Loading...
HomeMy WebLinkAbout115-15 Pier Pointe Owners Association IncPerm?hClass Permit Number NEW 115-15 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission COPY Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Pier Pointe Owners Association, Inc..100 Pier Pointe. New Bern. NC 28562 Authorizing development in Craven County at adjacent to Trent River along a man-made basin, at 25 Pier Point Drive in River Bend , as requested in the permittee's application dated 09/03/15 (MP-1, MP-2) and 05/04/15 (MP4) including attached workplan drawings (1-3 of 3) all dated received at DCM-MHC 09/08/15. This permit, issued on October 20, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina Facility 1) This permit authorizes only the new finger piers, platforms, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this expanded marina facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the expanded marina facility. Any sewage discharge at the expanded marina facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall bRECEIVE enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) NOV 0 2 2015 This permit action may be appealed by the permittee or other Signed by the authority of the S Pf$tIC qualified persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. Vt " This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. &r Bra" C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. '&VAU P/ffPo-nf ,W,,,yS JsWj4,,.1*atureof P Pier Pointe Owners Association Permit No. 11545 Page 2 of 3 ADDITIONAL CONDITIONS 3) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes 42 formalized boat slips. 6) The new portions of the expanded marina facility and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Shoreline Stabilization 8) The authorized bulkhead shall be constructed immediately waterward of the existing bulkhead. 9) The alignment of the permitted bulkhead shall be verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. 10) The bulkhead shall be constructed prior to any backfilling activities. 11) The temporary placement or double handling of fill materials within water or vegetated wetlands is not authorized. 12) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 13) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 14) No excavation, or other land disturbing activities, is permitted except for that which may be required for the construction of the bulkhead wall. 15) All backfill material shall be clean and free of any pollutants except in trace quantities. !.® 16) All backfill material shall be obtained from a high ground source and confined behind the per4tJd oh bulkhead. �G Qryti Pier Pointe Owners Association ADDITIONAL CONDITIONS Sedimentation & Erosion Control Permit No. 115-15 Page 3 of 3 17) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 18) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 19) No excavation or filling of any vegetated wetlands is authorized by this permit. 20) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 21) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 22) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. R E C E V E t NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of Tier Il NOV 0 2015 Programmatic General Permit 198000291 (Action ID No. SAW 201502099. nn��++nnAA NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Geiietal Water C Quality Certification 3900 and assigned the project DWR Project No. 15-0967. NOTE: The N.C. Division of Energy, Minerals, and Land Resources exempted the proposed project from stormwater requirements under project No. SW7150908. NOTE: The permittee is advised that any development or land disturbing activity that is considered non - water dependent is not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission (EMC) Neuse River buffer regulations in place at the time of such development. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. NOTE: An application processing fee of $400 was received by DCM for this project. Permit Class - Permit Number NEW 115-15 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Verint"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Pier Pointe Owners Association. Inc..100 Pier Pointe. New Bern. NC 28562 Authorizing development in Craven County at adjacent to Trent River along a man-made basin, at 25 Pier Point Drive in River Bend , as requested in the permittee's application dated 09/03/15 (MP-1, MP-2) and 05/04/15 (MP-4) including attached workplan drawings (1-3 of 3) all dated received at DCM-MHC 09/08/15. This permit, issued on October 20, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina Facility 1) This permit authorizes only the new finger piers, platforms, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this expanded marina facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the expanded manna facility. Any sewage discharge at the expanded marina facility shall be considered a violation of this permit for which the pennittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the qualified persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. ' Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. / (7 At BraxTofi C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Pier Pointe Owners Association Permit No.115-15 Page 2 of 3 ADDITIONAL CONDITIONS 3) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes 42 formalized boat slips. 6) The new portions of the expanded marina facility and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Shoreline Stabilization 8) The authorized bulkhead shall be constructed immediately waterward of the existing bulkhead. 9) The alignment of the permitted bulkhead shall be verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. 10) The bulkhead shall be constructed prior to any backfilling activities. 11) The temporary placement or double handling of fill materials within water or vegetated wetlands is not authorized. 12) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 13) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 14) No excavation, or other land disturbing activities, is permitted except for that which may be required for the construction of the bulkhead wall. 15) All backfill material shall be clean and free of any pollutants except in trace quantities. 16) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Pier Pointe Owners Association ADDITIONAL CONDITIONS Sedimentation & Erosion Control Permit No.115-15 Page 3 of 3 17) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 18) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 19) No excavation or filling of any vegetated wetlands is authorized by this permit. 20) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 21) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 22) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of Tier II Programmatic General Permit 198000291 (Action ID No. SAW 201502099. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 3900 and assigned the project DWR Project No. 15-0967. NOTE: The N.C. Division of Energy, Minerals, and Land Resources exempted the proposed project from stormwater requirements under project No. SW7150908. NOTE: The permittee is advised that any development or land disturbing activity that is considered non - water dependent is not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission (EMC) Neuse River buffer regulations in place at the time of such development. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. NOTE: An application processing fee of $400 was received by DCM for this project. Project Narrative Project: Bulkhead and Finger Pier Replacement Owner: Pier Pointe Owner's Association, Inc. Applicant: Coastline Building Company, LLC The proposed project involves replacing approximately 640 LF of an existing wooden bulkhead with a vinyl bulkhead. The existing boardwalk, finger piers and pilings shall be removed and replaced with pressure treated wood materials. The number of finger piers shall be reduced from 24 to 21. Four additional boat lifts will be installed. Upon completion new sod shall be installed on disturbed areas of land. The construction of the bulkhead and boardwalk shall be constructed from land with a 20,000 lb excavator with vibratory hammer attachment to drive vinyl sheet piles. The construction of the finger piers and boat lifts will be conducted from a floating barge and work deck. The pilings will be driven with the excavator and vibratory hammer attachment. RECEIVED OCT 01 2015 DCM- MHD CITY RECENED SEP 0 9 W5 Pier Pointe Owners Association 0 M � m EXISTING PLAT � t 0 o m r 3 N !A o i 1� 1 loth equals 100 feet — OPo Pime Owners Association 25 Pier Pointe New Bern,NC 28562 vw�ak.hn. Vicinity Map Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven Courdy NC Coastline Building Company, LLC V = 100' PO Box 12632 Page 1 of 3 New Bern, NC 28561 252-670-5573 %J O i 5e' Iv - \ / Z- P apaeyu. Man Made Basin/Canal Connected to Trent River 0 Approximately 220' Wide Total Number of New Boat Slips equals 42 Bipuim PraPcrly Line Bulkhmd Pemoln Edo,.d a N. ai Endm New Con. rl Whhcad Tit to Existing Cam. Bulid,md / I water Depth at ih,"saii / 3' A" Emire Lmgm m New N,ry18u1kM1mtl Enimirg Open Boat Lifte—\ _ 1 I I I'�I� Y. Nw1. m Proposed Baldimd '.'hoc IB' sakes the Top of Bu4md Typical of 22 Erch Winer Depth at End of Proposed Flom, Dock Prapoeed 2' 6's 20' Finger nee 1;: Piers is 4'-B' Typical Typical of 22 ssees! Lift oa�n N. NOpen NiceUshng Open Boot Lift Bant Lift r open Open BamlJ—.R — L j//�a — . — .-[— as as oe . e Arm m Nigh q�w oim.coMe Appramnetely 15' a.nhd Yxyl Vinyl 459' wwhm Bdisel PROPOSED PLAN � Bulkhead, Finger Pier and Boat Slip o m v Owner: Replacement A T /�Vq Pier Pointe Owners Association Pier Pointe Owners Association .t. � m CD1 1 1 25 Pier Pointe 1ni 0 New Bern,NC 28562 Riverbend Craven County NC Coastline Building Company, LLC t ® uy yr 1 - 40' PO Box 12632 Page 2 of 3 New Bern, NC 28561 252-670-5573 Normal Water Level 32' Below Top of Bulkhead Depth of water 4'-8" at End of Finger Pier 8" PT Piling Proposed Open Boat River Bottom v a' PT Piling 0 AM O m v o m n v Proposed Finger Pier SECTION A -A SECTION AT BOAT LIFT Depth of Water 3' at Face of Bulkhead 2x6 Boardwalk Planks 7--4x4 PTRuaners Finished Grade Conc. Cap Block 5/8' Tiaboek Rod PT Deadman Proposed Vinyl Bulkhead Existing Wooden Bulkhead Remove Top Portion as Necessary to install 5/8" Galy. Teback Rods. BOW ill Between the Existing Bulkhead and the New Bulkhead Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Crown County NC Coastline Building Company, LLC 3/8" a 1'-0' PO Box 12632 Page 3 of 3 New Bern, NC 28561 252-670-5573 1 A MWI APPLICATION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Pier Pointe Owners Association, Inc. Project Name (H applicable) Bulkhead and Finger Pier Replacement Applicant 1: First Name Samuel MI Last Name Bidwell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 100 Pier Pointe PO Box City New Bern State INC ZIP 28562 Country US Phone No. 252-878-5050 ext. FAX No. Street Address ffdiflerertfrom above) _ City State ZIP Email SamuelBidwell@aol.com 2. Agent/Contractorinformadon Business Name RECEIVEr Coastline Building Company, Inc. Agend Contractor 1: First Name MI Last Name Anthony D Tyndall Agentl Contractor 2: First Name MI Last Name ' MHU CT Cad G Merchant Mailing Address PO Box City State 12632 New Bern NC ZIP Phone No. 1 Phone No. 2 28561 252-870-5573 exl 252-675-1786 ext. FAX No. Contractor N Street Address (t ddferent from above) City State ZIP Email atyndall@coas8inebuildingcompany.com gECEIVED <Form continues on back> 7Y 252.808-2808 :: 1-888.4RCOAST :: www.necoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for , Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. S Craven 25 Pier Pointe Subdivision Name City State Zip Pier Pointe Condominiums Riverbend INC 28562 - Phone No. Lot No.(s) (d many, attach additional page with list) ext. 8-201-MOA, 8-201-8-OOB, 8-201-8-OOC, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Neuse Man -Made Canal off of Trent River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown Nauss River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ONO work falls within. Town of Riverbend 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 658' 179,076 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 79,236, 45,738, 54102, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 2'-6" ❑NHW or ®NWL e. Vegetation on tract Residential Lawn and Landscaping f. Man-made features and uses now on tract Condominiums, 658 LF Bulkhead, 24 Finger Piers RECEIVED g. Identify and describe the existing land uses adiiacent to the proposed project site. OCT Q 12015 Recreational Commercial Marina, Roadway DCM- MHD CITY h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? PDR-MF (Attach zoning compliance certificate, if applicable) ®Yes ONO ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it Involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> RECEIVED SEP 0 S 2015 cx:w A:" 252-808-2808 :: 1-888.4RCOAST :: www.necoastaimanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. () Are there wetlands on the site? []Yes ®No (it) Are there coastal wetlands on the site? []Yes ®No (III) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. MUNICIPLE SEWER o. Describe existing drinking water supply source. MUNICIPLE WATER p. Describe existing stone water management or treatment systems. SHEET FLOW 5. Acdvides and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The existing bulkhead and piers will be replaced. The piers shall continue to be for the private use of the property owners. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where It's to be stored. Bulkhead shall be constructed of vinyl sheet piles. The finger piers shall be constructed of pressure treated wood. Construction will be accomplished with floating backhoe with vibratory hammer, work deck and tug. d. List all development activities you propose. RECEI Bulkhead and finger pier replacement. Addition of 5 new boat lifts which will be within the existing slips. OCT 01 e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 3,015 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. there are three existing storm drainage culverts from the existing property penetrating the existing bulkhead and discharge into the water. I. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. PECENED SEp 0 S X6 <Form continues on back> t1Cµ,tW+aA:PW VED Z015 CITY 252-808-2808 .. 1-888-4KCOAST" .. www. nccoastaimanagement. net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following Items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Bent Pectic Phone No. 252-638.8068 Address 108 Outrigger Rd New Bern, NC 28562 Name Town of Riverbend Phone No. 252-638-3870 Address 45 Shoreline Dr. Riverbend, NC 28562 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, 'd applicable. I. Weiland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. to Enter on I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application andfg�lgyyy monitoring of the project. .. _ _ ftb I further certify that the information provided in this application is truthful to the best of my knowledge. Date q' 3 -'% Print Name Anthony D. Tyndall, PE. OCT U 12015 Signature r' r� Please indicate application attachments pertaining to your proposed project. ODCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts E)DCM MP-3 Upland Development ®DCM MP-4 Structures Information DCW&D CITY SEP 0 & 2015 13C►o-e0rwV>�v 252.808-2808 :: 1-888-411COAST :: www.nccoastalmanagement. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this forth to Joint Application for CAMA Major Permit, Forth DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other Channel (NLW or Canal Boat Bain Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length Width Avg. EAsting NA NA Depth Final Project NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 0 Cubic Yards c. (i) Does the area to be excavated include coastal wetlands/marsh (CM, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ CIVIL ®None (ii) Describe the purpose of the excavation in these areas: Excavation is for installation and connection of deadman piles to the new bulkhead. 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (it) Describe the purpose of disposal in these areas: ❑This section not applicable Type of material to be excavated. Fill Sand previously placed at top of bulkhead. d. High -ground excavation in cubic yards. Approximately 100 Cubic Yards b. area. RECEIVED OCT 01 2015 DCM- MHD CITY ®This section not applicable d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ®NA 01) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No DNA (it) If yes, how much water area is affected? RECEIVED SEP 4 8 2015 252-808.2808 :: 1-888-4RCOAST :: www.nccoastalmanaoement.net revised: 12126/06 Form DCM M1P-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4— Structures) a. Type of shoreline stabilization: b. Length: ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: _ Width: 18" c. Average distance watenvard of NHW or NWL: T-6" d. Maximum distance waterward of NHW or NWL: 4' e. Type of stabilization material: Vinyl Bulkhead g. Number of square feet of fill to be placed below water level. Bulkhead backfll Riprep _ Breakwater/Sill Other None i. Source of fill material. 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. (1) Will fill material be brought to the site? ®Yes []NO ❑NA If yes, (ii) Amount of material to be placed in the water None (III) Dimensions of fill area 5' Wide x 12" Deep x 603' (iv) Purpose of fill To level existing grade from settlement at existing bulkhead. f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ®No ❑NA (i) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. [I This section not applicable b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV _ ❑SB _ OWL ®None (ii) Describe the purpose of the fill in these areas: RECEIVED 15. GENERAL vvlvr- rear r" . m a t a. How will excavated or fill material be kept on site and erosion b. What tvoe of construction eauipment will be used (e.a.. draoline. controlled? The limited amount of excavated material taken from the area at the surface of the top of existing bulkhead shall be stock piled on site and surrounded with sift fencing. c. (i) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. badkhoe, or hydraulic dredge)? RECEIVED Excavator d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No []NA (h) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 9 -3'l5 Anll4 ew T`14C/ Date 8'er I kale ©Wlvtl, Project Name Re Q14r e 7�khc h eft, uC. Y:- Applicant Name Applicant gnature r ri`e" 252.808.2808 :: 1-988.4RCOAST :: vvww.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1, DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑PublldGovernment ®Private/Community c. (i) Dock(s) and/or piers) (ii) Number 2 (iii) Length 16' (iv) Width 10, (v) Floating ®Yea ❑No e. (i) Are Platforms included? []Yes ®No If yes: (h) Number _ (iii) Length (iv) Width (v) Floating ❑Yes []No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 42 (ii) Number of slips existing 44 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required []Other; please describe: ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ONO d. (i) Are Finger Piers included? ®Yes ONO If yes: (ii) Number 21 (iii) Length 20' (iv) Width 226" (v) Floating []Yes ONO f. (1) Are Boatlifts included? ®Yes []No If yes: (ii) Number 8 (iii) Length 10, (iv) Width 10' h. Check all the types of services to be provided. ❑ Full service, including travel Irft and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ('Wet slips") only, number of slips: 42 ❑ Dry storage, number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Motor Boats including runabouts, oontoon boats, cabin cruisers. etc. RECEIVED OCT 01 Z015 Q�,,4111,- MHD CITY k. Typical boat length: 20' I. (1) Will the facility be open to the gene w ❑Yes ONO RECEIVED M. (i) Will the facility have tie pilings? "• ort oilings? SEP 0 8 2015 9_4\ 00*.l�W 1.888.4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. - d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of 'No Sewage Discharge" signs proposed. (ii) Give the location and number of'Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. _ 1. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? RECEIVED OCT e 129 k. Describe design measures that promote boat basin flushing? 1. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marinaldocking facility proposed within a primary or secondary nursery area? Qles ❑No RECEIVED SEP 0 8 208 MHD CITY 1 252-808-2808:: 1.8884RCOAST:: www.nccoastalmanagement.net Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SW, shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL []None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? []Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public(Govemment ❑Private/Community (ii) Number (III) Length _ (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number _ (ii) Length (iii) Width _ 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Lend _ b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NFIW, NWL or wetlands S. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PubliCGovernment ❑Private/Community c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED OCT 01 2015 DCM- MHD CITY RECEIVED SEP 4 8 Y015 ddl•Rf,(w0+00N 252.808.2808:: 1-888-4RCOAST:: www.nccoastalmanauement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 15, b. Proximity of structure(s) to adjacent docking facilities. 35, Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body d. Water depth at waterward end of structure at NLW or NWL 200' 4' to 6' e. (i) Will navigational aids be required as a result of the project? DYes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. & OTHER ®This section not applicable a. Give complete description; May 4, 2015 Date Pier Pointe Owners Association, Inc. Bulkhead and Finger Pier Replacement Project Name Coastline Building Company, LLC Anthony D. Tyndall, PE Appli5/n Name Lam'°•- —• f�7�i'1u Applicant Signature RECEIVED OCT 01 2015 DCM- MHD CITY RECEIVED SEP 0 6 2015 252.808.2808 :: 1-888.4RCOAST :: www.nccoastaimana-qement.net revised: 12/27/06 DCM Coordinator: Sir Y5 Permit #: � 1 MAILING DISTRIBUTION SHEET '�Permiteel PI f,(� PI)GYU f IA-..,i-randlin0 (Iiu W he (enanehu Ihr. X411AKid Tt,mjiY %' Oad klvprhahf. PO 663(1202- DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Blan4 William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Cnimbley Liz Hard Cultural Resources: Renee Gledhill -Early Public Water Supply: Diane Williams (WIRO) Joey White (WARO) DCM/ Shane Staples Fisheries Specialist Gregg Bodnar NC DOT: Ken Pace DMF/ Patti Fowler Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton Water Resources: Karen Higgins (Raleigh) John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 Wilmington: Joanne Steenhuis - 401 Chad Coburn - 401 DEMLR Washington: Scott Vinson-Stormwater Wilmington: 'Georgette Scott- Stormwater Wildlife Resources: Maria Dunn LPO: Fax Distribution: Permitee Agent #:_ New 6ptn,IJG North Carolina Department of Environmental Quality Pat McCrory Governor October 20, 2015 Pier Pointe Owners Assn., Inc. 100 Pier Pointe New Bern, N.C. 28562 Dear Sir or Madam: Donald R. van der Vaart Secretary The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. c�Sincerely, A Douglas V. Huggett Major Permits and Consistency Manager N.C. Division of Coastal Management Enclosure 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: mvw.nccoastalmanagement.net An Equal Opportunity IAttrmative Action Employer — Made In part by recycled paper Cs DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Pier Pointe Owners Association, Inc. LOCATION OF PROJECT SITE: The project is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive, in River Bend, Craven County. Longitude: 77° 08'53.56"W Latitude: 35° 04'28.48"N INVESTIGATION TYPE: CAMA/D&F INVESTIGATIVE PROCEDURE: Date(s) of Site Visit — 3/17/15 Was Applicant or Agent Present —No Photos Taken — No PROCESSING PROCEDURE: Application Received — cc: 9/8/15 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — Craven County (10/29/2009) Land Classification from LUP — Developed (B) AEC(s) Involved: PTA, PTS (C) Water Dependent: Yes (D) Intended Use: Residential (E) Wastewater Treatment: Existing — municipal sewer Planned - N/A (F) Type of Development: Existing — marina, bulkhead, and townhouses Planned - replace bulkhead and finger piers, and construct new boatlifts within existing slips (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED FILLED INCORP/SHADED (A) Shallow Bottom 1,206 fO 11,200 ftZ incorp (B) High Ground 11 7,236 fO IF III (E) Total Area Disturbed: 19,642 ftz (F) Primary Nursery Area: No (G) Water Classification: C; Sw, NSW Open: No (H) Cultural Resources: None Project Summary: The applicant wishes to replace an existing bulkhead and marina for residential use near the Trent River, Craven County. Field Investigation Report: Pier Pointe Owners Association Page 2 Narrative Description: The property is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive in River Bend, Craven County. This 4.1-acre parcel is developed with townhouses, marina, and bulkhead. The adjacent properties are similarly developed. The elevation of the high ground of the parcel is about 2.5' above the normal water level (nwl). Vegetation on the lot mainly consists of lawn grasses. There are no Coastal Wetlands in the vicinity of the project area. This parcel has approximately 658' of continuous shoreline along the basin: Immediate offshore water depths adjacent to the parcel range from —3' to —6' normal water level (NWL). The subaqueous substrate is firm without shell. There is not a cultural resource in the nearby vicinity of the project area. This waterbody is approximately 220'across at this location. These Inland waters are not classified as a Primary Nursery Area and there is no submerged aquatic vegetation in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classified as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel in the nearby vicinity of this project area. This project area is subject to the Neuse River Riparian Buffer Rules. Proposed Development: The applicant wishes to replace the existing bulkhead, replace the existing finger piers, install four new boat lifts within existing boat slips, and construct two floating platforms within a man-made basin adjacent to the Trent River, in River Bend. The proposed development will take place at 25 Pier Pointe Drive, Craven County. The proposed development will serve the Pier Pointe Owners Association, Inc. The proposed vinyl bulkhead is proposed to be installed immediately waterward of the existing wooden bulkhead. This proposed vinyl bulkhead will be 603' long with a 15'-wide work corridor landward of the bulkhead. The proposed bulkhead will be approximately 5' high above the subaqueous substrate. There are a total of twenty-three marina piers proposed. Two of the piers would be floating. Each of these proposed floating kayak piers would be 10' wide and 16' long. The remaining proposed fixed finger piers would be 3' wide and 20' long to support the existing boat slips at this community marina. There are 44 boat slips currently, but after this reconfiguration they would be reduced to a total of 42 boat slips. There are four 10' by 10' boat slips proposed within four of the existing boat slips. Brad Connell September 9, 2015 Morehead City i. I C5 Field Investigation Report: Pier Pointe Owners Association Page 3 Anticipated Impacts: The proposed bulkhead replacement will impact 7,236 square feet of high ground and 1,206 square feet of shallow bottom habitat. The proposed dock replacement and floating kayak docks will remain in the same footprint within this man-made basin and usurp 11,200 square feet of Public Trust Area. Traditional marine construction methodology will be utilized during construction. Temporary turbidity impacts are not anticipated during construction as the vinyl sheets will be installed prior to backfilling and sod will be planted once work is complete. There is not a cultural resource in the nearby vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. These Inland Waters of the Trent River are not classified as a Primary Nursery Area and submerged aquatic vegetation is not present in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classified as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel near the project area. Brad Connell September 9, 2015 Morehead City DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Pier Pointe Owners Assoc., Inc. County: Craven LOCATION OF PROJECT: 25 Pier Pointe Drive, in River Bend, adjacent the Trent River. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 9/8/15 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No CONSISTENCY DETERMINATION: Attached: No To Be Forwarded: Yes FIELD REPRESENTATIVE: Brad Connell DISTRICT OFFICE: Morehead City DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: 9/11/15 FEE REC'D: $400.00 (100%) PUBLIC NOTICE REC'D: Yes END OF NOTICE DATE: 10/15/15 ADJ. RIP. PROP NOTICES REC'D: Yes DEED REC'D: Yes APPLICATION ASSIGNED TO: Courtney Spears ON: 9/11/15 C) 75 DAY DEADLINE: k4 IS/ 150 - DAY DEADLINE: MAIL OUT DATE: 9/11/15 STATE DUE DATE: IQ/ I / 1 s FEDERAL DUE DATE: I 1 / 1 / I S FED COMMENTS RECD: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON OBJECTIONS. YFS NO VOTES AGENCY DATE COMMENTS RETURNED Coastal Management - Regional Representative Coastal Management. LUP Consistency Determination (O I Division ofCommuniry Assistance 2 /S )J/ Land Quality Sation Division of Water Quality �'23 !