical functions of the estuary. Projects which would directly or indirectly block or impair existing navigation channels, increase shoreline erosion, deposit spoils below normal high water, cause adverse water circulation patterns, violate water quality standards, or cause degradation of shellfish waters are considered incompatible with the management policies of public trust areas. In every instance, the particular location, use, and design characteristics shall be in accord with the general use standards for coastal wetlands, estuarine waters, and public trust areas. Consistent: The applicant proposes to construct a bulkhead to prevent erosion. This development will be consistent with the use standards and would not interfere with the public's right for navigation and recreation. 07H.0208 Use Standards Paragraph (a) addresses General Use Standards, and sub -paragraph (1) precludes uses that are not water dependent within the EW and PTA and lists uses that may be considered water dependent. Consistent: The applicant proposes to construct a bulkhead. This sub -paragraph lists this structure as water dependent. Paragraph (a)(2)(A) requires that the location, design and need for development, as well as the construction activities involved be consistent with the stated management objective. Consistent: The proposed bulkhead is consistent with the management objectives. Paragraph (a)(2)(B) requires that no suitable alternative site or location outside of the AEC exists RECEIVED for the use of development. It further states, "that the applicant has selected a combination of sites and design that will have a minimum adverse impact upon the productivity and biologic JUL 2 0 1015 integrity of coastal marshland, shellfish bed, beds of submerged aquatic vegetation, spawning and nursery areas, important nesting and wintering sites for waterfowl and wildlife, and important natural erosion barriers. Billy Roughton Major Permit Recommendations July 15, 2015 Page 3 Consistent: The proposed development is consistent with the intent of this rule. Paragraph (a)(2)(C) requires that the development shall not violate water and air quality standards. Consistent: This development will not violate water and air quality. Paragraph (a)(2)(D) requires no major or irreversible damage to valuable documented archaeological or historic resources. Consistent: There are no known archaeological or historic resources on the property. Paragraph (a)(2)(E) requires that the development shall not measurably increase siltation. Consistent: It does not appear that this development will measurably increase siltation. Paragraph (a)(2)(F) requires that the development shall not create stagnant water bodies. Consistent: It does not appear that this development will create stagnant water bodies. Paragraph (a)(2)(H) requires that development shall not impede navigation or create undue interference with access to, or use of, PTA or EW. Consistent: The proposed bulkhead, associated backfill and pier will not impede or create undue interference with access to, or use of, PTA or EW. Paragraph (b) addresses Specific Use Standards. Of these, subparagraph (6) Docks and Piers and (7) Bulkheads and Shore Stabilization Measures pertain to this project, and those subparagraphs not listed are not applicable to this project. Parag_rat)h (7) is Bulkheads and Shore Stabilization Measures Subparagraph (7)(A) states, 'Bulkhead alignment, for the purpose of shoreline stabilization, shall approximate normal water level." Inconsistent: The applicant proposes to construct a bulkhead at an average of 33 ft waterward of NWL to reclaim land due to erosion. Subparagraph (7)(B) states, "Bulkheads shall be constructed landward of significant marshland or marsh grass fringes." RECEIVED Consistent: No wetlands exist on the property. JUL 2 0 1015 W""_W1HW c u.r Subparagraph (7)(C) states, 'Bulkhead fill material shall be obtained from an upland source approved pursuant to this Section, or if the bulkhead is a part of a permitted project involving excavation from a non -upland source, the material so obtained may be contained behind the bulkhead." Consistent: The applicant's have indicated that clean upland fill will be used. Billy Roughton Major Permit Recommendations July 15, 2015 Page 4 Subparagraph (7)(D) states, "Bulkheads or other structures employed for shoreline stabilization shall be permitted below approximate mean high water or normal water level only when the following standards are met: (i)the property to be bulkheaded has an identifiable erosion problem, whether it results from natural causes or adjacent bulkheads, or it has unusual geographic or geologic features, e.g. steep grade bank, which will cause the applicant unreasonable hardship under the other provisions of this Rule." Consistent: The applicant's property does have an identifiable erosion problem and has lost a significant portion of land. (ii)the bulkhead alignment extends no further below approximate mean high water or normal water level than necessary to allow recovery of the area eroded in the year prior to the date of application, to align with adjacent bulkheads, or to mitigate the unreasonable hardship resulting from the unusual geographic or geologic features. Consistent: The proposed bulkhead alignment would align it with an adjacent bulkhead to the east and west. (iii)the bulkhead alignment will not result in significant adverse impacts to public trust rights or to the property of adjacent riparian owners. Consistent: The proposed bulkhead, associated backfill and pier will not impede or create undue interference with access to, or use of, PTA or EW. (iv) the need for a bulkhead below approximate mean high water or normal water level is documented in the Field Investigation Report or other reports prepared by the Division of Coastal Management. Consistent: The need for a bulkhead below approximate mean high water or normal water level is documented in the Field Investigation Report. Based on my review of the applicable subsections of the North Carolina Administrative Code, the permit application, and plans, I recommend a Major Permit be issued to Billy Roughton with the standard permit conditions associated with bulkhead shoreline stabilization. RECEIVED JUL 2 0 2og NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary May 13, 2015 MEMORANDUM TO: Maria Tripp Dunn NC Wildlife Resources Commission FROM: Daniel Govoni Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Billy Roughton Project Location: 130 D Victor Meekins Road in Manteo, Dare County Proposed Project: Bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. So-e 0i-6 c Gr This office objects to the project for reasons described in the attached comments. SIGNED Z) DATE (o t t 2 JI aECEtvEo juN 16 VAS 1367 US 17 South, Elizabeth City, INC 27909"� WNu loll* Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: hai):Hponal.ncdenr.org/web/crTVdcm-home dcm-home An Equal Opportunity 1 Affirmative Action Employer ® North Carolina Wildlife Resources Commission Gordon Myers, Executive Director MEMORANDUM TO: Doug Huggett, Assistant Major Permits Processing Coordinator Division of Coastal Management North Carolina Department of Environment and Natural Resources FROM: Maria T. Dunn, Coastal Coordinator Habitat Conservation DATE: June 12, 2015 SUBJECT: CAMA Dredge/Fill Permit Application for Billy Roughton, Dare County, North Carolina. Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed the permit application with regard to impacts on fish and wildlife resources. The project site is located at 130 D Victor Meekins Road adjacent the Croatan Sound in Manteo, NC. Our comments are provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100 through 113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended, and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). The applicant proposes to construct a new vinyl bulkhead an average 33' waterward (maximum 60' waterward) the normal water level. The bulkhead will connect adjacent bulkheads, 376' apart, for a 3.87 acre property with a bluff shoreline. The Croatan Sound at this location is classified SC by the Environmental Management Commission. The NCWRC is concerned with the amount of fill associated with the proposed bulkhead alignment. We understand the two adjoining properties have bulkheads, but believe an alternate shoreline stabilization method could be explored. Options include cutting the bluff landward within the 3.87 acre property (no upland development plans were included and the onsite residence is uninhabited) to minimize slope, install steps or retaining walls going toward the sound with associated fill, or construct a living shoreline within the footprint of the bulkhead and fill. It is apparent from aerial photography and nearby shoreline structures that significant Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919)707-0220 • Fax: (919)707-0028 RECEIVED JUN 15 20b DDk-IWrtl� S.!1,; r CMDF_Billy Rougfiton Page 2 June 12, 2015 sediment transport occurs in this area. Installation of a sill or breakwater would minimize shallow water habitat impacts, increase shallow water habitat opportunities, and provide shoreline stabilization. Installation of a series of groins, like done on the adjacent property waterward the bulkhead, would also capture sand and protect the property. Re -working the uplands and alternative shoreline stabilization methods that lessen impacts to shallow water habitat are methods more preferred by our agency. We appreciate the opportunity to review and comment on this permit application. If you need further assistance or additional information, please contact me at (252) 948-3916 or at maria.dunn(aD,ncwild life.org RECEIVED juN 15 2015 P('.wMH1) QV' r. 4 ATA NCDENR North Carolina Department of Envi�nt and Natural Resources Pat McCrory Governor May 13, 2015 MEMORANnf l" FROM: �. C D✓dlt SUBJECT: Applicant: Project Loc Proposed P R. van der Vaart Secretary MAY 18 1g15 & 3a 'eati k' 90— -_ onal i Chief shellfish Sanitation & Recreational Water Quality nits Coordinator Management i FILL Permit Application Review ins Road in Manteo, Dare County Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. XThis office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. SIGNED �I`� �/ ` DATE 5,4V 5 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-39011 FAX: 252-2643723 ; Internet: hito:lloonal.nodenr.oralweblcm/dcm-home RECEIVED MAY 2 0 2015 DCV-MH0 (RITY An Equal Opportunity 1 Affirmative Action Employer FTWA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 MEMORANDUM TO: l y ,ilhi � SUBJECT: Applicant: Project Location: Proposed Project: Donald R. van der Vaart Secretary Charlan Owens, District Planner Division of Coastal Management Daniel Govom Assistant Major Permits Coordinator Division of Coastal Management CAMA/DREDGE 8c FILL Permit Application Review Billy Roughton 130 D Victor Meekins Road in Manteo, Dare County Bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached SIGNED DATF __7* f JAI RECEIVED 1367 US 17 South, Elizabeth City, NC 27909 MAY 2 2 mil Phone: 252-264-39011 FAX: 252-264-3723 ; Internet: htto://i)oftal.ncdenr.orglweb/cm/dcm-home WAAi "'4wyn �rry An Equal Opportunity 1 Affirmative Action Employer 4* NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor MEMORANDUM TO: Daniel Govoni, DCM Assistant Major Permits Coordinator Division of CoastaJ Management FROM: Charlan OwenSOP, District Planner Division of Coastal Management Donald R. van der Vaart Secretary SUBJECT: Major Permit Request by Billy Roughton to install 376 linear feet of vinyl bulkhead and associated fill on the Croatan Sound at 130 D Victor Meekins Road (SR 1115) on Roanoke Island, Dare County. DATE: May 19, 2015 Consistency Determination: The request is consistent with/not in conflict with the Dare County 2009 Land Use Plan certified by the CRC on February 24, 2011. Overview: The 3.87 acre subject property has approximately 440 linear feet of shoreline along the Croatan Sound to the west. The site is approximately 10 feet above Normal Water Level (NWL). The property is vegetated with pine trees and typical wild yard grasses. There are no delineated wetlands on the site. The northern shoreline has a high wooded bluff while the southern shoreline is a sandy beach. The property is primarily located outside of the floodzone, with AE (EL 7) floodzone along the shoreline. Existing site improvements consist of a residential structure, a cottage, and three (3) bam structures that are all in disrepair. The shoreline is in a natural state with no improvements. Installation of 376 linear feet of vinyl bulkhead with associated fill is proposed. The bulkhead will be aligned an average of 33 feet and a maximum of 60 feet waterward of NWL and tie into adjacent bulkhead on either side. Fill sand will be placed behind the bulkhead. The Croatan Sound in this area is classified as SA;HQW and is open to shellfishing. No Submerged Aquatic Vegetation (SAV) was observed in the project area. There are no known sites of archaeological significance on the property. Anticipated impacts resulting from this project are expected to include: the filling of .28 acre of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC) and 5,640 sq. ft. of Estuarine Shoreline AEC. RECEIVED 1367 US 17 South, Elizabeth City, NC 27909 MAY 2 2 1015 Phone: 252-264-39011 FAX: 252-264-3723; Internet: www.nccoastalmanagement.net An Equal Opportunity i Affirmative Action Employer - Made in part by recycled paper WKiM'IMRR P,ITd North Carolina Department of Environment and Natural Resources MEMORANDUM Division of Coastal Management Page 2 of 4 Basis for Determination: The Dare County Land Classification Map identifies the property as "Community Residential". All