Loading...
HomeMy WebLinkAbout30-15 Renewal 2020 NC Dept of Cultural ResourcesPermit Class Permit Number RENEWAL 30-15 STATE OF NORTH CAROLINA Department ofiEnvironmental Quality and Z Coastal Resources Commission .Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to NC Dept of Cultural Resources 4605 Mail Service Center, Raleigh, NC 27699-4605 Authorizing development in New Hanover County at Cape Fear River, 101 USS North Carolina Battleship Road Wilmington , as requested in the permittee's application dated letter dated 2/27/2020 This permit, issued on June 2, 2020 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to tines, imprisonment or civil action; or may cause me permit to De nuts anu votu. 1) This renewal shall be attached to the Permit No. 30-15, which was issued to the permittee on 3/2/15, as well as all subsequent renewals, modifications, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 02-0730. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2010-00175. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee DCM Coordinator Curt Weychert WIRO E-MAIL DISTRIBUTION SHEET County: U, L Permit #: gD _ 1 ) Circle one: Bio Report / Permit for: �)CQ U ( _� C L'-ruf� 01-swg'� Oversize Plans sent: * DCM Offices: Morehead City: PT (if oversize) via Courier 'cc Curt & Amanda on group email w/ bio.narr.app.drawings, deed, comment sheet _ 'MHC documents (Curt & Amanda) Wilmington: Original hard -copy AANA ONLY USACE & DWR (wtro): Recommen atigps. M, Letter w/Site Card, Fee Chart and Agent Authorization USACE Wilmington: LizTFldir ( ende/r✓&"Carteret Co): PN, CL, Reports, Split Sheet _ (until territories are decided) 4 WilmingtonNCREG@usace.army.mil (NH / BR): PN, CL, Reports, Split Sheet Div of Water Resources: vJI6bb Mairs - 401 (ON/PN/BR/NH): PN, CL, Reports, Split Sheet Div of Water Resources: ✓Sheri Montalvo for Karen Higgins: PN, CL, /Reports, Split Sheet_ Marine Fisheries: Anne Deaton (temporary) w/Reports V/ Z +'qI'#gq NA"w DCM Planner/WiRO: Mike Christenbury,21� Cultural Resources: Renee Gledhill -Earley Environmenta/.Review@ncdenraov y Natural Heritage Prog. Rodney Butler DCA-Rural Eco. Dew Mark Ziegler NC DOT: David Harris Wildlife Resources: Maria Dunn w/Reports State Property Office: Tim Walton: D` b ✓ Mike Moser ✓ -1Nend&*hff anf' Real Property Agent (Bio Reports only) Shellfish Sanitation: Jeremy Humphrey (Bio) /Shannon Jenkins (Pt) Sharon Gupton, Admin. DEMLR: Christine Hall - Stormwater Section _ Dan Sams - Land Quality Section Public Water Supply: Heidi Cox 2 City of Wilmington: Kathryn Thurston / Enforcement: Field Rep: i'AM Co. LPO I VA002 ' a� Agent: DISTRIBUTED: 3 Updated 311V20 CAMA/Shaun majors docs/e'Agency List 4. District: Choose a district Wilmington NC Division of Coastal Management CAMA Major Permit Renewal Request Major Permit Staff: DreggBo'dtlat' Applicant lnrormation Applicant NC Department or Cultural Name: Resources clo Mr. Tony Romaine USS NC Battleship Request Date: 2.27.20 Last Flrst Received in Office:3 2.20 Project Address: 1 Battleship Road Wilmington NC 28401 Street Address City ZIP Code CAMA Permit No.: 30-15 Permit Expiration Date: 12.31.18 Payment $ 100 Agent's Name: Ed Woloszyn/ Walter Cole S&ME YES NO District Manager/Field Rep Approve? (Initial Appropriate Box) TMO Cl No: Project Q2- - O may/ ^ USAGE Anion S't.. l /14 1 U , Has substantial YES NO If Yes, The NC Battleship Coffer Dam, Memorial Walkway and Bat development occurred? x❑ ❑ Explain: Docks with Kayak launch Recommend to Renew? If Not Staff N Signature: YES NO X❑ Cl Requires re -circulation due topermit expiration `7 Date: kU D North Carolina Department of Environmental Quality Divlslonof Coa5ul Management Washington Office 1 943 Washington Square Mall I Washington. North Camllm 27889 1252946.6481 Wilmington Office 1127 Cardinal Drive Extension I Wlknington, Noah Carolina 28405 910.796.7215 Morehead0tvOmce 1400Cnmmerce Aveni¢ Morehead Chv. North Cantina 28557 1 2528082808 February 27, 2020 North Carolina Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Attention: Ms. Tara MacPherson Reference: CAMA Permit No 15-30 Renewal USS Battleship North Carolina Memorial Wilmington, North Carolina S&ME Project No. 4305-14-078 Dear Ms. MacPherson: On behalf of the North Carolina Department of Natural and Cultural Resources (NCDNCR) and the USS North Carolina Battleship Commission (the Battleship), S&ME formerly requests to expedite the renewal of the expired CAMA Major Permit (No. 15-30) based on the same conditions originally submitted to the Division by permit application dated December 11, 2014, and subsequent minor modifications that have been approved