Loading...
HomeMy WebLinkAboutNTB_05-03_SmithLocal Government CAMA DEVELOPMENT p(�(S,O�N0 �FF PERMIT r�a�t�ptrZe$l�tG'of Florth Carolina, Department of Environment and a ural Resources and the Coastal Resources Commission for development in an area of environmental concern pursuant to Section 7H.1800 . of the - n 15A NCAC , "Coastal Area Management." as requested in the permittee's application, dated GZS' LL3 Perms umber This permit, issued on f)PIC l 071 0.iw5is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. DEVELOPMENT FOR BEACH BULLDOZING - 7H. 1800 1. The area in which this activity is being performed must maintain a slope of adequate grade so as to not endanger the public or the public's use of the beach and should follow the pre-cmergency slopes as closely as possible. The movement of material by a bulldozer, front-end loader, backhoe, scraper or any type of earth moving or construction equipment shall not exceed 1 foot in depth measured from the pre -activity surface elevation. 2. The activity must not exceed the lateral bounds of the applicant's property unless he has the written permission of the adjoining landowner(s). 3. Movement of material from seaward of the mean high water line is not authorized 4. The activity must not significantly increase erosion on neighboring properties and must not have a significant adverse effect on important natural or cultural resources. 5 Adding to dunes shall be accomplished in such a manner that the damage to existing vegetation is minimized The fill areas will be immediately replanted or temporarily stabilized until planting can be successfully completed 6. In order to minimise adverse impacts to nesting sea turtles, no work shall occur within the period of May 1 through November 15 of any year, without the prior approval of the Town of North Topsail Beach, Division of Coastal Management, in coordination with the North Carolina Wildlife Resources Commission, the United States Fish and Wildlife Service and the United States Army Corps of Engineers. 7. If one contiguous acre or more of oceanfront property is to be excavated or filled, an erosion and sedimentation control plan must be filed with the Division of Land Resources, Land Quality Section, or appropriate local government havingjurisdiction. This plan must be approved prior to commencing the land disturbing activity. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this per- mit m..st cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modifications not covered under this permit requires further written permit approval. All work must c s when tis p it expire on n1vvS In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. R FUR: PM 1 / ��� Permittee (signature required if special conditions above apply to permit) (1 Work permitted by this general permit shall be subject to the following limitations: A) no work shall be permitted other than that which is necessary to real ly protect against or reduce the imminent danger caused by the emergency :or to resto a damaged property to its condition immediately before the emergency; (B) erosion control structure shall be located no more 0 feet waterward of the endangered stru e; (C) any fill terials used in conjunction with a ency woif sion control shall be obtained fr an upland source except thedging for fit c is facilities or transportation dors willbe con ' ered in accordance stan C 7H .0208;(D) all fill materials ors associated with temporaryot��jjare locat Coastal Wetlands, Es Water, or Public Trust AE�s ll bp�xnovedra$��e ewer nc event has ended a e area r ored to pre -disturbed co �// (//S (2) This permit only autho ' es the immediate p ection or temporary rehabi 194. // n of public facilities. ng-term stabilization or re lion of public facilities sltallbb nt wi ocal governments' st-disaster recovery plans and policy which are part of their Land Use�A „ History Note: Auth ty G.S. 113-229(cl), 113A-107(a),(b); 113A-113(b) 118.1; Eff. November], 1985; ended Eff. April 1, 1999; February 1, 1996; June 1,1995; Temporary Amendment Eff. July 1, 2 00 0,- May 22, 2000. SECTION .1800 -GENERAL PERMIT TO ALLOW BEACH BULLDOZING LANDWARD OF THE MEAN HIGH WATER MARK IN THE OCEAN HAzARD AEC 