CAMA Areas of Environmental Concern (AECs) are designated as "Conservation" as indicated on Page 217. A glossary of key words is provided on Page 140. Defined terms include: Advocate: to promote or encourage Encourage: to favor or foster (also see support Recognize: to show awareness of an issue or condition Shall: mandatory, not optional; a more formal term for "will' Should: preferred or recommended but not mandatory in all cases Support: to foster; may imply financial support The following LUP policies may be applicable to this request: Land Use Compatibility: Archaeological/Historic Resources Policy LUC #15, Page 159. "The Dare County Board of Commissioners supports the protection of structures, lands, and artifacts that have been identified by the NC Department of Cultural Resources, Division of Archives and History, as archaeologically or historically significant. On a case -by -case basis individual protection/management strategies should be implemented to ensure archaeological and/or historical resources are not destroyed." Natural Hazards: Estuarine Systems Policy NH #2, Page 180. "Estuarine shoreline development should continue to be managed to protect and preserve the natural resources of the estuarine waters and the estuarine shoreline. The appropriate tools for this are the existing CAMA permit program and the Areas of Environmental Concerns (AECs) designated under the CAMA program..." RECEIVED 1367 US 17 South, Elizabeth City, NC 27909 MAY 2 2 1015 Phone: 252-264-39011 FAX: 252-264-3723; Internet: www.ncooastalmanagement.net wtiw w nu �r*, An Equal Opportunity 1 Afirma ive Action Employer - Made in part by recycled paper North Carolina Department of Environment and Natural Resources Division of Coastal Management Implementation Strategy, Page 180. "1. Rely on existing CAMA AEC regulations to address development activities along the ocean beaches, estuarine shoreline, and other public trust areas in unincorporated Dare County... " Policy NH#3, Page 180 and Policy WQ#10, Page 192. MEMORANDUM Page 3 of 4 "Dare County supports the installation and maintenance of estuarine bulkheads. Offshore breakwaters, slopes, rip -rap, and voluntary setbacks are appropriate alternatives for property owners for addressing estuarine shoreline management in lieu of estuarine bulkheads where these other techniques may be equally effective in abating a shoreline erosion problem." Implementation Strategy: 1. Oppose efforts to eliminate the use of estuarine bulkheads or other efforts designed to prioritize or amend the current State regulations on their installation and maintenance. (2010-2015) Flood Hazards Policy NH #5, Page 181. "Dare County supports, as minimum standards, the administration and enforcement of all applicable floodplain management regulations and the National Flood Insurance Program..." Water Quality: Water Quality Policy WQ #2, Page 188. "Development projects shall be designed and constructed to minimize detrimental impacts on surface water quality, groundwater quality, and air quality. Structures should be designed to fit the natural topographic conditions and vegetation versus modifications to natural conditions to accommodate structures." RECEIVED 1367 US 17 South, Elizabeth City, NC 27909 MAY 2 2 10b Phone: 252-264-3901 1 FAX: 252-264-3723 ; Internet: www.nccoastaimanagement.net ygN,.M"a yT An Equal Opportunity 1 AAinafive Adon Employer- Made in part by recycled paper North Carolina Department of Environment and Natural Resources Division of Coastal Management Stormwater Policy WQ #5, Page 190. "Efforts to manage stormwater runoff should be based on local conditions and natural features. Properties immediately adjacent to SA classified waters should be developed consistent with the dimensional standards and lot coverage limitations of the Dare County Zoning Ordinance. Vegetative buffers and other low —impact development methods identified by the UNC Coastal Studies Institute are appropriate tools to address stormwater runoff adjacent to SA waters." Fisheries Resources Policy WQ #11, Page 193. "Dare County recognizes the importance of our surrounding waters that serve as habitats for the area's abundant fisheries resources. The continued productivity of Dare County's fisheries shall be fostered through restoration and protection of the unique ecosystems upon which they depend..." 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-3901 \ FAX: 252-264-3723 ; Internet: www.nccoastaimanagement.net An Equal Opportunily 1 Affinnafive Action Employer - Made in pan by recycled paper MEMORANDUM Page 4 of 4 RECEIVED MAY 2 2 1015 „l MMW ant, ERMA w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 MEMORANDUM TO: Donna Creef, Planning Director Dare County FROM: Daniel Govont Assistant Major Permits Coordinator Donald R. van der Vaart Secretary SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Billy Roughton Project Location: 130 D Victor Meekins Road in Manteo, Dare County RECEIVED MAY 2 2 10b Proposed Project: Bulkhead k"10-mmWP ft Please indicate below your agency's position or viewpoint on the proposed project and return this form by 06/03/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. I SIGNED (�DATE S'ZD - ZD/S 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-39011 FAX: 252-264 3723 ; Intemet: hltp //aortal.ncdenr.orQ/web/cm/dcm-home An Equal Opportunity 1 Affirmative Action Ern fter RESEW North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary July 21, 2015 Billy Roughton P.O. Box 1877 Kill Devil Hills, N.C. 27948 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. -Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, �• v �,- glas V.Iiugge PW Major Permits and Consistency Manager N.C. Division of Coastal Management 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastaimanagement.net An Equal Opportunity/ Affirmative Action Employer DCM Coordinator: rMU61c_- Permit #• MAILING DISTRIBUTION SHEET Agents:. DCM Fiel f+eg Elizabeth City (with revised work plan drawings) ore ea ity Washington Wilmington US ACOE Offices: Washington: g jRalei i ey eeler William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Crumbly Cultural Resources: Renee Gledhill -Early Public Water Supply: Diane Williams (WIRO) Joey White (WARD) L/ Marine Fisheries: Shane Staples i/ Gregg Bodnar NC DOT: Ken Pace i% Shellfish Sanitation: Patti Fowler State Property: Tim Walton t/ Water Quality: Karen Higgins (Raleigh) t/ John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 Scott Vinson-Stormwater Wilmington: Joanne Steenhuis — 401 Chad Coburn - 401 Linda Lewis - Stormwater Wildlife Resources: Maria Dunn (WARO)1/ Vacant (WIRO) 1003 Fax Distribution: Permitee Agent #:_ Govoni, Daniel From: Jennings, Frank Sent: Wednesday, July 15, 2015 9:29 AM To: Govoni, Daniel; Russell, Kelly Subject: RE: Billy Roughton bulkhead Daniel, We recommend the project be authorized as requested with standard conditions. Thanks, Frank Frank A. Jennings, III District Manager NC Division of Coastal Management 1367 US Hwy 17 South z Elizabeth City, NC 27909 trank.iennin,qs@ncdenr.gov 252-264-3901, ext. 235 252-264-3723,fax Please visit www.nccoastalmanagament.net to subscribe to CoastalManagemenrs quaderlynewsletter, the CAMAgram. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Govoni, Daniel Sent: Wednesday, July 15, 2015 9:18 AM To: Russell, Kelly; Jennings, Frank Subject: Billy Roughton bulkhead Please see attached and let me know if you have any comments, thanks Daniel M. Govoni Policy Analyst NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252)808-2808 (252) 247-3330 fax daniel.eovoni@ncdenr. oovv E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Billy Roughton 2. LOCATION OF PROJECT SITE: 130 D Victor Meekins Rd, Manteo, Dare County on the Croatan Sound Photo Index —2000: 181-2170 (0,14) 1995: 181-1870 (J,19) State Plane Coordinates - X: 2974108 Y: 805740 3. INVESTIGATION TYPE: CAMA, D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— Feb. 24, 2015 Was Applicant Present - no 5. PROCESSING PROCEDURE: Application Received Complete — May 5, 2015 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Dare County Land Classification From LUP — Conservation, transitional (B) AEC(s) Involved: ES, EW, PTA (C) Water Dependent: yes (D) Intended Use: private (E) Wastewater Treatment: Existing - private septic system Planned - none (F) Type of Structures: Existing - single family residence and accessory structures Planned - bulkhead (G) Estimated Annual Rate of Erosion: 20 ft Source - applicant 7. HABITAT DESCRIPTION: AREA DREDGED FILLED SHADE (A) Estuarine Shoreline 5,640 sq. ft. (B) EW, PTA 12,408 sq. ft. (C) Other (D) Total Area Disturbed: (E) Primary Nursery Area (F) Water Classification: 18,048 sq. ft. (0.41 acres) no Sc Open: no RECEIVED MAY 18 2015 8. PROJECT SUMMARY: The applicant proposes to construct a new vinyl bulkhead an average of 33 ft waterward of normal water level (NWL). Field Investigation Report Page 2 Project Setting The proposed project is located at 130 D Victor Meekins Rd (SR 1115) on Roanoke Island in Dare County. The property is located adjacent to the Croatan Sound. The size of the property is approximately 168,583 sq ft (3.87 acres) and is approximately 10 ft above normal water level (NWL). Manmade features associated with the property include one main residential structure, a cottage, and three small barn structures that are all in poor repair. The property is vegetated mainly with pine trees and typical wild yard grasses. There are no recent permits on file associated with this property and there are no known sites of archaeological significance on the property. The property has approximately 440 linear feet of shoreline and no delineated wetlands on the site. The southern portion of the shoreline consists of a sandy beach area and the northern portion has experienced higher erosion and is a high wooded bluff. The adjacent property to the south has a concrete bulkhead and several vinyl groins and the property to the south has a wooden bulkhead with several vinyl groins. The Roanoke Sound is classified as SC in this area and is closed to shellfish harvesting. The water depths at the proposed bulkhead alignment are approximately 6 inches. The water bottom is sandy loam in this area and there were no submerged aquatic vegetation (SAV) observed in the area. Development Proposal The applicant proposes to construct 376 linear feet of new vinyl bulkhead and fill behind the proposed bulkhead. The proposed bulkhead alignment is at an average of approximately 33 ft waterward of NWL with a maximum distance of 60 ft from NWL. This bulkhead alignment is proposed at this location to line up with existing adjacent bulkheads. The applicant has noted in his application that since the adjacent properties have constructed bulkheads and due to recent severe storms his property has been experiencing an accelerated erosion rate. The sand for the fill material would be hauled in from an upland source. Anticipated Impacts The proposed project would result in the filling of 12,408 sq ft of Estuarine Waters Public Trust Area of Environmental Concern and 5,640 sq ft of Estuarine Shoreline, also 229 cubic yards of fill material would be placed below NWL. Temporary water turbidity would occur in the project area. Submitted by: Kelly Russell Date: 5/5/15 ,A NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 Mr. Brian Rubino Quible & Associates, PC P.O. Drawer 870 Kitty Hawk, NC 27949 Dear Mr. Rubino: Donald R. van der Vaart Secretary The NC Division of Coastal Management hereby acknowledges receipt of the application submitted on behalf of Billy Roughton for State approval for development of property located at 130 D Victor Meekins Road in Manteo, Dare County. It was received complete on May 5, 2015, and appears to be adequate for processing at this time. The projected deadline for making a decision is July 19, 2015. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from May 5, 2015, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along the property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting the property, or at a point along the road right-of-way where a private road would lead one into the property. Failure to post this notice could result in an incomplete application. RECEIVED MAY 18 1015 1367 US 17 South, Elizabeth City, NC 27909 vpw w n a Gr r Phone: 252-264-3901 \ FAX: 252-264-3723 ; Internet: htto l/oortal.ncdenr.oro/web/cm/dcm-home An Equal opportunity 1 Affirmative Action Employer Quible & Associates, PC May 13, 2015 Page 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact Kelly Russell, Field Representative, if you have any questions and/or if you wish to receive a copy of her field report. Sincerely, Frank Jennings District Manager, Northeastern District Division of Coastal Management FJ/yc Enclosure cc: Daniel Govoni, Assistant Major Permits Coordinator, DCM Kelly Russell, Field Representative, DCM Billy Roughton, Applicant LAMA PERMIT APPLIED FOR PROJECT: CONSTRUCT 376 Ift. OF NEW VINYL BULKHEAD & FILL BEHIND BULKHEAD. BULKHEAD ALIGNMENT PROPOSED AN AVERAGE OF 33 ft. WATERWARD OF NWL. COMMENTS ACCEPTED THROUGH APPLICANT: Billy Roughton P.O. Box 1877 Kill Devil Hills, NC 27948 252-441-4988 06106115 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: '-� Kelly Russell, Division of Coastal Management, 1367 US Hwy 17 South, Elizabeth City, NC 27909 252-264-3901, ext. 233 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor EMAIL MEMORANDUM TO: Susan Simpson The Coastland Times Manteo, NC 27954 legals(a_)thecoastlandtimes.net FROM: Yvonne Carver, Administrative Assistant Division of Coastal Management DATE: 05/13/15 SUBJECT: Major Public Notice: Billy Roughton Donald R. van der Vaart Secretary Please publish the attached Notice in the Sunday, May 17, 2015 issue of The Coastland Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Melissa Sebastian, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557, (Telephone 252-808-2808). Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office (252) 264-3901. Attachment cc: Daniel Govoni, Assistant Major Permits Coordinator, DCM, Morehead City Michele Walker, PIC, DCM, Raleigh RECEIVED Melissa Sebastian, Accounts Payable, DCM, Morehead City File MAY 18 2015 h+�.wrrwnu dµr 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-3901 1 FAX: 252-264-3723; Internet: hital/oortal.ri enr.org/web/cm/dcm-home An Equal opportunity 1 Affirmative Action Employer NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT NCDENR hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an AEC as designated under the CAMA was received on 05/05/15. Billy Roughton proposes to construct a bulkhead at 130 D Victor Meekins Road in Manteo, Dare County. A copy of the entire application may be reviewed at the office of the Division of Coastal Management, located at 1367 US 17 South, Elizabeth City, NC, 252-264-3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to 06/06/15, will be considered in making the permit decision. Later comments will be considered up to the time of permit decision. Project modification may occur based on review & comment by the public, state & federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: Sunday, May 17, 2015 RE: Agent Authorization for CAMA Major Permitting Isabel Lennon Warren, Tract A As managing member of the above referenced property, I authorize Quible & Associates, P.C. to act as agent for the purpose of CAMA Permitting. Authorized Sigrfature —� Name:—R;ll"4 AI Date: 3 /Z6 RECEIVED MAY 18 2015 Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SUMINNG SINCE 1959 --_-� APR 2 3 2015 March 23, 2015 Mary S. Fearing P.O. Box 1048 Manteo, NC 27954 RE: CAMA Major Permitting Dare County Parcel 25226000 Roanoke Island, Dare County, North Carolina Dear Ms. Fearing, As an adjacent riparian property owner, you are required by NCDENR, Division of Coastal Management (NCDCM) to be notified of the proposed development in proximity to the Estuarine Area of Environmental Concern (AEC) that requires CAMA Major Permitting. As depicted on the accompanying site plan, the applicant proposes to construct a shoreline stabilization bulkhead that ties into your bulkhead that serves the same purpose. Due to extensive erosion in this area, the applicant proposes to reclaim a portion of the shoreline in order to build a bulkhead that ties into the existing bulkheads on either side of the subject property in a straight line. Should you have no objections to the proposed work, please check the statement below, sign and date the blanks below the statement and return one copy of this letter to: Brian Rubino, Quible & Associates P.C., PO Drawer 870, Kitty Hawk, NC 27949 as soon as possible. Keep the second copy for your files. Should you have objections to this proposal, please send your written comments to Mrs. Kelly Russell, NCDCM, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates, P.C. Brian Rubino I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments Signature Date RECEIVED MAY 18 2015 r aw �wnp 4" Ln M1 O M1 M1 W RJ a O OC3 a v 7 a l -1 0 t ■ Complete items 1, 2, and 3, Al item 4 if Restricted Delivery is a complete ■ Print your name and address n the reverse SO WO Can eturn the ca ■ Attach tthis card rto the back o the mailpiece, or an the front If space permits. 1. Article Addressed to: Q Ay w TO 1ujp Po Qc)x 66, J� eY�jl C rate of Delivery 'erel frge from item 1? ❑ Yes relll"a below: ❑ No f 3. Service?ype ._ certified Mail ❑Express Mail ❑ Registered - ❑ Return Receipt for Merchandise ❑ Insured Mall ❑ C.O.D. 4. Restricted Delivery? Fee) !. Article Number ❑ Yes (rmnsferfromseMoelabel) 7013 1710 0000 2879 4387 'S Form 3811, February 2004 Domestic Return Receipt 102595-02-W1540 RECEIVED MAY 18 2015 ry'Oviso of 1% vt y^pa C Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENC SINCE 1959 March 23, 2015 PLANNING • SURVEYING Rex and Joann Meekins P.O. Box 661 Manteo, NC 27954 RE: CAMA Major Permitting Dare County Parcel 25226000 Roanoke Island, Dare County, North Carolina Sir/Madam, 2015 P.O. D a 570 My Hawk, NC 27949 Phone: 252-261-500 Fax: 252-261-1260 web: qu ble.=n As an adjacent riparian property owner, you are required by NCDENR, Division of Coastal Management (NCDCM) to be notified of the proposed development in proximity to the Estuarine Area of Environmental Concern (AEC) that requires CAMA Major Permitting. As depicted on the accompanying site plan, the applicant proposes to construct a shoreline stabilization bulkhead that ties into your bulkhead that serves the same purpose. Due to extensive erosion in this area, the applicant proposes to reclaim a portion of the shoreline in order to build a bulkhead that ties into the existing bulkheads on either side of the subject property in a straight line. Should you have no objections to the proposed work, please check the statement below, sign and date the blanks below the statement and return one copy of this letter to: Brian Rubino, Quible & Associates P.C., PO Drawer 870, Kitty Hawk, NC 27949 as soon as possible. Keep the second copy for your files. Should you have objections to this proposal, please send your written comments to Mrs. Kelly Russell, NCDCM, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates, P.C. liah Rub���� and hereby waive that right of objection �_I have no objection to the project as presently proposed e y g f as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments 11n� 4, / ll' . � �/- -- ,s-- RECEIVED Signature Date MAY 18 2015 � t.atl•uYr1G wFk4 E1,J�� Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING SINCE 1959 March 23, 2015 Mary S. Fearing P.O. Box 1048 Manteo, NC 27954 RE: CAMA Major Permitting Dare County Parcel 25226000 Roanoke Island, Dare County, North Carolina Dear Ms. Fearing, ACT:' P.O. Drawer 870 ally Hawk NC27949 Phone: 252-261-3300 Fax: 252-261-1260 web: qulble.com As an adjacent riparian property owner, you are required by NCDENR, Division of Coastal Management (NCDCM) to be notified of the proposed development in proximity to the Estuarine Area of Environmental Concern (AEC) that requires CAMA Major Permitting. As depicted on the accompanying site plan, the applicant proposes to construct a shoreline stabilization bulkhead that ties into your bulkhead that serves the same purpose. Due to extensive erosion in this area, the applicant proposes to reclaim a portion of the 'shoreline in order to build a bulkhead that ties into the existing bulkheads on either side of the subject property in a straight line. Should you have no objections to the proposed work, please check the statement below, sign and date the blanks below the statement and return one copy of this letter to: Brian Rubino, Quible & Associates P.C., PO Drawer 870, Kitty Hawk, NC 27949 as soon as possible. Keep the second copy for your files. Should you have objections to this proposal, please send your written comments to Mrs. Kelly Russell, NCDCM, 1367 US 17 South, Elizabeth City, NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates, P.C. Brian Rubino I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments Signature Date ■ Complete items 1, 2, and 3, Also complete Item 4 if Restricted_ Delivery Is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, oron the front if space permits. 