� /� C\ Y DW L Wltlfi- Sonar Water. Management (DWQ) ' � K State Property Office 101` Division of Archives & History I/] //45 -/1 Division of Enviromnentel Health Division.£Highways Wildlife Resources Commission D Local Permit Office Division of Marine Fisheries 1/'L61s Corps of Engineen � 1 110 1p7 `/ j� l / q �L I Z 0 / lG �WS !o/� /r"� x 02Fl QTA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary MEMORANDUM DATE: September 9, 2015 TO: Courtney Spears THRU: Roy Brownlow 8-� FROM: Brad Connell g" SUBJECT: Comments and Recommendations - CAMA Major Permit —Pier Pointe Owners Association, Craven County The following is my assessment and consequent recommendations of the above referenced proposal: This proposal will fill 1,206 square feet of shallow bottom and 7,236 square feet of high ground. This proposal will usurp 11,200 square feet of Public Trust Waters. These inland waters of the Trent River are closed to shellfish harvest. This waterbody is not a Primary Nursery Area. This proposal will not pose a hazard to navigation. Assuming that state and federal agencies concur with the proposal, I recommend the project be authorized as proposed, contingent upon the following conditions: 1) The bulkhead will not extend waterward more than two feet from the existing bulkhead at any point along its alignment at the time of construction; 2) The bulkhead must be constructed prior to any backfilling activities; 3) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure; 4) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment; 291 Pier Pointe marina September 9, 2015 Page 2 of 2 5) The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used; 6) All backfill material will be obtained from a high ground source and confined behind the permitted bulkhead; 7) No backfill material is to be placed within 50 feet of the normal water level line, except that which will be used to backfill the area behind the permitted bulkhead; 8) All fill material to be placed below mean high/normal water level will be confined behind the permitted bulkhead; 9) The piers and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge; 10) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.); 11)A ground cover sufficient to restrain erosion shall be provided within the shorter of 15 working or 30 calendar days of completion of any phase of grading on cut or filled slopes. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: This permit does not convey any rights, either in real estate or material. CC: Roy Brownlow, DCM 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nocoastalmanagement.net An Equal Opportunity 1 Affirmative Actlon Employer MEMORANDUM To: Courtney Spears From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Application, Pier Pointe Owners Association, Inc. — River Bend, Craven County Date: October 14, 2015 This project is; consistent with the Craven CountyLand Use Plan Update., , The applicant proposes to replace an existing bulkhead and marina for residential use near the Trent River at 25 Pier Pointe Drive in River Bend, Craven County. Areas of Environmental Concern (AEC's) impacted by the proposal are PTA, PTS. Waters at the project site are classified as C; Sw, and NSW and are not open to the harvesting of shellfish. The area is not a Primary Nursery Area. I have reviewed this proposal for consistency with the Craven County Land Use Plan and offer the following comments. The general area of the project is classified as Developed. In general, Craven County and River Bend allows development in Developed classified AECs which is consistent with the State's minimum use standards. The Craven County Land Use Plan contains some policies, which exceed the State's minimum use standards., However, none of these standards appear to be applicable to this proposal. This project is consistent and not in conflict with the Craven County Land Use Plan. Cc: File AAK ki-11 Alk NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor September 11, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Cs Donald R. van der Vaart Secretary Lee Padrick Division of Community Assistance Courtney Spears Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Pier Pointe Owners Association, Inc. Craven County, at 25 Pier Pointe Drive, in River Bend. Proposes to replace an existing bulkhead and marina for residential use near the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 214. When appropriate, in-depth comments with supporting data is requested. RECEIVED _1tEELYY �' _,_,.. as proposed. SEP 2 4 1015 t/ .This agency has no comment on the proposed project. 0-WnA-it" 1� ,'. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. �+ SIGNED �� - DATE 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 1 FAX 252-247-33301 Internet: www.nocoastaimanagement.net An Equal Opportunity / Affirmative Action Employer �5 NOT A CAMA PERMIT North Carolina Department of Environmental Quality Pat McCrory Governor September 23, 2015 Donald R, van der Vaart . Secretary DWR # 15-0967 Craven County Pier Pointe Owners Association, Inc. Attn: Mr. Samuel Bidwell 100 Pier Pointe New Bern, NC 28562 Subject: Approval of 401 Water Quallty Certification with Additional Conditions Approval of Neuse River Riparian Buffer Impacts with Additional Conditions Pier Pointe Owners Association, Inc. - Bulkhead and Finger Pier Replacement Dear Mr. Bidwell: You have our approval for the impacts listed below for the purpose described in your application dated September 11, 2015 and received by the Division of Water Resources (Division) on September 17, 2015. These impacts are covered by the attached Water Quality General Certification Number 3900, Neuse River Riparian Buffer Rules, and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USAGE). This Certification allows you to use the LAMA Major Permit when the Division of Coastal Management issues It. Please note that you should get any other federal, state or local permits before proceeding with your project, Including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The followingimpacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)] Type of Impact Amount Approved AmountApproved Plan location/ (units) (units) Reference Attached Permanent Temporary Open Waters OW-1 (Fill for Bulkhead 0.03 (acres) 0 (acres) CAMA Major App. Construction) Sheet Nos. 2 of 3 Buffers -Zones Division of Water Resources -Water Quailty Regional Operations Section - Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-64811Fax: 252-9753716X Intemet www.nodenr.gov An Equal OpperWnxyIAfliwtvakdon Employer —Made In pan bymayded paper �S Pier Poipt :Owners.F*0ciatioh, lhc: I,.) Attn: Mr. Samuel Bidwell DWR # 15-0967 401 AND BUFFER APPROVAL Page 2 of 4 B-1(Construction Corridor) 0 (square feet) 7,236 (square feet) CAMA Major App. Sheet Nos. 2 of 3 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions, [15A NCAC 02B .0507(d)(2)] 3. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certification(s) 3900. [15A NCAC 02B .0507(c)] 4. The Permittee shall replant the vegetation within temporarily disturbed areas associated with this project in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a density sufficient to provide 320 trees per acre at maturity., This density can usually be achieved by planting approximately 436 (10 x 10 spacing) to 681 (8 x 8 spacing) trees per acre.) Restoration of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 320 trees per acre at maturity. [i5A NCAC 02H .0507 (c), 15A NCAC 02H .0506 (b)(3), and 15A NCAC 02B .0233 (6)] 5. All mechanized equipment'operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Divisiori of Water Quality, between the hours of 8 am to 5 pm at the Washington Regional Office at 252.946.6481 and after hours and on weekends call (800) 858-0368. Management of•such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A] 6. ReOoenerClause Pier Pointe Owners Association, Inc. and their authorized agents shall conduct their activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. Pier Pointe Owners Association, Inc. CS Pier Pointe Owners Association, Inc. Attn: Mr. Samuel Bidwell DWR q 15-0967 401 AND BUFFER APPROVAL Page 3 of 4 shall require their contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of their contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWR determines that such standards or laws are not being met (including the failure'to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWR may reevaluate and modify this.certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the certification, DWR shall notify the Pier Pointe Owners Association, Inc. and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 21-1.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to DWR in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 7. Upon completion of all work approved within the 401 Water Quality Certification or applicable.Buffer Rules, any subsequent modifications, the applicant is required to return the attached.certificate of completion to the 401 & Buffer Permitting Unit, NC Division of Water Resources, 1617 Mail Service Center, Raleigh, NC 27699-1650. [35A NCAC 02H .0507 (c)] 8. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at http://portal.ncdenr.org/web%cop/swp/ws/401/certsandpermits/apply/forms). [15A NCAC 02H .0506(b)(5)] 9. This approval and its conditions are final and binding unless contested. [G.S.143-215.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH.. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the. OAH during normal office hours (Monday through Friday between 8:0Oam and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address forthe OAH: CS 1/sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Pier Pointe Owners Association, Inc. Attn: Mr. Samuel Bidwell DW R # 15-0967 401 AND BUFFER APPROVAL Page 4 of 4 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam H. Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water and Neuse River Buffer Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anthonV.scarbraugh@ncdenr.eov if you have any questions or concerns. Sincerely, RobertTarikard, Assistan egional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDENR Enclosures: GC 3900 Certification of Completion cc: Courtney Spears, DCM Morehead City Josh Pelletier, USACE Washington Regulatory Field Office (via email) Pat McClain, DEMUR WaRO (via email) Jennifer Burdette, DWR 401 & Buffer Permitting Unit (laserfiche) File v \ APIPFUNED norm'sCUINAEin MMERML MANAt COI SSM �appe tea�a ee �+IOF11fA7B11iES01{�$ �p�n� DWRPGMRNL Man. Made Basln/Ca1m1 randE am re warm Connected to Trent River c �! Approximately 220' Wide Depa,�m�wrnd Total Number of New Boat Slips equals 42 s' nkq �a4ctvgth of Nw Vao BuWmd Bdanrg Openeovt Nft II t ( Nft&Pnpattd Binh d II gp� ftpad Fbtbg bx A '*06c N'BalmvlhsTeeef B4O.wd TyplodeP 22 Esh Water Depth et-WT r Fbvhg Ded, Peoposdt' d' 2a' roger%er %^9a'%crab 4'-8°YYgmi tidvnrg apm eearutr Two d 2eea, W opw / t. r"op.e Uft Jy PrWniyuna I L q� I 1111=llll�111�I11L 1111�T1=�lll___=111L-1(1L�lll__1W__lilt__ll1L..11ll_-111L=-111L=11iL—=ll1L=.1111=111L�11ll� +5s•.Z. Nmai HA _ - Dbne4anw I . napery Uae PROPOSED PLAN' ® m owner: Pier Pointe Owners Association 25 Pier Pointe New BernNC 28562 Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association zver6end Craven county' Nd P_40. New Page 2 of lien, NL 28861 3 252-6765573 North Carolina Department of Environment and Natural Resources Pat McCrory Donald R, van der Vaarf Governor Secretary RECEIVED/NCDBNR/DWR September 11, 2015 $EP 212015 MEMORANDUM: Water LIugILLy Regional opemuons section .. Washing, Agg D� TO: '%�Aritlion,y Scarbraugh Scott Vinson Division of Water Resources FROM:. Courtney Spears. Major Permits Processing Coordinator. ,i SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Pier Pointe Owners Association, Inc. Project Location: Craven County, at 25 Pier Pointe Drive, in River Bend. Proposed' Project: Proposes to replace an existing bulkhead and marina for residential use near'the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If.you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. V This agency has no comment on the proposed project. This agency approves of the project only if the r0commended changes are incorporated. See attached. This agency objects to the project for reasons described in. the attached . comments. SIGNED ! ! DATE / 400 Commerce Avenue, Morehead City, North Carollna 28557 Phone:252.808-2808,1 FAX M-247-33301 Internet: www.nccoastalmanagementnet An Equal Opportunity/ Affirmative Action Employer �•: OCDM� North Carolina Department of Environment and Natural Resources Pat McCrory Governor September 11, 2015 MEMORANDUM: TO: SUBJECT: Applicant: Project Location: Proposed. Project: Anthony Scarbraugh `Scott Vinson Division of Water Resources Courtney Spears Major Permits Processing Coordinator Donald R. van der Vaart Secretary RECEIVED/NGDENR/OWR SEP 212015 Water quality Regional Washington Reg of nali 0rflce CAMA/DREDGE & FILL Permit Application Review Pier Pointe Owners Association, Inc. Craven County, at 25 Pier Pointe Drive, in River Bend. Proposes to replace an existing bulkhead and marina for residential use near the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 214. When appropriate, in-depth comments with supporting data is requested. REPLY: ✓ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency, approves of the project only if the recommended changes are incorporated. Seeattached. This agency objects to the project for:reasons described in the attached comments. f SIGNED LC r-- DATE / dI s I 210- f s l� `j LL Zw•r'1 �[ tz. i ra't�o'►r.i�G�2r iti.dv�ctiCl vs+ 2" i—eftt�r�.w2�TSa 400 Commerce Avenue; Morehead City, North Carolina 257 Phone: 252-808-28081 FAX 25M47-3330Internet www.nccoastalmanagernent.net An Equal opportunity / Affirmative Action Employer Pat McCrory Governor North Carolina Department of Environmental Quality October 15, 2015 Pier Pointe Owners Association, Inc. Attn: Samuel Bidwell 100 Pier.Point New Bern, NC 28562 Subject: EXEMPTION from Stormwater Management Permit Regulations LAMA Major- Dredge & Fill / Bulkhead / Pier Pier Pointe Bulkhead and Finger Pier. Replacement Stormwater Project No. SW7150908 Dear Mr. Bidwell: Don Van der Vaart Secretary. The Washington Regional Office received a copy of your CAMA Major application for the bulkhead and finger pier replacement project at the property located at 25 Pier Pointe, Craven County, NC on September 22, 2015. Staff, review of the plans and specifications has determined that the project, as proposed, consists of activities that will not pose surface water quality threats from stormwater runoff since no new impervious area is proposed. The Director has determined that projects that are reviewed and approved by the Division as not posing water quality threats from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000. For this reason, we are informing you by way of this letter that your project will not require a State Stormwater management permit at this time. The stormwater rules require the Division to permit the common plan of development, therefore, any future development on the property, regardless of whether a SEC plan or CAMA Major permit is also required, will require a Stormwater Management. Permit application and permit issuance from the Division of Energy, Mineral, and Land Resources prior to any construction. Any construction on the subject site,.prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement actions by this Office. Please keep in mind that this determination does not affect your legal requirements to obtain other permits which may be required by the Division of Water Resources, the Division of Land Resources, Coastal Area Management Act or any other Federal, State or Local Government. Please reference the Stormwater Project Number above on all correspondence. If you have any questions or need additional information concerning this matter, please contact me at (252) 946-6481. Sincerely, 4 1 Thom Edgerton Environmental Engineer cc: Courtney Spears, DCM Washington Regional Office Division of Energy, Mineral, and Land Resources. Land Quality Section Washington Regional Office 943 Washington Square. Mall, Washington, North Carolina 27889 • Phone: 252-946E481/FAX: 252-97M716 Internet: hfio•lioodal.nodencorg/weblirlland�uality An Equal Opportunity 1 Affirmative Action Employer —50% Recycled 110% Post Consumer Paper CDETIR North Carolina Department of Environment and Natural Resources Pat McCrory Governor September 11, 2015 MEMORANDUM: TO: FROM: SUBJECT: Tim Walton State Property Office Courtney Spears Major Permits Processing Coordinator Donald R. van der Vaart Secretary RECEIVED SEP 17 201' DOA STATE PROPERTY OFFICE RECEIVED CAMA/DREDGE & FILL Permit Application Review OCT o 12015 Applicant: Pier Pointe Owners Association, Inc. DCM- MHD Project Location: Craven County, at 25 Pier Pointe Drive, in River Bend. Proposed Project: Proposes to replace an existing bulkhead and marina for residential use near the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 214. When appropriate, in-depth comments with supporting data is requested. REPLY: �+Qn Nlq RBcomments., SIGNED This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached gikATE — l 1/— �� — I '✓ ,�J , J 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalrnanagement.net An Equal Opportunity / Affirmative Action Employer NCDENR .-,`North Carolina Department.of Environment and Natural Resources. Pat McCrory Donald R; van derVaart" - Governor Secretary September 11, 2015 q— N� MEMORANDUM: - TO: Renee Gledhill -Early NC Departntent of Cultural Resources r,ko : Courtney -Spears h,- 9�ar11i Major Permits Processing Coordinator SIM CT: CAMAIDREDGE cC PILL Permit -Application Review Applicant: Pier Pointe, Owners Association, Inc. Project Location: Craven County, af.25 Pier Pointe llrive, in River Bend. Proposed Project: Proposes to replace an existing, bullchead and marina for residential use near the Trent,River; Please indicate below your agency's position or viewpoint -on the proposed project and return this form by October 'l; 2015. If you have any questions regatding'the proposed -project, please contact Brad Connell, penriit officer it (252)808-2808.. Eat: 214, tVhen approptiate, in-depth comments with supporting data is:regtiested. REPLY: This agency has no objection to -the project as•proposed. Y: This agency has no comment on the proposed proJect.. This' agency approves of the project only if the recommended changes are incorporated. See attae lied. This agency objects to the project for reasons described, in the attached comments: SIG\'rm \k:La - DATE I�• 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252,808-28081 FAX 252.247.33301 Intemoh vAmnecoasIdmanagement.nel A.nEqual Opportunity / Affirmative Actlon'Employer SEp 2 2 2015 Im (5 Pat McCrory Governor O EM North Carolina Department of Environment and Natural Resources E. C E � V SEP 14 2015 D Shellfish Sanitation E=ec,eational Water Quality Sac: on September 11, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Patti Fowler Shellfish Sanitation Courtney Spears Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Pier Pointe Owners Association, Inc. Donald R. van der Vaart Secretary Craven County, at 25 Pier Pointe Drive, in River Bend. Proposes to replace an existing bulkhead and marina for residential use near the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. x This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. ,,�. D SIGNED /�- Fek PM rwLek- DATE 9 /� !v't S R�,EIVED SE? 12 1055 400 Commerce Avenue, Morehead City, North Carolina 28557 �'�y r4uN Phone: 252-808-28081 FAX 252-247-33301 Internet: www.ncooastalmanagement.net An Equal Opportunity I Affirmative Action Employer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor September 11, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Ken Pace NC DOT, State Construction/Materials Branch Courtney Spears Major Permits Processing Coordinator Donald R. van der Vaart Secretary RECEIVED SEP 2 5 2015 NEW BERN DISTRICT OFFICE CAMA/DREDGE & FILL Permit Application Review Pier Pointe Owners Association, Inc. Craven County, at 25 Pier Pointe Drive, in River Bend. Proposes to replace an existing bulkhead and marina for residential use near the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 214. When appropriate, in-depth comments with supporting data is requested. REPLY: —This agency has no objection to the project as proposed. ✓ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. j} SIGNED DATE `7 CEIVED 400 Commerce Avenue, Morehead City, North Carolina 28557 OCT 15 2015 Phone: 252-808.28081 FAX 252-247-33301 Internet: www.ncooastalmanagement.net An Equal opportunity I Affirmative Action Employer DC M- M H D CITY RECEIVED OCT 15 2015 DCM- MHD CITY (4 ®7 OEM North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Govemor Secretary G . '.5. oq. i g. z�-1 September 11, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Maria Dunn NC Wildlife Resources Commission Courtney Spears Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Pier Pointe Owners Association, Inc. Craven County, at 25 Pier Pointe Drive, in River Bend. Proposes to replace an existing bulkhead and marina for residential use near the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 214. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 4.1,' DATE 9'29-2o1S 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www,nccoastatmanagement.net An Equal Opportunity /Affirmative Action Employer Coo North Carolina Department of Environment and Natural Resources Pat McCrory 'Donald R. van der Vaart Governor RECEIVED Secretary SEP -01015 i DCM-Flehailea WARD September,l1, 2015 p��R a MEMORANDUM: I 1�� 1e�� 99 SEP rg 2015 TO:. Shane Staples Division of Coastal Management MARO FROM: Courtney Spears Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Pier Pointe Owners Association, Inc. Project Location: Craven County, at 25 Pier Pointe Drive, in River Bend. a i Proposed Project: Proposes ,to replace an existing bulkhead and marina for residential use near the Trent River. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 1, 2015. If you have any questions regarding the proposed project, please contact Brad Connell, permit officer at (252)808-2808. Ext. 21.4. When appropriate, in-depth comments with supporting data is requested. . REPLY: This agency has no objection to the project as proposed. ✓This agency has.no comment on the proposed project, This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for , reasons described in the attached comments. - SIGNED DATE 9 zg 9Z/ 5 400.Commerce Avenue, Morehead City, North Carolina28557 = Phone: 252-808.2808 k FAX 252-247-33301Internet wwwmccoasfalmanagement.net An Equal Opportunity /Affirmative AcBon Employer C5 North Carolina Department of Environmental Quality Pat McCrory Governor October 1, 2015 MEMORANDUM: To: Courtney Spears Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City, NC 28557 From: Dyk Luben, P.E., Regional Engineer, PWSS/WaRO Subject: CAMA/DREDGE & FILL PERMIT Application Review Applicant: Pier Pointe Owners Association, Inc. Project Location: Craven County, at 25 Pier Pointe Drive, in River Bend Donald R. van der Vaart Secretary Proposed Project: Proposes to replace an existing bulkhead and marina for residential use near the Trent River. REPLY: This office has no objection to the project as proposed. X This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. This office objects to the project for reasons described in the attached comments. SIGNED DATE 10/2/2015 RECEIVED OCT 0 9 2015 Washington Regional Office DCM- MHD CITY 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-64811 FAX: 252-948-00401 Internet: www.ncwater.org/pws An Equal Opportunity 1 Affirmative Action Employer— Made in part by recycled paper Out Spears, Courtney From: Bland, Raleigh W SAW <Raleigh.W.Bland@usace.army.mil> Sent: Tuesday, October 13, 2015 11:04 AM To: Spears, Courtney Cc: Pelletier, Josh R SAW Subject: RE: CAMA Major Permit comments (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Pier Pointe is SAW 201502099. It will be a Tier II PGP 198000291. There will not be any additional conditions. John Hoepfner is SAW 201501936. It is also a Tier II PGP 198000291 with no additional conditions. Thanks! I have Chowan, Beaufort, Craven, Hertford, Hyde, Perquimans, Tyrrell, and Camden. Josh has Currituck, Dare, Bertie, Gates, Pasquotank, Pamlico, and Washington. Hope this helps..... -----Original Message ----- From: Spears, Courtney [mailto:courtney.spears@ncdenr.gov] Sent: Friday, October 09, 2015 10:06 AM To: Bland, Raleigh W SAW; Pelletier, Josh R SAW Subject: [EXTERNAL] CAMA Major Permit comments Hello there! It was nice to see you both yesterday and tremendously helpful to me to hear about how things work in your office. I meant to ask yesterday if you could let me know which counties each of you are responsible for so that when I have a question about a project I can contact either of you. Or, if you would prefer, I could contact you both at the same time about all projects. I'm happy to do either. I have four permit applications I wanted to inquire after: a * John & Brenda Hoepfner- pier and watercraft lift on Yeopim Creek in Perquimans * Clifton & Shelly Spencer- upland commercial boat basin, bulkhead, new dock, and maint. dredging in Dare * Willie R. Etheridge Seafood -1,854 ft of bulkhead in Dare * Pier Pointe Owners Assn. - replace bulkhead and marina for residential use in Craven (this one is a little further out, but the last one I have in your area for now so I thought I would ask!) Thanks for all your help! Also, please do not hesitate to let me know if these aren't ready yet (especially Pier Pointe). I am ready to move forward with them, but understand if more review time is necessary. J Courtney Spears Assistant Major Permits Coordinator NC Division of Coastal Management courtney.spears@ncdenr.gov 252.808.2808 Ext. 215 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties Classification: UNCLASSIFIED Caveats: NONE 1S Anthony Tyndall From: Connell, Brad <brad.connell@ncdenr.gov> Sent: Thursday, May 28, 2015 10:10 AM To: Anthony Tyndall (atyndall@coastlinebuildingcompany.com) Cc: samuelbidwell@aol.com Subject: revisions request for Pier Pointe application Attachments: mp 2p.dot Importance: High Mr. Tyndall, Thank you for your well prepared and thorough LAMA Major Permit application package. However, there are some minor issues that need to be addressed before the DCM can process the application: 1. Form DCM MP-1, 3: please provide the street address for the project location; 2. Form DCM MP-1, 3b: please note that this waterbody is a man-made canal; gig, era Z CansrQ 3. Form DCM MP-1, 4d: please note the elevation of the tract relative to the NWL; Tr e„ 4- 4. Form DCM MP-1, 5d: please note that the proposed boat lifts are within existing slips; 5. Form DCM MP -I, 5e: please note that this is "both"; 6. Form DCM MP-1, 6e: please submit $400 payable to the NCDENR; 7. Form DCM MP-1, 6f: please submit the signed "green" cards; 8. Form DCM MP-1, 7: please check the MP-2 box and submit this completed form (attached) as it relates to the bulkhead construction; 9. Form DCM MP-4, 7a-b: please answer these questions; 10. Work Plan Drawings: please draw to scale, please submit a side view drawing, please note the riparian property lines, please list the property owner names, please name the waterbody, please note the width of the waterbody, please show water depths relative to the marina, please label the proposed vs the existing structures, please label the normal water level (NWL) at the bulkhead, and please cross -hatch the amount of high ground disturbance. If you have any questions in the interim, please do not hesitate to contact me. Thank you, Brad Connell Field Representative NC Division of Coastal Management http://portal.ncdenr.org/web/cm/dcm-home C� sys� E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. RECEIVED SEP 0 8 1UTh Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4*4 F�nMalMd41 1 ma", k. Shore k n �L NOJ1, ICE MP-1 C5 APPLICATION for Major Development Permit past revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name Pier Pointe Owners Association, Inc. Project Name (if applicable) Bulkhead and Finger Pier Replacement Applicant 1: First Name Samuel MI Last Name Bidwell Applicant 2: First Name MI Last Name If adddional applicants, please attach an additional paga(s) with names listed. Mailing Address 100 Pier Pointe PO Box City New Bern State NC ZIP 28562 Country us Phone No. 252-876-5050 ext. FAX No. Street Address (d different from above) City Stets, ZIP Email SamuelBidwell@aol.com 2. AgentContractor Information Business Name Coastline Building Company, Inc. Agent/ Contractor 1: First Name MI Last Name Anthony D Tyndall Agent/ Contractor 2: First Name MI Last Name Cad G Merchant Mailing Address PO Box City State 12632 New Bem NC ZIP Phone No. 1 Phone No. 2 28561 252 - 670 - 5573 ext. 252 - 675 -1786 ext. FAX No. Contractor • Street Address (d different from above) City State ZIP Email atyndall@coestlinebuildingcompany.com gECEIVED <Form continues on back> ��p A 6 lot �-un K r1 r.nv 252-808-2808 :: 1.888-4RCOAST :: w,:w.nccoast.,manag�.iient.net Form DCM MP-1 (Page 2 of 4) APPLICATION �cr� Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. • Craven 25 Pier Pointe Subdivision Name City State Zip Pier Pointe Condominiums Riverbend NC 28562 - Phone No. Lot No.