15A NCAC 07H .1801 PURPOSE This permit will allow beach bulldozing needed to reconstruct or repair frontal and/or primary dune systems. For the purpose of this general permit, beach bulldozing is defined as the process of moving natural beach material from any point seaward of the first line of stable vegetation to repair damage to frontal and/or primary dunes caused by a major storm event. This general permit is being developed according to the procedures outlined in Subchapter 7J A 100 and will apply only to the Ocean Erodible AEC. This general permit shall not apply to the Inlet Hazard AEC. History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; Eff. December 1, 1987. 15A NCAC 07H .1802 APPROVAL PROCEDURES (a) The applicant must contact the Division of Coastal Management or local permit officer (LPO) and complete an application form requesting approval for development. The applicant shall provide information on site location, dimensions of the project area, and his name and address. (b) The applicant must provide: (1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners indicating that they have no objections to the proposed work; or (2) confirmation that the adjacent riparian property owners have been notified by certified mail ofthe proposed work. Such notice should instruct adjacent property owners to provide any comments on the proposed development in writing for consideration by permitting officials to the Division of Coastal Management within ten days of receipt of the notice, and, indicate that no response will be interpreted as no objection. DCM staff will review all comments and determine, based on their relevance to the potential impacts ofthe proposed project, if the proposed project can be approved by a General Permit. IfDCM staff finds that the comments are worthy of more in-depth review, the applicant will be notified that he must submit an application for a major development permit. (c) No work shall begin until an on -site meeting is held with the applicant and appropriate LPO or Division of Coastal Management representative so that the existing first line of stable natural vegetation can be appropriately marked and recorded on the application. Written authorization to proceed with the proposed development may be issued during this visit. All bulldozing must be completed within 30 days of the date of permit issuance or the general authorization expires. History Note: Authority G. S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; Eff. December 1, 1987; Amended Eff. January 1, 1990. 15A NCAC 07H .1803 PERMIT FEE The applicant must pay a permit fee of one hundred dollars ($100.00) by check or History Note: Authority G.S. 113-219(cl); 113A-107, 113A-113(b), Eff. December 1, 1987; Amended Eff. August 1, 1000; March 1, 1991. ! 13A-I18. l; 15A NCAC 07H .1804 GENERAL CONDITIONS rcN)- (a) Any future setback determinations which may be required shall be trade using the first line of stable natural vegetation established prior to the bulldozing activity. (b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make periodic inspections at any time deemed necessary to ensure that the activity being performed under authority of this general permit is in accordance with the terms and conditions prescribed herein. (c) This permit will not be applicable to proposed construction where the Department has determined, based on an initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality; coastal wetlands; cultural or historic sites; wildlife; fisheries resources; or public trust rights. If a shipwreck is unearthed, all work shall stop and both the Division of Archives and History and Coastal Management shall be contacted immediately. (d) This permit does not eliminate the need to obtain any other required state, local or federal authorization (e) Development carried out under this permit roust be consistent with all local requirements, AEC rules, and local land Use Plans current at the time of authorization History Note: Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; Eff. December 1, 1987; Amended Eff. May 1, 1990; RRC Objection due to ambiguity Eff. May 19, 1994; Amended Eff. August 1,1998; July 1, 1994. 