1. Article Addressed to: POD n1p�7Go a�9s y 2. Article Number PS Form f f ` ❑ Addressee B. Received by (Panted Narpe) rC. Date of Delivery rl D. Isdelive Less different fro 11 ❑Yes If er dei address low: ❑ No ', 7.. � M i aliq Prionty Mail Express" ❑ Registered - ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ Collect on Delivery 4. Restricted Delivery? (Edm Fae) ❑ Yes endoelabeq 7013 1710 0000 2878 7075 July 2013 Domestlp Return Receipt - -- ■ Complete Items 1, 2, and 3. Also complete a Item 4 if Restricted Delivery is desired. •. Print your name and address on the reverse so that we can return the card to you. P ■ Attach this card to the back of the mallpiece, f� or on the front. if space permits. 1 1. Article Addressed to: D po\) iv�"oA,✓N m�E >>1s PO Qx Colo 7 from item 1? ❑ Ye: ss below: ❑ No ti �� mrreo, au �.i�Express Mail ❑ Registered ❑Return Receipt for Merchandise 0 Insured Mall ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (transfer tram service label) 7013 1710 0000 2879 4387 PS Form 3811, February 2004 Dor - Receipt 102595-02-M-1540 RECEIVED MAY 18 7015 Wi,hr-iwnw w" —This is a word processing form to be completed in Microsoft Word' NC Division of Coastal Management Major Permit Application Computer Sheet (11/01/2012) Applicant: O L-L Date: 05113115 Project Site County �-e_ Staff USSf l District: lizabeth City Washington Morehead City ❑Wilmington Project Name: pier extension kft platform k66 I Rover File: Date of initial application submittal (EX: 1/&2007): Date application "received as complete" in the Field office ( : 1 007): S ' Permit Authorization: OCAMA Dredge & Fill Dboth SITE DESCRIPTION/PERMIT INFORMATION PNA: ❑Ye No Photos Taken: YesIX No❑ Setback Required (riparian): ❑Yes No Critical Habitat: ❑Yes JpNo ❑Not Sure 15 foot waiver obtained: ❑Yes No Hazard Notification Returned: ❑Yes VNo SA V: ❑ Yes No ❑Not Sure Shell Bottom: D Yes No ❑ Not Sure Temporary Impacts: LJ Yes No Sandbags: ❑Yes oEl Not Sure Did the land use classification come from counlyLUPlYes ❑No Mitigation Required (optional): ❑Yes NNo Moratorium Conditions D Yes No DNA Environm ntal Assessment Done: ❑Yes FNo DNA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) WETLANDS IMPACTED El (404) Corp. of Engineers (Jurisdictional D (LS) Sea lavender (Limonium sp.) (SS) Glasswort ( Salicomia sp.) wetlands) (CJ) Saw grass (Cladium jamaicense) D (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina altemfflore) cynosurofdes) (DS) Salt or spike grass (Distichlis El (SC) Bullrush or three square (Scirpus ❑ ('TV) Cattail (Typha sp.) spicata) sp.) (JR) Black needlerush (Juncus D (SP) Salf/meadow grass (Spartina roemerianus) patens) APPLICATION FEE No fee required - $0.00 111(A) Private w/D&F up to 1 acre; 3490 0 III(D) Priv. public or comm w/D&F to 1 can be applied - $250 acre; 3490 cant be applied - $400 ❑ Minor Modification to a CAMA Major El Major Modification to a CAMA Major D IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 El Permit Transfer- $100 lll(B) Public or commercial w/ D&F to 1 Express Permit - $2000 cre; 3490 can be.applied - $4W ❑ Major development extension request - LJ 11. Public or commerciaUno dredge RKetlytU $100 and/or fill - $400 ❑ I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or comet w/D&F to 1 acre; 3490 can be applied, DCM needs pMr woow 0" DWQ agreement - $400 252-908-2808 :: 1-8883111COAST :: www.neeonstalmanaaement.net revised: Nov. 2012 WC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: Date: 05/13/15 Descdbe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE ActivityName Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One I New Work • Maint ❑ Replace ❑ Y N New Work Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Wodc❑ Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint ❑ ❑ Y ❑ N New Work [I Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work [I Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N revised Nov. 2012 i NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: Date: 05113115 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or ter im acts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration andror temp impact amount) TOTAL Feet (Applied for: Disturbance total includes any anticipated restoration or ternImpacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration andror temp impact amount 56( , redge ❑ Fill Both ❑ Other ❑ ' ( 0 N Ir Y Dredge ❑ Fill Both ❑ Other ❑ V �� Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED 1W 16 10P6 252.808.2808 :: 1.888.4RCOA8T :: www.nccoastalmanaaement.net revised: Nov. 2012 A aFoFNEo MAC 18 TVs w �09 g.. MAJOR PERMIT FEE MATRIX Applicant: Billy Rouehton, Isabel Lennon Warren, Tract A Selection Development ee DCM % DWQ % 4not (14300 1601 4351000931625 6253) (243001602 435100095 2341) I. Private, non-com development that d50 1001%,o ($250) 0%($0) involve the filling or excavation of any wetlands or open water areas: 11. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Ma or ermit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3490 (See attached can be applied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3490 (see attached) could be applied, but DCM staff RECEIVED determined that additional review and written DWQ MAY ] 8 1015 concurrence is needed k� f�,uf} because of concerns Clty related to water quality or aquatic life: ). If General Water lity Certification No. $400 60%($240) 0 (see attached) cannot F40%($160) q lied: or development that El lves the filling and/or $475 60%($285) 40% ($190) avation of more than one acre of wetlands and/or III open water areas: Search/View/Find - Inquiry by Parcel Number Results Page I of 2 Search by Parcel Number Results • PARCEL DATA SHEET • BUILDING PHOTOS • TAx BILL • TAX CERTIFICATION Parcel: 025226000 PIN: 9870104666o5 Location:13o D VICTOR MEEKINS RD District: [11] MANTEO OUT Subdiv: [Io9o] ISABEL LENNON WARREN Lot -Block -Sect: LOT: BLK: SEC: Multiple Lots: - Living Units: 2 Plat -Cab -Slide: PL: H SL: 66 Status: ACTIVE Billing Values Land: 1,455,200 Building: o Misc• o_ Total: 1455,200 Owner: ROUGHTON, BILLY G Owner: Address: P 0 BOX 1877 KILL DEVIL HILLS NC 27948 Ownership: SECONDARY9% Nature of Ownership: EAL Deed Date: 08/01/2014 Bk/Pg:1968/o899 PUSE: [oloo] RESIDENTIAL Next Year Values* Land: 1,387,400 Building: o Misc• 0 Total: 1,387,400 xxxxxxxxxx END OF RECORD xxxxxxxxxx (data file last updated on 4/17/2015) *Next year values on file as of 4/17/2015 • PARCEL DATA SHE • BUILDING PHOTOS • TAx BILL • TAX CERTIFICATION Parcel: 025226000 PIN: 987010466605 Location:13o D VICTOR MEEKINS RD District: (11] MANTEO OUT Subdiv: [Iogo] ISABEL LENNON WARREN Lot -Block -Sect: LOT: BLK: SEC: Multiple Lots: - Living Units: 2 Plat -Cab -Slide: PL: H SL: 66 Status: ACTIVE Billing Values Land: 1,455,200 Building: o Misc: 4 Owner: ROUGHTON, BILLY G, NOMINEE FOR Owner: DARE DEVELOPMENT OPPORTUNTIES, LLC Address: PO BOX 1877 KILL DEVIL HILLS NC 27948 Ownership: SECONDARY41% Nature of Ownership: EAL Deed Date: o8/01/2014 Bk/Pg:1968/o899 PUSE: [oioo] RESIDENTIAL Next Year Values* Land: 1,387,400 Building: o Misc: 4 RECEIVED MAY 18 70b 06M-"rjN r-" http://www.darenc.com/public/TaxIngParceIRslts.asp?PareelNumber-025226000 4/23/2015 Search/View/Find - Inquiry by Parcel Number Results Page 2 of 2 Total: 19455,200 Total: xxxxxxxxxx END OF RECORD xxxxxxxxxx (data file last updated on 4/17/2015) *Next year values on file as of 4/17/2015 • PARCEL DATA SHEET • BUILDING PHOTOS • TAx BILL • TAX CF.RT mcmiON Parcel: 025226000 PIN: 987010466605 Location: 13o D VICTOR MEEKINS RD District: [n] MANTEO OUT Subdiv: [Io9o] ISABEL LENNON WARREN Lot -Block -Sect: LOT: BLK: SEC: Multiple Lots: - Living Units: 2 Plat -Cab -Slide: PL: H SL: 66 Status: ACTIVE Billing Values Land: 1,455,200 Building: o Misc• Q Total: 44551200 1,387,400 Owner: WHITE, STANFORD M Owner: WHITE, SUSAN B Address: P O DRAWER 1447 NAGS HEAD NC 27959 Ownership: PRIMARY - 50% Nature of Ownership: EAL Deed Date: 08/01/2014 Bk/Pg:1968/o899 PUSE: [oloo] RESIDENTIAL Neat Year Values* Land: 1,387,400 Building: o Misc• Q Total: 1,387,400 xxxxxxxxxx END OF RECORD xxxxxxxxxx (data file last updated on 4/17/2015) *Next year values on file as of 4/17/2015 Dare County Government 954 Marshall C Collins Dr PO Box r000 Manteo NC 27954 Phone: 252.475.5000 aEGE\\jED MA'S l a 1015 0'vo'Oh6o Ri" http://www.darenc.com/public/TaxIngParceIRslts.asp?ParcelNumber=025226000 4/23/2015 Its IVED APR - 9 2015 View of Property Looking Northwest View of Property Looking Southeast RECEIVED MAY I a lob get.i. 1t10 A(n BOOK jy(jtj PAGE bzy k4) Ci IIkkIJJI II I'uIuII11 IIII IIuuII IuIu^^II IunulI IINNII IuIIN1'I v � _ 700001597 _ IIII�I�11 Ulp I411II�II�IIIIIII NI ._—^— �1 DARE REAL ESTATE COUNTY TRANSFER TAX LT �,.I CAROLINA GENERAL: WARRANTY DEED " Excise Tax: S Land Traas7ta S Land Transier # Parcel Identifier No. 025226000 & 025226007 Mail/Box to: Grantee 6), This instrument was prepared by: d P. Pipkin, Attorney Brief description for the Index: IsabelOVpVcm Homeplace Tract THIS DEED made this _day of Jttne, 2 0, by and between GRANTOR STANFORD M. WHTTE, and wife, SUSAN B. WHITE, A 1/54 undivided interest P.O. Box 1447 Nags Head, NC 27959 BILLY G. ROUGHTON P. Oi Box 1877 Kill Devil Hills, NC 27949 The designation Grantor and Grantee as used herein shall include said parties their heirs, successors, and assigns, and shall include singular, plura4 masculine, feminine or neuter as required by context. W nWESSEfH, that the Grantor, for a valuable consideration paid by the the receipt ofwhich is hereby admowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee a o fourth (1/54) undivided interest in fee simple in that certain lot or parcel of land situated on the northwest side of Roanoke Island irl O Head Township, Dare County, North Carolina and more particularly described as follows: 0 See Exhibit A NC Bar Ac iatim Farm No. 7 ® 1976, Revised ® 1112010 Printed by Agee nt with the NC Bar Association RECEIVED MAY 18 9Rt4 04KP Wm Cnty datetl April 27, 2006, recorded June 5, 2006 in Book 1688, Page 221, Dare County Registry and by a deed from Mary Carolyn O'b�4d�1, unnamed, dated December 21, 2001, recorded December 27, 2001 in Book 1407, Page 9, Dare County Registry. See also, "a with Restrictive Covenants to Grantor and others fromMalcohnK. Fearing, III and others, recorded mBook 1752, Page 116, D ounty Registry, and deeds to Isabel Lennon Warren recorded in Deed Book 83, Page 332, and Deed Book 83, Page 334, Dunty Registry. A trap ihowir(j)he property described in Exhibit A, captioned "Plat Survey for Isabel Lemon Warren" is recorded in Plat Cabinet B, Slide 112, Dar®aunty Registry and a map of the Sumyview Subdivision showing Lot G, which is within the bounds of the map recorded in Plat IgWnet B, Slide 112 and is conveyed by this deed, is recorded in Plat Cabinet C, Slide 183D Dare County Registry. Noce of the prope rein conveyed includes the primary residence of the Grantor. TO HAVE AND TO the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee a one/fifty-fourth (1/54) vided interest in fee simple pertaining to Tracts A, B & C as described in Exhibit A. And the Grantor covenan"th the Grantee, that Grantor is seized of the premises in fee simple a one/fifty-fourth (1/54) undivided interest, has the right to convey the same in fee simple, that title is marketable aid free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: Covenants, easements, right of way agreements and any other reservations applicable thereto of record in Dare County Registry. All zoning ordinances and other It gulatiom applicable thereto. Ad valorem property taxes subsegtu j2014. IN WITNESS WHEREOF, the Grantor }t�s�ttly executed the foregoing as ofthe day and year first above written. aw/,� (SF -AL) Q� Printi Name: STANFORDM. WHITE (SEAL) P ' t/l ype Name: SUSAN B. WHITE State of North Carolina - County/Gieyef �( � I, the undersigned Notary Public of the County and State" resaid, certify that Stanford M. White , personally appeared before me this day and acknowledged the d et�ecm�io;n,�o�f the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this 31 y of i� 2014. My Commission Expires- 10'14"�0�v (Affix Seal) BARBALVAUGHM NOROPU�JC DAR1f1Y, NC NC Bar Association Form No. 3 0 1976, Revised ® 1/1/2010 Printed by AVwnrar with the NC Bar Assocation µ An Notary Public Notary's Printed or Typed Name RECEIVED MAY 18 10b pta>:r�wga �%7! i trument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this the day ofTLj 2014. My Co sssion Expires:IL JGflvarrt �. Ul9 uc ero�� Notary Public Notary's Printed or Typed Name NO 0 �j, t�l *ing Tracts A, B and C as shown on that certain plat or map entitled "Plat Survey for Isabel I*l on Warren", prepared by Jasper W. Hassell, Registered Land Surveyor, dated August 13, 1982 d duly recorded in Plat Cabinet B, Slide 112, Public Registry of Dare County, North C a together with a one/fifty-fourth (1/54) undivided interest in the rights of way of State Road 15 and 1116. It being th ' tent of Grantor to convey to Grantee with this Deed a one/fifty-fourth (1/54) undivided in in Lot G of Sunnyview Subdivision as shown on the map