Loading...
HomeMy WebLinkAbout121-15 Minor Mod 2018 NCDNCRPermit Class MODIFICATION/MINOR Permit Number 121-15 STATE OF NORTH CAROLEVA Department of Environmental Quality and Coastal Resources Commission Permit RECEIVED MAY 3 0 2018 for DCM-MHD CITY X Major Development in an Area of Environmental Concem pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to NC Dept. Of Natural and Cultural Resources, 8884 St. Phillips Road SE, Winnabow, NC 28479 Authorizing development in Brunswick County at the Cape Fear River, 8884 St. Phillips Drive SE. Winnabow , as requested in the permittee's application letter dated 4/10/18 met. attached d workplan drawings (10), Sheets 1-10 of 10, dated 4/10/18. This permit, issued on May 21, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this Minor Modification authorizes the reconfiguration of the permitted sills, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910) 796- 7215 for this determination. 2) All conditions and stipulations of the active permit remain in force under this Minor Modification, unless specifically altered herein. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. '�R� r I r�97'Wi K Braxton . Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Petmittee NC Dept. of Natural & Cultural Resources Permit No.121-15 Page 2 of 2 ADDITIONAL CONDITIONS 3) In accordance with commitments made by the permittee, the intermediate flanking protection authorized under this Minor Modification shall be removed in conjunction with the construction of Phase 3. The permittee is further advised that any additional deviation from the originally permitted plans may require further.modification of the permit prior to the initiation of Phase 3. 4) This Minor Modification shall be attached to the original permit, which was issued to the permittee on 10/26/15,.the Minor Modification which was issued on 5/1/17, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 5) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers assigned the proposed project Action ID No. SAW-2012- 00739. NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. DWR- 15-0672. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. Coats, Heather From: Coburn, Chad Sent: Monday, May 14, 2018 12:52 PM To: Coats, Heather; Hair, Sarah E CIV CESAW CESAD (US) Subject: RE: Ft. Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Attachments: GC41444097.pdf This doesn't require anything from me now that the GP291 has been updated. Our GC4144 covers it. From: Coats, Heather Sent: Monday, May 14, 2018 9:35 AM To: Coburn, Chad <chad.coburn@ncdenr.gov>; Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Subject: RE: Ft. Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Hi Chad, No excavation- and I don't think there's any fill by your standards- its realigning the reef maker sill structure from the original proposal. The individual components are disks installed on pilings. Do you need a copy of the mod request? Heather Coats Beach & Inlet Management Project Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heather. coatsComcdenr.00v 127 Cardinal Drive Extension Wilmington, NC 28405 RECEIVED KC. !''Nothing Compares - u. MAY 3 0 2018 Email correspondence to and from this address is subject to the OCM'MHO CjTy North Carolina Public Records Law and may be disclosed to third parties. From: Coburn, Chad Sent: Monday, May 14, 2018 7:33 AM To: Coats, Heather <heather.coats@ncdenr.gov>; Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Subject: RE: Ft. Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Was there any new fill or excavation? From: Coats, Heather Sent: Friday, May 11, 2018 3:23 PM To: Hair, Sarafi E C.IV CESAW CESAD (US),<Sarah,E. Hair@usace.army.mit>; Coburn, Chad <chad.coburn@ncdenr.aov> Subject: Ft Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Hey Liz and Chad, Have you had a chance to look over the minor mod request for Ft. Anderson/Brunswick Town or Liz, do you know if Tyler issued that before he left? Thanks! Heather Heather Coats Beach & Inlet Management Project Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heath a r. co a is (aD n cd e n r. g ov 127 Cardinal Drive Extension Wilmington, NC 28405 f X:�- Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ROY COOPER Gov,, mw MICHAEL REGAN - Secreurry CoastalROment BRAXTON DAVIS ENVIRONMENTAL QUQUALITY Z)lNaw MEMORANDUM TO: Heather Coats DCM Major Permit Assistant Coordinator, Wilmington FROM: Brooks Surgan$S DCM Field Representative, Wilmington THRU: Debra D. Wilson of DCM District Manager, Wilmington DATE: April 16, 2018 SUBJECT Permit Modification Request to State Permit #121-15 NCDCR State Historic Site Brunswick Forest/Fort Anderson Southport, Brunswick County Mr. Christopher Dustin with North State Engineering, PLLC is requesting a minor modification to State Permit #121-15 on behalf of the N.C. Department of Natural and Cultural Resources. State Permit #121-15 was issued on October 26, 2015, authorizing the construction of an offshore living sill, riprap placement and marine mattress relocation to stabilize the shoreline adjacent to the Cape Fear River at Fort Anderson, near Winnabow, Brunswick County. State Permit #121-15 was modified May 1, 2017 authorizing the reconfiguration of 200 linear feet of offshore living sill, the construction of a riprap wall, and relocation 50 feet of existing mattress. State Permit #121-15 is due to expire on December 31, 2018. Mr. Dustin is requesting a modification to State Permit #121-15 to allow for the construction of "Reef Phase 2" which comprises of approximately 240 feet of additional wave attenuators. The applicant states that the alignment of the new structures would remain approximately along the negative 4-foot contour with the last four attenuator units aligned at a 45- degree angle towards the shore. The purpose of the 45-degree angle would be to protect the shoreline from flanking. The applicant proposes to use 4 eco-discs from each existing attenuator to construct the new attenuators and the alignment of the new structures would be congruent with what is existing (see drawing 3 and 4 of 10, dated 04/10/18). No wetland vegetation planting is proposed as part of this modification request. The applicant has requested that all proposed modifications be conducted in Phase 2 of the construction process, due to funding and time constraints, and the urgent need for protection in those specific areas. RECEIVED APR 18 2018 Smte of Noah Camlma I EnROnmenml QmJny I Cmw Management DC M-MHD CITY 127 Catdmal Drive Ezt. Wilmington NC 29405 910 796 7215 T The applicant has submitted a check (check No. 204) in the amount of $100 for the modification request along with the letters and proof of notification to the adjacent riparian property owners. As proposed, this office has no objection to the proposed project modification as long as there are no objections from the other agencies to this proposal. It appears that the project continues to be CONSISTENT with the use standards set forth in 15A NCAC 07H .0206 and 15A NCAC 07H.0209. This project aims to protect historic resource, which continues to be CONSISTENT with the general use standard enumerated in 15A NCAC 07H .0208(a)(2)(C). By copy of this memo, DCM is requesting that the DWR, DMF-Shellfish Section, DCM-Fisheries Representative, WRC, and US ACOE provide any comment that your agency may have on the proposed project to Heather Coats of DCM's Wilmington office within 14 days of receipt of this memo. Enclosures cc: AChad Coburn, DWR ✓ Maria Dunn — WRC ✓Jeremey Humphrey, DMF-Shellfish Section , Tyler Crumbley, USACE , / Curt Weychert, DCM RECEIVED APR 18 ZOIB State of North Cmalma I Enwonmewl Quality I Coastal MaWment DCM-MHD CITY 127 CmdhW Drive Fad. Wilmington NC 29405 910 796 7215 T North State Engineering, PLLC April 10, 2018 Brooks R. Surgan North Carolina Department of Environmental Quality Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405 Subject: Minor Modification to existing LAMA Major Permit #121-15 for Brunswick Town/Fort Anderson in Brunswick County. Dear