(s) (rf many, attach additional page with list) ext. 8-201-8-00A, 8-201-8-OOB, 8-201-8-OOC, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Neuse Man -Made Canal off of Trent River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown Neuse River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Town of Riverbend 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 658' 179,076 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 79,236, 45,738, 54102, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 2'-6" ❑NHW or ®NWL e. Vegetation on tract Residential Lawn and Landscaping f. Manmade features and uses now on tract Condominiums, 658 LF Bulkhead, 24 Finger Piers g. Identify and describe the existing land uses adiacent to the proposed project site. Recreational Commercial Marina, Roadway h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? PDR-MF (Attach zoning compliance certificate, it applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? RECEIVED <Form continues on next page> SEP 0 8 2nt5 ()C�& 252-808-2808 :: 1-888-4RCOAST :: www. nccoastalma nagement. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? []Yes ®No (ii) Are there coastal wetlands on the site? []Yes ®No (iii) If yes to either (i) or (it) above, has a delineation been conducted? []Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. MUNICIPLE SEWER o. Describe existing drinking water supply source. MUNICIPLE WATER p. Describe existing stone water management or treatment systems. SHEET FLOW 5, Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The existing bulkhead and piers will be replaced. The piers shall continue to be for the private use of the property owners. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Bulkhead shall be constructed of vinyl sheet piles. The finger piers shall be constructed of pressure treated wood. Construction will be accomplished with floating badfioe with vibratory hammer, work deck and tug. d. List all development activities you propose. Bulkhead and finger pier replacement. Addition of 5 new boat lifts which will be within the existing slips. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 3,015 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. there are three existing storm drainage culverts from the existing property penetrating the existing bulkhead and discharge into the water. i. Will wastewater or stornavater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. RECEIVED SEp 0 S 206 <Forrn continues on back> OCMAWtiyA'," 252.808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit & Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certtfied mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Berl Peck Phone No. 252-638-8068 Address 108 Outrigger Rd New Sam, NC 28562 Name Town of Riverbend Phone No. 252-638-3870 Address 45 Shoreline Dr. Riverbend, NC 28562 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, perrniltee, and issuing dates. It. Signed consultant or agent authorization forth, if applicable. I. Welland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), If necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. DatePrint Name Anthony D. Tyndall, PE. Signature 9�� D/ RECEIVED Please indicate application attachments pertaining to your proposed project. SEP 0 8 2015 ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culvertsv ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information 252-808-2808 :: 1-888-4RCOAST :: www. nccoasta[management. net �S Form DCM ill EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 0 Cubic Yards c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ®None (ii) Describe the purpose of the excavation in these areas: Excavation is for installation and connection of deadman piles to the new bulkhead. 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (i) Do you claim title to disposal area? Oyes ONO DNA (U) If no, attach a letter granting permission from the owner e. () Does the disposal area include any coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (1) Describe the purpose of disposal in these areas: ❑This section not applicable Type of material to be excavated. Fill Sand previously placed at top of bulkhead. d. High -ground excavation in cubic yards. Approximately 100 Cubic Yards ®This section not applicable area. d. (i) Will a disposal area be available for future maintenance? [--]Yes ONO ®NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? [-]Yes ONO ❑NA (ii) If yes, how much water area is affected? RECENED SEP 0S2" 252-808-2808 :: 1-888-4RCOAST :: www.necoastalmanarrement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION ❑This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 60T ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: T-6" e. Type of stabilization material: Vinyl Bulkhead g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap _ Breakwater/Sill Other None i. Source of fill material. Width: ,tg" d. Maximum distancewaterward of NHW or NWL: 4' f. () Has there been shoreline erosion during preceding 12 months? ❑Yes ®No ❑NA (i) If yes, state amount of erosion and source of erosion amount information. It. Type of fill material. 4. OTHER FILL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water None (ill) Dimensions of fill area 5' Wide x 12" Deep x 603' (iv) Purpose of fill To level existing grade from settlement at existing bulkhead. 5. GENERAL a. How will excavated or fill material be kept on controlled? The limited amount of excavated material taken from the area at the surface of the top of existing bulkhead shall be stock piled on site and surrounded with silt fencing. c. (I) Will navigational aids be required as a result of the project? ❑Yes ONO ❑NA (i) If yes, explain what type and how they will be implemented. submerged aquatic vegetation (snv), snen bonom (sn), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? RECEIVED Excavator d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ONO ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Date �p Applicant Name �rer fig. -at e dot-eli l�Sf)Lr4f:0/'1 Project Name ReQI4i-e vk l K h e44C io- � Applicant ignature `* er f %C/'f 252.808.2808 :: 1. 88-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 3 of 3) CC7 RECEIVED SEP 0 S 205 252-808-2808:: 1-888.4RCOAST:: w .nccoastalmanaaement.net revised: 12i26'06 C� Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: []Commercial ❑PublirdGovemment NPrivate/Community ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes NNo c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes []No (ii) Number 2 If yes: (iii) Length 16' (ii) Number 21 (iv) Width 10, (iii) Length 20' (v) Floating NYes ❑No (iv) Width 22=6" (v) Floating ❑Yes NNo e. (i) Are Platforms included? ❑Yes NNo f. (i) Are Boatlifts included? NYes ❑No If yes: If yes: (ii) Number (it) Number 8 (ill) Length (iii) Length 10' (iv) Width IN) Width 10, (v) Floating []Yes []No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 42 ❑ Full service, including travel lift and/or rail, repair or (III Number of slips existing maintenance service 44 ❑ Dockage, fuel, and marine supplies N Dockage ('Wet slips") only, number of slips: 42 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel NOpen water; no dredging required ❑Other; please describe: k. Typical boat length: 20' m. (i) Will the facility have tie pilings? NYes ❑No (ii) If yes number of tie pilings? 24 j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Motor Boats including runabouts, pontoon boats, cabin cruisers. etc. (i) Will the facility be open to the general public? [--]Yes NNo RECEIVED SEP 0 S 2015 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanaSlement.net revised: 12/27/06 (s Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACIUMMARINAOPERATIONS ® This section not applicable a. Check each of the following sanitary facilities that will be included In the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of 'No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h_ Give the number of channel markers and "No Wake' signs proposed. _ i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing manna, what types of services are currently provided? RECEIVED SEP 0 8 20t m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No 252-808-2808 :: i-888-4RCOAST :: www.nccoastalmanagement.net revised: 112127/06 CS Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes []NO o. Is the madnaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marinaidocking facility located within or within close proximity to any shellfish leases? ❑Yes [--]No If yes, give the name and address of the leasehoider(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-Z Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width & BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands B. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s). ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED SEP 0 8 205 252-808-,<6GB :: 1-888-4RCOAST :: www.nccoastalmiananement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) �S a. Proximity of structure(s) to adjacent riparian property lines 15, Note: For buoy or mooring piling, use arc of swing including length ofvesset c. Width of water body 200' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 35' d. Water depth at waterward end of structure at NLW or NWL 4' to 6' 8. OTHER ®This section not applicable a. Give complete description: May 4, 2015 Date Pier Pointe Owners Association, Inc. Bulkhead and Finger Pier Replacement Project Name Coastline Building Company, LLC Anthony D. Tyndall, PE AppI NNaam-e ,/& /L Applicant Signature RECEIVED SEP 0 8 2015 252-808-2808 :: 1-888-4RCOAST :: wwwmccoastalmananement.net revised: 12/27/06 I Project Narrative Project: Bulkhead and Finger Pier Replacement Owner: Pier Pointe Owner's Association, Inc. Applicant: Coastline Building Company, LLC The proposed project involves replacing approximately 640 LF of an existing wooden bulkhead with a vinyl bulkhead. The existing boardwalk, finger piers and pilings shall be removed and replaced with pressure treated wood materials. The number of finger piers shall be reduced from 24 to 21. Four additional boat lifts will be installed. Upon completion new sod shall be installed on disturbed areas of land. The construction of the bulkhead and boardwalk shall be constructed from land with a 20,000 lb excavator with vibratory hammer attachment to drive vinyl sheet piles. The construction of the finger piers and boat lifts will be conducted from a floating barge and work deck. The pilings will be driven with the excavator and vibratory hammer attachment. RECEIVED SEP 0 91015 "AMW AJ�" Pier Pointe Owners Association G;;;;2!!!M N t inM epuele t00 bet A vt�. EXISTING PLAN Owner: Pier Pointe Owners Association 25 Pier Pointe New 8ern,NC 28562 -� PUIvebM/e Vicinity neP Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Crown County NC Coastline Building CompaM. LLC I o PO Box 12632 1" = New Bern, NC 28561 Page f 3 252-670-5573 /Jo� i-a Scq /r $ee enelowel- Draj•,- js .�pjw+.r Praiv Lin A-- Appraximaf.lr l5' WMir Vugl B "oxl A C3 Man Made Basin/Canal Connected to Trent River Approximately 220' Wide Approximot.ly 2' 6mnd N Vuryl llull+m PROPOSED PLAN opp..ir. sM.n. J. Total Number of New Boat Slips equals 42 Owner: Pier Pointe Owners Association 25 Pier Pointe New Bern,NC 28562 Rlpaim Prvpvdy Lira Exinirg Corvete BvlWuad to 0.rmain� , ErM of Nw Virryl BuPdrmd .1 Tie ro Existing Conc. B "o*d / I Wafer Deem at Bultlrmd / 3Al" Emim i-m," of Nm V.wIk Mmd Edstlrg apm Baar Uft l� y Dxk 7 ` -i ha"lJn. I Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County NC Coastline Building Company, llC PCI Box 12632 P - 40' New Bern, NC 28561 Page 2 of 3 252-670-5573 r1 Normal Water Level 32" Below Top of Bulkhead Depth of Water 4'-8' at End of Finger Pier 8" PT Piling Proposed Open Boat River Bottom 8" PT Piling ttl���\\\'''000posed 2x6 Boardwalk Plar" x4 PT Bunn 8 Proposed Finger Pier � \ \ �-.4x8x16 Conc. Cap Black SECTION A -A SECTION AT BOAT LIFT Finiwhed Grade 5/8' Tieback Rod PT Deadman Depth of Water 3' ii at Face of Bulkhead 1-w Proposed Vinyl Bulkhead 1--. Existing Wooden Bulkhead Remove Top Portion as Necessary to install 5/8" 6a1y. Tieback Rods. Backf ill Between the Existing Bulkhead and the New Bulkhead Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County INC Coastline Building Comparry, LLC 3/8" z V-0" PO Box 12632 Page 3 of 3 New Bern, NC 28561 252-670-5573 n . h. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Pier Pointe Owners Association, Inc. LOCATION OF PROJECT SITE: The project is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive, in River Bend, Craven County. Longitude: 770 08'53.56"W Latitude: 350 04'28.48"N INVESTIGATION TYPE: CAMA/D&F INVESTIGATIVE PROCEDURE: Date(s) of Site Visit— 3/17/15 Was Applicant or Agent Present —No Photos Taken — No PROCESSING PROCEDURE: Application Received — cc: 9/8/15 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — Craven County (10/29/2009) Land Classification from LUP — Developed (B) AEC(s) Involved: PTA, PIS (C) Water Dependent: Yes (D) Intended Use: Residential (E) Wastewater Treatment: Existing — municipal sewer Planned - N/A (F) Type of Development: Existing — marina, bulkhead, and townhouses Planned - replace bulkhead and finger piers, and construct new boatlifts within existing slips (G) Estimated Annual Rate of Erosion: N/A Source — N/A (A) Shallow Bottom 1.206 I t' 11,200 ft2 incorp (B) High Ground 7,236 ftz (E) Total Area Disturbed: 19,642 ftz (F) Primary Nursery Area: No (G) Water Classification: C; Sw, NSW Open: No (H) Cultural Resources: None Project Summary: The applicant wishes to replace an existing bulkhead and marina for residential use near the Trent River, Craven County. RECEIVED OCT 15 2015 DCM- MHD CITY Field Investigation Report: Pier Pointe Owners Association Page 2 Narrative Description: The property is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive in River Bend, Craven County. This 4.1-acre parcel is developed with townhouses, marina, and bulkhead. The adjacent properties are similarly developed. The elevation of the high ground of the parcel is about 2.5' above the normal water level (nwl). Vegetation on the lot mainly consists of lawn grasses. There are no Coastal Wetlands in the vicinity of the project area. This parcel has approximately 658' of continuous shoreline along the basin: Immediate offshore water depths adjacent to the parcel range from —3' to —6' normal water level (NWL). The subaqueous substrate is firm without shell. There is not a cultural resource in the nearby vicinity of the project area. This waterbody is approximately 220' across at this location. These Inland waters are not classified as a Primary Nursery Area and there is no submerged aquatic vegetation in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classified as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel in the nearby vicinity of this project area. This project area is subject to the Neuse River Riparian Buffer Rules. Proposed Development: The applicant wishes to replace the existing bulkhead, replace the existing finger piers, install four new boat lifts within existing boat slips, and construct two floating platforms within a man-made basin adjacent to the Trent River, in River Bend. The proposed development will take place at 25 Pier Pointe Drive, Craven County. The proposed development will serve the Pier Pointe Owners Association, Inc. The proposed vinyl bulkhead is proposed to be installed immediately waterward of the existing wooden bulkhead. This proposed vinyl bulkhead will be 603' long with a 15'-wide work corridor landward of the bulkhead. The proposed bulkhead will be approximately 5' high above the subaqueous substrate. There are a total of twenty-three marina piers proposed. Two of the piers would be floating. Each of these proposed floating kayak piers would be 10' wide and 16' long. The remaining proposed fixed finger piers would be 3' wide and 20' long to support the existing boat slips at this community marina. There are 44 boat slips currently, but after this reconfiguration they would be reduced to a total of 42 boat slips. There are four 10' by 10' boat slips proposed within four of the existing boat slips. Brad Connell September 9, 2015 Morehead City Field Investigation Report: Pier Pointe Owners Association Page 3 Anticipated Impacts: The proposed bulkhead replacement will impact 7,236 square feet of high ground and 1,206 square feet of shallow bottom habitat. The proposed dock replacement and floating kayak docks will remain in the same footprint within this man-made basin and usurp 11,200 square feet of Public Trust Area. Traditional marine construction methodology will be utilized during construction. Temporary turbidity impacts are not anticipated during construction as the vinyl sheets will be installed prior to backfilling and sod will be planted once work is complete. There is not a cultural resource in the nearby vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. These Inland Waters of the Trent River are not classified as a Primary Nursery Area and submerged aquatic vegetation is not present in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classified as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel near the project area. RECEIVED OCT 15 2015 DCM- MHD CITY Brad Connell September 9, 2015 Morehead City RECEIVED OCT 15 2015 DCM- MHD CITY IN M!-1 APPLICUION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Prlmary Applicant/ Landowner Information Business Name Pier Pointe Owners Association, Inc. Project Name (if applicable) Bulkhead and Finger Pier Replacement Applicant 1: First Name Samuel MI Last Name Bidwell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address 100 Pier Pointe PO Box City New Bern State NC ZIP 28562 Country us Phone No. 252-876-5050 ext. FAX No. Street Address (if dlHerent from above) Cily State ZIP Email SamuelBidwell@aol.com 2. Agent(Con&actor Information Business Name Coastline Building Company, Inc. Agent/ Contractor 1: First Name MI Last Name Anthony D Tyndall Agent/ Contractor 2: First Name MI Last Name Carl G Merchant Mailing Address PO Box City State 12632 NewBern NC ZIP Phone No. 1 Phone No. 2 28561 252-670-5573 e)t. 252-675-1786 ext. FAX No. Contractor 0 Street Address (if different from above) City State ZIP Email atyndall@coastlinebuildingcompany.com RECEIVE- EIVED <Form continues on back> OCT 15 2015 `alp 0 8 7015 DCM— MHO" C T"; 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Craven 25 Pier Pointe Subdivision Name City State zip Pier Pointe Condominiums Riverbend NC 28562 - Plone No. Lot No. (a) fd many, attach additional page with list) ext. 8-201-8-OOA, 8-201-8-00B, 8-201-8-OOC, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Nauss Man -Made Canal off of Trent River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade []Unknown Neuse River e. Is proposed work within city limits or planning jurisdiction? f_ If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Town of Riverbend 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 658, 179,076 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 79,236, 45,738, 54102, NWL (normal water leveo (If many lot sizes, please attach additional page with a list) 2'-6" ❑NHW or ®NWL e. Vegetation on tract Residential Lawn and Landscaping f. Man-made features and uses now on tract Condominiums, 658 LF Bulkhead, 24 Finger Piers g. Identify and describe the existing land uses adiiacent to the proposed project site. Recreational Commercial Marina, Roadway h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? PDR-MF (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA J. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? RECEIVED <Form continues on next page> RECEIVEDSEP 252.808-2808 .. 1-888-4RCOAv [ .. yr vvr.nccoostalmanagement.net DCM- MHD CITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? []Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. MUNICIPLE SEWER o. Describe existing drinking water supply source. MUNICIPLE WATER p. Describe existing stann water management or treatment systems. SHEET FLOW 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment ®Private/Community b. Give a brief description of purpose, use, and dairy operations of the project when complete. The existing bulkhead and piers will be replaced. The piers shall continue to be for the private use of the property owners. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Bulkhead shall be constructed of vinyl sheet piles. The finger piers shall be constructed of pressure treated wood. Construction will be accomplished with floating backhoe with vibratory hammer, work deck and tug. d. List all development activities you propose. Bulkhead and finger pier replacement. Addition of 5 new boat lifts which will be within the existing slips. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 3,015 ®Sq.R or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. there are three existing storm drainage culverts from the existing property penetrating the existing bulkhead and discharge into the water. i. Will wastewater or stonnwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ❑NA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. RECEIVED RECENED or n A 1nt5 <Form continues on back> OCT 15 2015 OeWmo4t� kj" 252-808.2808 :: 5-888-4KCOAST :: wv,,w.nccoasta ma m Y. et Forth DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Berl Peck Phone No. 252-638-8068 Address 108 Outrigger Rd New Bern, NC 28562 Name Town of Riverbend Phone No. 252-638.3870 Address 45 Shoreline Dr. Riverbend, NC 28562 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permiltee, and issuing dates. In. Signed consultant or agent authorization forth, If applicable. 1. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Ad (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 17. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date L 3 — t<.y Print Name Anthony D. Tyndall, PE. Signature 7% RECEIVED Please indicate application attachments pertaining to your proposed project. SEP 0 S 1015 ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts+W+rev ❑DCM MP-3 Upland Development RECEIVED ®DCM MP-4 Structures Information OCT 15 2015 252.808-2808 :: 1.888-41RCOAST :: www.nccoastalmana gbrp"- nMHD CITY Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 0 Cubic Yards a (i) Does the area to be excavated include coastal wetlands/marsh (011), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (i) Describe the purpose of the excavation in these areas: Excavation is for installation and connection of deadman piles to the new bulkhead. b. []This section not applicable Fill Sand previously placed at top of bulkhead. d. High -ground excavation in cubic yards. Approximately 100 Cubic Yards 12. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. a (i) Do you claim title to disposal area? []Yes []No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SS _ ❑WL ❑None (ii) Describe the purpose of disposal in these areas: b. Dimensions of disposal area. d. (i) Will a disposal area be available for future maintenance? []Yes []No ®NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? []Yes ❑No ❑NA (ii) If yes, how much water area is affected? RECEIVED RECEIVED SEP 0 8 2015 OCT 15 2015 oer.w�w�+wr DCM- MHIL 42!7,f 252-808.2808 :: 1-888.4RCOAST :: www.nccoastalmanaaement.net revised: 12/26/06 Forth DCM MP-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABIUZATION ❑This section not applicable (If development is a wood groin, use MP-0— Structures) a. Type of shoreline stabilization: b. Length: 60V ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: 18" c. Average distance waterward of NHW or NWL: T 6" d. Maximum distance waterward of NHW or NWL: 4' e. Type of stabilization material: f. () Has there been shoreline erosion during preceding 12 Vinyl Bulkhead months? ❑Yes ®No ❑NA (i) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill _ Riprap _ Breakwater/Sill _ Other None I. Source of fill material. 4. OTHER FILL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water None (ii) Dimensions of fill area 5' Wide x 12" Deep x 603' (iv) Purpose of fill To level existing grade from settlement at existing bulkhead. 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? The limited amount of excavated material taken from the area at the surface of the top of existing bulkhead shall be stock piled on site and surrounded with silt fencing. c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. Date r%er IO.nfe dw"// 4Sytraf:cn ProjectName Re plae-e -�Pu lk heat 4- submerged aquatic vegetation (SAV), shell bottom (58), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV _ ❑SB ❑WL ONone (ii) Describe the purpose of the fill in these areas: backhoe, or hydraulic dredge)? RECEIVED Excavator d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. /- ni4 ny 7- Applicant Namee% ' VE1 Applicant ignatur� iJ 2015 252.808-2808 :: r r - e" :: wrww.nccoastalmananement.net Cr Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑PublidGovernment ®Private/Community ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes ONO (ii) Number 2 If yes: (iii) Length 16' (ii) Number 21 (iv) Width 10, (iii) Length 20' (v) Floating ®Yes []No (iv) Width 2=6' (v) Floating ❑Yes ®No e. (1) Are Platforms included? ❑Yes ®No f. (i) Are Boatlifts included? ®Yes []No If yes: If yes: III) Number _ (ii) Number 8 (iii) Length (iii) Length 10, (iv) Width (iv) Width 10, (v) Floating ❑Yes []No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 42 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies 44 ® Dockage ('Wet slips") only, number of slips: 42 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of sting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). []Open water; dredging for basin and/or channel Motor Boats including runabouts, n nIR L,20 EYID A E D ®Open water; no dredging required cruisers. etc. []Other; please describe: OCT 15 2015 DCM- MHD CITY k. Typical boat length: 20' I. (i) Will the facility be open to the general public? []Yes ®No RECEIVED m. (i) Will the facility have tie pilings? ®Yes ❑No SEP U 8 2015 (ii) If yes number of tie pilings? 00J4AKW VAW 24 revised! 12i27106 Form DCM MP-4 (structures, Page 2 of 4) 2. DOCK/NG FACIUMMARINA OPERATIONS 0This section not applicable a. Check each of the following sanitary facill ies that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (11) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and 'No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? It. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED SEP 0 8 2015 m. Is the marina/docking facility proposed within a primary or secondary nursery area? RECEIVE® []Yes []NO OCT 15 2015 ?Sf ..F'-22rk'"2 .: 1-50R_4F 6'CY r'i,$"d-.. vlv,,ncxq �tarmana,gem�rec.:ee4 �1^�ll_ MHD CITY eevised:12/27106 Form DCM MP-4 (structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (St3), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SI3 ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (1) Is the boathouse structure(s): ❑Commercial ❑PublictGovemment ❑Private/Community (ii) Number _ (iii) Length _ (iv) Width _ Note: Roofed areas are calculated from dnp/ine dimensions. 4. GROIN (e.g., wood, sheetpi/e, etc. if a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width _ 5. BREAKWATER (e.g., wood, sheelpfle, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc ofthe swing _ 7. GENERAL b. Number _ d. Description of buoy (color, inscription, size, anchor, etc.) RE3ECEIVED SEP L'-"*""CT15Z015 DCM- MHD CITY 252-808-2808:: 1-888-4 revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structures) to adjacent docking facilities. 15' 35' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 200' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 4' to 5' 8. OTHER ®This section not applicable a. Give complete description: May 4, 2015 Date Pier Pointe Owners Association, Inc. Bulkhead and Finger Pier Replacement Project Name Coastline Building Company, LLC Anthony D. Tyndall, PE Applignj NNaam�e '/`' /& Applicant Signature RECENED SEP 0 8 2015 RECEIVED '�"pP.4ftOW OCT 15 2015 DCM' MHD CirY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Project Narrative Project: Bulkhead and Finger Pier Replacement Owner: Pier Pointe Owner's Association, Inc. Applicant: Coastline Building Company, LLC The proposed project involves replacing approximately 640 LF of an existing wooden bulkhead with a vinyl bulkhead. The existing boardwalk, finger piers and pilings shall be removed and replaced with pressure treated wood materials. The number of finger piers shall be reduced from 24 to 21. Four additional boat lifts will be installed. Upon completion new sod shall be installed on disturbed areas of land. The construction of the bulkhead and boardwalk shall be constructed from land with a 20,000 lb excavator with vibratory hammer attachment to drive vinyl sheet piles. The construction of the finger piers and boat lifts will be conducted from a floating barge and work deck. The pilings will be driven with the excavator and vibratory hammer attachment. RECEIVED SEP Q 91515 cx:*#Ap+`zoko` RECEIw '.