HomeMy WebLinkAboutNTB_05-01_Securiy Builders Group LLC--NTB E-----
05 / O 1---
Local Government Permit Number
JAN 1 4 2005 E(CEHVDLAMA
M1NPftA�QfMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management'
Issued to Security Builders Group. LLC, authorizing development in Estuarine Shoreline AEC at 1 559 New
River Inlet Road, NTB, NC 28460 as requested in the permittee's application, dated December 20, 2004.
This permit, issued on lanuary 11. 2005, is subject to compliance with the application and site drawing
(where consistent with the permit), all applicable regulations and special conditions and notes set forth
below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may
cause the permit to be null and void.
DEVELOPMENT FOR THE ESTAURINE SHORELINE - 7H. 0209
This permit authorizes the construction of a multi family dwelling, gravel driveway, crosswalk and
landscaping.
1. All proposed development and associated construction must be done in accordance with the
application submitted on December 20, 2004. All construction must conform to the N.C.
Building code requirements and all other Local, State and Federal regulations.
2. Any change or changes in the plans for development, construction, or land use activities will
require a re-evaluation and modification of this permit.
3. The amount of impervious surface shall not exceed 30% of the lot area within the 75' of the
normal high water contour/normal water contour, which defines the Coastal Shoreline AEC at
this location. In this case 6.367 square feet of impervious surface is authorized.
4. In order to prevent sedimentation, a vegetated or planted buffer zone must be maintained
between all disturbed areas and the adjacent water body or marsh. In this case a 30-foot wide
buffer has been accepted.
Conditions continued on second page
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date. From
the dale of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2008
In issuing this permit it is agreed that this project is consistent with
the local land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
CAMA Local Permit Official
Pernittee (signature required ti conditions above apply to permit)
Name: SECURITY
Minor Permit #05/01
Date: JANUARY 11, 2005
5. Prior to initiating any land -disturbing activities, adequate sedimentation/erosion control
measures must be employed to prevent the movement of unconsolidated materials into the marsh
or water. These measures must remain in place until such time as the area is properly stabilized
with vegetated cover.
6 .Pursuant to 15 NCAC, Subchapter 710406 (b), this permit may not be assigned, transferred,
sold or otherwise disposed of to a third parry by the applicant, agent, or any entity other than the
NC Division of Coastal Management.
7. It is noted that coastal marsh does exist on the property, and that the proposed development
addressed on the submitted plat dated October 14, 2004 is not located within this marsh.
8. No excavation or filling of any wetlands or waters is authorized under this permit.
9. The development authorized under this permit must be accomplished a minimum of 30'
landward of the normal high water contour/normal water contour, maintaining this as a
vegetated or planted buffer area.
10. The area proposed for grading within the 30' buffer from the normal high water
contour/normal water contour must immediately be vegetatively stabilized, and must remain
in a vegetated state.
11. This permit does not authorize the construction of anv piers or docks.
12. A copy of this permit must me maintained on site during development.
Signature Date
D E(CF7VE
JAN 1 4 2005
DIVISION OF
COASTAL MANAGEMENT
168474 Affidavit of Publication
15049551 Jacksonville Daily News
1 of 2 Jacksonville, NC
Personally appeared before me, a N ary Public of the County of Onsiow, State of North Carolina, on this the 23rd day
of Dece 004
of The Daly News, who being duly sworn, states that the advertisement entitled CAMA- SECURITY BUILDING
GROUP, LLC a true copy of which is printed herewith, appeared in The Daily News, a newspaper published in the City
of Jacksonville, NC, County of Onsiow, State of North Carolina, 1 day a creek far—y."":&On the following
dates:
December 23, 2004
NORTH CAROLINA
ONSLOW COUNTY
NOTICE OF FILING
OF APPLICATION
FOR CAMA MINOR
DEVELOPMENT PERMIT
Pursuant to NCGS 113A-119 (b), the Town of North Topsail Beach, a locality authorized to issue CAMA permits in
Areas of Environmental Concern, hereby gives NOTICE that on December 20, 2004, Security Building Group, LLC,
applied for a CAMA permit to construct a duplex dwelling with a foot print of 1,470 square feet at 1559 New River Inlet
Road, North Topsail Beach, Onslow County, North Carolina. The applications may be inspected at the address below.