recorded in Plat Cabinet C, Sli 83D, Dare County Registry, and a one/ ,fifty-fourth (1/54) undivided interest in Areas A and B as shown on the map captioned "Boundary' Agreement — Survey — Isabel Lennon Warren & Fearing Tracts," Plat Cabinet H, Slide 66, Dare County Registry, notwithstanding that these tracts have now been subdivided from the parcels shown on the map recorded in Plat Cabinet B, Slide 112,(j$we County Registry. O Less and Except: 1 First Excepted Parcel: `fin That certain tract or parcel of al tid described in Deed Bonk 1350, Page 216 of the Dare County Registry. Second Excepted Parcels: Being Lots A, B, C, D, E, F, H, I anc�f the Sunnyview Subdivision as shown on that certain plat or map entitled "Plat of "Sunnyvt Nags Head Township, Roanoke Island, Dare County, North Carolina, Surveyed 6/30/92 and(92", prepared by William S. Jones, Jr., Registered Land Surveyor, dated April 15, 1993 an SdAy recorded m Plat Cabinet C, Slide 183D, Public Registry of Dare County, North Carolina. �V� Third Excepted Parcels: All of that property conveyed in a deed with restrictive e6ovenants from Grantor to Malcom K. Fearing,111, and others, recorded in Book 1752, page 115, Dare County Registry (being Area C as shown on a map recorded in Plat Cabinet H, Slide 66 Dare County Registry, together with a certain interest in the rights of way of State Road 1115 1116). O Additional Exception: The claimed lappage of about 1,000 square feet by the ow!nerti southeast comer of Area A as shown on the map recorded in Registry. 4atOfi178-1787, v. 1 )he Gaylord Tract affecting the {lint H, Slide 66, Dare County RECENED MAY 18 2015 NOTES i Gel I.' CURRENT OWNER: STANFORD M. & SUSAN B. WHINE & BILLY C. BOUGHTON PO BOX 1877 KILL DEAL HILLS, NC 27M 2. PIN:9870-1D46-6605 PID:025226000 3. SUBJECT REFERENCES: DB 1968 PG. 899; PC 'H', SL 66 4. PROPERTY ZONED: Rl (ALL ADJACENT PROPERTIES ARE ZONED Rl) 5. TOTAL PARCEL AREA = 168.583.37 sqR / 3.87 aces AREAS BY COORDINATE METHOD. 6. PROPERTY IS LOCATED IN NFlP FLOOD ZONES AS SHOWN AND SUBJECT TO CHANGES. BASED ON COMMUNITY CID NO. 375348; PANEL 9870; SUFFIX J. (MAP NUMBER 3720987000J) EFFECTIVE DATE: D9/20/06 7. THIS SURVEY SUBJECT TO ANY FACTS, INCLUDING BUILDING SETBACK RESTRICTIONS, EASEMENTS, COVENANTS, ETC., THAT MAY BE REVEALED BY A FULL AND ACCURATE TITLE SEARCH. B. BOUNDARY INFORMATION BASED UPON PLAT ENTITLED "BOUNDARY AGREEMENT - SURVEY, ISABEL LENNON WARREN TRACT & FEARING TRACTS, DATED 12/14/07 BY OUIBLE & ASSOCIATES, PC. C I ER N. 4 2q' I4' E 277,M' 240.00- STARTPROPOSED BULKHEAD V \\ B I \ \A PROPOSED BULKHEAD 376 LF CROA TAN 50UND PROPOSED BULKHEAD_ BACKFILL 12,359 SF 47'3 TOPILO PROPOSED 5't �.hRPFBIT 'S BULKHEAD TOP O 5.7' FINISH GRADE APPROX =PROPOSED 2012W BACKFILL SECTION B-B NTS END PROPOSED- 85.i BULKHEAD TCP OF PROPOSED 39 i ITAt BULKHEAD TOP O 5.7' FINISH — GRADE _EX �w BOTTCH OF PROPOSED) E5CARIry� BACKFILL SECTION A -A NTS WORK - STABILIZATION OF A HIGHLY ERODING EAD - 376 LF; TIES INTO ADJOINING WNERS BULKHEADS ON BOTH SIDES LINE RECLAMATION - 12.359 SF WITH I SLOPE TO TOP OF ESCARPMENT Lore Worr NEW C,a SL 3 —� PG L, 163E NIP REX t JOANN MEEKIA5 LOT A DO 6V P& 204 EIR_ N 56 ° 07' 12" E_ — 133.04' E/R N 33' 54' 40" EX I>OWE r 56.45,64.5' /\ EX BARN \A \ 24- k2 ..6' LYD ElR \ i S FENCE R" -iA'ol , OA< TRACT A TREE DIA 168,583.37 5q. \. EOrroM of 3.87 Acres EAR!'!-IHJT Si TOP OFF E5LARF'i-ffNT COT TA6E \\\22250221 1 I'. I - / I j OAK TREE 3.0' DIA OAK TREE AY DIA l� /... � Ex 34.61't DlSTtxutr7 I J IO.O 195' R,_ — / 220.66' 25527' -- 5 5q° 32' l2" h' s T_I1 IRMZ a , LRIHfiIED ElP N/F MARY 5, FEARIA6 DB 1g36, PG 46q LOT FG /. 5L 75 1 I ' LOTH i .1 I N 3q0 36' 46'W >` 1. 1 EIR 8.84' N 5q° Oq' 12' E 1 1 , EIR z LOT G a -VNNr'VIEW t 0 5UBDlV15/ON m 20,731.67 5q.Ft. N 46' 27' 46' W 0.48 AGre5 EIR 10.00 N 5q° Oq' 12'E 270.GC' -- EIR T' AI3GRT m \ = i \ VICINrrr t AP EIR 5 2015 n+r� LEGEND: EXISTIAU 4'k4° COAGRETE . i O� .. Rv✓ t-mhlNT, ELM [O� RIGHT-OF-WAY HURXMGIT RW �� S♦ \ �e ' 'Li�\ Q - EX15TlN6 IRON ROD, EIR • - 5ET IRON ROD, 51R PK NAIL POINT LALLLLATED EIR S 13 . \ EIR 72 ° 15.711Q23' ELM 560°l5'12"W BROKEN EIR N 71`/5'/2'E. �� _. EIR N60'15'12 E I �/117JIMS I 5 OL9�� •. 33° 50' 25 AVF MWL565M K. FEAR lIl t FEAR/NG SfSAN F. 11)6 / DB M17, P6 322 LOT FY, it 51 326 / /� wP MALLOLMK. FEAR/RNS, /lI / SltrxlN F. FEARING DB 1936, P6 464 LOT / PC 1, SL 75 Z Z m Y m •z' n E ag> a-� in upUn ro osvm- m 2w rU Uim 4 ii� am. ^ VZ a o p ^ u a '✓ r J O C p W 35 zz ylww a PRELIMINARY FOR CAMA PERMITTING ONLY z z �)N Q z o i w a z W i w z dUZ o a Fw�wz �.O V2mn soli,. a za.'oz z D z J9 VJ� mom Off_ N a ro, _7r �-• ul 0 RECEIVED MAY 19 2015 w6iw,i ,nw 6" 1. TLCURRENT OWNER: STANFORD N. & SUSAN B. WHITE & BILLY G. ROUGHTOO 9. PROPOSED WORK - STABILIZATION OF A HI NA'&' 61.11! rX --rw �7W� PO BOX 1877 SHOREUNE KILL DEVIL HILLS, NC 27948 A. BULKHEAD - 376 LF; TIES INTO ADJOINING E IR 2- PIN:9870-1046-6605 PROPERTY OWNERS BULKHEADS ON BOTH SIDES. LOTH PID:025226000 B. SHORELINE RECLAMATION - 12,350 SF WITH X 3- SU13JECT REFERENCES:D8 1968 PG. 899: PC 'H*, SL 66 VEGETATED SLOPE TO TOP OF ESCARPMENT 4. PROPERTY ZONED: RI Lor B N' 3qo -�W' 46' iY (ALL ADJACENT PROPERTIES ARE ZONED R1) 6' 5- TOTAL PARCEL AREA - 168,583,37 oqft / 187 =u tg I -"q' 0q 12' E 271/0' .7: AREAS BY COORDINATE METHOD. 6. PROPERTY IS LOCATED IN NFIP FLOOD ZONES AS SHOWN AND SUBJECT TO CHANGES BASED ON COMMUNITY CID NO. 375348; PANEL 9870; SUFFIX J. (MAP NUMBER 3720987000JI EIR EFFECTIVE DATE.' 09/20/06 L 7. THIS SURVEY SUBJECT TO ANY FACTS, INCLUDING BUILDING SMACK RESTRICTIONS, EASEMENTS, LOT A ci BY A FULL AND ACCURATE TITLE SEARCH. De &�3 Fu� 2124 3UNNTVIEN 7:7� COVENANTS, ETC., THAT MAY BE REVEALED 8, BOUNDARY INFORMATION BASED UPON PLAT ENTITLED "BOUNDARY AGREEMENT - SURVEY. ISASSOCIATES, PC. 20,731.67 I;q.Ft. 0 'p ABEL LENNON WARREN TRACT & FEARING TRACTS DATED 12/14/07 BY QUIBLE & Ai 46 t 274 � A 0.4e Acre5 2 70. no, 'EIR N 54- 24114 PRELIMINARY 37-563± AIRPORT FOR CAMA START PROPOSED-X\ BULKHEAD V161NI Tr MAP PERMITTING ONLY bcm j 01. ply I z EA75TIM-, IRON PIPE, EIP EX15TIIJ5 IRC*y ROD, EIR 0 01 5E r hwN ROD, 51R PK WIL CALCILAYEP POINT EX a 0 W < Z :j < Vk f�R s s ib 1OAK 0 "IR C'2.3 go, Z w 7as 7Fr46 T A EIR 3 60' 15' 12� n z -REE 16a!��565373q. IFP� PROPOSED EcTrom L z BULKHEAD376 LF toTOP OF EIR C,ROA TAN < x 5OUNE) 0 0 z 010 PROPOSED COTTA6E < BULKHEAD 22�25022' ,4 C) Of T 47'± 12,359 ��F 1 747P OF I w Y'I z PROPOSED_ OAK rFeE BULKHEAD TOP O 5.7' TINR I -/ % Ex. OAK TREE Ur- .20.2 *)L 35LIIA lot COLI-f K� FlEARIA6, Ill tdY PROPOSED --45M F. FEAPIA6 BACKFILL Pe 1117, Fr, 522 AY-5 2015 SECTION B-B LOT I P5 4 a 926 NTS END PROPO SED 220� 66 L, BULKHEAD 25527 T PROPOSED 39'* IE5 i BULKHEAD t TOP 0 5.7* mi H GRAD 1-fk2 COLM r FEAPAW�, If/ Z�61q�, F& 469 i 9,t�AN F, FEAFJW, PROP-0 tor�2 MART'5. F54RIN6 SACXnLL Fr 1, -14 75 17)B IqA�' P$ 46q LOT 2 SECTION A -A P6 11 5L 73 NTS