` OCT 15 2015 DCM- MH MY8 Pier Pointe Owners Association 1 inCn equals 100 feel — — ^V J M o �. n _ C.11 v _M o M EXISTING PLAN Owner: Pier Pointe Owners Association 25 Pier Pointe New Sern,NC 28562 NOW 61 r ".111 111 t �e vdlaa��na i Vicinity Map Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riwsbend Craven County NC Coastline 8ullding Company, t1C t" c 200' PO Box [2632 Page t of 3 New Bern, NC 28561 252-670-5573 e,00 A< OppoNte Shor<Une Ar."mLess Man Made Basin/Canal Connected to Trent River Approximately 220' Wide Total Number of New Boat Slips equals 42 NWL at Proposed Bwkhead Tin Pilns 18" Below the Top of Bulkod Proposed Flaatlrg Dak A Typical of 22 Each Wory Depth at End of Propose Proposed 2' 6' x 2a' Flrga Fa //�—w Fiver Piers is 4'-8' Typcal Existin Corm Boss Lift Typical of 22 Oath New Open / Exis i,, Open Reat Lift New fts(� //'� /// //New Ihial Lift 15.13' a � n aset �s f� • eft a/. � �� we 459' Aeev of Hgh auW Diswrlwan `� Existirq Wooden k"as ANpgvNmotey Be61nd Approximately 15' Behim inryl a w Vlrryl BUMAmd BuNAwd Propvty Lin< A PROPOSED PLAN N j7o 0 o n m O m O c Is" ♦ J G, m tV O Lin � < Rn v Owner: Pier Pointe Owners Association 25 Pier Pointe New Sern,NC 28562 Ri,xim Prapvty Lia Exianrg Concrete Bulkhmd to Remain Erd of New YMI Bulkhmd xl Tie so Existin3[anc. wil,hesd / Waeee Depth st ie,"esd / 3Alarg Emirs Length of New West Buwwmtl Exish, Open soot Lift 1, oak _I Propvtyua I —qAt� _Is I J1=1111-_ ' V I Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riwrbend Craven County NC Coastline Building Company, LLC 1" _ 40, PO Box 12632 Page 2 of 3 Ness, fin, NC 28561 252-670-5573 Proposed Open Boat Normal Water Level 32" Below Top of Bulkhead Proposed Finger Pier 2x6 Boardwalk Planks Cones Cap Block Tieback Rod PT Deadman Depth of Water 3' Depth of Water 4'-8" at Face of Bulkhead Proposed Vinyl Bulkhead at End of Finger Pier River Bottom • \ B'PT Piling �� I I 8' SECTION A -A SECTION AT BOAT LIFT Existing Wooden Bulkhead Remove Top Portion as Necessary to install 5/8" Galy. Tieback Rods. Ba lifill Between the Existing Bulkhead and the New Bulkhead Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County NC Coastline Building Company, LLC 3/8' c 1'A" PO Box 12632 Page 3 of 3 New Bern, NC 28561 252-670-5573 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Pier Pointe Owners Association, Inc. LOCATION OF PROJECT SITE: The project is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive, in River Bend, Craven County. Longitude: 77° 08'53.56"W Latitude: 35° 04'28.48"N INVESTIGATION TYPE: CAMA/D&F INVESTIGATIVE PROCEDURE: Date(s) of Site Visit— 3/17/15 Was Applicant or Agent Present —No Photos Taken — No Application Received — cc: 9/8/15 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — Craven County (10/29/2009) Land Classification from LUP — Developed (B) AEC(s) Involved: PTA, PTS (C) Water Dependent: Yes (D) Intended Use: Residential (E) Wastewater Treatment: Existing — municipal sewer Planned - N/A (F) Type of Development: Existing — marina, bulkhead, and townhouses Planned - replace bulkhead and finger piers, and construct new boatlifts within existing slips (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED FILLED INCORP/SHADED (A) Shallow Bottom 1,206 ft2 11 11,200 ft2 incorp (B) High Ground 7,236 ft2 (E) Total Area Disturbed: 19,642 ft2 (F) Primary Nursery Area: No (G) Water Classification: C; Sw, NSW Open: No (H) Cultural Resources: None Project Summary: The applicant wishes to replace an existing bulkhead and marina for residential use near the Trent River, Craven County. RECEIVED OCT 0 9 2015 DCM- MHD CITY Field Investigation Report: Pier Pointe Owners Association Page 2 Narrative Description: The property is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive in River Bend, Craven County. This 4.1-acre parcel is developed with townhouses, marina, and bulkhead. The adjacent properties are similarly developed. The elevation of the high ground of the parcel is about 2.5' above the normal water level (nwl). Vegetation on the lot mainly consists of lawn grasses. There are no Coastal Wetlands in the vicinity of the project area. This parcel has approximately 658' of continuous shoreline along the basin. Immediate offshore water depths adjacent to the parcel range from —3' to —6' normal water level (NWL). The subaqueous substrate is firm without shell. There is not a cultural resource in the nearby vicinity of the project area. This waterbody is approximately 220'across at this location. These Inland waters are not classified as a Primary Nursery Area and there is no submerged aquatic vegetation in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classified as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel in the nearby vicinity of this project area. This project area is subject to the Neuse River Riparian Buffer Rules. Proposed Development: The applicant wishes to replace the existing bulkhead, replace the existing finger piers, install four new boat lifts within existing boat slips, and construct two floating platforms within a man-made basin adjacent to the Trent River, in River Bend. The proposed development will take place at 25 Pier Pointe Drive, Craven County. The proposed development will serve the Pier Pointe Owners Association, Inc. The proposed vinyl bulkhead is proposed to be installed immediately waterward of the existing wooden bulkhead. This proposed vinyl bulkhead will be 603' long with a 15'-wide work corridor landward of the bulkhead. The proposed bulkhead will be approximately 5' high above the subaqueous substrate. There are a total of twenty-three marina piers proposed. Two of the piers would be floating. Each of these proposed floating kayak piers would be 10' wide and 16' long. The remaining proposed fixed finger piers would be 3' wide and 20' long to support the existing boat slips at this community marina. There are 44 boat slips currently, but after this reconfiguration they would be reduced to a total of 42 boat slips. There are four 10' by 10' boat slips proposed within four of the existing boat slips. Brad Connell September 9, 2015 Morehead City Field Investigation Report: Pier Pointe Owners Association Anticipated Impacts• The proposed bulkhead replacement will impact 7,236 square feet of high ground and 1,206 square feet of shallow bottom habitat. The proposed dock replacement and floating kayak docks will remain in the same footprint within this man-made basin and usurp 11,200 square feet of Public Trust Area. Traditional marine construction methodology will be utilized during construction. Temporary turbidity impacts are not anticipated during construction as the vinyl sheets will be installed prior to backfilling and sod will be planted once work is complete. There is not a cultural resource in the nearby vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. These Inland Waters of the Trent River are not classified as a Primary Nursery Area and submerged aquatic vegetation is not present in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classified as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel near the project area. RECEIVED OCT 0 9 2015 DCM- MHD CITY Brad Connell September 9, 2015 Morehead City EOM W-1 APPLICATION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Pier Pointe Owners Association, Inc. Project Name (if applicable) Bulkhead and Finger Pier Replacement Applicant 1: First Name Samuel MI Last Name Bidwell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address 100 Pier Pointe PO Box City New Bern State NC ZIP 28562 Country us Phone No. 252-876-5050 ext. FAX No. Street Address (9cliflerentfromabove) City State ZIP Email Samuel B idwel I @ aol. com 2. Agent(Contractor Information Business Name Coastline Building Company, Inc. Agent/ Contractor 1: First Name MI Last Name Anthony D Tyndall Agent Contractor 2: First Name MI Last Name Carl G Merchant Mailing Address PO Box City State 12632 New BernNC ZIP Phone No. 1 Phone No. 2 28561 252-670-5573 e)t. 252-675-1786 ext. FAX No. Contractor # Street Address (if different from above) Chy State ZIP Email RECEIVED aiyndall@coasUinebuildingcompany.com EIVED OCT 0 9 2015 <Form continues on back> yyyVJ A%!!K DIM MHDC', 252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Craven 25 Pier Pointe Subdivision Name City state zip Pier Pointe Condominiums Riverbend NC 28562 - Phone No. Lot No.(s) (d many, attach additional page with list) ext. 8-201-MOA, 8-201-8-OOB, 8-20"-OOC, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Neuse Man -Made Canal off of Trent River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. []Natural ®Manmade ❑Unknown Neuse River e. is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed Was []No work falls within. Town of Riverbend 4. Silts Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) (W. 179,076 c. Sae of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 79,236, 45,738, 54102, NWL (normal waterleveq (If many lot sizes, please attach additional page with a list) 2'-6- ❑NHW or®NWL e. Vegetation on tract Residential Lawn and Landscaping I. Man-made features and uses now on tract RECEIVED Condominiums, 658 LF Bulkhead, 24 Finger Piers OCT o s 2015 g. Identify and describe the existing land uses adlacent to the proposed project site. Recreational Commercial Marina, Roadway h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? PDR-MF (Attach zoning compliance certificate, if applicable) ®Yes ONO ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? RECEIVED <Form continues on next page> SEP 0 8" tx A:' " 252.808-2808 :: 1-888-4RCOA_ : .. ..;rv,,.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. () Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (Ili) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes []No (Attach documentation, 0 available) n. Describe existing wastewater treatment facilities. MUNICIPLE SEWER o. Describe existing drinking water supply source. MUNICIPLE WATER p. Describe existing storm water management or treatment systems. SHEET FLOW & Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PublidGovemment ®PrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The existing bulkhead and piers will be replaced. The piers shall continue to be for the private use of the property owners. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Bulkhead shall be constructed of vinyl sheet piles. The finger piers shall be constructed of pressure treated wood. Construction will be accomplished with floating backhoe with vibratory hammer, work deck and tug. d. List all development activities you propose. Bulkhead and finger pier replacement. Addition of 5 new boat lifts which will be within the existing slips. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 3,015 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use o% h. Describe location and type of existing and proposed discharges to waters of the state. there are three existing storm drainage culverts from the existing property penetrating the existing bulkhead and discharge into the water. I. Will wastewater or stonnwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. RECEIVED RECEIVED sEP O "Is <Form continues on back>r wu+r rl� OCT 0 9 2015 252.808-2808 :: 1.888-4RCOAST :: www.nc= !f 6A4 ) Qrltln et Form DCM MP-1 (Page 4 of 4) APPLICATION for, Major Development Permit 6. Additional Information In addition to this completed applicaton form, (MP-1) the tollowing items below, Nappliceble, must be submitted in order I& the application package to be complete. Items (a) —, (t) are always applicable to any major development application. Please consult the application instruction booklet on how to propedy prepare the required items below: a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Berit.Peck . _ Phone No.. 2527638-6068. - -- Address,108Outrigger Rd - - New Bern, No 28562 Name Town of Riverbend Phone No. 252-6383870 Address 45 Shoreline Dr. Riverbend, NC 28562 Name Phone No. - - - Address. g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization forth, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Ad. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fad grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Anthony D. Tyndall, PE. i Signature i%� RECEIVED Please indicate application attachments pertaining to your proposed project. SEP Q 9 21115 ODCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts yv",M4y ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information 252-808-2808 :: 1-888.4RCOAST :: www. n ccoastal management. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information., Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline (NLW or NWL stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL In cubic yards. 0 Cubic Yards c. (1) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the . number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ®None (11) Describe the purpose of the excavation in these areas: Excavation is for installation and connection of deadman piles to the new bulkhead. 2. DISPOSALOFEXCAVATED,MATERIAL a. Location of disposal area. c. (i) Do you claim title to disposal area? []Yes []No ❑NA (i) If no, attach a letter granting permission from the owner e. (i) Does the disposal area include any coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (11) Describe the purpose of disposal in these areas: []This section not applicable Type of material to be excavated. Fill Sand previously placed at top of bulkhead. d. High -ground excavation in cubic yards. Approximately 100 Cubic Yards b. area. ®This section not applicable d. (l)Willa disposal area be available for future maintenance? ❑Yes ❑No ®NA (ii) If yes, where? f. (i) Does the disposal include any area In the water? []Yes ❑No ❑NA (ii) If yes, how much water area is affected? RECEIVED SEP Q s 2015 252-808.2808 :: 1-888.4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 Fonts DCM MP-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION ❑This section not applicable (If devebpment is a wood groin, use MP-4— Structures) a. TVDe of shoreline stabilization: b. Lenoth: 603' ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: _ Width: 18" c. Average distance waterward of NHW or NWL: T-6" d. Maximum distance waterward of NHW or NWL: 4' e. Type of stabilization material Vinyl Bulkhead g. Number of square feet of fill to be placed below water level. Bulkhead backfill _ Riprap Breakwater/Sill Other None I. Source of fill material. f. (i) Has there been shoreline erosion during preceding 12 months? []Yes ONO ❑NA (if) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or (if) Amount of material to be placed in the water None other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) Dimensions of fill area 5' Wde x 12" Deep x 603' ❑CW ❑SAV _ ❑SB (iv) Purpose of fill OWL ®None To level existing grade from settlement at existing (if) Describe the purpose of the fill in these areas: bulkhead. 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? The limited amount of excavated material taken from the area at the surface of the top of existing bulkhead shall be stock piled on site and surrounded with silt fencing. c. (i) Will navigational aids be required as a result of the project? ❑Yes ONO ❑NA EC 1jl�ljypq.eypl@in what type and how they will be implemented. R EE vv CC ��JJ OCT 0 DCM- t Date F,er Aynte dWhtl'I J73Sf)Gr4t.`k M Project Name XeQI,.j-e -Pink hearc-'I- p1hor 1 ,p i-erf badkhoe, or hydraulic dredge)? RECEIVED Excavator d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No ❑NA (if) If yes, explain steps that will be taken to avoid or minimize environmental impacts. /-+n'f449r /yh4C1 Applicant Name dA,Pry Applicant dkinature 252.808-2808:: 1-9B8.4RCOAST:: www.nccoastaimanaaement.net revised: 12126/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public(Government ®Private/Community ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ONO c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes ONO (ii) Number 2 If yes: (iii) Length 16' (ii) Number 21 (iv) Width 10, (iii) Length 20' (v) Floating ®Yes ❑No (iv) Width 226" (v) Floating []Yes ONO e. (i) Are Platforms included? ❑Yes ONO f. (i) Are Boatlifts included? ®Yes []No If yes: If yes: (ii) Number _ (ii) Number 8 (iii) Length _ (iii) Length 10, IN) Width _ (iv) Width 10, (v) Floating []Yes ONO Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 42 ❑ Full service, including travel lift and/or rail, repair or (it) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies � ® Dockage ("wet slips") only, number of slips: 42 ❑ Dry storage; number of boats: _ ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of string: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Open water; dredging for basin and/or channel Motor Boats including runabouts Pontoon boats. Cabin ®Open water; no dredging required Cruisers. etc. []Other; please describe: k. Typical boat length: 20' R E C E I V ED) Will❑tYes cONboe open to the general publi m. (i) Will the facility have tie pilings? REopen CEIVED ®Yes ❑No OCT U 9 2015 SEP 081015 (a) If yes number of tie pilings? 01210 24 DCM- MHD CITY e^9.2808 :: 1-888.4RCOAST :: WvvW.nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACIUTYANARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal locafion for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of'No Sewage Discharge" signs proposed. (ii) Give the location and number of'Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? it. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECENED SEP 0 8 205 m. Is the marina/docking facility proposed within a primary or secondary nursery area? RECEIVED Oyes ONo OCT 0 9 2015 252-808.2808 :: 1.888.4RCOAST :: www.nccoastatmanagement.net revised: 12/27/06 DCM- MHD CITY Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting areal ❑Yes []NO o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)1 If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. () Is the boathouse structure(s): ❑Commercial ❑PublidGovemment ❑Private/Community (ii) Number _ (III) Length (iv) Width Note: Rooted areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. It a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheelplle, etc.) ®This section not applicable a. Length _ b. Average distance from NM, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PublidGovemment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, ff present e. Arc of the swing _ 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED OCT 0 9 2015 DCM- MHD CITY RECEIVED SEP 0 8 205 r,aiao 252.808.2808::1-888-4RCOAST:: www.nccoastalmanagement.nef .� i�>. �::>G€t Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 16 35' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 200' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) It yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 4' to 6' 8. OTHER This section not applicable a. Give complete description: May 4, 2015 Date Pier Pointe Owners Association, Inc. Bulkhead and Finger Pier Replacement Project Name Coastline Building Company, LLC Anthony D. Tyndall, PE App!':!NNaamePSyr Applicant Signature REc1E,`. 0 Oct � 9 ,;15 DcM� SE-D RECEIVED SEP 0 S 2015 262-808.2808 :: 1-888-4RCOAST n www.nccoastalmanagement.net revised: 12/27106 Project Narrative Project: Bulkhead and Finger Pier Replacement Owner: Pier Pointe Owner's Association, Inc. Applicant: Coastline Building Company, LLC The proposed project involves replacing approximately 640 LF of an existing wooden bulkhead with a vinyl bulkhead. The existing boardwalk, finger piers and pilings shall be removed and replaced with pressure treated wood materials. The number of finger piers shall be reduced from 24 to 21. Four additional boat lifts will be installed. Upon completion new sod shall be installed on disturbed areas of land. The construction of the bulkhead and boardwalk shall be constructed from land with a 20,000 lb excavator with vibratory hammer attachment to drive vinyl sheet piles. The construction of the finger piers and boat lifts will be conducted from a floating barge and work deck. The pilings will be driven with the excavator and vibratory hammer attachment. RECEIVED OCT 0 9 2015 DCM- MHD CITY RECENED SEP 0 91015 ogle 'k4w v 0 1 v 0 Pier Pointe Owners Association -- — — -- _.. l inch equals 100 ket X m n m_ v EXISTING PLAN Owner: Pier Pointe Owners Association 25 Pier Pointe New Bern,NC 28562 Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverlxnd Craven County NC V =100' PO Box 12632 Page 1 of 3 New fin• NC 28561 252-670-5573 /J0 t I O 156q ke T �llO oPn /'.�mCO/f / JAM. �i�n i1G /Z- BliMar Properly LBr Man Made Basin/Coral Connected to Trent River Approximately 220' Wide R Total Number of New Boat Slips equals 42 Proposed Flootiy Dock A Teplpicvl of 22 Each y Proposed 2' 6• x 20' Fiyc Pier Exisriy OPen Baal Lift rypiral of 22 mdr N.Open ,. Nw OVar BooiU f liked t i 1 It i i t i Bei ind V* Bulkhead 459' wwj-. BeAind aiparivn Properly Urie Exisny Concretees] wilodto Remain - End,d New NMI Bulkhmd r Vero Exiniy Canc. Bulkhmd / Wets Depth at middead / 3Alay Entire LengM of New Nryl BWFhmtl Exisfly Open Boor Lift II— N19L of Proposed Ikd /B" Below Me of WTop of Bulkwd + �Water Depth of End of ProposN Fbofly Dod Flnger Piers is l'-B'Typiml Pntpery Une _ _, Ezistiy Opm Bmt Ufi —)-� PLAN toPROPOSED Cp m ti Owner: Pier Pointe Owners Association m n 25 Pier Pointe y O I" n New Bern,NC 28562 s p n 0 o rn �, v Proposed 2x6 Boardwalk Planks 4x4 PT Runners Proposed Open Boat Lift Proposed Finger Pier Finished Grade 4z8x16 Canc. Cop Block Normal Water Level - 32' Mow Top of Bulkhead 5/8" Tieback Rod �I i PT Deadmon Depth of Water 3' Depth of Water 4'-8" at Face of Bulkhead ;, Proposed Vinyl Bulkhead at End of Finger Pier River Bottom►\ ail '—' Existing Wooden Bulkhead it Remove Top Portion as Necessary to install 5/8" 6aly. Tieback Rods. ji Backf ill Between the Existing ii Bulkhead and the New Bulkhead 8' PT Piling iLI B" PT Piling v y n m o m v N < n 0 m v � m a < Bulkhead, Finger Pier and Boat Slip MO n Replacement CP r' m• �` Pier Pointe Owners Association Q SECTION A -A SECTION AT BOAT LIFT 1 o dk Riverb<nd Craven County NC F Coastline Building Company, LLC 3/8' c 1'-0" PO Box 12632 Page 3 of 3 New fin, NC 28561 252-670-5573 SOUK i.%40P46L NORTH CAROLINA Prepared by Dunn and Dunn t CRAVEN COUNTY WARRANTY DEED / Sr day 1)E C THIS DEED, made and entered into this of 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain„ sell, and convey unto I' the party of the second part, said party's heirs and assigns, the following described property, to wit: Being all that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly described as follows: Beginning at a point in the southern right-of-way line of a 30-foot service road shown and delineated on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" Q recorded in Plat Cabinet E, Slide 304, in the office of the RECEIVE .r, Register of Deeds of Craven County, said point of beginning being the northern corner of that certain tract or parcel of OCT e.i; ZoiS land conveyed to the Pier Pointe Owners' Association, Inc. by deed dated April 17, 1989 and recorded in Book 1219, at Page 262, in the office of the Register of Deeds of Craven Count.DCM- MHD. CIT said "point of beginning also being located North 69 degrees 05 minutes 32 seconds East 341.41 feet from the intersection of the eastern right-of-way line of Shoreline Drive with then southern right-of-way line of said 30-foot service road and RECENED from said point of beginning being so located running thence, along and with the southern line of said 30-foot service road North 69 degrees 05 minutes 32 seconds East 123.00 feet; thence continuing along and with the southern right-of-way line of said 30-foot service road following a curve to the right having a radius of 75.0 feet and an arc distance of 101.92 feet; thence South 33 degrees 00 minutes 18 seconds x East 119.21 feet along and with the western right-of-way line of said 30-foot service road; thence continuing along and with the western right-of-way line of said 30-foot service f' road following a curve to the left having a radius of 75 feet tt and an arc distance of 48.36 feet; thence South 33 degrees 00 ,� 3 Page 2 minutes 18 seconds East 40.86 feet to an existing iron pipe; thence North 60 degrees 15 minutes 24 seconds East 97.00 feet to an existing iron pipe; thence South 37 degrees 00 minutes 00 seconds East 203.96 feet to a point lying in the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds West 255.51 feet; thence leaving Plantation Canal and running North 37 degrees 54 minutes 28 seconds West 407.33 feet; thence North 87 degrees 54 minutes 28 seconds -West 59 feet; thence North 20 degrees 54 minutes 28 seconds West 130.00 feet to the point of beginning. The above -described parcel of land is designated as "Phase III" on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41 and 42 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Three, said map being recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds. of Craven County to which reference is hereby made for a more perfect descripton of the numerically designated Lots being withheld from the con- veyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and deli- neated on the aforesaid map. The party of the first part expressly reserves unto itself, R EC EVE its' successors and assigns, a nonexclusive perpetual right- of-way and easement over each and every street and road shown OCT Q 1 2��5 and delineated on the map or plat of Pier Pointe at River Bend, Phase Three, recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County for DC M- M H D CITY the purposes of providing ingress, egress, regress and access to and from Shoreline Drive and for the purpose of installa- tion and maintaining utilities. RECEIVED This conveyance is made subject to that certain Declaration $EP 0 82015 of Annexation for Pier Pointe at River Bend, Phase Three, r recorded in Book 2� o , at Page z 3 y , in the office of the Register ofDeeeds of Craven County together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County.< TO HAVE AND TO HOLD said property and all privileges and appur- tenances thereunto belonging to the party of the second part, said party's heirs and assigns forever. I I SOUK t � l)I'i ye �47 AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that, said party will warrant and defend the title to the same against the lawful claims of all persons Whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this. instrument to be executed in its corporate name Oy its President, attested by its Secretary, and its corporate seai to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. . PIER POINTE AT RIVER BEND, INC. BY: )-)/,,A i,� )dl 11 Pres Men NORTH CAROLINA CRAVEN COUNTY RECEIVED;- OCT 0 1Z015` DCM- MHO€ Crr's Lbi_rtSeh , a No Public in and for - said County and t e o hereby cer fy that fx C')p k'. Z r+4 iDun personally appeared before me this day and acknowledged that he/She is the Secretary of Pier Pointe at River Bend, Inc., a corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its President, sealed with its cor- porate seal, and attested by himself/herself as its Secretary. Wi mess my hand and notarial seal, this the lat— day of to 0` , 1989. My Commission Expires: I f f 60UK i � 4 t1 PJGE % � �3 Page 4 NORTH CAROLINA CRAVEN COUNTY C The foregoing certificate ofk 1 if e d Notary Public of said county and State, s ter, o e correct. This instrument was presented for registration this day and hour and duly recorded in the office of the Register of Deeds of Craven County, North Carolina, in Book I a,,, b , at Page This the _L day of 9, at o'clockl M. _By: e s er of Deeds s er o ee��— i RECFNED _ SEP 0 8 sh RECEIVED vim OCT 01 2015 DCM- MHD CITY BOUT( i 21z)PA0E %62 NORTH CAROLINA Prepared by Dunn and Dunn CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this day o ;:4rz_ 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the parties of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the parties of the second part, said par- ties' heirs and assigns, the following described property, to wit: Being all that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly C ���'^gt described as follows: R EG Beginning at a point in the southern right-of-way line OCT 01 2015 of the a 30-foot service road shown and delineated on that certain map or plat entitled "Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, Slide 265, DC M- M H E1 ', 'Y said point of beginning being the northern corner of that certain tract or parcel of land conveyed to the Pier Pointe Owners' Association, Inc. by deed dated December 7, 1988 and recorded In Book 1207, at page 155, in the office of the Register of Deeds of Craven County, said point of beginning also being located North 69 RECENED degrees 05 minutes 32 seconds East 196.00 feet from the intersection of the eastern right-of-way line of SEP 9 8201i Shoreline Drive with the southern right-of-way line of said 30-foot service road and from said point of pyreayypy beginning being so located running thence along and with the southern line of said 30-foot service road North 69 degrees 05 minutes 32 seconds East 145.41 feet to a point in the southern right-of-way line of said 30-foot service road; thence South 20 degrees 54 minutes 28 seconds East 130 feet to a point; thence South 87 degrees 54 minutes 28 seconds East 59 feet to a point; thence South 37 degrees 54 minutes 28 seconds East 407.33 feet to the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds r1-r- orb;. BOUK i21:1P46E 263 Nest to a point marking the southeasternmost corner of that certain tract or parcel of land conveyed by Pier Pointe at River Bend, Inc. to Pier Pointe Owners' Association, Inc., by deed dated December 7, 1988, and recorded in Book 1207, at Page 155, in the office of the Register of Deeds of Craven.County; thence running along and with the easternmost line of the property conveyed to the Pier Pointe Owners' Association, Inc. North 37 degrees 54 minutes 28 seconds West 496 feet to a point;. thence North 23 degrees 54 minutes 28 seconds West 123 feet to the point of beginning. The above described parcel of land is designated as "Phase II" on that cer- tain map or plat entitled "Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 13, 14, 15, 16, 17, 18, 19. 