15A NCAC 07H .1805 SPECIFIC CONDITIONS (a) The area in which this activity is being performed must maintain a slope of adequate grade so as to not endanger the public or the public's use of the beach and should follow the pre -emergency slopes as closely as possible. The movement of material by a bulldozer, front-end loader, backhoe, scraper or any type of earth moving or construction equipment shall not exceed 1 foot in depth measured from the pre -activity surface elevation. (b) The activity must not exceed the lateral bounds of the applicants property unless he has the written permission of the adjoining landowner(s). (c) Movement of material from seaward of the mean high water line is not authorized. (d) The activity must not demonstratively increase erosion on neighboring properties. (e) Adding to dunes shall be accomplished in such a manner that the damage to existing vegetation is minimized. The fill areas will be immediately replanted or temporarily stabilized until planting can be successfully completed. (f) In order to minimize adverse impacts to nesting sea turtles, no work shall occur within the period of May 1 through November 15 of any year, without the prior approval of the Division of Coastal Management, in coordination with the North Carolina Wildlife Resources Commission, the United States Fish and Wildlife Service and the United States Army Corps of Engineers, that the work can be accomplished without adversely impacting sea turtle nests or suitable nesting habitat. (g) If one contiguous acre or more of oceanfront property is to be excavated or filled, aneamioAApd sedimentation control plan must be filed with the Division of Land Resources, Land Quality Section or app ap$�p ME jurisdiction. This plan must be approved prior to commencing the land disturbing activ �Ii�pgd; 11/ History Note: Authority G.S.113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-11 I ttt�U Eff. December 1, 1987; MAY U 2 2W5 Temporary Amendment Eff. September 2, 1998; DI V Amended Eff. August 1, 1000. COASTA 'SION OF MANAGEMENT SECTION .1900 — GENERAL PERMIT TO ALLOW FOR TEMPORARY ST5UCTURES WITHIN COASTAL SHORELINES AND OCEAN HAZARD AECS A NCAC er 'S90'ec PURPOSE A p t underthis Section shall allow for the placement of temporary structures within estuarine and publ' tmst shorelines, and o an baaard AECs according to the provisions provided in Subchapter 7I .1100 and accordin o the roles in this Section. HistoryNote: Authority G.S.113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; March 1, 1989; / Arkknded Eff. August 1, 2000. 15A NCAC 07H .1902 PROVAL PROCEDURES (a) The applicant must con t the Division of Coastal Management and c lete a general permit application form requesting approval for develo t. Applicants shall provide information site location, dimensions of the project area, proposed activity, name, address, telephone number. (b) The applicant must provide: (1) confirmation that a wn statement has bee/obmed igned by Ure adjacent riparian property owners indicating that they have objections to theork; or (2) confirmation that the adjacen 'parianpr work. Such notice should ins t adjac development in writing for consi within ten days of receipt of the no DCM staff will review all co and proposed project, if the propos project comments are worthy of in-depth pe owners have been notified by certified mail ofthe proposed property owners to provide any comments on the proposed by permitting officials to the Division of Coastal Management d, indicate that no response will be interpreted as no objection. teZea;rovedby based on their relevance to the potential impacts ofthe a�a General Permit If DCM staff finds that the revthe applicant will be notified that he must submit an application for a major d elopment permit. (c) No work shall begin until an ons' meeting is held with the I representative to inspect and mark th ite of construction of the propose with the proposed development ma a issued by the Division during this vi removed within 180 days follo g the day written authorization is issued. History Note: Authori G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 11 Eff. Afi6rch 1, 1989; Eff. January 1, 1990. and a Division of -Coastal Management ipment Written authorization to proceed l work must be completed and the structure 15A NW 07H .1903 PERMITFEE \ The appXcant must pay a permit fee of one hundred dollars ($100.00) by check or money order payab o the Department. Note: Authority G.S. 113-119(cl); 113A-107, 113A-113(b); 113A-118.1; 113A-119; 113A-119.1; Eff. March 1, 1989; Amended Eff. August 1,1000; March], 1991. 