Loading...
HomeMy WebLinkAboutHB_03-033_RobertsV F° Local Government APR 1 1 2003 CAMA INOR DEVELOPMENT DIVISION OF PERMIT COASTAL MANAGEMENT as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission for development in an area of environmental concern pursuant to Section 113A-118 of the r `- General Statutes, "Coastal Area Management.. Is uad,to,f rCl CIiI�fs authonzin development in Pe!t)Number as requested in the permittee's application, dated—,',S. H Iaa� This permit, issued on .3 'D I— 03 is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. PERMIT INSTALL SEPTIC SYSTEM!!!!!!! (1) All proposed development and associated construction must be done in accordance with the permitted work plat drawings(s) submitted on aL j-O� (2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations and the local flood damage prevention ordinance as required by the National Flood Insurance Program. (3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit. (4) The total amount of land disturbing activity shall not exceed one acre. (5) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion control measures. (6) The terms of the settlement agreement requires that the project is in compliance with 7H.0306(c). In keeping with that regulation no direct or indirect public funds may be used for the proposed project. This includes expenditures for construction and perpetual maintenance of roads, waterlines, sewer lines and associated facilities. Costs incurred to maintain all roads and utilities shall be the responsibility of the developers and /or the Holden Beach West Property Owners Association. This permit action may appealed by the permitted or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this per- mit m.st cease until the appeal is resolved. Permit Office (signature) This permit must be on the project site and accessible to the�� `Local permit officer when the project is inspected for compliance. J SJi� lL� Ldc Any maintenance work or project modifications not covered name under this permit requires further written permit approval.31, All work musj cease when this permit expires on December address •� ' f In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. (JAW This permit may not be transferred to another party without Perm tted the written approval of the Division of Coastal Management. si nature required if special conditions above apply to permit) 9e�-a � �bl& Local Government 00 -off Permit Number Pt " y ON\ P P EMiITNOR 00 p,510- DEVELOPMENT PERMIT as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission for development in an area of environmental concern pursuant to Section 113A-118 of the application, dated - o 00 This permit, issued on 3 a 1- 03 .. is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. (7) Pursuant to 15 NCAC, Subchapter 71.0406 (b), this permit may not be assigned, transferred, or otherwise disposed of to a third party, except by the Division Director. (8) All development will be subject to the conditions and use standards for inlet hazard areas as -described in NCAC T15A:07H.0310 (9) Permittee is not authorized to commence work until the proposed adjacent road is completed and the necessary utilities area approved and installed. (10) The structure must be set back 60 feet from the fast line of stable natural vegetation (FLSNV). The permittee is required to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement which will be effective for sixty (60) days barring a major shoreline change. Construction must begin within sixty (60) days of the determination or the measurement is void and must be redone. (11) The structure must be located entirely off of the frontal dune, and if a primary dune is present, landward of the crest of the primary dune. (12) Any structure shall be relocated or dismantled when it becomes imminently threatened by changes in shoreline configuration. The structure(s) shall be relocated or dismantled within 2 years of the time when it becomes imminently threatened, and in any case upon its collapse or This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this per- mit m,.st cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modifications not covered under this permit requires further written permit approval. ocal Permit Office (signature) n t�1—[L�t�e r1 pCt� name address 31, All =ase when this permit expires on December In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. J fAI61�v This permit may not be transferred to another party without I Perminee the written approval of the Division of Coastal Management. ( ignature required if special conditions above apply to permit) �q�- I oral C'n ECKYj� CAMA � DEVELOPMENT APR 1 1 2003 PERMIT DIVISION ��nrOF as aunt QzedbG �lia 9[gt�(f4 a E Pt",, Department of Environment and Natural Resources and the Coastal Resources Commission for development in an area of environmental concern pursuant to Section 113A-118 of the as requested in the permittee's application, dated Permit Number This permit, issued on is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject pennittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. (13) No impermeable surface shall be allowed over any functional part of the septic system. Septic system must be installed according to Brunswick County Health Department #zL-LI-03 (19) In accordance with T15A NCAC 7H. 0308(a), no seawall or riprap revetments will be will be allowed in the future should any structure become threatened from erosion. (20) Permanent structures shall be permitted at a density of no more than one unit per 15,000 square feet of land. (21) Only residential structures of four units or less or non-residential structures of less than 5,000 square feet total floor area shall be allowed. This condition shall not apply to the subdivision access road. (24) No fill material is to be placed within the 60 foot ocean setback on Lots 200-213. No land disturbance or dune disturbance is to occur within the 60 foot setback. (25) No retaining wall or bulkheads will be allowed on the oceanfront lots 200-213. (26) Driveways to oceanfront lots are to "ramp -up" to meet the elevation of the existing, natural topography. Natural dunes and topography is to be preserved to the greatest extent possible. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this per- mit m.st cease until the appeal is resolved. This permit must be on the project she and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modifications not covered under this permit requires further written permit approval. (; - Local Permit Officer ignature) own l t )- �Ao) .n-eCLc�1 name address 31,All wo ust ce�� when this permit expires on December �U y In issuing this permit it is agreed that this project is consistent `I with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without Permittee the written approval of the Division of Coastal Managem'q (_ 5' nature required if special conditions above apply to permit) I nrs,l (�nvarnmont � 11 .1i11� 1Y' 1\ \1 PBfmif Number CAMA �\ ` 2�3 0, \MPN o ,VINOR DEVELOPMENT �oPS�P� PERMIT as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission for development in an area of environmental concern pursuant to Section 113A-118 of the r t General Statutes, "Coastal Area Manag�elnent.' Is ued to authorizing development in afe 05 _ ��i ?? as requested in the permittee's application, dated E -> J dog This permit, issued on 7 -0 --o3 . is subjectto compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject pennittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. (27) No disturbance of a dune area will be allowed when other techniques of construction can utilized and alternative site locations exits to avoid unnecessary dune impacts. (28) All development and construction shall meet all code requirements located in the -Code-of Ordinances for the Town of Holden Beach. Please be advised that if you the owner or your authorized agent has any questions concerning the ordinances or etc. you may call Town Hall (910) 842-6488 NOTE: The proposed area of development is an inlet hazard area that is especially vulnerable to erosion, flooding and other adverse effects of sand , wind and water because of its proximity to a dynamics ocean inlet. Inlet hazard areas are subject to inlet migration, rapid and severe changes in watercourses, flooding and strong tides. NOTE: Past history has shown that the area is severely affected by flooding during strong winds and exceptional high tides and that there is a high probability that the inlet will continue to migrate back and forth across Shallotte Inlet over time and may effect severe erosion along the applicant's property. NOTE: Permanent erosion control structures may cause significant adverse impacts on the value and enjoyment of adjacent properties or public access to and use of the ocean beach, and, therefore, are prohibited. Such structures include, but are not limited to; bulkheads; seawalls; revetments; jetties; groins and breakwaters. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this per- mit mist cease until the appeal is resolved. This permit must be on the project she and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modifications not covered under this permit requires further written permit approval. Local Permit Officer (signature) t address All work must cease hsn this permit expires on December 31, In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without Permittee the written approval of the Division of Coastal Managemme�nt.q (signature required if special conditions above apply to permit) AZARD�/yNOTICE // Project Is In An: Ocean Erodib rea _AI h Fla�dr od Area Inlet Hazard Area APR 1 12003 Date Lot Was Platted: D1VjS1pN SPE NOTE: This hazard notice is required for This notice is intended to make you, the �t4i ISI @¢belopment in areas subject to sudden and massive of the special risks and conditions associated with'NA erosion. developmenterosion.Permits issued for inthis development in this area, which is subject to natural area ex on December 31 of the third year fllowing the hazards such as storms, erosion and currents. The rules of year in which the permit was issued. Shortly before work the Coastal Resources Commission require that you begins on the detterminethevegetationroject ethe Local Permit Officer will lineandsebackdistance at your receive an AEC Hazard Notice and acknowledge that site. If the property has seen little change and the proposed notice in writing before a permit for development can be issueddevelopment can still meet the setback requirement, the LPO will inform you that you may begin work. It is impor- The Commission's rules on building standards, oceanfront tant that you check with the LPO before the permit expires setbacks and dune alteration are designed to minimize,but for official approval to continue the work after the permit not eliminate, property loss from hazards. By granting has expired. Generally, if foundation pilings have been permits, the Coastal Resources Commission does not placed and substantial progress is continuing, permit guarantee the safety of the development and assumes no renewal may not be necessary. If substantial progress has liability for future damage to the development. not been made, the permit must be renewed and a new The best available information, as accepted by the Coastal h Resources Commission, indicates that the annual ocean e ion rate for the area where your property is located is feet per year. The rate was established by careful analysis of aerial photographs of the coastline taken over the past 50 years. Studies a indicate that the shoreline could move as much as feet landward in a major storm. The flood waters in amajor storm are predicted to be about Meet deep in this area. Preferred oceanfront protection measures are beach nourishment and relocation of threatened structures. Hard erosion control structures such as bulkheads, seawalls, revetments, groins, jetties and breakwaters are prohibited. Temporary devices, including sand bags, may be allowed under certain conditions. This structure shall be relocated or dismantled within two years of becoming imminently threatened. The applicant must acknowledge this information and requirements by signing this notice in the below space. Without the proper ture, the application will not be complete. e s' f4pplicant's Signature setback line estabhs ed. It ss unlawful to continue work after permit expiration without this approval. F re information, contact: Local Permit Officer Revised 11193