20, 21, 22, 23, 24, 25, 26, 27 and 28 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Two, said map being recorded in Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County to which reference is hereby .made for a more perfect descripton of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual right-of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River B end, Phase Two, recorded in Plat Cabinet E, Slide 265, in the office of the Register of Deeds of Craven County, for the purpose of providing ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party of the first part lying North and East of'Phase Has shown and delineated on the aforesaid map. The party of the first part also expressly reserves for itself, its' successors and assigns, a perpetual nonexclusive ease- ment for the purposes of the installation and main- tenance of utilities located along the streets, roads, utility lines, water lines, and sewage lines presently existing or proposed on the properties and to provide utilities, water, and sewage service to the additional properties of the party of the first part lying North and East of Pier Pointe at River Bend, Phase Two. The above described easements are appurtenant toand shall forever run with the land of the.party of the first part lying North and East of Pier Pointe at.River Bend, Phase Two. PAGE 2 RECEIVED OCT 01 2015 DCM- MHD CITY RECENED SEP 0 a IMS t?t:Pr w+w A�W w BOUT( i%1JeAGE 264 PAGE 3 This conveyance is made subject to that certain Declaration of Annexation for Pier Pointe at River Bend, Phase Two, recorded in Book_, at Page , in the office of the Register of Deeds of Craven oun y together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County. TO HAVE AND TO HOLD said property and all privileges and appur- tenances thereunto belonging to the parties of the second part, said par- ties' heirs and assigns forever.. AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of 'its Board of Directors duly given, this day and year first above written. By ATTEST: PIER POINTE AT RIVER BEND, INC. Secretary `>. • '+. ..•• 1+ ,;tip RECEIVED OCT 01 2015 DCM MHD CITY VO K i U iPAGt 155 NORTH CAROLINA Prepared by unn and Dunn CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this A day of bck" 1988, by and between PIER POINTE AT RIVER BEND, INC. , a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: All.that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, more particularly described as follows: Beginning at a point in the northeastern right-of-way line of Shoreline Drive, said point of beginning being located South 30 degrees 54 minutes 08 seconds East 306.44 feet from the intersection of the northeastern right-of-way line ,of Shoreline Drive with the southeastern right-of-way line of Pirates Road and from said point of beginning being so located running thence North 69 degrees 05 minutes 32 seconds East 196 feet along the southern line of a 30 foot service road; thence South 23 degrees 54 minutes 28 seconds East 123 RECEIVED feet to a point; thence South 37 degrees 54 minutes 28 _ seconds East 496 feet to the mean high water mark of OCT Plantation Canal; thence South 44 degrees, 52 minutes, . ' O 1 2015 45 seconds West 40.65 feet along and with mean high water mark of Plantation Canal; thence South 01 degr�q 18 minutes West 196 feet along and with the mean 'higPCM- MHD CITY water mark of Plantation Canal to the northeastern night -of -way line of Shoreline Drive; thence North 36 degrees 42 minutes 17 seconds West 151.18 feet along and with the northeastern right-of-way line of Shoreline Drive to a set iron pipe; thence continuing along and (,00 with the northeastern right-of-way line of Shoreline S�Q c Drive North 41 degrees 07 minutes 06 seconds West 344.23 feed to an existing concrete monument; thence North 36 degrees 04 minutes 13 seconds West 167.66 feet along and with the northeastern right-of-way line of Shoreline B�UK 1��,r1'AGt PAGE 2 Drive to an existing concrete monument; thence North 30 - degrees 40 minutes 16 seconds West 127.16 feet along and with the northeastern right. -of -way Line of Shoreline Drive to the point of beginning. Said parcel of land is designated as "Phase I" on that certain map or plat entitled "Pier Pointe at River Bend, Phase One", recorded in Plat Cabinet E, Slide 153, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 1, 2, 3, 4,-.5, 6, 7, 8, 9, 10, 11, 12 (which Lots include the patio areas) as the same are shown 'and delineated on a map or plat of Pier Pointe at River Bend, Phase One, said map being recorded in Plat Cabinet E, at Slide 153, in.the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect description of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual right-of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase One, recorded in Plat Cabinet E, Slide 153, in the office of the Register of Deeds of Craven County, for the purpose of providing , ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party of the first part lying North and East of Phase I as shown.and delineated oh the aforesaid map. The party of the first part also expressly reserves for itself, its' a EIVED successors and assigns, a perpetual nonexclusive ease- RE ment for the purposes of the installation and main- tenance of utilities located along the streets, roads, OCT 0 12015 utility lines, water lines, and sewage lines presently existing or proposed on the,properties and to provide ITY utilities, water, and sewage service to the additional 0CM.. MH ® C properties of the party of the first part tying North and East of Pier Pointe at River Bend, Phase One. I This conveyance is made subject to those certain RECENFo Covenants, Conditions, Restrictions and Easements for 8 1n15 Pier Pointe at River Bend, Phase One, recorded in Book R /a7pZ, at Page i/ 9 , in the office of the egister of Deeds of raven County. TO HAVE AND TO HOLD said property and all privileges and appurtenances thereunto belonging to the party of the second part, said party's successors and assigns forever. _ 1F A yn I. , BDuK i U 1 YKGE 7 AND the party of the first part does covenant that said party is seized of said premises 1n fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions men- tioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. r" f; to •... A1TE$T.; PIER POINTE AT RIVER ON INC. Pre d NORTH CAROLINA CRAVEN COUNTY I, iY1Rl�tueer4e�L:y nSon a Notary P blic in and for said County and State o ereby certify t a (-)e6 . _ h `i�"+h_ personal l;E,, appeared before me this day and acknowledged that he/she is the becretary M, Pier Pointe at River Bend, Inc., a corporation, and that by authority duly givCn•,kjj, and as the act of the corporation, the foregoing instrument was signed in s, name by its President, sealed with its corporate seal, and attested by himself/herself as its Secretary. r " Witness my hand and notarial seal) this 7 day of _ec�(1ber, 1988. Notary Pul is My Commission Expires: RECEIVED OCT 01 2915 DCM- MHD CITY BWATA CAROL/Iaa 10 O CRAVEN COUNTY (� Notary The foregoing certificate of Public of said county and State, is certi i d o be correc . This nstrument was pre se registration this day and h r and duty recorded in the office of t egister of ee of Craven County, Nor h Carolina, to Book .ZO at age This t day of 4Reg oIclock�M. eg s e ee s r o ee s. i I i i RECEIVED OCT,01 2015 DCM- MHD CITI t: i • "`This is a word processing form to be completed in Microsoft Word'** C7 NC Division of Coastal Management Major Permit Application Computer Sheet (11/1/2012) Applicant: Pier Pointe Owners Association, Inc. Date: 9/9/2015 Project Site County: Craven Staff: Brad Connell District: ❑Elizabeth City ❑Washington ®Morehead City ❑Wilmington Project Name: Pier Pointe marina Date of initial application submittal (EX: 1/8/2007): 5/8/2015 Date application "received as complete" in the Field office (EX: 1/8/2007): 9/8/2015 Permit Authorization: ❑CAMA ❑Dredge & Fill ®Both SITE DESCRIPTION/PERMIT INFORMATION PNA: ❑Yes NNo Photos Taken: Yes ❑ No® Setback Required (riparian): ❑Yes E No Critical Habitat: ❑Yes ENo ❑Not Sure 15 foot waiver obtained: ❑Yes ENo Hazard Notification Returned: []Yes NNo SAV: ❑Yes ENo []Not Sure Shell Bottom: ❑Yes ENo ❑ Not Sure Temporary Impacts: []Yes ENo Sandbags: ❑Yes ENo ❑ Not Sure Did the land use classification come from county LUP: EYes ❑No Mitigation Required (optional): ❑Yes ENo Moratorium Conditions: ❑Yes NNo ❑NA Environmental Assessment Done: []Yes ❑No [RNA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) E Nutrient Sensitive Waters (NSW) E Swamp Waters (SW) ❑ High Quality Waters (HOW) ❑ Outstanding Resource Waters (ORW) WETLANDS IMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort ( Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina alterniflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichiis ❑ (SC) Builrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Black needlerush (Juncus ❑ (SP) Salttmeadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 ❑ III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit-$100 permit -$250 more than 1 acre -$475 ❑ Permit Transfer - $100 ❑ III(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - ❑ II. Public or commercial/no dredge $100 and/or fill - $400 ❑ I. Private no dredge and/or fill - $250 E III(C) Priv. public or comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808-2808 :: 1.8884RCOAST :: www.nccoastaimananement.net revised: 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) CS Applicant: Pier Pointe Owners Association, Inc. Date: 9/9/15 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. Activity Name Number TYPE Choose One REPLACE Choose One Dimension 1 Dimension 2 Dimension 3 Dimension 4 Finger piers 21 New Work ❑ Maint E Replace MY [:IN 20' 3' Floating platforms 2 New Work ® I Maint ❑ Replace E Y ❑ N 10, 16' Bulkhead (vinyl) 1 New Work ® Maint ❑ Replace E Y ❑ N 603' 1.5' 5 revised 02115110 NC Mvision of Coastal Mgt. Application Computer Sheet, Page 3 of 3) CS Applicant: Pier Pointe Owners Association, Inc. Date: 9/9/15 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp Impact temp impacts) impact amount) temp impacts) amount Shallow Bottom Dredge ❑ Fill ® Both ❑ Other ❑ 1,206 ftz 1,206 ftz High ground Dredge ❑ Fill ❑ Both ® Other ❑ 7,236 ftz 7,236 ft2 Open Water Dredge ❑ Fill ❑ Both ❑ Other ® 11,200 ftz 11,200 ftz Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1.888-4RCOAST :: w nu.nccoastaimananement.net revised: 02/15/10 NORTH CAROLINA Prepared by08unn a d DunnGt CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this -- A day of 1988. by and between PIER POINTE AT RIVER BEND, INC. , a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; W I T N E S S E T H: That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: All that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, more particularly described as follows: Beginning at a point in the northeastern right-of-way line of Shoreline Drive, said point of beginning being located South 30 degrees 54 minutes 08 seconds East 306.44 feet from the intersection of the northeastern right-of-way line .of Shoreline Drive with the southeastern right-of-way line of Pirates Road and from said point of beginning being so located running thence North 69 degrees 05 minutes 32 seconds East 196 feet along the southern line of a 30 foot service road; thence South 23 degrees 54 minutes 28 seconds East 123 feet to a point; thence South 37 degrees 54 minutes 26 seconds East 496 feet to the mean high water mark of Plantation Canal; thence South 44 degrees, 52 minutes, 45 seconds West 40.65 feet along and with mean high water mark of Plantation Canal; thence South 01 degree 18 minutes West 196 feet along and with the mean high water mark of Plantation Canal to the northeastern right-of-way line of Shoreline Drive; thence North 36 degrees 42 minutes 17 seconds West 151.18 feet along and with the northeastern right-of-way line of Shoreline Drive to a set iron pipe; thence continuing along and with the northeastern right-of-way line of Shoreline Drive North 41 degrees 07 minutes 06 seconds West 344.23 feet to an existing concrete monument; thence North 36 degrees 04 minutes 13 seconds West 167.66 feet along and with the northeastern right-of-way line of Shoreline SOUK i 2 U 1 VGt i 0 6 PAGE 2 Drive to an existing concrete monument; thence North 30 - i degrees 40 minutes 16 seconds West 127.16 feet along and with the northeastern right-of-way line of Shoreline Drive to the point of beginning. Said parcel of land is designated as "Phase I" on that certain map or plat entitled "Pier Pointe at River Bend, Phase One", j recorded in Plat Cabinet E, Slide 153, in the office of li the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase One, said map being recorded in Plat Cabinet E, at Slide 153,' in the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect description of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual right-of-way and easement over each and every street and road shown and delineated on the map or plat i of Pier Pointe at River Bend, Phase One, recorded in Plat Cabinet E, Slide 153, in the office of the Register of Deeds of Craven County, for the purpose of providing ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party of the first part lying North and East of Phase I as shown and delineated on the aforesaid map. The party of the first part also expressly reserves for itself, its' i successors and assigns, a perpetual nonexclusive ease- ment for the purposes of the installation and main- tenance of utilities located along the streets, roads, utility lines, water lines, and sewage lines presently existing or proposed on the properties and to provide utilities, water, and sewage service to the additional properties of the party of the first part lying North and East of Pier Pointe at River Bend, Phase One. RECEIVEfJ This conveyance is made subject to those certain MAY ; Covenants, Conditions, Restrictions and Easements for S 20155 Pier Pointe at River Bend, Phase One, recorded in Book n n,nnun at Page in the office of the rif .. 4 egister of Deeds of raven ounty. TO HAVE AND TO HOLD said property and all privileges and appurtenances thereunto belonging to the party of the second part, said party's successors and assigns forever. BOOK 12U rV�o, 11:)7 AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions men- tioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER ON INC. {,�M Bkith tn Secretary NORTH CAROLINA CRAVEN COUNTY I, nib txe r rt uL •y tnSoe) a NotaryP�(blic in and for said County and State do hereby cert fy t a `tiV6 c ti personally appeared before me this day and acknowledged that a she is the Secretary of Pier Pointe at River Bend, Inc., a corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its President, sealed with its corporate seal, and attested by himself/herself as its Secretary. Witness my hand and notarial seal this 'd�ay of ec�/Imr ber,,, ,1�9}�88•\/ Notary Pu is ''' " My Commission Expires: �i 1� `i3 REC E7JED MAY 0 9 2015 7�:;'r.;........ :. r pp PAGE 4 B���TI� , qL/, jAGL l o 8 CRAVEN COUNTY The foregoing certificate of Notary Public of said county and State, is certi 1 d o be correct. This Instrument was prese registration this day and h r and duly recorded in the office of t egister of ee of Craven County, Nor h Carolina, in Book .ZO , at age /� � �ay of lg8 at_/,O.' o'clock—ZM. This t ut+llReaKter of Deeds CS NORTH CAROLINA CRAVEN COUNTY BOOK .1%40 apt 5 Prepared by Dunn and Dunn WARRANTY DEED THIS DEED, made and entered into this / ST— day of L C C 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part to consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the party of the second part, said party's heirs and assigns, the following described property, to wit: Being all that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly described as follows: Beginning at a point in the southern right-of-way line of a 30-foot service road shown and delineated on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" recorded in Plat Cabinet E, Slide 304, in the office of the Register of Deeds of Craven County, said point of beginning being the northern corner of that certain tract or parcel of land conveyed to the Pier Pointe Owners' Association, Inc. by deed dated April 17, 1989 and recorded in Book 1219, at Page 262, in the office of the Register of Deeds of Craven County, said point of beginning also being located North 69 degrees 05 minutes 32 seconds East 341.41 feet from the intersection of the eastern right-of-way line of Shoreline Drive with the southern right-of-way line of said 30-foot service road and from said point of beginning being so located running thence along and with the southern line of said 30-foot service road North 69 degrees 05 minutes 32 seconds East 123.00 feet; thence continuing along and with the southern right-of-way line of said 30-foot service road following a curve to the right having a radius of 75.0 feet and an arc distance of 101.92 feet; thence South 33 degrees 00 minutes 18 seconds East 119.21 feet along and with the western right-of-way line of said 30-foot service road; thence continuing along and with the western right-of-way line of said 30-foot service road following a curve to the left having a radius of 75 feet and an arc distance of 48.36 feet; thence South 33 degrees 00 r / RECEIVED NAY 0 8 2015 J,A. A W11 J e wilt, 6GUK i %401eAA I4�' minutes 18 seconds East 40.86 feet to an existing iron pipe; thence North 60 degrees 15 minutes 24 seconds East 97.00 feet to an existing iron pipe; thence South 37 degrees 00 minutes 00 seconds East 203.96 feet to a point lying in the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds West 255.51 feet; thence leaving Plantation Canal and running North 37 degrees 54 minutes 28 seconds West 407.33 feet; thence North 87 degrees 54 minutes 28 seconds -West 59 feet; thence North 20 degrees 54 minutes 28 seconds West 130.00 feet to the point of beginning. The above -described parcel of land is designated as "Phase III" on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41 and 42 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Three, said map being recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect descripton of the numerically designated Lots being withheld from the con- veyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and deli- neated on the aforesaid map. The party of the first part expressly reserves unto itself, Its' successors and assigns, a nonexclusive perpetual right- of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase Three, recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County for the purposes of providing ingress, egress, regress and access to and from Shoreline Drive and for the purpose of installa- tion and maintaining utilities. This conveyance is made subject to that certain Declaration of Annexation for Pier Pointe at River Bend, Phase Three, recorded in Book 2 0 , at Page -234 to the office _ of the Register of eeds of Craven County together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County. TO HAVE AND TO HOLD said property and all privileges and appur- Page 2 tenances thereunto belonging to the party of the second part, said party's heirs and assigns forever. ti€ceivEo. MAY'O 8 1015 , SOUK 1 :4 it %) N41ge �4 AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this Instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER BEND, INC. q% tnr By• Prevent NORTH CAROLINA CRAVEN COUNTY I, AiFrG U PRl i'e L, i/irlSorl _ , a Notary Public in and for said County and stAte do hereby certify tat f_,rt*j,e6- Z �+y'?" personally appeared before me this day and ac no7w edged t� efieAheess i Secretary of Pier Pointe at River Bend, Inc., a corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its President, sealed with its cor- porate seal, and attested by himself/herself as its Secretary. Wi ness my hand and notarial seal, this the 12� day of Q �a� , 1989. My Commission Expires RECOVED MAY 0 81015 SOUK i YA6t !i Page 4 NORTH CAROLINA CRAVEN COUNTY The foregoing certificate of !/.. ! Notary Public of said county and State, is cer if a to correct. Inis instrument was presented for registration this day and hour and duly recorded in the office of the Register of Deeds of Craven County, North Carolina, in Book I o , at Page This the �_ day of _�, 9, at //->/c) o'clock/"M. l i li By: ? Register of Ueeas ister of Deeds RECEIVED MAY 0 8 1015 bbwi-,wnm riry m C3 BGJK 1210 ME 262 NORTH CAROLINA Prepared by Dunn and Dunn CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this 2 day o , 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the parties of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the parties of the second part, said par- ties' heirs and assigns, the following described property, to wit: Being ail that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly described as follows: Beginning at a point in the southern right-of-way line of the a 30-foot service road shown and delineated on that certain map or plat entitled Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, Slide 265, said point of beginning being the northern corner of that certain tract or parcel of land conveyed to the Pier Pointe Owners' Association, Inc. by deed dated December 7, 1988 and recorded in Book 1207, at page 155, in the office of the Register of Deeds of Craven County, said point of beginning also being located North 69 degrees 05 minutes 32 seconds East 196.00 feet from the intersection of the eastern right-of-way line of Shoreline Drive with the southern right-of-way line of said 30-foot service road and from said point of beginning being so located running thence along and with the southern line of said 30-foot service road North 69 RECEIVED degrees 05 minutes 32 seconds East 145.41 feet to a point in the southern right-of-way line of said 30-foot MAY 0 S 2015 service road; thence South 20 degrees 54 minutes 28 kA W_p, kN" seconds East 130 feet to a point; thence South 87 degrees 54 minutes 28 seconds East 59 feet to a point; thence South 37 degrees 54 minutes 28 seconds East 407.33 feet to the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds 5 is BOUK i Z 10 ME West to a point marking the southeasternmost corner of that certain tract or parcel of land conveyed by Pier Pointe at River Bend, Inc, to Pier Pointe Owners' Association, Inc., by deed dated December 7, 1988, and recorded in Book 1207, at Page 155, in the office of the Register of Deeds of Craven County; thence running along and with the easternmost line of the property conveyed to the Pier Pointe Owners' Association, Inc. North 37 degrees 54 minutes 28 seconds West 496 feet to a point;. thence North 23 degrees 54 minutes 28 seconds West 123 feet to the point of beginning. The above described parcel of land is designated as "Phase II" on that cer- tain map or plat entitled "Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27 and 28 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Two, said map being recorded in Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County to which reference is hereby ,made for a more perfect descripton of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual right-of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase Two, recorded in Plat Cabinet E, Slide 265, in the office of the Register of Deeds of Craven County, for the purpose of providing ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party of the first part lying North and East of Phase II as shown and delineated on the aforesaid map. The party of the first part also expressly reserves for itself, its' successors and assigns, a perpetual nonexclusive ease- ment for the purposes of the installation and main- tenance of utilities located along the streets, roads, utility lines, water lines, and sewage lines presently existing or proposed on the properties and to provide utilities, water, and sewage service to the additional properties of the party of the first part lying North and East of Pier Pointe at River Bend, Phase Two. The above described easements are appurtenant toand shall forever run with the land of the party of the first part lying North and East of Pier Pointe at.River Bend, Phase Two. %63 PAGE 2 RECEIVED MAY 0 B 701; DC.M-Mr9R grrw BOOK i%1jr1bL %64 PAGE 3 This conveyance is made subject to that certain Declaration of Annexation for Pier Pointe at River Bend, Phase Two, recorded in Book /,2/ 5� _, at Page in the office of the Register of Deeds of Craven County together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County. TO HAVE AND TO HOLD said property and all privileges and appur- tenances thereunto belonging to the parties of the second part, said par- ties' heirs and assigns forever. AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same to fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever, IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER , INC. RECEIVED MAY 0 8 lob 1 Craven County Geographic Information System Craven County does NOT warrant the Informatlon shown on this page and should be used ONLY for tax assessment purposes. This report was created by Craven County GIS reporting services on 4/26/20151:14:36 PM Parcel ID : 8-201-A -029-A Owner: RIVER BEND - TOWN OF Mailing Address: 45 SHORELINE DR NEW BERN NC 28562 Property Address Description : COMMON AREA r2 Lot Description: Assessed Acreage: 0.770 Calculated Acreage: 0.760 Deed Reference: 1397-0254 Recorded Date: 12 16 1993 Recorded Survey: F-114-E Estate Number: Land Value : $4,000 Tax Exempt, Yes Improvement Value: $0 # of Improvements: 0 Total Value: $4,000 City Name: RIVER BEND Fire tax District Drainage District: Special District: Land use: SERV-GOVERNMENT OWNED, EXEMPT Recent Sales Information SALE DATE Sellers Name Buyers Name Sale Type Sale Price 12/16/1993 LOCHBRIDGE RIVER BEND - TOWN OF STRAIGHT $0 HOMEOWNERS ASSO TRANSFER INC 12/16/1993 LOCHBRIDGE RIVER BEND - TOWN OF STRAIGHT $0 HOMEOWNERS ASSO TRANSFER INC 2/15/1991 EPAR PARTNERSHIP LOCHBRIDGE NAME CHANGE $0 HOMEOWNERS ASSO INC List of Improvements to Site No improvements listed for this parcel Parcel ID Owner: Mailing Address: Property Address Description : Lot Description Craven County Geographic Information System GS Craven County does NOT warrant the Information shown on this page and should be used ONLY for tax assessment purposes. This report was created by Craven County GIS reporting services on 4/26/20151:12:55 PM 8-201 -025 PECK, BERIT 108 OUTRIGGER RD NEW BERN NC 28562 1 MARINA RD ODD FELLOWS FARM to Assessed Acreage: 0.000 Deed Reference: 2006-1040 Recorded Survey: Estate Number: Land Value: $236,940 Improvement Value : $1,090,700 Total Value: $1,327,640 City Name: RIVER BEND Drainage District Calculated Acreage: 2.200 Recorded Date: 2 28 2003 Tax Exempt: No # of Improvements: 3 Fire tax District : Special District : Land use: REC - COMMERCIAL MARINA Recent Sales Information SALE DATE Sellers Name Buyers Name 2/28/2003 ROBBINS, DOUGLAS K & PECK, BERIT MARGARET E 3/12/1987 ECKBERG, DAVID E & ROBBINS, DOUGLAS K & DRUSILLA E MARGARET E Type of Structure NEIGHBORHOOD BAR MARINA PARKING LOT List of Improvements to Site Year Built 1976 2005 2005 Sale Type Sale Price STRAIGHT $475,000 TRANSFER BUILDING SALE $350,000 Base Area 7st Floor Value 4900 $287,700 0 $751,900 0 $51,100 i Connell, Brad �S From: Connell, Brad Sent: Thursday, May 28, 2015 10:10 AM To: Anthony Tyndall (atyndall@coastlinebuildingcompany.com) Cc: 'samuelbidwell@aol.com' Subject: revisions request for Pier Pointe application Attachments: mp_2p.dot Importance: High Mr. Tyndall, Thank you for your well prepared and thorough CAMA Major Permit application package. However, there are some minor issues that need to be addressed before the DCM can process the application: 1. Form DCM MP-1, 3: please provide the street address for the project location; 2. Form DCM MP-1, 