by the North Carolina Department of Coastal Management (NCDCM). In reference to Figure AU from the minor modification request (see attached), three major phases of the project were completed in May 2018 prior to expiration of Permit 15-30. These phases included the following: Coffer dam Memorial Walkway Boat docks and kayak launch Projects listed in Permit No. 15-30 and conceptually presented in Figure A1.1 that have not been completed and are planned for the future development include the following: • Demolition of Existing USS NC Museum and Visitor Center • Construction of new USS NC Museum and Visitor Center • Dock Master's Office and Park Restroom r Construction of the bulkhead Parking lot upgrades (raising the lot three to four feet) and installing of stormwater control systems Seawall upgrades and construction • Construction of the Open -Air Pavilion RECEIVED emoval of existing pavilion and construction of an amphitheater stage on the park Iaw;DGM 011LUNGTON, NC %IWWAne Expedition Trail System Access Covered Pavilion/Outdoor Classroom MAR 0 2 2020 tlln-* Second Park Side Visitor Walk Exit 1�behalf of the NCDNCR and the Battleship, requests the NCDCM to renew the CAMA Permit No. 15-30 lating the application and subsequent NCDCM-approved minor modifications. S&ME, Inc. 13201 Spring Forest Road I Raleigh, NC 27616 1 p 919.872.2660 1 w .smeinc.com CAMA Permit No 15-30 Renewal USS Battleship North Carolina Memorial Wilmington, North Carolina S&ME Project No.4305-14-078 We, the undersigned at S&ME, attest that the project has not changed from the initial CAMA Permit application and subsequent minor modifications that were approved by NCDCM. Attached is the Agent Authorization Form signed by Mr. Tony Romaine, P.E., with Capital Projects at NCDNCR authorizing S&ME to act on this request on behalf of NCDNCR. Per your email dated February 21, 2020, S&ME has enclosed a check for $100.00 for the renewal fee, and we request that the process be expedited. Should you require additional information, please do not hesitate to contact the undersigned. Sincerely, S&ME, Inc. alter Cole, LSS Edmund Wolosryn, Jr., R.E.M. Senior Project Manager Principal Scientist wcole@smeinc.com ewolosUn0smeqnc.conn D:919-801-3798 D:919-9S4-6212 cc: Mr. Tony Romaine, P.E., NCDNCR Captain Terry Bragg, USN (retired), USS Battleship North Carolina Memorial Chip Hemmingway, BMH Architecture Attachments I Agent Authorization Form II BMH Architects Figure A1.1 Enclosures: RECEIVED Check Number 473798 for the amount of $100.00 MAR I 0 2M MP DCM ON, NC MAR 0 2 2020 February 27, 2020 2 Permit Class Permit Number MODIFICATION/MINOR 30-15 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to NC Dept. of Cultural Resources, 4605 Mail Service Center Raleigh, NC 27699-4605 Authorizing development in New Hanover County at Cape Fear River, 101 US North Carolina BattleshipRoad Wilming oion,as r!�quested in the permittee's application letters dated 9/1 zit 7- 2LIVIL 8 12/11/17 including the attached workplan drawing (1) Sheet ALL dated 11/27/17. This permit, issued on January 12, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may he suhiect to fines. imprisonment or civil action; or may cause the permit to be null and void. USS North Carolina Battleship Park 1) Unless specifically altered herein, this Minor Modification authorizes the reconfiguration of the permitted pier and docking facility, sidewalk access, walkway, and all associated upland development, all as expressly and specifically set forth in the modification request and attached workplan drawing. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910)796- 7215 for this determination. (See attached sheet for Additional Conditions) This permit action may be appealed by the pernuttee or other qualified persons within twenty (20) days of the issuing date: M { 21tis oewiit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. wgnea oy the aumonry of me Jel:MMY u, un1,4 Chairman of the Coastal Resources Commission. FUR Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee NC Dept. of Cultural Resources Permit t#30-15 Page 2 of 2 ADDITIONAL CONDITIONS 2) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 3) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 4) This Minor Modification shall be attached to the original permit, which was issued to the permittee on 3/2/15, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 5) All conditions and stipulations of the active permit remain in force under this Minor Modification, unless specifically altered herein. 6) No new excavation or filling of any open water area or vegetated wetlands is authorized by this Minor Modification. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to a Stormwater Permit from the Division of Energy, Mineral and Land Resources. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. NOTE: The N.C. Division of Water Resources has assigned the proposed DWR Project No. 02-0730. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. Nos. SAW-2010-00175. Attachments DCM WllAiiP:i:,";'aN, NC MAR 0 2 2020 Attachment I - Agent Authorization Form RECEIVED MAR 1 0 2W MP SECTION DOM - MHD CRY jo DCM Vill..iti ih!( "fON, NC MAR 0 2 2020 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: North Carolina Department of Cultural Resources Mailing Address: Phone Number: Email Address: 4605 Mail Service Center Raleigh, North Carolina 276994605 (919) 814-6614 tony. romalne@ncdcr.gov I certify that I have authorized Ed Woloszyn & Welter Cole with S&ME Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: usS North Carolina Battleship Hull Repair & Site Improvements at my property located at 1 Battleship Road, Wilmington, North Carolina , In New Hanover County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature 'Tone RoM0,114�p- Print or Type Name IAQi Tod i>r-o'lPuc-t i NC -WJ CR, Title ' 2fZsl2,0 Date This certification is valid through I�5 I 2p t-1#_rj=1VED ' lllll MiNGTON, NC MAR 0 2 2020 Attachment 11 — Figure AM Dciwl MAR 0 2, 2010 Date Date Checkfiom Nome of Vendor Check ,C'heek Permit' Received Deposited Permit Holder Number amount Humber/CommOnts 3/6J2020 S&ME; JQNC'Battleship' 'Bankof 473798 $100.00 major renewal#30-S,1 'TPrcG America Battleship Rd, Wilmington NHCo 19789t 4 P i, i i February 20, 2020 North Carolina Division of Coastal Management 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Attention: Ms. Tara MacPherson Issued by email to: tara.macpherson(a)ncdenr.gov Reference: Exemption Determination Hull Steel Plate Replacement USS Battleship North Carolina Wilmington, North Carolina S&ME Project No. 4305-14-078 Dear Ms. MacPherson: On behalf of the North Carolina Department of Natural and Cultural Resources (NCDCNR) and the USS North Carolina Battleship Memorial (the Battleship), S&ME requests you issue a formal exemption determination for certain activities associated with the repairs of the Battleship's hull, which has suffered severe corrosion damage at the ship's waterline by elements of nature. From 2015 to 2018, the Battleship, under CAMA Permit 15-30, constructed a cofferdam for the purpose of performing maintenance activities to maintain the ship under US Navy requirements to address the emergency condition of hull failure. This situation was formerly recognized by the North Carolina General Assembly, who granted funding of $500,000 to initiate engineer design solutions for the necessary emergency repairs. In addition, funds were also raised by the Battleship to complete tasks specified in Permit No. 15-30, which include the construction of the Memorial Walkway and the boat docks. Tasks specified under Permit No. 15-30 that were not completed include the following: • Dock Master's Office and Park Restroom • Construction of the bulkhead • Parking lot upgrades (raising the lot three to four feet) and installing of stormwater control systems) • Seawall upgrades and construction • Demolition of Existing USS NC Museum and Visitor Center • Construction of new USS NC Museum and Visitor Center • Removal of existing pavilion and construction of an amphitheater stage on the park lawn • Construction of the Open -Air Pavilion • Phase I and Phase 2 of the Eagles Island Expedition Trail To continue with the Memorial Park's upgrade developments, the Battleship will resubmit the CAMA Major permit application to complete the development tasks listed above, which have not changed in scope since original permit issuance or from subsequent minor permit modifications. S&ME, Inc. 13201 Spring Forest Road I Raleigh, NC 276161 p 919.872.2660 1 www.smeinc.com Exemption Determination � Hull Steel Plate Replacement USS Battleship North Carolina I" Wilmington, North Carolina S&ME Project No.4305-14-078 The State Construction Office has recently opened bids to perform hull repairs to the Battleship. The repair work is scheduled to begin in mid -April 2020. It is the NCDCNR's and Battleship's interpretation of the rules that the current hull repair, and future hull maintenance, within the coffer dam area is exempted from CAMA permitting under 15A NCAC 07K .0103 (a). "Maintenance" and "repairs" are specifically excluded from the definition of "development" under the conditions and in the circumstances set out in G.S. 113A-103(5)(b)(5)." G.S. 