Public comments received by January 2, 2005, will be considered. Later comments will be accepted and considered up
to the time of permit decision. Project modifications may occur based on further review and comments. Noticeof the
permit decision in this matter will be provided upon written request. CAMA PERMIT #04/110 1
Sue McLaughlin, CAMA
Local Permit Officer
Town of
North Topsail Beach
2008 Loggerhead Court
North Topsail Beach,
NC 28460
December 23, 2004
E CE�VE
IAN 1' 2111
COASTAL DIVISION
MANAGEMENT
DEVELOPMENT
PERMIT
In 1974, the North Carolina General Assembly passed the Coastal Area
Management Act and set the stage for guiding development in fragile
and productive areas that border the state's sounds and oceanfront. Along
with requiring special care by those who build and develop, the General
Assembly directed the Coastal Resources Commission (CRC) to imple-
ment clear regulations that minimize the burden on the applicant.
This application for a minor development permit under CAMA is part
of the Commission's effort to meet the spirit and intent of the General
Assembly. It has been designed to be straightforward and require no
more time or effort necessary from the applicant. Please go over this
folder with the Local Permit Officer (LPO) for the locality in which you
plan to build to be certain that you understand whatinformation he or
she needs.
Under CAMA regulations, the minor permit is to be issued within 25
days once a complete application is in hand. Often less time is needed if
the project is simple. The process generally takes about 18 days. You
can speed the approval process by making certain that your application
is complete and signed, that your drawing meets the specifications given
inside and that your application fee is attached.
Other permits are sometimes required for development in the coastal
area. While these are not CAMA-related, we urge you to check with the
Local Permit Officer to determine which of these you may need. A
listing is included on page 2 of this folder.
'.We appreciate your cooperation with the North Carolina Coastal Man-
agement Program and your willingness to build in a way that protects
xhe resources of our beautiful and productive coast.
Coastal Resources Commission
Division of Coastal Management
G
Lbca
P1
Pe Ocea
rei
p] GEN
LAN]
PI
Name
Addre;
City
AUTHORIZED AGENT
If' Name AVID R HF44/1/1zle.
Address S_/7 n,/ 111 MORE ,(aett/E
City Sg~ 6" State Ak- Zip 2e*460 Phone 9/&' 3Z7. 2%1%
LOCATION OF PROJECT. (Address, street
If the adjacent waterbody?) 1559 /✓ald
and/or directions to site. If not oceanfront, what is the name of
DI DESCRIPTION OF PROJECT: (List all proposed construction and land disturbance.)
4 pd r zw'146 GkocriA6.
SIZE OF LOTMARCEL: % l square feet " acres
PROPOSED USE: Residential (Single-family _Multi -family ) Commerical/Industrial _
Other
Ni TOTAL ENCLOSED FLOOR AREA OF A BUILDING IN THE OCEAN HAZARD AREA OF ENVI-
r'.
H. RONMENTAL CONCERN (AEC): square feet (includes all floors and roof -covered decks)
SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT -UPON SURFACES IN
THE COASTAL SHORELINE AREA OF ENVIRONMENTAL CONCERN (AEC): 2814- sq. ft.
(Calculations include the area of the roof/drip line of all buildings, driveways, covered decks, concrete or masonry patios,
etc. that are within the applicable AEC. Attach your calculations with the project drawing.)
Choose the AEC area that applies to your property:
(1) within 75 feet of Normal High Water for the Estuarine Shoreline AEC
(2) within 575 feet of Normal High Water for the Estuarine Shoreline AEC, adjacent to Outstanding
Resource Waters
(3) within 30 feet of the Public Trust Shoreline AEC
(Contact your Local Permit Officer if you are not sure which AEC applies to your property.)
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a
State Stormwater Management Permit issued by the N.C. Division of Water Quality?
YES NO
-
I
If yes, list the total built -upon areahmpervious surface allowed for your lot or parcel. square feet.