15A NCAC 07H .1904 GENERAL CONDITIONS Onslow County, North Carolina Spatial Data Explorer Pagel of 2 IVr Spatial Data £Zpl(--.)rtr North Carolina Click on the Map to: Ill G MAY v `I Zoomin r ZoomOut G Recenter Map C Identify: Parcel Map M1 Zoom Factor: rRadius Search ( feet) C _COAS �1V1 N ,..�.! SA � MA N.c 4 Parcel Data Find Adjoining Parcels • Abstract Tax Value: $84,439.00 • Tax Parcel ID: 812-16 • Current Tax Value: $84,439.00 • NC PIN Number: 426613047753 • Land Value: $30,000.00 • Tax Record Number 7693 • Structure Value: $54,439.00 • Owner's Name: SMITH HARRY R & LINDA D • Other Buildings Value: • Property Record Card • Improvement Code: D • Plat Book and Page Number.. 03-061 • House Square Feet: 768 • Deed Book and Page:1925 50 • Property Address: 364 TOPSAIL RD • Date Deed Recorded: 11082002 • Township Code: 114 • Deed Stamp Amount: 182000 • City Code: 26 • Tax Acreage Charged: 0.03 • Neighborhood Code: 185 • Zoning Code: R-5 SCALE 1:865 Reference Map W 7 1v Parcel Map [ ETJ Multi Syl Fire Distric Flood Data Multi Syl Soil Map Township [ Election Di [ Census TrE Nelghborh, [ Zoning [ Street Cent [ Index Map (— Aerial Phot Physical r Streams Draw L MAP Cu I me map is prep; inventory of real I within this jurisdic compiled from rep plats, and other r and data. Users hereby notified th aforementioned f information sours consulted for ved information conta map. The Onslov mapping, and sot companies assur responsibility for information conta map or in this we Data Effective DE March 2005 Current Date: 4f; Time: 8:33:57 http://sdx.roktech.netlservleticom.esri.esrimap. Esrimap?name=Onslow&Cmd=sParcel2&P... 4/26/2005 Onslow County, NC Property Record Card Page 1 of 1 OWNERSHIP 02222005 44055 301 IPROPERTY DESCRIPTION ITAX SUBDIVISIONS IMAP NUMBER CARD NO SMITH R 4 L SO LID I P 0�U TWV—I — -I I INORTH TOPSAIL BEACH IRECORD NUMBER:. 7693 300 MILL CREEK DR I I IROUTE 1850444 FUQUAY VARIMA NC 27526 1 ]TEMP-426613 13 1LISTER:HF 060800- 5 DEED:1925 50U11082002 182000- 31364 TOPSAIL RD I IREVIEW:K/D062001 ............. 32 ............. ITOPO ISTREET ..7..: IEEV"@i IPSI—IP WAT RI DT65 I ]SEPTIC I NOTES:OCEAN UNDER HOUSE AT HIGH TID ILIGHT IELECTRICIVDY :BP 10/99 3,500 8 G 1 1 Z PT AD -AD TE -LN - UE 5 C- 5 I1-32KGFUCR3-1-32P— 9DD1 ——3D'tfOII :.7..: WOODDECK I I I ....... .....32............: ]LAND VALUE: 30000 2 2 4 A- 4 BCHHOUSE .4.: 5F @.... 12...... 32....... 12...: :4.6 B- 6 E 6 D- 6 . PORCH ...8..: PORCH :.... 12....: :.... 12...: I IOTHER VALUE: I�N�IALUM LI GABLE 1�itfJGl I WOOD I I1.00STHTI I I I I I I WALLFNSH I FLOORS I HEAT6AIR H TFUELI Rb Y WAALi ISO ` 0I-HM PUFI MEC=1 2 BDRMI I IVINYL I 1 1 6 ROOMI I I I I I1.00LFUFI MAY 0 2 2005 NAGEMENT DWELLING C T C B197UE1985RI991AVERAGE CONDITION 0 - - L - R D -R D -Rl2CD4R8U4L8 t-DJCL4UbR4D5 G-U29CU8L7D8R7H #lSTRUUTUREl5KTCH-SF-STHT=+ - A S3C H1 H 99E 1-7561 17. 601 'r661 -MRS I 0-851 1 �3662I 1 1.00 RATH I I I I I I 1 1 2600.001 1 26001 0.851 1 2210 A177CATUNFGARI 76811.001 7681 14.551 1 1 1 1 14.551 7681 111741 0.851 1 9498 B180 PORCH I 7211.001 721 17.161 1 1 1 1 17.161 721 12361 0.851 1 1051 C188 WOODDECKI 48011.001 4801 7.581 1 1 1 1 7.581 4801 36381 0.851 1 3092 D180 PORCH 1 7211.001 721 17.161 1 1 1 1 17.161 721 12361 0.851 1 1051 E188 WOODDECKI 3211.001 321 10.071 1 1 1 1 10.071 321 3221 0.851 1 274 PISS WOODDECKI 2011.001 201 10.191 1 1 1 1 10.191 201 2041 0.851 1 173 G188 WOODDECKI 5611.001 561 9.821 1 1 1 1 9.821 561 5501 0.851 1 468 768HSF,----=TSF RPCN--63-33/HSF —SS VALU- 70.88/HSF--nM STRUCTURE VALUE: 54439 VALUATIONI-SALrIS-N%i TOTAL VALUE 64439 SZ1=I URTU=FI 11047115LV/AC OTHERFEATI I 1 01 1 1110820021 1 STRUCTURE1 1 1 544391 325471167%11925- 501 1 109TV/HSF TOTAL I 1 1 844391 520991162%1 1820001 4681 236SP/HSF http://www.roktech.net/cgi-bin/onslow/CreatePRC_2.pll?recNum=7693 4/26/2005