Mr. Surgan, The North Carolina Department of Cultural and Natural Resources would like to request a minor modification to its existing CAMA Major Permit #121-15 for shoreline stabilization at the Brunswick Town/Fort Anderson State Historic Site. The primary reason for this request is to utilize existing funds to further expand our shoreline protection efforts. The modifications requested are an adjustment to the location of the planned Phase II reef maker sill. A new plan set along with the original plans are included for reference. The current funds allow us to continue from Phase I which is now complete and emplace 1pproxi 240 feet of additional structur"The alignment will remain approximately along the negative 4-foot contour with the last four units on a 45 degree angle to serve as an intermediate flanking protection for the shoreline. Four eco-disks from each reef maker unit of the existing Phase I structure will be removed and utilized for the construction of Phase II reef maker structure. Phase II will connect into the existing Phase I structure and the rest of the permitted structure as funding allows. The North Carolina Department of Natural and Cultural Resources is in continuing discussions with the North Carolina State Legislature and is optimistic that the approval of additional fund appropriations will be allocated this year and in future years for construction of the remainder of this project. it is also still the intent of the North Carolina Department of Natural and Cultural Resources to use this site for research monitoring and environmental education and outreach to promote the preservation of cultural resources and the restoration of natural resources. Sincerely, North State Engineering, PLLC ���'D`� C ristopher ustm Environmental Project Manager & UAS Program Manager North State Engineering, PLLC 910-612-1302 P.O. Box 10339 RECEIVED Wilmington, NC 28404 APR 182018 DCM-MHD CITY AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: �L �ep.r Ok N1�Tt�Kt. W�Jt ,,v�r11 p,Csv Ll PLC: Mailing Address: ti+CO� M&IL ee,JUe R- 'Rf\LEIC1bi IBC 2-.1 b99- t}foo5 Phone Number: 11� `$O 1-7 4-7 4 Email Address: TQV1W,P,011VJU (I V)(AG1L1g0'V I certify that I have authorized North State Engineering, PLLC. Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: at my property located at W I N tl* P0yo 1� C in AU�5iwlck County. 1 furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature `Tony RomA MG Print or Type Name FA I u t!� c0ANV(T1 o N C'1J6r I N 67F2 Title (,I I Date RECEIVED This certification is valid through I I APR 18 2018 DCM-MHD CITY NOTIFICATION FOR CAMA MAJOR MINOR MODIFICATION North State Engineering, PLLC 2889 Lowery Street Winston-Salem, NC 27101 Certified Mail — Return Receipt April 10, 2018 Orton Plantation Holdings, LLC 1711 Floor. 1251 Avenue of the Americas, New York, NY 10020 Orton Plantation Holdings, LLC: ru ,n m 085157-ONSAMUMM s r NEIJYORY Y NY 10020 m cemned-rwfiPeo $3.45 04U s ktlra Survicm R emJ Icnxk po,l acV ra .O�v ml 1 � ❑ONwnnucay�N.�coml s_- I 111_ 18 �Qnannn Hw.ln��.�•cvo�xcl f.�CL_00 - AP �9P*" p s_-.tom_ Hero 1-3 QhMif :Jyupxe xp.4kiivl O.YVgy i .__ _____ O 7 pm,go $2.05 m f fiw osuyeandFe 04/10/2018 r- $5.50 Sa�n io 1 (7�QN PLAN'jM16N ----- M1".4 o' Va' e'APW rib, mF'driocNe.._.._.-_ c� _ r-. WAR --- --M ,61✓L� .4 )J2K, nJ v /0U.1? 0 Brunswick Town/Fort Anderson is applying for a CAMA Major permit to its CAMA Major Permit #121-15 for shoreline stabilization along the Cape Fear River, located at 8884 St Phillips Road SE, in Winnabow, NC 28479. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to District Manager Debbie Wilson, Wilmington District, 127 Cardinal Drive Extension, Wilmington, NC 28405-3845, within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 910-612-1302, or e-mail me at c.dustinCc+)nseneullc.com Sinc rely, Christopher Dustin North State Engineering, PLLC P.O. Box 10339 Wilmington, NC 28404 910-612-1302 RECEIVED APR 182018 DCM-MHD CITY NOTIFICATION FOR CAMA MAJOR MINOR MODIFICATION North State Engineering, PLLC 2889 Lowery Street Winston-Salem, NC 27101 Certified Mail - Return Receip April 10, 2018 MOTSU (Colonel C. Hart) 596tt' Transportation Brigade 6280 Sunny Point Rd SE, Southport, NC 28461-7800 MOTSU: U.S. Postal Service'" CERTIFIED MAIL' RECEIPT Domestic Mall Only Information. visit our website at www.usps.corn For delivery S O Co ra ra 0 0 0 0 s m m r- r_1 0 r` Brunswick Town/Fort Anderson is applying for a CAMA Major permit to its CAMA Major Permit #121-15 for shoreline stabilization alongthe Cape Fear River, located at 8884 St P h i I I i ps R oa d SE, in Winnabow, NC 28479. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to District Manager Debbie Wilson, Wilmington District, 127 Cardinal Drive Extension, Wilmington, NC 28405-3845, within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 910-612-1302, or e-mail me at c.dustin(@nsenaollc.com Sincerely, I ArisUtovpthotfr�Dusqini`4A�� North State Engineering, PLLC P.O. Box 10339 Wilmington, NC 28404 910-612-1302 RECEIVED APR 18 Z018 DCM-MHD CITY Date Date Check From Name of Vendor Check Check Permit Rd. # Received Deposited Permit Holder Number amount Number/Comments 4/16/2018 Christopher Dustin NC Dept of Natural Sharonview 204 $100.00 minor modification BS rct. 6167 & Cultural Federal fee/121-15/Ft.Anderson, Rescources Credit Winnabow BrCO Union W LLI co ao a U Q CU a I Coats, Heather From: Weychert, Curtis R Sent: Friday, April 20, 2018 8:25 AM To: Wilson, Debra Cc: Coats, Heather; Surgan, Brooks R Subject: modification to Permit#121-15 Fort Anderson I have no comments on the proposed changes. Curtis Weychert Fisheries Resource Specialist North Carolina Division of Coastal Management North Carolina Department of Environmental Quality 252-808-2808 ext. 213 Curt. Weychert(a)ncdenr.gov 400 Commerce Ave. .Morehead City, NC 28557 4= Nothing Compares I�v DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 May 14, 2018 Regulatory Division Action ID No. SAW-2012-00739 and State Permit No. 121-15 General Permit No. 198000291 Re: NCDCR State Historic Site Brunswick Town/Fort Anderson North Carolina Department of Natural and Cultural Resources Mr. Tony Romaine, Facility Construction Engineer Brunswick Town/ Fort Anderson 4605 Mail Service Center Raleigh, North Carolina 27699 Dear Mr. Romaine: Through coordination with the North Carolina Division of Coastal Management, and on behalf of the North Carolina Department of Cultural and Natural Resources, we have learned of your request to modify your existing Department of the Army (DA) permit, issued on November 9, 2015. Your recent request involves the construction of "Reef Phase 2," which comprises of approximately 240' of additional wave attenuators to stabilize the shoreline adjacent to the Cape Fear River at Fort Anderson, near Winnabow, Brunswick County. Coordinates are: 34.03991 N,-77.943393 W. Your proposal continues to be consistent with the provisions and objectives of general permit No. 198000291 (copy enclosed). The permit is hereby modified. It is understood that all other conditions of your permit remain applicable. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2021. RECEIVED MAY 14 2018 DCM WILMINGTON, NC -2- Questions or comments may be addressed to Ms. Liz Hair, Wilmington Field Office, Regulatory Branch, telephone 910-251-4049. Sincerely, Liz air Regulatory Project Manager Enclosures: CAMA permit Plans GP291 Conditions Copy Furnished (w/ enclosures): North State Engineering, PLLC Attn: Mr. Christopher Dustin Post Office Box 10339 Wilmington, North Carolina 28404 e-Copies Furnished (w/o enclosures): Mr. Doug Huggett - NCDEQ/DCM Mr. Chad Coburn - NCDEQ/DWR Ms. Courtney Spears — NCDEQ/DCM Ms. Karen Higgins - NCDEQ/DWR Mr. Greg Bodnar —NCDEQ/DCM Dr. Pace Wilber —NOAA/NMFS-HCD Mr. Fritz Rohde — NOAA/NMFS-HCD Mr. Pete Benjamin — USFWS Mr. Todd A. Bowers — USEPA/WPD r� Coats, Heather From: Coburn, Chad Sent: Monday, May 14, 2018 12:52 PM To: Coats, Heather; Hair, Sarah E CIV CESAW CESAD (US) Subject: RE: Ft. Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Attachments: GC41444097.pdf This doesn't require anything from me now that the GP291 has been updated. Our GC4144 covers it. From: Coats, Heather Sent: Monday, May 14, 2018 9:35 AM To: Coburn, Chad <chad.coburn@ncdenr.gov>; Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Subject: RE: Ft. Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Hi Chad, No excavation- and I don't think there's any fill by your standards- it's realigning the reef maker sill structure from the original proposal. The individual components are disks installed on pilings. Do you need.a copy of the mod request? Heather Coats Beach & Inlet Management Project Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heather.coats(dr cdenr.gov 127 Cardinal Drive Extension Wilmington, NC 28405 Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Coburn, Chad Sent: Monday, May 14, 2018 7:33 AM To: Coats, Heather <heather.coats@ncdenr.eov>; Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.armv.mil> Subject: RE: Ft. Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Was there any new fill or excavation? From: Coats, Heather Sent: Friday, May 11, 2018 3:23 PM To: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.armv.mil>; Coburn, Chad <chad.coburn@ncdenr.gov> Subject: Ft. Anderson/Brunswick Town minor mod request- CAMA Permit #121-15 Hey Liz and Chad, Have you had a chance to look over the minor mod request for Ft. Anderson/Brunswick Town or Liz, do you know if Tyler issued that before he left? Thanks! Heather Heather Coats Beach & Inlet Management Project Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heath er. coatsen cdenr. q ov 127 Cardinal Drive Extension Wilmington, NC 28405 r. Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 7.1 0 N 0 N PROPOSED SHORELINE PROTECTION MEASURES FOR BRUNSWICK TOWN/FORT ANDERSON PHASE 2 BRUNSWICK COUNTY • NORTH CAROLINA NORTH CAROLINA BRUNSWICK COUNTY STATE/COUNTY MAP VICINITY MAP DCM-MHD CITY Z 0 O +.BRUNSWICK TOWN/ FORT ANDERSON OCEAN TERMINAL SURNY PANT v z L CAPE FEAR RIVER 7 PHASE 3 PHASE 1 COMPLETE - PHASE 2 �, [/ _\— PHASE 3 GENERAL SITE MAP Sheet List Table Sheet Number Sheet Tifle 1 General Site Plan 2 CAMA plan 1 3 CAMA plan 2 4 Battery A Detail 5 Section 3+00 6 Section 3+50 7 Section 4+00 8 Section 5+00 9 Section A -A 10 Illustrative Section RECEIVED APR 18 18 DCM-MHO CITY North State Engineering 2889 LOWERY STREET WINSTON-SALEM, NC 27101 JC"' PHONE: 336 725 2010 + FAX: 336 725 2405 rg #� dW Ae '~ �y y £+SCR Qa •erg 4^ .10 •�9. d w - oL ; J f J �•.nF w° � ,.-�"sa''F ter.. 4 { E Of JAW WIN ,t„_ ,n +. p ', ra yam• tk,r d IN— w R i a Pn Q..,.,�,`�-•g-:...._. +w ,. ;�,°w ,ems a �L� POO woe 4 � +♦kY-i�yi.6 .J3 i.�-�11^^ �9-t' •C��4 s # •p r. a +-" IMP w i ' If ry F n• LLJ(_J _. .. _ ...._ . _.., _ _ . _ .. _ .. _NOTES: LED - - 10- -' - - - - 1. TIDAL DATUMS TAKEN FROM EXISTING REEF U NIT PHASE 1 NOAA TIDAL BENCHMARK EXISTING REEF UNIT PHASE 1 Z� _ "WILMINGTON, NC", ID # 8658120.cf) O PROPOSED RMARKER UNIT PHASE 2 - - - --- - PROPOSED REEF UNIT PHASE 2 W/NAV MARKER - - - - -- - - (D PROPOSED REEF UNIT PHASE 3 - 0 PROPOSED REEF UNIT PHASE 3 W/NAV MARKER MEAN HIGH WATER: 1.83 FT MEAN SEA LEVEL: -0.19 FT MEAN LOW WATER: -2.44 FT AREA OF SHORELINE EROSION G 5— PROPOSED REEF PHASE 3 _ Q -- � • �' � s � _ � � `— -- --USACE NAVIGATION EASEMENT 2006 $4 • - • • . w _ _ (j ` SHOREUNE (2006) .� o• 10.�:�. ; - - - - SHORELINE 120141 hZ a (9 g - _ _ _ _ rl CUSH17 COVE p 0 �`' - Z O v' _ IL z Z O z - _STATE OF NORTH CAROLINA - _ - :2 O ' D.B' 113- PC, 287 ' >- -PIN#31100-09748o - EvwRECEIVED o SR APR 18 018 f - - - DCM-MFlf', �11Y N • - • 0 100 200 •Q - - - _ ' - _ 50 150 a' y SCALE: 1 "=100' a� a c`o J MANA APPLICATION/DRAWING A SHORELINE PROTECTION MEASURES FOR SHEET 3m RBOYD 10APRIL2018 North State Engineering u 0 CHECKED BO SCALE, NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) g g R BOYD AS NOTED AT 2889 LOWERY STREET 2 �O DRAWN BY: JOB NUMBER: BRUNSWICKTOWN/FORTANDERSON WINSTON-SALEM,NC27101 of �a C DUSTIN C1801 1 PHASE 2 Air PHONE: 336 725 2010 + FAX: 336 725 2405 10 61 ^ 10 EXISTING REEF PHASE 1 PROPOSED REEF PHASE 3 ef � � �EXISTING v 100' EXISTING ROCK MATTRESS c TOE PROTECTION 2012 INSTALL EXISTING 100'BATFERY LEGEND � ``-E�S�NGlr7 anmoxrxu/m�/x�n [�EXISTING REEF UNIT PHASE | u / TOE PROTECTION STATE '\ 0U EXISTING REEF UNIT PHASE l � ^-2O06SH0REUNE , � .