3b: please note that this waterbody is a man-made canal; 3. Form DCM MP-1, 4d: please note the elevation of the tract relative to the NWL; 4. Form DCM MP-1, 5d: please note that the proposed boat lifts are within existing slips; 5. Form DCM MP-1, 5e: please note that this is "both"; 6. Form DCM MP-1, 6e: please submit $400 payable to the NCDENR; 7. Form DCM MP-1, 6f: please submit the signed "green" cards; 8. Form DCM MP-1, 7: please check the MP-2 box and submit this completed form (attached) as it relates to the bulkhead construction; 9. Form DCM MP-4, 7a-b: please answer these questions; 10. Work Plan Drawings: please draw to scale, please submit a side view drawing, please note the riparian property lines, please list the property owner names, please name the waterbody, please note the width of the waterbody, please show water depths relative to the marina, please label the proposed vs the existing structures, please label the normal water level (NWL) at the bulkhead, and please cross -hatch the amount of high ground disturbance. If you have any questions in the interim, please do not hesitate to contact me. Thank you, Brad Connell Field Representative NC Division of Coastal Management http://Portal.ncdenr.org/web/cm/dcm-home E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. NORTH CAROLINA CRAVEN COUNTY souk i 240Na�t5 Prepared by Dunn and Dunn WARRANTY DEED THIS DEED, made and entered into this / ST day of LJ E e , 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; W I T N E S S E T H; That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the party of the second part, said party's heirs and assigns, the following described property, to wit: Being ail that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly described as follows: Beginning at a point in the southern right-of-way line of a 30-foot service road shown and delineated on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" recorded in Plat Cabinet E, Slide 304, in the office of the Register of Deeds of Craven County, said point of beginning being the northern corner of that certain tract or parcel of land conveyed to the Pier Pointe Owners' Association, Inc. by deed dated April 17, 1989 and recorded in Book 1219, at Page 262, in the office of the Register of Deeds of Craven County, said point of beginning also being located North 69 degrees 05 minutes 32 seconds East 341.41 feet from the intersection of the eastern right-of-way line of Shoreline Drive with the southern right-of-way line of said 30-foot service road and from said point of beginning being so located running thence along and with the southern line of said 30-foot service road North 69 degrees 05 minutes 32 seconds East 123.00 feet; thence continuing along and with the southern right-of-way line of said 30-foot service road following a curve to the right having a radius of 75.0 feet and an arc distance of 101.92 feet; thence South 33 degrees 00 minutes 18 seconds East 119.21 feet along and with the western right-of-way line of said 30-foot service road; thence continuing along and with the western right-of-way line of said 30-foot service road following a curve to the left having a radius of 75 feet and an arc distance of 48.36 feet; thence South 33 degrees 00 1 t2ECE�VED SEP 0 61015 6 OOUK 1 2401'hE % ifi minutes 18 seconds East 40.86 feet to an existing iron pipe; thence North 60 degrees 15 minutes 24 seconds East 97.00 feet to an existing iron pipe; thence South 37 degrees 00 minutes 00 seconds East 203.96 feet to a point lying in the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds West 255.51 feet; thence leaving Plantation Canal and running North 37 degrees 54 minutes 28 seconds West 407.33 feet; thence North 87 degrees 54 minutes 28 seconds -West 59 feet; thence North 20 degrees 54 minutes 28 seconds West 130.00 feet to the point of beginning. The above -described parcel of land is designated as "Phase III" on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" recorded in Plat Cabinet E, at Slide 304, 1n the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41 and 42 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Three, said map being recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect descripton of the numerically designated Lots being withheld from the con- veyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and deli- neated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive perpetual right- of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase Three, recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County for the purposes of providing ingress, egress, regress and access to and from Shoreline Drive and for the purpose of installa- tion and maintaining utilities. This conveyance is made subject to that certain Declaration of Annexation for Pier Pointe at River Bend, Phase Three, recorded in Book t!q , at Page -2 3 y , in the office of the Register of e— ends of Craven County together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County. TO HAVE AND TO HOLD said property and all privileges and appur- Page 2 RECEIVED SEP 0 S 1015 p�plAYN4 kdi�� tenances thereunto belonging to the party of the second part, said party's heirs and assigns forever. SOUK i %4vP e 3 47 AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name Oy its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER BEND, INC. By. Pres Aen NORTH CAROLINA CRAVEN COUNTY I, 1I]Arl;oe(,t'Y L.VinSe?), a Notary Public in and for said County and t e o hereby certify at e C. 4-A5 � personally appeared before me this day and acknowledged that he/she is the Secretary of Pier Pointe at River Bend, Inc., a corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its President, sealed with its cor- porate seal, and attested by himself/herself as its Secretary. Wi mess my hand and notarial seal, this the 1� day of Q` 1989. My Commission Expires I-EIVED 082015 "4gootAm BOOK ; NORTH CAROLINA CRAVEN COUNTY The foregoing certificate of Notary Public of said county and State, s cer ifie to be correct. This instrument was presented for registration this day and hour and duly recorded in the office of the Register of Deeds of Craven County, North Carolina, in Book -1 4- o , at Page t-1—Y-6-_• Thus the �_ day of 9, at �� o'cloc0b- B e e y Deter Rea ster of Deeds Page 4 RECENFO SEP U 6 V6 C CS SOUK 12-OME 262 NORTH CAROLINA Prepared by Dunn and Dunn CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this /Z-- day o , 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the parties of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the parties of the second part, said par- ties' heirs and assigns, the following described property, to wit: Being all that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly described as follows: Beginning at a point in the southern right-of-way line of the a 30-foot service road shown and delineated on that certain map or plat entitled "Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, Slide 265, said point of beginning being the northern corner of that certain tract or parcel of land conveyed to the Pier Pointe Owners' Association, Inc. by deed dated December 7, 1988 and recorded )n Book 1207, at page 155, in the office of the Register of Deeds of Craven County, said point of beginning also being located North 69 RECFlVFo degrees 05 minutes 32 seconds East 196.00 feet from the intersection of the eastern right-of-way line of SEP �y81G1S Shoreline Drive with the southern right-of-way line of said 30-foot service road and from said point of x..'j.uv beginning being so located running thence along and with the southern line of said 30-foot service road North 69 degrees 05 minutes 32 seconds East 145.41 feet to a point in the southern right-of-way line of said 30-foot service road; thence South 20 degrees 54 minutes 28 seconds East 130 feet to a point; thence South 87 degrees 54 minutes 28 seconds East 59 feet to a point; thence South 37 degrees 54 minutes 28 seconds East 407.33 feet to the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds (km pq , l u 1"� r - ""°� -mac BOUK i;G1JME Nest to a point marking the southeasternmost corner of that certain tract or parcel of land conveyed by Pier Pointe at River Bend, Inc. to Pier Pointe Owners' Association, Inc., by deed dated December 7, 1988, and recorded to Book 1207. at Page 155, in the office of the Register of Deeds of Craven.County; thence running along and with the easternmost line of the property conveyed to the Pier Pointe Owners' Association, Inc. North 37 degrees 54 minutes 28 seconds West 496 feet to a point;. thence North 23 degrees 54 minutes 28 seconds West 123 feet to the point of beginning. The above described parcel of land is designated as "Phase II" on that cer- tain map or plat entitled "Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 13, 14, 15, 16, 17, 18, 19, 20, 21, 22. 23, 24, 25, 26, 27 and 28 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Two, said map being recorded to Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect descripton of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual right-of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase Two, recorded to Plat Cabinet E, Slide 265, in the office of the Register of Deeds of Craven County, for the purpose of providing ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party of the first part lying North and East of Phase II as shown and delineated on the aforesaid map. The party of the first part also expressly reserves for itself, its' successors and assigns, a perpetual nonexclusive ease- ment for the purposes of the installation and main- tenance of utilities located along the streets, roads, utility lines, water lines, and sewage lines presently existing or proposed on the properties and to provide utilities, water, and sewage service to the additional properties of the party of the first part lying North and East of Pier Pointe at River Bend, Phase Two. The above described easements are appurtenant toand shall forever run with the land of the party of the first part lying North and East of Pier Pointe at.River Bend, Phase Two. 263 PAGE 2 RECENE6 SEP 0 81013 SGUK i % i J ra6L % 611 PAGE 3 This conveyance is made subject to that certain Declaration of Annexation for Pier Pointe at River Bend, Phase Two, recorded in Book / Q�, at Page _�,��, in the office of the Register of Deeds oP Craven ouC my together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County. TO HAVE AND TO HOLD said property and all privileges and appur- tenances thereunto belonging to the parties of the second part, said par- ties' heirs and assigns forever. AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER BEND, INC. RECSNSO 5? o % 10t t4'�' (5 NORTH CAROLINA Prepared byt�unn a d Dunna 5 CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this 7 Am day of bcA. JL 1988, by and between PIER POINTE AT RIVER BEND, INC. , a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; W I T N E S S E T H: That the party of the first part in consideration of the sum of Ten Dollars (E10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which is hereby acknowledged, has bargained and.sold and by these presents does bargain, sell, and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: All that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, more particularly described as follows: Beginning at a point in the northeastern right-of-way line of Shoreline Drive, said point of beginning being located South 30 degrees 54 minutes 08 seconds East 306.44 feet from the intersection of the northeastern right-of-way line .of Shoreline Drive with the southeastern right-of-way line of Pirates Road and from said point of beginning being so located running thence North 69 degrees 05 minutes 32 seconds East 196 feet along the southern line of a 30 foot service road; thence South 23 degrees 54 minutes 28 seconds East 123 feet to a point; thence South 37 degrees 54 minutes 28 seconds East 496 feet to the mean high water mark of Plantation Canal; thence South 44 degrees, 52 minutes, 45 seconds West 40.65 feet along and with mean high water mark of Plantation Canal; thence South 01 degree 18 minutes West 196 feet along and with the mean high water mark of Plantation Canal to the northeastern right-of-way line of Shoreline Drive; thence North 36 degrees 42 minutes 17 seconds West 151.18 feet along and aSCENEO with the northeastern right-of-way line of Shoreline Drive to a set iron pipe; thence continuing along and p 91015 with the northeastern right-of-way line of Shoreline SEP;C)t Drive North 41 degrees 07 minutes 06 seconds West 344.23 feet to an existing concrete monument; thence North 36 degrees 04 minutes 13 seconds West 167.66 feet along and with the northeastern right-of-way line of Shoreline (5 L J PAGE 2 SOUK Drive to an existing concrete monument; thence North 30 - degrees 40 minutes 16 seconds West 127.16 feet along and with the northeastern right-of-way line of Shoreline Drive to the point of beginning. Said parcel of land is designated as "Phase I" on that certain map or plat entitled "Pier Pointe at River Bend, Phase One", recorded in Plat Cabinet E, Slide 153, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase One, said map being recorded in Plat Cabinet E. at Slide 153,' in the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect description of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual and easement over each and every .right-of-way street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase One, recorded in Plat Cabinet E, Slide 153, in the office of the Register of Deeds of Craven County, for the purpose of providing ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party ' of the first part lying North and East of Phase I as shown and delineated on the aforesaid map. The party of the first part also expressly reserves for itself, its' successors and assigns, a perpetual nonexclusive ease- ment for the purposes of the installation and main- tenance of utilities located along the streets, roads, utility lines, water lines, and sewage lines presently existing or proposed on the, properties and to provide utilities, water, and sewage service to the additional properties of the party of the first part lying North and East of Pier Pointe at River Bend, Phase One. ) This conveyance is made subject to those certainGFNE� Covenants, Conditions, Restrictions and Easements for 1 Pier Pointe at River Bend, Phase One, recorded in Book P 0 7 ae Page in the office of the ,a, , �, egister of Deeds of raven ounty. i TO HAVE AND TO HOLD said property and all privileges and appurtenances j thereunto belonging to the party of the second part, said party's successors and assigns forever. r.i R... - CS BOUK 1:; 0 l yjdf,107 AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions men- tioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER ON INC. B Pre d ffE ecre ary NORTH CAROLINA CRAVEN COUNTY I, �Yif1'a q eet�e L V ()Son , a Notary Public in and for said County and State do 'hereby certi Ty—FFax°oe6 L fi yTtu h persona111XFo appeared before me this day and acknowledged that he she is the 5ecretary OT Pier Pointe at River Bend, Inc., a corporation, and that by authority duly giveglos and as the act of the corporation, the foregoing instrument was signed in name by its President, sealed with its corporate seal, and attested by himself/herseif as its Secretary.`' Witness m y hand and notarial seal this day of ec ber, 1988. Notary Pul is 7' My Commission Expires: 3.wtT. �,.�, Tom,'•` i� .CIS I'�V,Ib...• • M� pp� PAGE 4 KATA CRAVEN COUNTY The foregoing certificate of Notary Public of said county and State, is certi i d o be correct. This Instrument was pre registration this day and h r and duly recorded in the office Of egister of ee of Craven County, Nor h Carolina, in Book .z o at age This day of 198 , at o'clock�M. eg s e Dees e u Reg ter o ee s �EGF vH SEP � a 1015 N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date April 26, 2015 Name of Property Owner Applying for Permit: Pier Pointe Owners' Association, Inc., Attu: Sam Bidwell Mailing Address: 100 Pier Pointe New Bern, NC 28562 I certify that I have authorized (agent) Anthony Tyndall to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) Remove and Replace Bulkhead and Finger Piers , at (my property located at) Pier Pointe in New Bern, NC This certification is valid thru (date) December 31, 2015 C5 RECEIVED SEP Q S 2015 ('cµ-owbi iz** Property Owner Signature — Larry Weiss, President, Pier Pointe Owner's Association, Inc. Date 2! o&Pr.12-o Sam Bidwell, Chairman Waterfront Committee and Project Manager Date CS COASTLINE BUILDING COMPANY, LLC. - PO BOX 12632 - NEW BERN, NC 28561 - TEL. 252-670-5573 www.coastlinebuildinacompany.com • email: info(alcoastlinebuildinacomoany.com June 16, 2015 Mr. Berit Peck 108 Outrigger Rd New Bevy NC 28562 Reference: CAMA Major Permit Notification Enclosure: (1) Copy of application form, Division of Coastal Management CAMA Major Development Permit Dear Mr. Peck, On behalf of our client, Pier Pointe Owners Association, Inc., we are providing the enclosure for your review and comment. Craven County records indicate that you own waterfront property that is adjacent to our client's property. That makes you an adjacent riparian property owner. The Division of Coastal Management (DCM) application process requires us to notify adjacent riparian property owners of the proposed project and inform them that they have 30 days from receipt of their notification to provide comments. The proposed project involves replacing the existing bulkhead and piers. Additional boatlifts will also be installed. RECENED No action is required on your part. However, if you have any comments about the project, please dirWA VA to Mr. Brad Connell at the NC Division of Environmental and Natural Resourses (NCDENR), Divisieft ' - Coastal Management(I)CM), 400 Commerce Ave, Morehead City, NC 28557. Indicate clearly that your comments regard this project. - - -- If you have any questions, Very Truly Yours, Coastline Building Company, LLi Anthony D. Tyndall, PE ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mallpiace, or on the front if space permits. new; � Pule_ �.1Q�ofG "�jarn� /J4 Zo,sG IIIIIIIII IIII IIIII IIIII I III II III IIII III III I III 9590 9403 0239 5146 2495 01 2. Article Number (714nsfer from selvlcs ❑ Agent ❑ Addm D. Is delivery address different from item 11 ❑ YN If YES, enter delivery address below: ❑ No 3. Service Type ❑ Adult Signature ❑ Adult Signature Restricted Delivery ❑ Certified Mall® El Certified Mail Restricted Delivery, ❑ Collect an Deliver/ ❑ Collect on Delivery Restricted Delivery ❑ Insured Mail ❑ Insured Mall Restricted Delivery ❑ Priority Mail ExpnN* ❑ Registered Mail" ❑ Registered Mall Pa*WW Delivery ❑ Return Recelpt for Merchandise ❑ Signature Confirmatlon- ❑ Signature Confirmation Restricted Delivery Ps Form 3811. April 2015 Domestic Return Receipt Cs COASTLINE BUILDING COMPANY, LLC. — PO BOX 12632 - NEW BERN, NC 28561 - TEL. 252-670-5573 www.coastlinebuildinacompany.com • email: info0coastlinebuildinacomoanv.com June 16, 2015 Town of Riverbend 45 Shoreline Dr. New Bern, NC 28562 Reference: CAMA Major Permit Notification Enclosure: (1) Copy of application form, Division of Coastal Management CAMA Major Development Permit Dear Sir, On behalf of our client, Pier Pointe Owners Association, Inc., we are providing the enclosure for your review and comment. Craven County records indicate that you own waterfront property that is adjacent to our client's property. That makes you an adjacent riparian property owner. The Division of Coastal Manaagement (DCM) application process requires us to notify adjacent riparian RFCEIVED property owners of the proposed project and inform them that they have 30 days from receipt of their SEP 0 8 2015 notification to provide comments. OW40ilv iow The proposed project involves replacing the existing bulkhead and piers. Additional boatlifts will also be installed. No action is required on your part. However, if you have any comments about the project, please direct them to Mr. Brad Connell at the NC Division of Environmental and Natural Resourses (NCDENR), Division of Coastal Management(DCM), 400 Commerce Ave, Morehead City, NC 28557. Indicate clearly that your comments regard this project. If you have any questions, Very Truly Yours, Coastline Building Company, LL a,l�- P 11� Anthony D. Tyndall, PE IS Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. . Article Addressed to: -row" o f iZ1/et 45- Slvorel�n��r N e,,-V ►'3a29562- II I IIIIII IIII III I I I I III I III II III I I IIIII I III III 9590 9403 0239 5146 2494 95 O Agent ❑ Addre ! Name) C. Date of Dell D. Is delivery address different from Item 17f u re: If YES, enter delivery address below: ❑ No :e Type ❑ Pdodty Mail Fxptme® gnature ❑ Registered Msll�" gnature Restricted Delivery ❑ Reglsteretl Mall Rsblctsd 1 Mall® Delivery f Mail Restricted D61Nery ❑ Return Receipt for on Delh m Merchandise on Delivery Restricted Delivery O Signature ConflnnatIon- Mall ❑ signature Confirmation Mail Restrcted Delivery Restricted Delivery PS Form 3811, April 2015 PSN 7530-02-000-g053 Domestic Return Receipt NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary September 9, 2015 Pier Pointe Owners Association, Inc. c/o Mr. Samuel Bidwell 100 Pier Pointe New Bern, NC 28562 Dear Mr. Bidwell: The NC Division of Coastal Management hereby acknowledges receipt of Pier Pointe Owners Association, Inc.'s application for State approval for development of its property located near the Trent River at 25 Pier Pointe Drive in River Bend, Craven County. It was received on September 8, 2015, and appears to be adequate for processing at this time. The projected deadline for making a decision is November 22, 2015. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from September 8, 2015, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of- way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.ncxoastalmanagement.net An Equal Opportunity% Af rmativeAction Employer 0 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Brad Connell Coastal Management Representative U9 Enclosure CC: Anthony Tyndall, Coastline Building Company, Inc. Roy Brownlow, District Manager Courtney Spears, Asst. Major Permits Coordinator 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nocoastalmanagement.net An Equal Opportunity 1AIPomativa Action Employer APPLIED F R PROJECT: Construct a bulkhead, finger piers, and boat lifts within a basin adjacent to the Trent River at 25 Pier Pointe Drive, in River Bend. COMMENTS ACCEPTED THROUGH October �5.2015 APPLICANT: Pier Pointe Owners Assoc, Inc c/o Mr. Samuel Bidwell 100 Pier Pointe New Bern, NC .:28562. FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Brad Connell - DCM 400 Commerce Avenue Morehead City, NC 28557 (252)808-2808 :r NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor The Sun Journal Legal Advertisement Section P.O. Box 1149 New Bern, NC 28563 Re: Public Notice — Pier Pointe Owners Association, Inc. Dear Sir: Donald R. van der Vaart Secretary September 9, 2015 Please publish the attached Notice in the September 16, 2015 issue of the Sun Journal. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Arthur Stadiem, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, �,� Brad Connell Coastal Management Representative Enclosure cc: Courtney Spears Roy Brownlow 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-2808 \ FAX: 252-2473330 Internet: www.nccoastalmanagement.net An Equal Oppodunity 1 Alfiniative ACW Employer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A- 119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on September 8, 2015. According to said application, the Pier Pointe Owners Association, Inc. proposes to reconstruct a marina and bulkhead near the Trent River, at 25 Pier Pointe Drive, Craven County. A copy of the entire application may be examined or copied at the office of Brad Connell, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to October 15, 2015, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: September 16, 2015 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247J330 Internet: www.nocoastaimanagement.net An Equal Oppa unity 1 Afirmadve Mon Employer TRANSMISSION JOURNAL T160SYOW2121 F670-A07 • TIME : 09-09-2015 13:59 S FAX NO.1 NAME NO, FILE NO. DATE TIME DURATION PGS TO DEFT MODE STATUS 057 091 09.0913:58 00:19 2 8919109382722 EC 603 OK C5 org DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Pier Pointe Owners Association, Inc. LOCATION OF PROJECT SITE: The project is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive, in River Bend, Craven County. Longitude: 770 08'5356"W Latitude: 35° 04'28.48"N INVESTIGATION TYPE: CAMA/D&F INVESTIGATIVE PROCEDURE: Date(s) of Site Visit— 3/17/15 Was Applicant or Agent Present —No Photos Taken — No PROCESSING PROCEDURE: Application Received — cc: 9/8/15 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — Craven County (10/29/2009) Land Classification from LUP — Developed (B) AEC(s) Involved: PTA, PTS (C) Water Dependent: Yes (D) Intended Use: Residential (E) Wastewater Treatment: Existing — municipal sewer Planned - N/A (F) Type of Development: Existing — marina, bulkhead, and townhouses Planned - replace bulkhead and finger piers, and construct new boatlifts within existing slips (G) Estimated Annual Rate of Erosion: N/A Source — N/A (A) Shallow Bottom 1,206 fe 11,200 ftz incorp (B) High Ground 11 7,236 ft2 (E) Total Area Disturbed: 19,642 ft2 REGE (F) Primary Nursery Area: No OCT O 1 2()15 (G) Water Classification: C; Sw, NSW Open: No (II) Cultural Resources: None DCM- MHD CITY Project Summary: The applicant wishes to replace an existing bulkhead and marina for residential use near the Trent River, Craven County. Field Investigation Report: Pier Pointe Owners Association Pace 2 Narrative Description: The property is located along a man-made basin adjacent to the Trent River at 25 Pier Pointe Drive in River Bend, Craven County. This 4.1-acre parcel is developed with townhouses, marina, and bulkhead. The adjacent properties are similarly developed. The elevation of the high ground of the parcel is about 2.5' above the normal water level (nwl). Vegetation on the lot mainly consists of lawn grasses. There are no Coastal Wetlands in the vicinity of the project area. This parcel has approximately 658' of continuous shoreline along the basin. Immediate offshore water depths adjacent to the parcel range from —3' to —6' normal water level (NWL). The subaqueous substrate is firm without shell. There is not a cultural resource in the nearby vicinity of the project area. This waterbody is approximately 220' across at this location. These Inland waters are not classified as a Primary Nursery Area and there is no submerged aquatic vegetation in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classified as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel in the nearby vicinity of this project area. This project area is subject to the Neuse River Riparian Buffer Rules. Proposed Development: The applicant wishes to replace the existing bulkhead, replace the existing finger piers, install four new boat lifts within existing boat slips, and construct two floating platforms within a man-made basin adjacent to the Trent River, in River Bend. The proposed development will take place at 25 Pier Pointe Drive, Craven County. The proposed development will serve the Pier Pointe Owners Association, Inc. The proposed vinyl bulkhead is proposed to be installed immediately waterward of the existing wooden bulkhead. This proposed vinyl bulkhead will be 603' long with a 15'-wide work corridor landward of the bulkhead. The proposed bulkhead will be approximately 5' high above the subaqueous substrate. There are a total of twenty-three marina piers proposed. Two of the piers would be floating. Each of these proposed floating kayak piers would be 10' wide and 16' long. The remaining proposed fixed finger piers would be 3' wide and 20' long to support the existing boat slips at this community marina. There are 44 boat slips currently, but after this reconfiguration they would be reduced to a total of 42 boat slips. There are four 10' by 10' boat slips proposed within four of the existing boat slips. RECEIVED OCT 01 2015 DCM- MH'_ Brad Connell September 9, 2015 Morehead City Mp'k Field Investigation Report: Pier Pointe Owners Association Page 3 Anticipated Impacts: The proposed bulkhead replacement will impact 7,236 square feet of high ground and 1,206 square feet of shallow bottom habitat. The proposed dock replacement and floating kayak docks will remain in the same footprint within this man-made basin and usurp 11,200 square feet of Public Trust Area. Traditional marine construction methodology will be utilized during construction. Temporary turbidity impacts are not anticipated during construction as the vinyl sheets will be installed prior to backfilling and sod will be planted once work is complete. There is not a cultural resource in the nearby vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. These Inland Waters of the Trent River are not classified as a Primary Nursery Area and submerged aquatic vegetation is not present in the immediate vicinity of