OTHER PERMITS MAYBE REQUIRED: The activity you are planning may require permits er than the CAMA minor
development permit. As a service we have compiled a list of the kinds of permits that might be required.' efs�t you check over the list .y
with your LPO to determine if any of these apply to your project: Zoning, Drinking Water Well, Septic r r sanitarywaste .r.
treatment system), Building, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Eric ns i, Certification, [i
Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway,
co �Fc d
Z
STATEMENT OF OWNERSHIP: q O<"9I, the undersigned, an applicant for a CAMA minor development permit, being either the ow erQ4Q r manperson authorized to act as an agent for purposes of applying for a CAMA minor development perm thalisted as landowner on this application has a significant interest in the real property described therein. Th ''� 4res
described as: (check one) p 2Fj� a
�a'n_ owner or record title. Title is vested in Sfwi!47 p 1164or 1!1P h.� , see Deed Book 2✓TZ
pageJw''�1 in the oms4 a County kegistry of Deeds. 1
_an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in County.
_if other interest, such as written contract or lease, explain below or use a separate sheet and attach to this application.
NOTIFICATION OF ADJACENT PROPERTY OWNERS:
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given
ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit.
(1)
(2)
(3)
(4)
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
I acknowledge that the land owner is aware that the proposed development is planned for an area which may be susceptible to
erosion and/or flooding. I acknowledge that the local permit officer has explained to me the particular hazard problems associ-
ated with this lot. This explanation was accompanied by recommendations concerning stabilization and floodproofing tech-
niques.
PERMISSION TO ENTER ON LAND:
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer and his agents to
enter on the aforementioned lands in connection with evaluating information related to this permit application.
This application includes: general information (this form), a site drawing as described on the back of this application, the
ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality, and any infor-
mation as may be provided orally by the applicant. The details of the application as described by these sources are incorporated
without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any
person developing in an AEC without permit is subject to civil, criminal aiA administrative action.
Landowner or person authorized to act as his agent for pui¢ose of filing a CAMA permit application.
-SITE DRAWING/APPLICATION CHECKLIST
Please make sure your site drawing includes the following information required for a CAMA minor development
permit. The drawing may be simple and not necessarily to scale. The Local Permit Officer will help you, if
requested.
PHYSICAL DIMENSIONS
Label roads
Label highways right-of-ways
Label local setback lines
Label any and all structures and driveways currently existing on p
PHYSICAL CHARACTERISTICS O
Draw and label mean high water mark
Draw location of on -site wastewater system
If you will be working in the ocean hazard area:
Draw and label dune ridges (note height)
Draw and label toe of dune
Identify and locate first line of stable vegetation
Draw and label setback line under CAMA
Draw and label topographical features (optional)
If you will be working in an estuarine shoreline area:
Draw and label landward limit of AEC
Describe terrain (slope)
DEVELOPMENT PLANS
o-'a
9�2,9 0� �Ooy
F�
F�
Draw and label areas that will be disturbed
If a house is to be placed on lot, describe location of house
Note size of piling and depth to be placed in ground
Draw and label all areas to be paved or graveled
Describe composition of surface
Note and list fully all trees and vegetation to be removed or relocated
Show landscaping
NOTE TO APPLICANT
Have you:
• completed all blanks and / or indicated if not applicable?
• notified and listed adjacent property owners?
• included your site drawing/
• signed both application and statement of ownership?
• enclosed the $100.00 fee?
• completed an AEC Hazard Notice, if necessary?
FOR STAFF USE
Site Notice Posted !�WOyFinal Inspection Fee Received
Site Inspections
Date of Action: Issued Exempted
Denied Appeal Deadline (20 days)
Revised 3/2003
a' z ;
IINTRACOASTAL WATERWAY
�IY o
�FC � N
?a, C003 0/1/0, i
38• q
S MgotVp,� z SUE o
leno/, Galleon Bay
4 9B. II, Pg. 72
S9
"
p1GSR 1668
VICINITY SKETCH
Not To Scale
ky
w
F
Z
Note:
House Dimensions Shown
Are Per Floor Plans
Furnished By Owner
Ist Line Of Vegetation
to Be Verified Prior To
Any Construction
Water service provided by
Onslow County.