````.\ D.8.113.PG. 2O7 \w/NAY��ARKEK PROPOSED REEF UNIT PHASE �-2006USACE � ` PIN #3ll0UO974338 / / ����\N/NAYMARKER PROPOSED REEF U��PHASE 2 , ^-20l4�H0REUNE NAVIGATION EASEMENT /' . / `'^� `' ``. �``�``�` mm��m"�x(�PROPOSED REEF UN�PHASE 3 u ` //^` ``� `' ```.``'.`n�0VNAVMARKER PROPOSED REEF UN�PHASE 3 l.83F[ MEAN HIGH WATER: k�EA�3[ALEYEif\lYF[ - ` � � � `` `. � �=��~~"k�[ANi0W w/ATER`2�4R _ AREA OFSHORELINE EROSION 0 100 200 FORT ANDERSON CL CIVIL WAR FORT PROJMT MANAGER: R BOYD APPLICATIONIDRAWING DATE 10 APRIL 2018 SHORELINE PROTECTION MEASURES FOR NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) North State Engineering. SHEET CHECKED BY: SCALE: R BOYD AS NOTED AT BRUNSWICK TOWN/FORT ANDERSON 2889 LOWERY STREET WINSTON-SALEM, NC 27101 Al r- OF DRAWN BY: JOB NUMBER: C DUSTIN C18011 PHASE2 PHONE: 336 725 2010 + FAX: 336 725 2405 10 DIn NAVIGATION MARKER TABLE NAVIGATION MARKER GRID NORTHING GRID EASTING LATITUDE LONGITUDE NAV MARKER 27 107947.6490 2319922.6425 N034002' 30.8821" W0770 56' 38.5969" NAV MARKER 28 107916.9531 2319961.4757 N034002' 30.5745" W0770 56' 38.1394" NAV MARKER 29 107886.2572 2320000.3088 N0340 02' 302668" W0770 56' 37.6819" NAV MARKER 30 107876.0665 2320013.2581 NW 02' 30.1646" W0770 56' 37.5293" NAV MARKER 31 107831.1445 2320061.6111 N034° 02' 29.7152" W0770 56' 36.9605' NAV MARKER 704 107957.5379 2319910.9=1 N0340 02' 30.9817' W0770 56' 38.7348" NAV MARKER 705 107992.4543 2319880.5013 N034° 02' 31.3297' W0770 56' 39.0919" NAV MARKER 712 108023.3084 2319852.9501 N0340 07 31.6378" W0770 56' 39.4154" NAV MARKER 716 108016.8763 2319845.8941 N0340 02' 31.5749" W0770 56' 39.5000" NAV MARKER 717 108027.4903 2319834.5929 N034" 02' 31.6811" W0770 56' 39.6330" NAV MARKER 724 108034.1349 2319841.3708 N034002' 31.7461" W077° 56' 39.5516' NAV MARKER 725 108062.5024 2319811.0549 N034" 02' 32.0299" W077° 56' 39.9087' NAV MARKER 732 108094.3272 2319777.0938 N0340 02' 32.3487' ' 40.307T' Rz �Z arNAV j arr o/ ui m <ARKER725 vZ w ? ,� l OV NAY ?� RR� .Q NAV MARKER 705 '� • R\Q Go, * \1tip�. NAV MARKER 712�� NAV MARKER 724�.1 _ E PHASE 2 PHASE 2 PHASE 2 PHASE 2 PHASE 2 PHASE 1 AS -BUILT PHASE 1 AS -BUILT PHASE 1 AS -BUILT PHASE 1 AS -BUILT PHASE 1 AS -BUILT PHASE 1 AS -BUILT PHASE 1 AS -BUILT PHASE 1 AS -BUILT �R\�O� �zcl<4 NAV Mi St� S\OaEGO NAV MARKER 30 ° \r'OF NAV MARKER 29-\11 NAV MARKER 28 1Q0 r�w +ter r i 11 01 •- EXISTING IW BATTERY ARMOR PROTECTION STATE OF NORTH CAROLINA D.B. 113, PG. 287 PIN # 311000974338 NOTES: 1. TIDAL DATUMS TAKEN FROM NOAA TIDAL BENCHMARK "W ILMINGTON, NC', ID # 8658120. RECEIVED APR 182018 DCM-►AHo CITY LEGEND u EXISTING REEF UNIT PHASE 1 EXISTING REEF UNIT PHASE 1 W/ NAV MARKER O PROPOSED REEF UNIT PHASE 2 PROPOSED REEF UNIT PHASE 2 W/ NAV MARKER O PROPOSED REEF UNIT PHASE 3 0 PROPOSED REEF UNIT PHASE 3 W/ NAV MARKER - - - -- MEAN HIGH WATER: 1.83 FT MEAN SEA LEVEL: -0.19 FT MEAN LOW WATER: -2.44 FT ®AREA OF SHORELINE EROSION 2. 4 ECODISKS PER PILING TO BE REMOVED FROM 0 30 60 PHASE 1 TO BE REPURPOSED IN PHASE 2 TO AN ELEVATION APPROXIMATELY 1 FT. ABOVE MEAN 15 45 HIGH TIDE. o ririiii�►ria 1 », �r� SCALE: 1 =30 c PROJECT MANAGER: d RBOYD APPLICATIONA)RAWINGSHORELINE 10APRIL2018 PROTECTION MEASURES FOR NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) North State Engineering SHEET s K BY: ALE: = R BOYD AS NOTED AT BRUNSWICKTOWN/FORTANDERSON 2889 LOWERY STREET 4 of DRAWN BY: JOB NUMBER: C DUSTIN 1 C 18011 PHASE 2 WINSTON-SALEM, NC 27101 PHONE: 336 725 2010 +FAX: 336 725 2405 1 O G' NOTES: 1. TIDAL DATUMS TAKEN FROM NOAA TIDAL BENCHMARK $+00 ' WILMINGTON, NC'S ID # 8658120. 