the project area. This area is closed to shellfish harvest and is classed as C; Sw, Nutrient Sensitive Waters. There is not a defined Federal Channel near the project area. RECEIVED OCT 01 2015 DCM- MHD CITY Brad Connell September 9, 2015 Morehead City RECEIVED OCT 01 7015 DCM- MHD CITY Please use this card to schedule a pre -construction conference immediately BEFORE you begin work on your permitted project. The pre -construction meeting will give you the opportunity to discuss permit conditions, construction techniques and any questions you may have with a Coastal Management representative. This will enable you to proceed with your project as quickly and smoothly as possible. When you are ready to begin construction, fill out his card and mail it to the Division of Coastal Management at the address on the reverse side of this card. Thank You. PennitNuraber i RECEIVEDExpiratiotfIIate lo�-f l ? NOV 0 2 2015 Issued to: �eot'_a &40 Lit y�a 5 � DC M- M H D CITY Contact w ntact Person:. A /Nl 13 l L 1, Telephone Number 2 Z- Q 7 6— S—c) icy Project Starting Date `1 NO V Z-o 15- Samuel Bidwell 25 Pier Pl. A New Bern, NC 28562 North Carolina Division of Coastal Managemei NC Division of Coastal Management 400 Commerce Avenue Morehead City, N.C. 28557 1111,1,1 iM11,91111t'f Ihtiiii'1"'t'Itl't1t1.1L�m6gLtd.. s.; Existing Bulkhead, Boa walk ,d Finger Pier Replacement r Area of Hf Ground: �. �2 tisturbance Riparian Pro, p`E ty Liri ti t fr Proposed New Vinyl Bulkhead In Front of than Existing Wood Bulkhead '- ",' a, s' Do nd[ exceed 24" from front of existing to the front of the n bulkhead 5 , Pier Pointe OvJi§ AssoIo a Water Depth at end"of Finger ers is,� y , x r' Normal aeveJ f= �'k at Existi ead is 32" e top of ! y,j a 9 the ulkhead e" F yril , l , .Water Depth at Bulk ad is 3' * Man Made Basin/Canal_ Connected to Trent River's ,�� tc I * ,, e�� YS ik S �, �,p4 1 �. �4• .. s Rj'3-ian Property Line 15.13' Riparian Property Line Proposed Floating Dock Existing Open Boat Lift Man Made Basin/Canal Connected to Trent River O Approximately 220' Wide N Tie Piles Typical of 22 Each Proposed 2' 6" x 20' Finger Pier Typical of 22 each New Open New Open Boat Lilt — Boat Lift 459' �+ Area of High 6 round Disturbance Approximately 2' Behind Approximately 15' Behind Vinyl New Vinyl Bulkhead Bulkhead Property Line A PROPOSED PLAN Opposite shore Line Total Number of New Boat Slips equals 42 Riparian Property Line Existing Concrete Bulkhead to Remain End of New Vinyl Bulkhead Tie to Existing Conc. Bulkhead / I Water Depth at Bulkhead / 3' Along Entire Length of New Vinyl Bulkhead \ Existing Open Boat Lift NWL at Proposed Bulkhead 18" Below the Top of Bulkead Water Depth at End of Proposed Floating Dock Finger Piers is 4'-8" Typical - Existing Open Boat Lift New Open Boat Lift Owner: Pier Pointe Owners Association 25 Pier Pointe New Bern,NC 28562 Q, �hoF° Property Line I RECEIVED sEP 0 8 2015 qwq "Ow tzoN Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County NC Coastline Building Company, LLC PO Box 12632 1" = 40 New Bern, NC 28561 Page 2 of 3 252-670-5573 M Normal W, 32" Below Dept at Er SECTION A -A SECTION AT BOAT LIFT shed Grade /ED 2015 tSUlKneaa, ringer rier ana Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County NC Coastline Building Company, LLC 3/8" = 1'-0" PO Box 12632 Page 3 of 3 New Bern, NC 28561 252-670-5573 RECEIVED SEP 0 8 2015 t9e-"4A*4Qe" IN MP-1 U APPLICATION for Major Development Per (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant(Landowner Information Business Name Pier Pointe Owners Association, Inc. Project Name (if applicable) Bulkhead and Finger Pier Replacement Applicant 1: First Name Samuel MI Last Name Bidwell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address 100 Pier Pointe PO Box City New Bern State NC ZIP 28562 Country us Phone No. 252 - 876 - 5050 ext. FAX No. Street Address (if diFerent from above) City State ZIP Email SamuelBidwell@aol.com I•� 2. Agent/Contractor Information Business Name Coastline Building Company, Inc. Agent/ Contractor 1: First Name MI Last Name Anthony D Tyndall Agent/ Contractor 2: First Name MI Last Name Carl G Merchant Mailing Address PO Box City State 12632 New Berm NC ZIP Phone No. 1 Phone No. 2 28561 252 - 670 - 5573 end. 252 - 675 -1786 ext. FAX No. Contractor # Street Address (d d itrent from above) City State ZIP Email atyndall@coastlinebuildingoompany.com RECEiVED ,qA Y A c 115 <Form continues on back> WL.,. VIA 252-808-2808 :: 1-888-4RCOAST .. www.nccoastaim-�.!agement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Craven Pier Pointe Subdivision Name City State Zip Pier Pointe Condominiums Riverbend NC 28562 - Phone No. Lot No.(s) (Amany, attach additional page with list) ext- 8-201-8-00A, 8-201-8-00B, 8-201-8-00C, a. In which NC river basin is the project located? It. Name of body of water nearest to proposed project Neuse Trent River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown Neuse River e. Is proposed work within city limits or planning jurisdiction? f. if applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Town of Riverbend 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 658' 179,076 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 79,236, 45,738, 54102, NWL (normal water level) (lfmany lot sizes, please attach additional page with a list) ❑NHW or ❑NWL e. Vegetation on tract Residential Lawn and Landscaping r f. Man-made features and uses now on trail -- Condominiums, 658 LF Bulkhead, 24 Finger Piers g. Identify and describe the existing land uses a 'scent to the proposed project site. Recreational Commercial Marina, Roadway h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? PDR-MF (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity pan of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a [--]Yes ®No ❑NA National Register listed or eligible property? R <Form continues on next page> MAY 08203 252-808-2808 :: 1-888-4;:-. .: www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. () Are there wetlands on the site? []Yes ®No (it) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (I) or (ii) above, has a delineation been conducted? ❑Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. MUNICIPLE SEWER o. Describe existing drinking water supply source. MUNICIPLE WATER p. Describe existing storm water management or treatment systems. SHEET FLOW & Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The existing bulkhead and piers will be replaced. The piers shall continue to be for the private use of the property owners. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Bulkhead shall be constructed of vinyl sheet piles. The finger piers shall be constructed of pressure treated wood. Construction will be accomplished with floating backhoe with vibratory hammer, work deck and tug. i d. List all development activities you propose. Bulkhead and finger pier replacement. Addition of 5 new boat lifts. 1 a. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance of an exsisting Project f. What is the approximate total disturbed land area resulting from the proposed project? 3,015 18Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. there are three existing storm drainage culverts from the existing property penetrating the existing bulkhead and discharge into the water. i. Will wastewater or stonnwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water7 []Yes []No ❑NA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> MAY 0 F gGM-Mf,l. 252-808-2808 :: 1.888-4RCOAST :: www. nccoasta lmanagement. net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (1) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Bent Peck Phone No. 252-63MO68 Address 108 Outrigger Rd New Bern, NC 28562 Name Town of Riverbend Phone No. 252-638-3870 Address 45 Shoreline Dr. Riverbend, NC 28562 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. 1 h. Signed consultant or agent authorization forth, if applicable. i I. Welland delineation, A necessary.- j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by properly owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. if the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 5 -1- 1 7eiPrint Name Anthony D. Tyndall, PE. RECEIVED Signature MAY A 8 20b Please indicate application attachments pertaining to your proposed project. oi` ; ne 'n' Xwy, ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts RECEVFf ❑DCM MP-3 Upland Development MAY 0 F ®DCM MP-4 Structures Information 252-808-2808 :: 1.888-4RCOAST :: www. nccoastal management. net Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: [--]Commercial ❑PublirJGovemment ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 2 (iii) Length 16' (iv) Width 10, (v) Floating ®Yes []No e. (t) Are Platforms included? ❑Yes ®No If yes: (ii) Number _ (iii) Length _ (iv) Width (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (!)Number of slips proposed 42 III) Number of slips existing 44 i. Check the proposed type of siting: ❑ land cut and access channel ®Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k. Typical boat length: 20' m. (i) Will the facility have tie pilings? ®Yes []No (ii) If yes number of tie pilings? 24 ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Am Finger Piers included? ®Yes ❑No If yes: (ii) Number 21 (iii) Length 20' (iv) Width 2_6" (v) Floating ❑Yes ®No f. (1) Are Boatlifts included? ®Yes []No If yes: III) Number 8 (iii) Length 10, (iv) Width 10, h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies E Dockage ('Wet slips") only, number of slips: ❑ Dry storage; number of boats: _ ❑ Boat ramp(s); number of boat romps: _ ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Motor Boats including runabouts, pontoon boats, cabin cruisers. etc. I. (i) Will the facility be open to the general public? ❑Yes ®No RECEIVED MA Y 0 8 1011 'CAA wgl' -'uA. 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) G6 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, it applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and 'No Wake* signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED m. Is the marinaldocking facility proposed within a primary or secondary nursery area? MAY O S 1 ❑Yes []No ,Q W-MHfy o, 252-808-2808:: 1-888.4RCOAST:: wwwmccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes []No o. Is the marinaidocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the lesseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ❑Pdvate/Community (ii) Number _ (III) Length _ (iv) Width Note: Roofed areas are calculated from dripline dimensions. 14. GROIN (e.g., wood, sheelpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 1 5- BREAKWATER (e.g, wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands , r a Maximum distance beyond NHW, NWL or wetlands \ \ `d B, MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community C. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Am of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, sae, anchor, etc.) RECEIVED MAY 0 8 11+±5 kA'4K 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Falrm DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines NA Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body 200' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. d. Water depth at waterward end of structure at NLW or NWL 4' to 6' 8. OTHER ®This section not applicable a. Give complete description: May 4.2015 Date Pier Pointe Owners Association, Inc. Bulkhead and Finger Pier Replacement Project Name Coastline Building Company, LLC Anthony D. Tyndall, PE App iyant Name ,tit¢it•- Applicant SignatureP '2ECEIVEF MAY 087 pr o-mi-ity wra 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanartement.net revised: 12/27/06 Tie Pilings Typical New Open Boat Lift New Open Boat Lift 2'-6' Finger PierTypical Existing Open Boat Existing Open Baal Off � — � _ — 21 Total Piers x 20' Long —\ —J — IL 459' Virn/I Bulkhead w/ 4'Boardwalk --/ New Open Boat Lift J New Open Boat Slip Virryl Bulkhead wy 2x12 Cop Existing Open Boat Lh Vinyl Bulkhead w/ 4' Boardwalk —1 New Open Boat Lift New Open Boat Lift 0,. Dock (a Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association April 26, 2015 """" "•" ""y `" I I" = 40• PO Box 12632 Page I of 2 New Bern, NC 28561 Yahoo Maps, Driving Directions and Traffic https://maps.yaboo.comlmap/?lat=35.09013612815873&ion=77.05759048461914&bt=35.... Directions ' t d a a C m on < ` River o Bend a Pier Pointe owners Association �IQI` n, I of 2 Sign od .W * N Woodrow p?��P Colony O` BR a c�a, rI 03 d 70 °may �di ti r Emerald Golf Club ��� j Main st �\ d 0 1Or �1 BR Trent BR ® 17 Woods Greyhound New Bern o Cypress Lake H > k Ze vent __n�Run woods Dr 6 PIq �4i New Bern Golf '.,/con & Country m Club u River BR 70 Degraffenried New Park w Park Ave AMERLd Moore Ave City N. K� Coa c °°c X RdB A 1 i- c`� Terms Privacy Feedgac�k � 4/27/2015 4:46 AM FA d if •,•;;, Craven County does NOT warrant the information shown on this map 1 inch equals 146 feet A and should be used ONLY for tax assessment purposes. Gs Project Narrative Project: Bulkhead and Finger Pier Replacement Owner: Pier Pointe Owner's Association, Inc. Applicant: Coastline Building Company, LLC The proposed project involves replacing approximately 640 LF of an existing wooden bulkhead with a vinyl bulkhead. The existing boardwalk, finger piers and pilings shall be removed and replaced with pressure treated wood materials. The number of finger piers shall be reduced from 24 to 21. Four additional boat lifts will be installed. Upon completion new sod shall be installed on disturbed areas of land. The construction of the bulkhead and boardwalk shall be constructed from land with a 20,000 lb excavator with vibratory hammer attachment to drive vinyl sheet piles. The construction of the finger piers and boat lifts will be conducted from a floating barge and work deck. The pilings will be driven with the excavator and vibratory hammer attachment. aFCEi\' MAY 0 S caK:M'Mh,— RECEIVED MAY0B N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date April 26, 2015 Name of Property Owner Applying for Permit: Pier Pointe Owners' Association, Inc., Attn. Sam Bidwell Mailing Address: 100 Pier Pointe New Bern, NC 28562 I certify that I have authorized (agent) Anthony Tyndall to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) Remove and Replace Bulkhead and Finger Piers , at (my property located at) Pier Pointe in New Bern, NC Ilk � This certification is valid thru (date) December 31, 2015 Property Owner Signature — Larry Weiss, President, Pier Pointe Owner's Association, Inc. Date Z;ke_- ( 2CApr.'2ni Sam Bidwell, Chairman Waterfront Committee and Project Manager Date RECEIVED MAY 0 8 1015 "iV"-kV)Pk k' ICE NP-1 APPLICATION for Major Development Permit (W! raeland 12/2706) North Carolina DIVISION OF COASTAL MANAGEMENT !. Primary ApplicarW Landowner lydbrmadon Business Name Pier Pointe Owners Association, Inc. Project Name (e applicable) Bulkhead and Finger Pier Replacement Applicant 1: First Name Samuel MI Last Nam Bidwell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 100 Pier Pointe PO Box City New Bern State NC ZIP 28562 Country us Phone No. 252 - 876 - 5050 sid. FAX No. - - Street Address (Ndklerent from above) City State ZIP Email SamuelBi(twell@aol.com ( 2. AgendContractor Information L r Business Name / Coastline Building Company, Inc. Agent/ Contractor 1: First Name MI Last Name Anthony D Tyndall ..l] Agent/ Contractor 2-. First Name MI Last Name Cart G Merchant Mailing Address PO Box City State 12632 New Bem NC ZIP Phone No. 1 Phone No. 2 28661 252-670. 5573 ext. 252-675-1786 ext. FAX No contractor e Street Address (ifddlierent from above) city Stab ZIP Email atyndall@coasbineWildingcompany.com Dorm continues on back> SEP 0 S lot �;ra ywb ,:52.808.2808 .. 1-888-4RCOAST .. www.nccoastalmanagen•.- Form DCM MP-1 (Page 2 of 4) APPLICATION for 'l Major Development Permit 3. Project Locadon County (can be multiple) Street Address State Rd. s Craven 25 Pier Pointe Subdivision Name City Stale Zip Pier Pointe Condominiums Riverbend NC 28582 - Phone No. Lot Ns(s) (ll many, attach additional page with fist) - - eta. &20148-OOA, 8-201-8-OOB, 8-201-8-00C, , a. In which NC river basin Is the project totaled? b. Name of body of water nearest to proposed project Neuse Man -Made Canal off of Trent River e. Is the water body ida~ in (b) above, natural or manmade? d. Name the closest major water body to the proposed project see. []Natural ®Manmade ❑Unknown Neuse River e. Is proposed work within city limes or planning jurisdiction? I. if applicable, list the planning jurisdiction or city lime the proposed ®yss ❑Nil work falls within. Town of Riverbend 4. Slte D"allpdon a. Total length of shoreline on the tract (ft.) b. Size of entire bad (sg.e.) M. 179,076 c. Sae of individual We) d. Approximate elevation of trod above NHW (normalW Water) or 79,236, 45.738, 54102, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 2'-8" ❑NHW or ®NWL e. Vegetation on trail — - Residential Lawn and Landscaping I. Man-made features and uses now on tried Condominiums, 658 LF Bulkhead, 24 Finger Piers g. Identify and describe the existing land uses adiaoent to the proposed project site. Recreational Commercial Marina, Roadway h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? PDR-MF (Attach zoning compliance caddicate, a applicable) ®Vas ❑No ❑NA j. Is the proposed activity Wit plan urban WVEerfraa redevelopmentproposal? Oyes ®No k. Hasa professional archaeological assessment been done for the tract! Ill teach s copy. ❑Yea ®No ❑NA If yea, by whom? I. Is the proposed project located in a National Registered Historic District or does a involve a ❑lies ®NO ❑NA National Register listed or eligible properly? <Forrn continues on next page> RECEIVED SEP 0 8 10f) 00#40w eiw 252-808-2808 . www. necoastal man agement.net Form DCM MP-1 (Paps 3 of 4) APPLICATION for `"-' in. @ Are there wetlands on the site? It) Are there coastal wetlands on the sae? Major Development Permit ❑Yes ®No ❑Yes ®No (m) If yes to either (i) or (a) above, has a delineation been conducted? []Yes [:]No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. MUNICIPLE SEWER o. Describe existing drinking water supply source. MUNICIPLE WATER p. Describe existing storm water management or treatment systems. SHEET FLOW 5. AdWNes and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PublictGovemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The existing bulkhead and piers will be replaced. The piers shall continue to be for the private use of the property owners. c. Describe the proposed construction malbodoopy, types of construction equipment to be used during COrgtirldbn, the number of each type of equipment and where a Is to be stored. Bulkhead shall be constructed of vinyl sheet piles. The finger piers shall be constructed of pressure treated wood. Construction will be accomplished with floating backhoe with vibratory hammer, work deck and tug. d. List all development activities you propose. Bulkhead and finger pier replacement. Addition of 5 new boat lifts which will be within the existing slips. e. Am the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from 8u propoasd projeW 3.015 ®Sq.Ft or ❑Aarsa g. YM the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. there are three existing storm drainage culverts from the existing property penetrating the existing bulkhead and discharge into the water. I. Will wastewater or stormwater be discharged into a wetland? ❑Yea ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water! ❑Yes []NO ❑NA J. Is tom any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. RECENED <Form contlnutN on DacIP SEP 08 IM OdOAWCOW 252-808-280P t-888.4RCOAST :: www.ncconstalmanagement. net Form DCM MP-1 (Page 4 of 4) APPLICATION for CS Major Development Permit B. Additional Information In addition to this completed application form. (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (p are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) draw to scab. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on reaps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that rich owners have received a copy of the application and plats by certified mail. Such landowners must he advised that they have 30 days In which to submit comments on the proposed project to the Division of Coastal Management. Name Berri Peck Phone No. 252-638-8068 Address 108 Outrigger Rd New Bern, NC 28562 Name Town of Riverbend Phone No. 252-6W-3870 Address 45 Shoreline Dr. Riverbend, NC 28562 Name Phone No. Address g. A Itst of previous state or federal permits issued for work on the protect tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, it applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceaMronl and inlet areas. (OW be signed by property, owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), If necessary. If the project involves expendkure of public funds or use of public lands, anaeh a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date l-I Print Name Anthony D. Tyndall, PE. Signature �( Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts RECEIVED ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information SEP Q 8 206 j.M„M'40004 4�'qw 252.808.2808 1-888.4RCOAST :: www.nccoastaimanagement.net C� Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet Access Other Channel (NLW or Carrel Boat Basin in BRamp oat Rock Groin Rock (excluding Breakwater shoreline NWL) stabilization Length Width Avg. Existing Depth NA NA Final Project Depth NA NA 1. EXCAVATION Whis section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type o1 material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal weWnds/mamh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? if any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas' 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (I) Do you claim We to disposal area? d. (i) Will a disposal area be available for future maintenance? []Yes []No ❑NA ❑Yes ❑No SNA (o) If no, attach a letter granting permission from the owner (ii) If yes, where? e. (i) Does the disposal area include any coastal wellands/mareh f- (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑YB6 ❑No ❑NA or other wetlands (Al If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB _ ❑WL ❑None RFUNED (n) Describe the purpose of disposal in these areas SEP U 8 2015 tka44inIot eA4 92-808.2808 :: 1 .14RCOAST :: www.nccoasta rovissid: 12/26106 Form DC ,IP-2 (Excavation and Fill, Page 2 of 3) C5 3. SHORELINE STABILIZATION (If development is a wood groin, use MP-4 — Shuctures) a. Type of shoreline stabilization: ®Bulkhead ❑Riprap ❑BreakwatedSill ❑Other: c. Average distance waterward of NHW or NWL: T-6' a. Type of stabilization material. Vinyl Bulkhead g. Number of square feet of fill to be placed below water level Bulkhead backfill _ Riprap _ Breakwater/Sill Other None I. Source of fill material. ❑This section not applicable Width: 11" d. Maximum distance waterward of NHW or NWL. 4' f. (i) Has there been shoreline erosion during preceding 12 months? []Yes ENO ❑NA (if) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES This section not applicable (Excluding Shoreline Stabilization) J a. (i) Will fill material be brought to the site? 'Yes []No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or (a) Amount of material to be placed in the water None other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (in) Dimensions of fill area (iv) Purpose of fill ❑CW ❑SAV ❑SB OWL ®None III) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? The Ixnited amount of excavated material taken from the area at Excavator the surface of the top of existing bulkhead shall be stock piled on site and surrounded with sift fencing. c. (i) Will nav ational aids be required as a result of the project? ❑Yes No ❑NA III) If yes, explain what type and how they will be implemented d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No []NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. NED Date /er714o ny / y1i411" SEP 0 8 1015 ,er AOnfP Aimwf ISrlcr4f:on Project Name Xe/14.'a w/k head f /n+9tr /r`r/'f Applicant NanNIF s/� Applicant Signature 252-808-2808 :: 1 9884RCOAST :: www.nccoastalmanagement.net revised: 12 1 -. C5 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a (i) Is the docking facility/marina. ❑Commercial ❑Public/Govemment OPrivate/Community c. (i) Docks) and/or Pieria) (ii) Number a (iii) Length 16' (iv) Width 19 (v) Floating ®Yes ONO ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ONO d- (i) Are Finger Piers included? ®Yes []NO If yes: (h) Number 21 (iii) Length 20' (iv) Width 22=6" (v) Floating []Yes ONO e. (i) Are Platforms included? ❑Yes ONO f. (i) Are Boatlifts included? ®Yes []No If yes: If yes: (n) Number (ii) Number 6 (iii) Length (iii) Length 10, IN) Width IN) Width 10' (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check ail the types of services to be provided. 42 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 44 ❑ Dockage, fuel, and marine supplies ® Dockage (*vet slips") only, number of slips 42 ❑ Dry storage, number of boats: ❑ Boat ramp(s), number of boat ramps. ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe. k. Typical boat length. 20' m. (i) Will the facility have tie pilings? ®Yes ONO (ii) If yes number of tie pilings? 24 j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Motor Boats including runabouts pontoon boats cabin cruisers, etc. I. (i) Will the facility be open to the general public? ❑Yes ONO RECENED SEP U 8 2015 oc"A os it" 252-808-28,. , v. neeoastalmenagement.net re.. .l: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACIUTY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that win be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Nlumber: _; Location: ❑ Showers ❑ Boathoding tank pumpout, Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. o. Descnbe the disposal of solid waste, ash offal and trash. d. Now will overboard discharge of sewage from bomb be eorrbonad? e. (i) Give the location and number of 'No Sewage Discharge' signs proposed. (it) Uwe the location and number of'Pumpout Available' signs proposed. L Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. _ I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality J. Wltstwnl be the manna policy on overnight and flue -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing manna, what types of services are currently provided? RECEIVED SEP 0 8 2015 m. Is the marina/docking facility proposed within a primary or secondary nursery area? L)(}OAA mkt" ❑Yes ❑No ii8 :: t-888.4RCOAST :: www.nceoastalmanagement.,,�, revised: 122' 06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the mannaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB). or other wetlands (WL)? If any boxes are checked, provide the number of square feel affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the lesseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lilts) ®This section not applicable a. (1) Is the boathouse stmctum(s). ❑Commercial ❑Publir9Government ❑Private/Community, (n) Number (III) Length (iv) Width Note: Roofed areas are calculated from dnpline dimensions 4. GROIN (e.g., wood, sheelpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable I a (i) Number (III Length (w) Width S. BREAKWATER (e.g., wood, sheebpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NNW, NWL or wetlands 6. MOORING PILINGS and BUOYS a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c Distance to be placed beyond shoreline NoteThis should be measured from marsh edge. d present. e. Arc of the swing 7. GENERAL ®This section not applicable 1 b. Number _ d. Description of buoy (color, inscription, size, anchor, etc.) � ncc_orastalmanagsment.net pECENED SEP 0 8 1015 revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) a. Prordmlty of structure(s) to adjacent riparian property lines 15' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body e. (i) Will navigational aids be required as a result of the projeet9 ❑yes ONO ❑NA (it) If yes. explain what type and how they will be implemented. & OTHER a. Give complete descnption May 4, 2015 Date Pier Pointe Owners Association, Inc. Bulkhead and Finger Pier Replacement --------- — Project Name Coastline Building Company, LLC Anthony D. Tyndall, PE Applicant Name � / - Applicant Signature b. Proximity of structure(s) to adjacent docking faculties. 35' d. Water depth at waterward end of structure at NLW or NWL 4' to 6' ®This section not applicabb RECENED SEP 0 S V5 0C-A4WNy 'too 252-808-2808 :: 1.888-4RCOAST :: vvwyv.nccoastalmanagrrrnent.nel revised: 12/27/06 Project Narrative Project: Bulkhead and Finger Pier Replacement Owner: Pier Pointe Owner's Association, Inc. Applicant: Coastline Building Company, LLC The proposed project involves replacing approximately 640 LF of an existing wooden bulkhead with a vinyl bulkhead. The existing boardwalk, finger piers and pilings shall be removed and replaced with pressure treated wood materials. The number of finger piers shall be reduced from 24 to 21. Four additional boat lifts will be installed. Upon completion new sod shall be installed on disturbed areas of land. The construction of the bulkhead and boardwalk shall be constructed from land with a 20,000 lb excavator with vibratory hammer attachment to drive vinyl sheet piles. The construction of the finger piers and boat lifts will be conducted from a floating barge and work deck. The pilings will be driven with the excavator and vibratory hammer attachment. RECENED SEP 0 g 2015 u*"A4k� ehm CS i+ iy _ Pier Polnte O"M A{.oewm m EXISTING PUN Bulkhead. Finger Parr and Boat Slip IDfOtL Peplacement Pur Point. Ow rf Av. W,.n P¢r Pointe OwAi .tw 25 P..r Pnnt. Nsw Bern lJC 28562 CMMe M4y GYwry.IIL ro w rxsu ' raw w,.. we zn.t . J P .r r 3 r��2onn p% f f a SC4 be gee tac%sa6 Dra..Jmj5 RECENED SEP 0 8 2015 6� a is CS 0 - wrE"rnu.. Man Made Bw.n/Coml Ew.