Sewer service provided by
North Topsail Utilities.
Subject property is located
Lot B
M.B. 20, Pg. II
\
Plan "Pfonmiller"
42.33'x35.67'
(Excluding Deck)
N70.02'31"E 75.05'
\
S
0.66 Ac
\ss
\
W
4 D \
9
e �
Q.
e PKF
P /O
n
33 W s 9 Al .j0.62`2q�, r t�
cpP njV f� S k'O Pg�a/@�Uc�
pF o
i5 � LEr FP1n
Cep R/W - RIGHT-OF-WAY
¢ - CENTERLINE
.To S M9L — MINIMUM BUILDING LINE
'p R/W — RIGHT OF WAY
\'020 P6
'15 \oi
�3 23vy0"�"t �Ny.U.
9 oy;�c+`0W C OCeAiN
cAgstseaua
� oa PPPr �.:
OP�o�
'�FESSlp 2 ;
cr-AI
SETBACKS.
SIDE YARD - B'
FRONT - 20'
REAR - 10'
+s a
i F
IPT
Fmdate
e flenrMe $2.30 0460
it R94opt+'Mie $0.00 Flare
Lj Rio
a (Enndmorse� mR�e"j,'dmy $0.00
a
Tmn1Pr: ap,I%Frrre $ $2.67 12/09/2004
m
L
RrPOBox In. 1�--2 i 11.q !te_ -- •---._..
a "to,(" `- a Jcd tv Y 1
,Fln
f`�, •MAIL. -p
rl-' I A L. US
$0.37
Poroatp ® 0460
OVINed Fee 02
M pcdmmk
Rat mPolept Fee Home
O (Embme neat Flequlmd) Flare
r� RosMct d" erwmr Fee
(°ntora� ae-t rtege!md) . 12/09/2004
m Totnl WtVn-Veae $
9
Thor'rt.es Qitfz __
!nrroB xtrp, .,� 40 �p �� __ ��-�4?-t— Orr ✓L-
lrr
F VV
ru r t
m • _
ti
I+, ) `I
r`-
Ir Ibe ego 8
Oerllded Fee $2.30 0460
0 02 Peetmadc
Im Ramm I Fee $0.00 Hate
� (Endorsement Repuh'ad)
CI Peeldmed ' Mirreee $0.00
rry (Endnraem t FRM•99ulrsd)
rR
m Shtal Pnetelte e. Fees $ $2.67 12109/2004
onk', �-h1cWia. i'Y1e1Re nul S
arPOBo,__-----
i`ay,--
.St,1.�t9.rtsboVo,
m A
rtl .
nu I q�SE
Fti —
Ir FMmlaga $
�r 0meaedFee $2.30 0460
02 Poetmerk
Rerun R + pt Fee Here
d (Endoroemtm mqu red) $0.00
m Remnmee�Iyery Fee $0.00
,.q (Endoosn=ReQn fed)
rq
m Tetat Fuetaw S Feee $ $2.67 11/07/2004
m
0 nt
o M �) n a s Zak ----
orPOBa w 2'2Z %1( ti-W' l7 S
�)
�RCEHVE
11121 2004
DIVISION OF
COASTAL MANAGEMFNT
AEC HAZARD NOTICE
Project Is In An: ✓ Ocean Erodible Are High Hazard Flood Area Inlet Hazard Area
Date Lot Was Platted:
This notice notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules on building standards, oceanfront
setbacks and dune alteration are designed to minimize,but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
—'5 - feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as 2Q feet landward in a major storm.