20 20 18 18 a76 16 0 14 14 $ 12 72 70 10 8 8 u 0 6 6 m 4 4 0 2 2 a 0 p �i 2 2 4 4 ¢ 6 U $ 6 g 10 -10 0 12 12 14 -14 16 16 �? -18 18 -20 -20 22 _22 24 -24 0 26 -26 Z ¢ 28 -28 20 -30 -30 w 32 -32 w i 34 a -34 z 36 -36 -38 U 10 40 -40 0 42 .42 5 44 44 -46 -46 < 48 (N 0 L. `0 Liiii� 50 0 50 100 200 0 `9� 7 N v v v M g N N n i� g m d e c�i g N o N o 0 m$ coi .2 :2 oro c�v 50 GRAPHIC SCALE IN FEET) $ 1 inch = 100 ft. (HOR.) 1 inch = 10 ft. (VER.) 0 a c PR ER: APP CA ON DRA D T SHORELINE PROTECTION MEASURES FOR RBOYD 10APRIL2018 North State EngineeringSHEET 3 CHECKED BY: SCALE:INC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) R BOYD AS NOTED AT 5 a 2889 LOWERY STREET o DRAWN BY: JOB NUMBER: BRUNSWICK TOWN/FORT ANDERSON WINSTON-SALEM, NC 27101 of a C DUSTIN C18011 PHASE 2 PHONE: 336 725 2010 +FAX: 336 725 2405 10 BATTERY A"SHORELINE BA I STABILIZATION I i I � —=�— TOP OF PHASE 2 STRUCTURE � � • OFFSET = 47.12 FT. I - Elev=2.83FT...l- - -- TOP OF PHASE2STRUCTURE - OFFSET = 30 79 FT. �. .... --- .,. I MEAN HIGH WATER ELEVATION: 7.83' (NAV[)881 Elev 2 83 FT. _ � MEAN SEA LEVEL: -0.I9'(NAVDBB)_'- _ MEAN LOW WATER ELEVA710N:-2K' (NAVD881 �-:- i Y 4 f Y � c , 28 Ff. EMBEDMENT ON 35 FT PILES - —� MAXIMUM PILE DEPTH ELEV. =±-31 FT.:- ---�-- - - - -- ---- , � i I _ I I of U c 0 20 10 5 N GRAPHIC SCALE ( IN FEET I 1 inch =100 ft. (HOR.) 1 inch = 10 ft. (VER.) NOTES: 1. TIDAL DATUMS TAKEN FROM NOAA TIDAL BENCHMARK 3+ 00 'WILMINGTON, NC", ID # 8658120. 20 .—r- - --�- f --�-- 20 18 18 16- 16 14 EXISTING BATTERY"N' 14 SHORELINE STABILIZATION 12 -.. 12 10 _. - __ _._ ---- ---- ---- —'T- - ---- 10 8 -- - - TOP OF PHASE 2 STRUCTURE - 8 6 _ _ OFFSET = -34.26 Ff. - Bev = 2.83 FT. 6 2 MEAN HGH WATER ELEVATION: I.& (NAVD88) ,z 0 MEAN SEA LEVEL -0.19'INAVD88I .. .__ ___ 0 2 MEAN LOW WATER ELEVATION:-2M INAVD881 _ - - --2 -4 - ..- -4 _10 - -y-._-,.-.---.-,--___ -.._ -_.__ _-.._. __....___..- __ _10 -14 -14 -16 -16 -18 -18 -20 ------------------------___. .... -------..-,..----IMAYMIMPlIF -20 -22 -22 _2q24 -26 -26 30- T ON 35 FT. PILES :--------- _----- -- ---- _.-- -� FI FV =+_�T FT �.. -40 --'--- ------- ------------ _.-_-_.-------------------- -40 42 ._ -42 -44 -44 _46 -46 FECEIVED 48 _. _. _ -48 -50o 50 182018 yD CITY E 0 3 PRUJtCI MANAUtN: RBOYD APPLICAIIUN/UNAWING UAIt 10APRIL2018219 SHORELINE PROTECTION MEASURES FOR NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) AT North State EngineeringSHEET 6 HE SCALE: R BOYD AS NOTED BRUNSWICK TOWN/FORT ANDERSON 2889 LOWERY STREET OF 1- DRAWN BY: JOB NUMBER: WINSTON-SALEM, NC 27101 � � C DUSTIN C 18011 PHASE 2 PHONE: 336 725 2010 + FAX: 336 725 2405 a NOTES: 1. TIDAL DATUMS TAKEN FROM NOAA TIDAL BENCHMARK T+ ' WILMINGTON, NC, ID # 8658120. 20 20 18 18 16 16 14 14 12 12 0 10 U 8 $ 6 6 0 4 4O 2 2 $ 0 2 2 77 O 4 4 ¢ 6 -6 U -8 -8 c 10 10 12 -12 u 14 14 3 16 16 m 18 18 0 20 -20 22 -22 ¢ 24 -24 LL 0 26 -26 Z -28 -28 20 -30 -30 ° -3 32 34 z 3 36 z f -38 p o 10 -40 -40 r0 0 5 -44 4 -46 ¢4 -48 n 0L -50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -50 0 50 100 200 0 .00 n e h h g v y v cm? m can m m n N� N m o v w$ m e$ n o N 0v e m o coi N GRAPHIC SCALE (IN FEET I 1 inch = 100 ft. (HOR.) 1 inch = 10 ft. (VER.) 0 iq c-PROJECTER: P ATI IDRA D SHORELINE PROTECTION MEASURES FOR ;)R BOYD 10APRIL2018 NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) North State Engineering SHEET j .. CHECKED BY: SCALE: < R BOYD AS NOTED AT 2889 LOWERY STREET 7 o DRAWN BY: JOB NUMBER: BRUNSWICK TOWN/FORT ANDERSON WINSTON-SALEM, NC27101 OF J C DUSTIN C18011 PHASE 2 - PHONE: 336 725 2010 + FAX: 336 725 2405 10 d 2 EXISTING MARSH ZONE . —r— ..-��---T I .. TOP OF PHASE 3 STRUCNRE OFFSEf=-91.82FT... FJev = 2.83 Ff. - r I MEAN HIGH WATER ELEVATION. 1.83' (NAVD88j 1 -MEAN SEA LEVEL'-0.17 INAVD88I I >--J-.— MEAN LOW WATER ETEVATION I 244 (NAVD88) I { kt I I r_ t stV 2- � Fi EMBEDMENT ON 35 FT PILES ' M2�8 MUM PILE DEPTH ELEV =+ 31 1_- I I 20 — — 1 16 En, 0 -- -2 -4 -6 -10 m 20 EXISTING M """ ""' OFFSET=-229.67 FT. Elev = 2.83 FT. MFAN NIGH WATER ELEVATION: 1.83' (NAVD8B) MEAN SEA LEVEL -0.19' (NAVD88) _. MEAN LOW WATER ELEVATION: -2.M' (NAVD88) ._... I�. ._ i I 28 FT. EMBEDMENT ON 35 FT. PILES �— MAXIMUM PILE DEPTH ELEV. =±-31 FT.