11 3A- 1 03(5)(b)(5) states: "Maintenance or repairs (excluding_realacement) necessary to repair damage to structures caused ¢y the elements or to prevent damage to imminently threatened structures by the creation of protective sand dunes." Following instruction provided on the DCM's website, "individuals required to take such measures within an AEC shall contact the local CAMA representative for consultation before beginning work." The intent for the construction of the coffer dam, which was completed under the original CAMA Major permit, was to perform the current emergency repairs, and future repairs as needed, without the need to obtain CAMA permits. The hull repair to the Battleship clearly falls under the NCAC and General Statute reference above. In addition, with the designed protections of the coffer dam, S&ME anticipates no adverse effects to the environment outside of the cofferdam enclosure. The NCDCNR and the Battleship requests formal acknowledgement from NCDCM the exemption from permitting for hull repair activities. Should you require additional information to make this determination, please do not hesitate to contact the undersigned. Sincerely, S&ME, Inc. �70a it Cole, LSS Senior Project Manager wcole@smeinc.com D:919-801-3798 muEi1 nd Wolosryn, Jr., R.E.M. Principal Scientist ewoloszyn Osm ei nc.co m D:919-954-6212 cc: Mr. Tony Romaine, P.E., NCDNCR Captain Terry Bragg, USN (retired), USS Battleship North Carolina Memorial Chip Hemmingway, BMH Architect February 20, 2020 Weychert, Curtis R From: Gledhill-earley, Renee Sent: Friday, March 27, 2020 10:31 AM To: Weychert, Curtis R Subject: RE: 30-15 Renewal Circulation for USS NC Battleship Part 1 of 2 Thank you, Curtis. We have no comment on the project as it is to be carried out by our department. But, were it not a conflict, we would certainly recommend the renewal. Renee Gledhill -Earley Environmental Review Coordinator State Historic Preservation Office 109 E Jones St MSC 4617 Raleigh, NC 27699 919 814 6579 office NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please Note: Requests for project review or responses to our review comments should be sent to our Environmental Review emailbox at environmental.review&ncdcr.itov Otherwise, I will have to return your request and ask that you send it to the proper mailbox. This will cause delays in your project. Information on email project submittal is at: httos://www.ncdcr.pov/state- historic-Dreseryation-office/environmenta I-review/environmenta I-review-submission-process-0 From: Weychert, Curtis R <curt.weychert@ncdenr.gov> Sent: Friday, March 27, 202010:22 AM To: kvafier@nhcgov.com; Deaton, Anne <anne.deaton@ncdenr.gov>; Harrison, James A <James. Ha rrison@ncdenr.gov>; Christenbury, Mike <mike.christenbury@ncdenr.gov>; Gledhill-earley, Renee <renee.gledhill-earley@ncdcr.gov>; Butler, Rodney A <Rodney.Butler@ncdcr.gov>; Zeigler, Mark D <mzeigler@nccommerce.com>; Harris, David B <davidharris@ncdot.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Humphrey, Jeremy <jeremy.humphrey@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Kathryn Thurston <Kathryn.Thurston@wilmingtonnc.gov>; Currey, Gregory E CIV USARMY CELRP (USA) <Gregory.E.Currey@usace.army.mil>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Montalvo, Sheri A <sheri. montalvo@ ncdenr.gov> Cc: Pietila, Tanya K <tanya.pietila@ncdenr.gov>; MacPherson, Tara <tara.macpherson@ncdenr.gov>; Cannon, Amanda J <Am a nda.Ca n no n @ ncde n r.gov> Subject: 30-15 Renewal Circulation for USS NC Battleship Part 1 of 2 Please refer to the above attachment(s) for materials associated with a renewal request for an inactive CAMA permit. It has been determined that development has occurred on site since the last permit action, however, the permit has expired. Due to this determination, the inactive permit cannot be renewed under CRC rule, but the rule does allow for circulation of the request to resource agencies to provide comment to any changes in circumstances or site conditions, or changes in your agency's rules or development standards that warrant a new application and CAMA major permit review. Therefore, DCM is requesting that your agency review the above materials to determine if site conditions or circumstances, or agency rules would prohibit DCM from issuing a renewal of the CAMA permit. Please provide comment within 21 days of receipt of this email to any changes in site conditions or rules that would prohibit DCM from issuing a permit renewal. If no reply is provided within 21 days of receipt, then DCM will assume that your agency intends a NO COMMENT. "'A second email will