The flood waters in a major storm are predicted to be about
'QI_ feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without tye7proper siggturr/, the application will not be
Z•2o�
Date
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for development in this
area expire on December 31 of the third year following the
yeF
which the permit was issued. Shortly before work
eon the project site, the Local Permit Officer will
deine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
C
Loca-r7l&mit Officer
act LoGc�e�J�oo
Address
Lo
Phone
CO�STq �MS�?9�
qN GFM�
NT
Revised 11193
NOTICE OF FII,ING
OF APPLICATION FOR
CAMA MINOR DEVELOPMENT
PERMIT
Pursuant to NCGS 113A-119(b), the Town of North Topsail Beach, a locality authorized
to issue CAMA permits in Areas of Environmental Concern, hereby gives NOTICE that
on December 20, 2004, Security Building Group, LLC, applied for a CAMA permit to
construct a duplex dwelling with a foot print of 1,470 square feet at 1559 New River Inlet
Road, North Topsail Beach, Onslow County, North Carolina. The application may be
inspected at the address below. Public comments received by January 2, 2005, will be
considered. Later comments will be accepted and considered up to the time of permit
decision. Project modifications may occur based on further review and comments.
Notice of the permit decision in this matter will be provided upon written request.
CAMA PERMIT # 04/110
Please print on December 23, 2004
Sue McLaughlin
CAMA, Local Permit Officer
Town of North Topsail Beach
2008 Loggerhead Court
North Topsail Beach, NC 28460
1p
CpgSTO��/S/� ?00f
MgN op
�FMF
Nr
?eoamber 1, 2004
i'ra k Thomas Patz
' 00 Country Haven Drive
' Vilirungfon, NC
_TtE: CAMA MINOR PERMIT APPLICATION
TO Whom It May Concern:
The Security Building Group is applying for a CAMA Minor Permit to construct a
cuplex at Lot 8 Sea. Dragons, 1559 New River Inlet Road.
If you have any question or concerns about this development, please contact Mrs. Sue
14-T.tugtlin of the Town of North Topsail Beach, 2008 Loggerhead Court, NTB, NC,
' S460 or at 910 328-1349.
ltdncervly,
Da.vP.d 31. Pfamniller
1,1,wag: ng Partner
Se-:crity Building Group, LLC
December 1, 2004
Stever Lyle
,f17 Wheeling Ave.
Staten Island, NY 10309
11 : CAMA MINOR PERMIT APPLICATION
.b Whom It May Concern:
Thy Sacurity Building Group is applying for a CAMA Minor Permit to construct a
dupl.et at Lot 8 Sea. Dragons, 1559 New River Inlet Road.
Tf you have any question or concerns about this development, please contact Mrs. Sue
AFc-Z.aaghlin of the Town of North Topsail Beach, 2008 Loggerhead Court, NTB, NC,
.-T460 or at 910 328-1349.
Minor-Tely,
David.-R- Pfanmiller
Pdanaging Partner
.security 3uilding Group, LLC
j90&jVz
DEC � 9 2M4
COgs At 4 10 Op
AGFMENl
December 1, 2004
Tb.omas Zak
`224 US Highway 17S
i 1,n. P.enr, NC 28562
III-: CAPITA MINOR PERMIT APPLICATION
"'o Whom It May Concern:
The Security Building Group is applying for a CAMA Minor Permit to construct a
i .uplex at Lot 8 Sea Dragons, 1559 New River Inlet Road.
EFyou have any question or concerns about this development, please contact Mrs. Sue
14icLaugbfin of the Town of North Topsail Beach, 2008 Loggerhead Court, NTB, NC,
€460 or at 910 328-1349.
Sincerely,
Dav:.d It. Pfanmiller
Manag: ng Partner
Swxft.y Building Group, LLC
CpgSTp(�Mq�N OF
���MFNT
7rxember 1, 2004
itank"i and Maria McReynolds
i3 8 Corbett Ave.
i;�r_.msboro, NC 28584
'ZL: CAJAA MINOR PERMIT APPLICATION
i'c'Whom It May Concern:
he: Security Building Group is applying for a CAMA Minor Permit to construct a
luple,c at Lot 8 Sea Dragons, 1559 New River Inlet Road.
If you have any question or concerns about this development, please contact Mrs. Sue
VcL.aughlin of the Town 'ofNorth Topsail Beach, 2008 Loggerhead Court, NTB, NC,
Z4�r5C" or at 910 328-1349.
Sincerely,
1�7vid R. Pfanmiller
4anag; ng Partner
Seoariy Building Group,.LL.0