-7 _T 20 In _.—...--------- 0 -2 d e -26 -28 ---- -30 -32 NOTES: 1. TIDAL DATUMS TAKEN FROM NOAA TIDAL BENCHMARK 'WILMINGTON, NC", ID # 8658120. -y 4 -34 -36 _ -36 -38 _ -38 10 -40 40 -42 .. _... -42 5 -44 -44 -46 _ - - - , -46 -48 - - -48 �0 50 100 200 B�S�8S9RgRg�r$NS�S�$$$NoRgg RECEIVED GRAPHIC SCALE APR 182018 (IN FEET) 1 inch =100 ft. (HOR.) DCM-M H D CITY 1 inch = 10 ft. (VER.) PROJECT MANAGER: R BOYD APPUCATION/DRAWING DATE 10APRIL2018 NC DEPARTMENT SHORELINE PROTECTION MEASURES FOR OF NATURAL AND CULTURAL RESOURCES (NCDNCR) North State Engineering SHEET CHECKED BY: SCALE: AT O CJ R BOYD AS NOTED BRUNSWICK TOWN/FORT ANDERSON 2889 LOWERY STREET WINSTON-SALEM, NC27101 OF DRAWN BY: JOB NUMBER: C DUSTIN C18011 PHASE 2 PHONE: 336 725 2010 + FAX: 336 725 2405 1 O DI3 R GRAPHIC SCALE (IN FEET) 1 inch =100 ft. (HOR.) 1 inch = 10 ft. (VER.) SECTION A -A SEE SHEET 3 e n e e g 9`? n e? " v� m N N N n m� Q N o o coi v �m o NOTES: 1. TIDAL DATUMS TAKEN FROM NOAA TIDAL BENCHMARK 'WILMINGTON, NC", ID # 8658120. 2 m VKUJtCI MANAUM RBOYD AYYUUAIIUN/UKAWINb UAIC lOAPRIL2018 SHORELINE PROTECTION MEASURES FOR NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) AT North State Eng ineerin g SHEEP 9 CHECKEDBY.- SCALE: a R BOYD AS NOTED 2889 LOWERY STREET OF BRUNSWICK TOWN/FORT ANDERSON wwsTON sALEM, NC27101 o DRAWN BY: JOB NUMBER: o C DUSTIN C18011 PHASE 2 - PHONE: 336 725 2010 + FAX: 336 725 2405 l a n 10 5 2.5 0 75 150 300 GRAPHIC SCALE ( IN FEET I 1 inch = 150 ft. (HOR.) 1 inch = 5 ft. (VER.) ILLUSTRATIVE SECTION DEPICTING REPURPOSED ECODISK 2+30 20 10 EXISTING PHASE 1 REEF PROPOSED PHASE 2 REEF- 18 __ _ __ REPURPOSED ECODISKS TO BE _ 14 - 1 ! ( - INSTALLED ON PHASE 2 REEF _ 14 .__. li ... _. _ _. __ 4_._ _.12 BATTERY Al SHORELINE PROTECTION 10 10 i 6 - -- I ------€60DLiKS TPR IN- PHASE 4 REEF - .-. -. .._ .. _. _.__ _ _ _.. _. . ____6 4 _.... i _. - ,� j . _. .... - _ . 4 0 _ _---.._. _—__— _— —_—_-- 0 JL ' -2 ..... _ _ :- -2 I -6 j _ -6 -10 —------------ ----- ----------- -10 -12 _. .. _ .. _... - --12 -14 -16 _. - _ _.L. __... -16 20 -20 8 S $ n a R 8 S g R N N F;I] NOTES: 1. TIDAL DATUMS TAKEN FROM NOAA TIDAL BENCHMARK ' W ILMINGTON, NC", ID # 8658120. 2. 4 ECODISKS PER PILING TO BE REMOVED FROM PHASE 1 TO BE REPURPOSED IN PHASE 2 TO AN ELEVATION APPROXIMATELY 1 FT. ABOVE MEAN HIGH TIDE. RECEIVED APR 182018 DCM-MHD CITY c 3 0 PROJECT A R BOYD APPLICATION/DRAWING DA 10APRIL2018 SHORELINE PROTECTION MEASURES FOR North State En ineerin Engineering SHEET w3 NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES (NCDNCR) CHECKED BY: SCALE: i < AT 10 z� R BOYD AS NOTED BRUNSWICK TOWN/FORT ANDERSON 2889 LOWERY STREET jlr OF DRAWN BY: JOB NUMBER: WINSTON-SALEM, NC 27101 10 C DUSTIN C18011 PHASE 2 PHONE: 336 725 2010 + FAX: 336 725 2405 C ° EXISTING 100' 1. TOE PROTECTION O , H' "l • • ' - - PHASE 1 - PROPOSED - O n� yJ . .- . . .- EXISTING 179' 100 BATTERY ARMOR O LEGEND w • ' - y ' _. TOE PROTECTION PROTECTION _r s ' STATE OF NORTH CAROLINA PROPOSED REEF UNIT UZ '-. �•_ .,> \,\\�1E SHORELINE (2006) , ����--, D.B. 113, PG. 287 ® PROPOSED REEF UNIT -jREE USACE NAVIGATION EASEMENT 2006 ����� PIN # 311000974338 W1 NAV MARKER F w �- „.-,:.-'' ' BRUNSWICK.TOWN�/� • - MEAN HIGH WATER:4.31 FT >> Z SHORELINE 2014 ( 1 _ \-'� ��., EXISTING BOARDWALK = MEAN SEA LEVEL: 2.29 FT S o J y. _- -' -' -.. FT. ANDERSON -., BEING UNDERMINED v PROPOSED APPROXIMATELY 100' MEAN LOW WATER: 0.16 FT U OF TOE PROTECTION i AREA OF SHORELINE EROSION u TIDAL DATUMS TAKEN FROM NOAA i N N O_ h N W 0 c l G T E ° a PR JE TMANAGE `0 R BOYD CHECKED BY: R BOYD Z o DRAWN BY: 0 C WARNER - TIDAL BENCHMARK"SUNNY POINT, MOTSU NORTH WARP, ID # 8658579; -- - NGS "865 8579 TIDAL 1", PID EA 1281. 0 100 200 50 150 SCALE: 1 "=100' ATION/DRAWING DATE 9JUNE2015 PROPOSED SHORELINE PROTECTION MEASURES FOR NORTH CAROLINA DEPARTMENT OF CULTURAL RESOURCES (NCDCR) ORIGINAL �p� REEF e�lA PHASE SHEET AS NOTED AT BRUNSWICK TOWN/FORT ANDERSON LAYOUTS 3 OF UMBER: 34 SR14.021.00 PHASES 1, 2 8,3