� w..gerr Connected to Trent River E'"^C"`~d o Approximately 220' Wide rural Mme[r of rye. Boat 5i s i[ t2 [ "'M 0e"^•.. / p [ .Y�b.nlwrE.111� Ny YY�i T.I.Y VYbvT1."- Jw1 •.[e+neneee` A^ rrpwa[r ! r.4+.r� •�rnrner Q' � er�e�ll Y'�a'IE'11'III I j'n�e.ew ff lyY/ � �, •[..,.ew.rnw n[r�ar / rrar. / _ i•�..n4[..�LX - '� [w.wrr I L I 1 459 +.ti�Mr� e�A.vs 4Fti1neY�[uY..ee Ns nyiYMrf �A� w A - PROPOSED PLAN Q., Pier Pointe 04I 1 A..t,on M PKr Pointe W Beat X 2e562 BuMwd, Finger Pier and Boat Shp RepkouMM Fier Pointe Oronere Association w.wr o�.«aewy uc c..rw 470` oryc] uc r.ea rowuau Pe^2d2 Ma[ tel61 2YanFT32! RECEIVED sEP 0 8 2015 ceeu tow CS po..E 2.6 Bw Fkoiw EM Raw. h'ImIecw mIeutt P. dF�y v,v fNM 4d IE.r�1e..W1.�1 ere+e*.rw�arr LY Txprc4 oae fio.a.. MFm.r wms 3' a.rin0 WR 4-4T nfan sF YUYYnm n.F.�E YMFIMN.m .f EM W F.r Yhv Mrn.i. A-• En.ny Wood,. puUvm Tq Mro.w.<uvy ro nn.p Sir sw T.e.0 q.y. b8fiY ft. .Iv Enn�y wm.m..e m< Nu. anaem r nNq PIT MYry Bul dmod, Finger Fier and Bast Slip Ry6cenne.d Pier Pointe Ommme s Association SECTION A -A SECTION AT BOAT LIFT an.o.e o... wrtF rc M So.T U LY. n,3 fO h.IH11 Iq.)Al �N.,MG 20561 ntato-»n RECENED SEP 0 8 2015 I i SOUK L%40PAU 245 NORTH CAROLINA Prepared by Dunn and Dunn CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this / ST day of L7G C 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which 1s hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the party of the second part, said party's heirs and assigns, the following described property, to wit: Being all that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly described as follows: Beginning at a point in the southern right-of-way line of a 30-foot service road shown and delineated on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" recorded in Plat Cabinet E, Slide 304, in the office of the Register of Deeds of Craven County, said point of beginning being the northern corner of that certain tract or parcel of land conveyed to the Pier Pointe Owners' Association, Inc. by deed dated April 17, 1989 and recorded In Book 1219, at Page 262, in the office of the Register of Deeds of Craven County, said point of beginning also being located North 69 degrees 05 minutes 32 seconds East 341.41 feet from the intersection of the eastern right-of-way line of Shoreline Drive with the southern right-of-way line of said 30-foot service road and from said point of beginning being so located running thence along and with the southern line of said 30-foot service road North 69 degrees 05 minutes 32 seconds East 123.00 feet; thence continuing along and with the southern right-of-way line of said 30-foot service road following a curve to the right having a radius of 75.0 feet and an arc distance o1 101.92 feet; thence South 33 degrees 00 minutes 18 seconds East 119.21 feet along and with the western right-of-way line of said 30-foot service road; thence continuing along and with the western right-of-way line of said 30-foot service road following a curve to the left having a radius of 75 feet and an arc distance of 48.36 feet; thence South 33 degrees 00 RECEIVED SEP 0 8 2015 F�►�iµYi!�i+� 3 SOUK I %40"'AbE % e Page 2 minutes 18 seconds East 40.86 feet to an existing Iron pipe; thence North 60 degrees 15 minutes 24 seconds East 97.00 feet to an existing Iron pipe; thence South 37 degrees 00 minutes 00 seconds East 203.96 feet to a point lying in the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds West 255.51 feet; thence leaving Plantation Canal and running North 37 degrees 54 minutes 28 seconds West 407.33 feet; thence North 87 degrees 54 minutes 28 seconds West 59 feet; thence North 20 degrees 54 minutes 28 seconds West 130.00 feet to the point of beginning. The above -described parcel of land 1s designated as "Phase IiI" on that certain map or plat entitled "Pier Pointe at River Bend, Phase Three" recorded in Plat Cabinet E, at Slide 304, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41 and 42 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Three, said map being recorded 1n Plat Cabinet E, at Slide 304, to the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect descripton of the numerically designated Lots being withheld from the con- veyance to the Owners' Association. it 1s the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and deli- neated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive perpetual right- of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase Three, recorded in Plat Cabinet E, at Slide 304, to the office of the Register of Deeds of Craven County for the purposes of providing ingress, egress, regress and access to and from Shoreline Drive and for the purpose of installa- tion and maintaining utilities. This conveyance is made subject to that certain Declaration of Annexation for Pier Pointe at River Bend, Phase Three, recorded to Book 1off, at Page Z 3 y in the office of the Register of elf Craven County together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County. RECEN):D TO HAVE AND TO HOLD said property and all privileges and appur- $EP 0 8 1015 tenances thereunto belonging to the party of the second part, said party's heirs [ar.04A440*ow and assigns forever. S11K i %4O?Ae �•#7 AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name py its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER BEND, INC. Pol- ,• 5 President ecre ary NORTH CAROLINA CRAVEN COUNTY I, Atjrl,,pela 1Y L Qjp&ar1 a Notary Public in and for said County and StAte do here y certify that ic, Z•r+S-to? 0 personally appeared before me this day and ac now edge that he/she Is the Secretary of Pier Pointe at River Bend, Inc., a corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its President, sealed with its cor- porate seal, and attested by himself/herself as its Secretary. W1 mess my hand and notarial seal, this the �, day of Q` , 1989. Notary ub is i My Commission Expires: /3- y?, r RECERfED SEP 0 9 2015 aftuAswil COW 60UK 'l 24JVAL NORTH CAROLINA CRAVEN COUNTY The foregoing certificate of �c sav Notary Public of said county and State, is certified to be correct. his instrument was presented for registration this day and hour and duly recorded in the office of the Register of Deeds of Craven County, North Carolina, in Book Z,-+ o , at Page td—t/-,6� . This the _L day of 9, at o'clock M. By:� e s er of DeAds ster of ee s Page 4 RECENED SEP U S IBIS Q&W0 9 Ply" 6GUK it 21 J abE %6 2 NORTH CAROLINA Prepared by Dunn and Dunn CRAVEN COUNTY WARRANTY OEEL THIS DEED, made and entered into this �_ day oi/ 1989, by and between PIER POINTE AT RIVER BEND, INC., a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part 1n consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the parties of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the parties of the second part, said par- ties' heirs and assigns, the following described property, to wit: Being all that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, and being more particularly described as follows: Beginning at a point in the southern right-of-way line of the a 30-foot service road shown and delineated on that certain map or plat entitled "Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, Slide 265, said point of beginning being the northern corner of that certain tract or parcel of land conveyed t0 the Pier Pointe Owners' Association, Inc. by deed dated December 7, 1988 and recorded in Book 1207, at page 155, in the office of the Register of Deeds of Craven County, said point of beginning also being located North 69 degrees 05 minutes 32 seconds East 196.00 feet from the intersection of the eastern right-of-way line of Shoreline Drive with the southern right-of-way line of said 30-foot service road and from said point of beginning being so located running thence along and with the southern tine of said 30-foot service road North 69 degrees 05 minutes 32 seconds East 145.41 feet to a point in the southern right-of-way line of said 30-foot service road; thence South 20 degrees 54 minutes 28 seconds East 130 feet to a point; thence South 87 degrees 54 minutes 28 seconds East 59 feet to a point; thence South 37 degrees 54 minutes 28 seconds East 407.33 feet to the mean high water mark of Plantation Canal; thence along and with the mean high water mark of Plantation Canal South 44 degrees 52 minutes 45 seconds 03 -- f (�Z, p9, iU1� Gq•u,vof 4� 8�p4u 61 BOUX i 21 J Nape West to a point marking the southeasternmost corner of that certain tract or parcel of land conveyed by Pier Pointe at River Bend, Inc. to Pier Pointe Owners' Association, Inc., by deed dated December 7, 1988, and recorded to Book 1207, at Page 155, in the office of the Register of Deeds of Craven County; thence running along and with the easternmost line of the property conveyed to the Pier Pointe Owners' Association, Inc. North 37 degrees 54 minutes 28 seconds West 496 feet to a point; thence North 23 degrees 54 minutes 28 seconds West 123 feet to the point of beginning. The above described parcel of land is designated as "Phase II" on that cer- tain map or plat entitled "Pier Pointe at River Bend, Phase Two" recorded in Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27 and 28 (which Lots include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase Two, said map being recorded in Plat Cabinet E, at Slide 265, in the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect descripton of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual right-of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase Two, recorded in Plat Cabinet E, Slide 265, to the office of the Register of Deeds of Craven County, for the purpose of providing ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party of the first part lying North and East of Phase II as shown and delineated on the aforesaid map. The party of the first part also expressly reserves for itself, its' successors and assigns, a perpetual nonexclusive ease- ment for the purposes of the installation and main- tenance of utilities located along the streets, roads, utility lines, water lines, and sewage lines presently existing or proposed on the properties and to provide utilities, water, and sewage service to the additional properties of the party of the first part lying North and East of Pier Pointe at River Bend, Phase Two. The above described easements are appurtenant toand shall forever run with the land of the party of the first part lying North and East of Pier Pointe at River Bend, Phase Two. 263 PAGE 2 RECEIVED SEP 0 8 1015 BOOK 1 G 1, rAbt 4 PAGE 3 This conveyance is made subject to that certain Declaration of Annexation for Pier Pointe at River Bend, Phase Two, recorded 1n Book / ? / q at Page , to the office of the Registe Deeds of Craven oun y together with those certain covenants, conditions, restrictions, and easements for Pier Pointe at River Bend recorded in Book 1207, at Page 119, in the office of the Register of Deeds of Craven County. TO HAVE AND TO HOLD said property and all privileges and appur- tenances thereunto belonging to the parties of the second part, said par- ties' heirs and assigns forever. AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same 1n fee simple; that the same are free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful clalms of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. ATTEST: PIER POINTE AT RIVER BEND, INC. Secretary RFCENED SEP 0 8 2015 NORTH CAROLINA nn Prepared by�bunn and Duv4h CRAVEN COUNTY WARRANTY DEED THIS DEED, made and entered into this L day of , 1988. by and between PIER POINTE AT RIVER BEND, INC. , a corporation, party of the first part; and PIER POINTE OWNERS' ASSOCIATION, INC., whose address is P. 0. Box 2384, New Bern, North Carolina 28560, party of the second part; WITNESSETH: That the party of the first part 1n consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which is hereby acknowledged, has bargained and sold and by these presents does bargain, sell, and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: All that certain tract or parcel of land lying situate and being in Number Eight (8) Township, Craven County, North Carolina, more particularly described as follows: Beginning at a point in the northeastern rlght-of-way line of Shoreline Drive, said point of beginning being located South 30 degrees 54 minutes 08 seconds East 306.44 feet from the intersection of the northeastern right-of-way line of Shoreline Drive with the southeastern right-of-way line of Pirates Road and from said point of beginning being so located running thence North 69 degrees 05 minutes 32 seconds East 196 feet along the southern line of a 30 foot service road; thence South 23 degrees 54 minutes 28 seconds East 123 feet to a point; thence South 37 degrees 54 minutes 28 seconds East 496 feet to the mean high water mark of Plantation Canal; thence South 44 degrees, 52 minutes, 45 seconds West 40.65 feet along and with mean high water mark of Plantation Canal; thence South 01 degree 18 minutes West 196 feet along and with the mean high water mark of Plantation Canal to the northeastern right-of-way line of Shoreline Drive; thence North 36 degrees 42 minutes 17 seconds West 151.18 feet along and with the northeastern right-of-way line of Shoreline Drive to a set iron pipe; thence continuing along and with the northeastern right-of-way line of Shoreline Drive North 41 degrees 07 minutes 06 seconds West 344.23 feec to an existing concrete monument; thence North 36 degrees 04 minutes 13 seconds West 167.66 feet along and with the northeastern right-of-way line of Shoreline RECEWD SEP 0 8 1015 urw Y too BOUK i %U i l'a6L 1 �) Drive to an existing concrete monument; thence North 30 degrees 40 minutes 16 seconds West 127.16 feet along and with the northeastern right-of-way line of Shoreline Drive to the point of beginning. Said parcel of land is designated as "Phase 1" on that certain map or plat entitled "Pier Pointe at River Bend, Phase One". recorded in Plat Cabinet E, Slide 153, in the office of the Register of Deeds of Craven County. SAVING AND EXCEPTING from this conveyance the following numerically designated Lots being Lots numbered 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 (which Lots Include the patio areas) as the same are shown and delineated on a map or plat of Pier Pointe at River Bend, Phase One, said map being recorded in Plat Cabinet E, at Slide 153, in the office of the Register of Deeds of Craven County to which reference is hereby made for a more perfect description of the numerically designated Lots being withheld from the conveyance to the Owners' Association. It is the intention of the party of the first part to convey to the party of the second part only the "Common Area" which is shown and delineated on the aforesaid map. The party of the first part expressly reserves unto itself, its' successors and assigns, a nonexclusive per- petual right-of-way and easement over each and every street and road shown and delineated on the map or plat of Pier Pointe at River Bend, Phase One, recorded 1n Plat Cabinet E, Slide 153, in the office of the Register of Deeds of Craven County, for the purpose of providing ingress, egress, regress, and access, to and from Shoreline Drive to the remaining properties of the party of the first part lying North and East of Phase I as shown and delineated on the aforesaid map. The party of the first part also expressly reserves for itself, its' successors and assigns, a perpetual nonexclusive ease- ment for the purposes of the Installation and main- tenance of utilities located along the streets, roads, utility lines, water lines, and sewage lines presently existing or proposed on the properties and to provide utilities, water, and sewage service to the additional properties of the party of the first part lying North and East of Pier Pointe at River Bend, Phase One. This conveyance is made subject to those certain Covenants, Conditions, Restrictions and Easements for Pier Pointe at River Bend, Phase One, recorded in Book at Page , in the office of the Re Deeds of Deeds of raven ounty. PAGE 2 RECEIVED SEP 0 8 ?Ob TO HAVE AND TO HOLD said property and all privileges and appurtenances thereunto belonging to the party of the second part, said party's successors and assigns forever. BOUK 1;40 1VEO':1'7 AND the party of the first part does covenant that said party is seized of said premises in fee and has the right to convey the same in fee simple; that the same are free from encumbrances except any encumbrances or restrictions men- tioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed in its corporate name by its President, attested by its Secretary, and its corporate seal to be affixed hereto, all by order of its Board of Directors duly given, this day and year first above written. PIER POINTE AT RIVER N , INC. _� t..v;•^� � B Pre d A , AT E,SY•vt ecre ary NORTH CAROLINA CRAVEN COUNTY I, MAP riuecr4uL.�,r of a Notar Public in and for said County and S a e da ere y cert yaE�x'oc6 . G A yZba h personally appeared before me this day and acknowledged that a she is the ecretary of Pier Pointe at River Bend, Inc., a corporation, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its President, sealed with its corporate seal, and attested by himself/herself as its Secretary. Witness my hand and notarial seal this day of ec�ff f/r[1ber, 1 9881 otary Pu c 'vim My Commission Expires: 7F;t �tiyyl� " RECEIVED SSEP0 8 20b UW4ANbA t4,, t n�i PAGE 4 8WT�1 CAROL�IN�I�t 1:) 8 CRAVEN COUNTY The foregoing certificate of Notary Public of said county and State, is ceVr be correct. This instrument was pres registration this day and hand duly recorded in the office of t egister of ee of craven County, No arolina, in Book /�Zo, at ageZ. �J Th1s t day of / 198 at O'clock M. 1 s� Deeds e u Reg ter of Deeds ^r• 2M Smmomk b _ �:OS \ itii4 OL]St it/ i61�9kl 44 RECEIVED SEP 0 81015 UICA#Ukta t" COASTLINE BUILDING COMPANY, LLC. — PO BOX 12632 - NEW BERN, NC 28561 - TEL. 252-670-5573 www.opestlinebuildinacomoanv.com • email: infodcoestlinetwildinacomoanv.com June 16,2015 Town of Riverbend 45 Shoreline Dr. New Bem, INC 28562 Reference: CAMA Major Permit Notification Enclosure: (1) Copy of application form, Division of Coastal Management CAMA Major Development Permit Dear Sir, On behalf of our client, Pier Pointe Owners Association, Inc., we are providing the enclosure for your review and comment. Craven County records indicate that you own waterfront property that is adjacent to our client's property. That makes you an adjacent riparian property owner. The Division of Coastal Management (DCM) application process requires us to notify adjacent riparian property owners of the proposed project and inform them that they have 30 days from receipt of their notification to provide comments. The proposed project involves replacing the existing bulkhead and piers. Additional boadifts will also be RECEIVED installed. No action is required on your part. However, if you have any comments about the project, please direct the to Mr. Brad Connell at the NC Division of EnvironmentalmSEP 0 81Db and Natural Resourses (NCDENR), Division of chim Coastal Management(DCM), 400 Commerce Ave, Morehead City, NC 28557. Indicate clearly that your comments regard this project. If you have any questions, contac " " ' ' ■ Complete items 1, 2, and 3. A Sgnature Very Truly Yours, ■ Print your name and address on the reverse X l IJ U l l V V W ❑ A Coastline Building Company, LL so mat we can return the card to you. X Racrlwd � 0. D r Del ddn ■ Attach this card to the back of the mailplece, IL or on the front it space permits. 1. Article Addressed to: 11 0. b Kkirm dMaart ham "am 19 ❑ Anthony D. Tyndall, PE �� ^ c f e` ,ie,r Y C �. c�— R YES, enter delivery address below: ❑ No 45-6hofreit-fDe-• N e." -g:r r- n , n/c. Z856 Z IIIIIIIII III II11111IIIIII1111111111I11 9590 9403 0239 5146 2494 95 ❑ A" Sgrat� 0ftS�auRoDney o dern "'a 0 cerheea MM noaerod 00,e7 Pl�M nReg*bweMel'•IN og:ga a ❑ Return R e A W 0 C %M m Delivery Mardurme :le Number(rmnsfer ham 3wvko bW ❑ 0a1W an Dwmy Rwasw ool 0 kw"d Mel 0SWwh"0x*rmeeam^ 0 av7 Cartenneson ❑MW Me ReehleledoetlMy Reebke Desvn PS Form 3811, April 2015 PSN 7530-02-000-WW - p. P M Rapes Craven County Geographic Information System Craven County does NOT warrant the information shown on this page and should tie used ONLY for tax assessment purposes. This report was created try Craven County GIS reporting serve a on 4/26/2015 1:14:36 PM Parcel ID : 8-201-A -029-A Owner : RIVER BEND - TOWN OF Mailing Address : 45 SHORELINE DR NEW BERN NC 28562 SAX Property Address : Description : COMMON AREA 0.770 Calculated Acreage : 0,760 1397-0254 Recorded Date: 12 16 1993 F-114-E $4,000 Tax Exempt: Yes $0 # of Improvements : 0 $4,000 RIVER BEND Fire tax District Special District SERV-GOVERNMENT OWNED, EXEMPT Recent Sales Information SALE DATE Sellers Name Buyers Name 12/16/1993 LOCHBRIDGE RIVER BEND - TOWN OF HOMEOWNERS ASSO INC 12/16/1993 LOCHBRIDGE HOMEOWNERS ASSO INC 2/15/1991 EPAR PARTNERSHIP Sale Type STRAIGHT TRANSFER RIVER BEND - TOWN OF STRAIGHT TRANSFER LOCHBRIDGE NAME CHANGE HOMEOWNERS ASSO INC List of Improvements to Site No improvements listed for this parcel Sale Price $0 $0 0 RECEIVED SEP 0 8 2015 k*44*4v 4*0" COASTLINE BUILDING COMPANY, LLC. — PO BOX 12632 - NEW BERN, I www.coastlinebuildinacomuanv.com • email1: info0coastli June 16,2015 Mr. Berit Peck 108 Outrigger Rd New Bern, NC 28562 Reference: CAMA Major Permit Notification Enclosure: (1) Copy of application form, Division of Coastal Management CAMA Major Development Permit Dear Mr. Peck, On behalf of our client, Pier Pointe Owners Association, Inc., we are providing the enclosure for your review and comment. Craven County records indicate that you own waterfront property that is adjacent to our client's property. That makes you an adjacent riparian property owner. The Division of Coastal Management (DCM) application process requires us to notify adjacent riparian property owners of the proposed project and inform them that they have 30 days from receipt of their notification to provide comments. The proposed project involves replacing the existing bulkhead and piers. Additional boadifts will also be RECEIVED installed. SEP 0 8 2n No action is required on your part. However, if you have any comments about the project, please direct t.11w� f9 to Mr. Brad Connell at the NC Division of Environmental and Natural Resourses (NCDENR), Division of Coastal Management(DCM), 400 Commerce Ave. Morehead City. NC 28557. Indicate clearly that your comments regard this project. If you have any questions, contac • e Complete items 1, 2, and 3. Very Truly Yours, IN Print your name and address on the reverse Coastline Building Company, ILLi so that we can return the card to you. • Attach this card to the back of the mailplece, or on the front if space permits. 1. ie A — to: 1 fee rdcts Qte-(a Anthony D. Tyndall, PE 168 G krI l y t' a Neel[ ?-Aral /Nc zd5�l IIIIIIIII IN 11111111111111111111111111111111111 9590 9403 0239 5146 2495 01 2. Article Number (rmdsfw from O Apem D. Is delivery adAen dMhrem sum Aran 17 U Yee It YES, enter diii atkini below. E3 No 3. Se Type 0Prieft NM eee�e ❑ Mud sig e OR Will ❑ Mud sor Rwekted Dow" O M1yMaad MV 11�11cre ❑Certihd Mae o= ❑ Cwe9ee Mr RwbkYed Dalwy OM un ae•Mrer ❑ Ca on Dw wy cn.mare ❑ Coyeot w Delver RwekW Dery O Slppaae Cdrhm'e - ❑ lh v Mee ❑ Siynrt Cm milian ❑ .k*1W Melt RwekW DelM y % • DOmy PS Form 3811, April 2016 PSN 7530-02-0DO-9053 Domestic All Receipt Craven County Geographic Information System Craven County does NOT warrant the infomrabw shown w this page and should be used ONLY for tax assessment purposes. This report was created try Craven County GIS mp"ng servke5 on 4/26/2015 1:12:55 PM Parcel ID : 8-201 -025 Owner: PECK, BERIT Mailing Address : 108 OUTRIGGER RD NEW BERN NC 28562 an Property Address : 1 MARINA RD Description : ODD FELLOWS FARM Lot Description : Assessed Acreage : 0.000 Calculated Acreage : 2,200 Deed Reference: 2006-1040 Recorded Date: 2 28 2003 Recorded Survey Estate Number: Land Value : $236,940 Tax Exempt: No Improvement Value : $1,090,700 # of Improvements : 3 Total Value : $1,327,640 City Name: RIVER BEND Fire tax District Drainage District : Special District Land use : REC - COMMERCIAL MARINA Recent Sales Information SALE DATE Sellers Name Buyers Name Sale Type Sale Price 2/28/2003 ROBBINS, DOUGLAS K & PECK, BERIT STRAIGHT $475,000 MARGARET E TRANSFER 3/12/1987 ECKBERG, DAVID E & ROBBINS, DOUGLAS K & BUILDING SALE $350,000 DRUSILLA E MARGARET E List of Improvements to Site Type of Structure Year Built Base Area 1st Floor Value NEIGHBORHOOD BAR 1976 4900 $287,700 MARINA 2005 0 $751,900 PARKING LOT 2005 0 $51,100 RECEIVED SEP 0 8 20b 6FM4#► V Wkl!1 C5 N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date April 26, 2015 Name of Property Owner Applying for Permit: Pier Pointe Owners' Association, Inc., Attn: Sam Bidwell Mailing Address: 100 Pier Pointe New Bern, NC 28562 I certify that I have authorized (agent) Anthony Tyndall to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) Remove and Replace Bulkhead and Finder Piers at (my property located at) Pier Pointe in New Bern, NC This certification is valid thru (date) December 31, 2015 �Aj tltiA, 51s11r_- Property Owner Signature — Larry Welss, President, Pier Pointe Owner's Association, Inc. Date kk 4 2C Ae1-1 2-I�—' Sam Bidwell, Chairman Waterfront Committee and Project Manager Date RECEIVEC SEP 0 9 2015 Pier Pointe Owners Association GiiMEMM t indi equals 100leet EXISTING PLAN Owner: Pier Pointe Owners Association 25 Pier Pointe New Bern,NC 28562 Ner Gem 7d?0-- _ PolbdnMNe Vicinity Map Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County W 1, _ 100, PO Box 12632 Page 1 of 3 New Bern, W 28561 252-670-5573 Rip. hr hgs»y ILr Man Made Basin/Canal Connected to Trent River a Approximately 220' Wide red Flaati^9 Dock A— Tie P.I. Typical of 22 Each 1 �+ Exi»irg Open Boat Lift TW.wI of 22��ms/cl�r Prapo»4 2' 6• x 20' Finger 7-. _ ^Ner OWn Boat—.---F _ //�� � �. lJ/f -� I��1= Arm of Hyh 4 Disturbance Apyoxunately 15' Behirk Virryl W"sod Properly Lur A- 459' Existing Wooden Bulkhead Appronm»eN 2BMkd New Virryl Bulkhead PROPOSED PLAN Opposte Shore LLnc —' Biperim Property Lin Total Number of New Boat Slips equals 42 Exi»irg Concr»e Bulkhad to Rrmoin End of New V"I Biil e i Te to E,steg Core. Bulkheod� / I Water D" 0 Bulkhead Y AW, E»ire I.,,M of New V.'I Bulkhead E.M, Open Boot Lift s—\ W at hoposed Bulkhead Below Me Top of Bulkwd W»er DspM» Erd of Prweeol Fioim, Plryer Piers is 4'.8• Tocal Exi»irg Open Bast Lift /''+New Oyer. / Boat 4f= Owner: Pier Pointe Owners Association 25 Pier Pointe New Sefi 28562 Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Rivertxnd Craven County NC 1, a 40, PO Box 12632 Pope 2 of 3 New fin• NC 28561 252-670-5573 Normal Water Level 32" Below Top of Bulkhead Depth of Water 4'-8" at End of Finger Pier 8" PT Piling !! CM Proposed Open Boat Lift River Bottom 8" PT Piling Proposed 2x6 Boardwalk Planks �+4x4 PT Runners Proposed Finger Pier r 4x8x16 Conc. Cap Block SECTION A -A SECTION AT BOAT LIFT 5/8" Tieback Rod PT Deadman Depth of Water 3' at Face of Bulkhead /- i Proposed Virryl Bulkhead Existing Wooden Bulkhead Remove Top Portion as Necessary to install 5/8" &lv. Tieback Rods. Backfill Between the Existing Bulkhead and the New Bulkhead Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County NC Coastline Building Company, LLC 3/8" = 1'-D" PO Box 12632 28561 Page 3 of 3 Now Bern, NC 252-670-5573 u N, 't (•�.� v I RECEIVED SEP 0 8 2015 Existing Open Boat Lift Tie Pilings Typical New Open Boat Lift — — \ New Open Boat Lift 2'-6" Finger PierTypical 21 Total Piers x 20' Long 459' Vinyl Bulkhead w/ 4'Boardwalk New Open Boat Lift New Open Boat Slip Typical Vinyl Bulkhead w/ 242 Cap Existing Open Boat Lift Vinyl Bulkhead w/ 4' Boardwalk Existing Open Boat Lift New Open Boat Lift New Open Boat Lift (0 Floating Dock �erT� a 4 I of o2' ,1�fpclin� �St.C'� i.J'as'. MAY 0 8 1015 Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County NC April 26, 2015 Coastline Building Company, LLC 1" = 40' PO Box 12632 Page 1 of 2 New Bern, NC 28561 Existing Open Boat Lift Tie Pilings Typical New Open Boat Lift New Open Boat Lift ---I 2'-6" Finger PierTypical 21 Total Piers x 20' Long - 459' Vinyl Bulkhead w/ 4'Boardwalk --/ New Open Boat Lift New Open Boat Slip Typical Vinyl Bulkhead w/ 242 Cap Existing Open Boat Lift Vinyl Bulkhead w/ 4' Boardwalk Existing Open Boat Lift 1 New Open Boat Lift New Open Boat Lift (0- Floating Dock lk Bulkhead, Finger Pier and Boat Slip Replacement Pier Pointe Owners Association Riverbend Craven County NC April 26, 2015 Coastline Building Company, LLC 1" = 40' PO Box 12632 Page 1 of 2 New Bern, NC 28561