be sent with additional drawings and permit documentation. Respectfully, Curt Weychert Curtis Weychert Assistant Major Permit Coordinator North Carolina Division of Coastal Management North Carolina Department of Environmental Quality 252-808-2808 x211 Curt. Wevchert(c ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 s'• I • b I i' •n 2NORTH CAR06NA -Environmental Quahly. . . March 27, 2020• MEMORANDUM:.. i FROM: SUBJECT:(; Applicant: .. _ Project Location: I f 1, Curt Weychert; Assistant Major Permit Coordinator . NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC-28557 Fax* 252-247-3330 (Courier 04-f5-33) curt.wevchertl�ncdenr eov CAMA• Malor Permit Renewal •Review NC Dept. of Cultural Resources/USS NC Battleship ROY.COOPER; 'Gn1Ynlar MICHAEL S. REGAN 'Srcrrlut}• .BRAXTON DAVIS Uimaor. aw"Im ofc"va'. -- ,M1fmugemnu' Permit No: 30-15 USS North Carolina Battleship Memorial Facility, on the west bank of the Cape Fear River, on Eagle Island, New Hanover County ;_.. This -project does not qualify -for a renewal under CRC rule 15A NCAC 07J:0404(b). However, 15A NCAC 071: 0404(c) allows the Division of Coastal Management to circulate the request to -the state agencies to determine if any changes In circumstances or in development standards warrant a new application and CAMA major permit review. DCM is.not aware,of any proposed changes to the previously authorized project Please: indicate below your agency's position or viewpoint on the_proposed renewal request and retain this ' form to Curt Wevchert at the address above by W pr/l J'7; 2� 02 . If you have any questions regarding the praposed project, contact Tara MacPherson (910)-796-7266. When appropriate, in-depth comments with supporting data is.requested. REPLY: �is agency has no objection to the renewal request as = proposed. **Additional comments may be attached" This agency, has determined that circumstances or development standards have. hanged and warrant anew CAMA major permit application review. See attached. .'-M � )tRINT;NA `[: IGNATU iLg"C t/z�� AM.3 30A070 •,, =--.� " [ 'SmmofNonh Carolina I Euvim=cntal QuaEtylCoasml Managemmt - - 400Co C=A� MarLead Ci NC2i557 ry. (252)808-2606 , . r - , t t I I MICHAEI S , RWAA BRAXTON DAWS. March,27,2020 MEMORAANDUM. FROM: Curt Weychert,'Assistant'MajorPermit Coordinator NCDEQ'-Division of Coastal'Management 400 Commerce Ave:, Morehead City, NC 26557 Farr: 252-2473330 (Courier 04-16-33) cudwevche tBecdery aov SUBJECT: CAMA-Maior Permit Renewal Review Applioane, NC Dept of Cultural Resources(USS NC Battleship Perk Noe 30-15 Project Location: USS North Carolina Battleship Memorial Fatuity, on the west bank oflhe Cape Fear River; on Eagle Island, New Hanover County This project does not qualify fora renewal under CRC rule 15A NCAC07J.0404(b):'However, l5A-NCAC 07J: 0404(c) allows the Division of Coastal Management to circulate the request to the state agencies-, deterrrilhw if any changes:in circumstances or in development standards;warant a new application and CAMA major permit review. ' DCM is not aware of any proposed changes to the previously-authotized project: Please Indicate below your agency s'posi -on or viewpoint on the posed renewal request and, return "this ibim to Curt Wevehert at the.address above by If -you have any questions regarding the proposed project, contact.Tara.MacPherson (910)-796-7266. When appropriate, in-depth conimer�ts with supporting data is requested. REPLY: %� This agency has no.objection to the renewalrequest as proposed. "Addidonal comments may be attached"' This, agency has determined"that circumstances or development standards. iave- changed -and warrant a new CAMA major pertnit.applicatim review. See:ettaohed: IvtCtO� � �oith'iPr' . �samorxonn5:adm..l tQmwrla�mrl�c�.• 4WC�A. MmwmC;tyrrassssn tzrnsO&M ROY COOPER Govemor 0 MICHAEL S. REGAN Secmiary BRAXTON DAVIS NORTH CAROLINA Director, Di Wcot ofCaaslat Environmental Quality Maaagror.r March 27, 2020 FROM: Curt Weychert, Assistant Major Permit Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) cu rt.weychert(a)n cde nr. g ov SUBJECT: CAMA Major Permit Renewal Review Applicant: NC Dept. of Cultural ResourceslUSS NC Battleship Permit No: 30-15 Project Location: USS North Carolina Battleship Memorial Facility, on the west bank of the Cape Fear River, on Eagle Island, New Hanover County This project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, 15A NCAC 07J. 0404(c) allows the Division of Coastal Management to circulate the request to the state agencies to determine if any changes in circumstances or in development standards warrant a new application and CAMA major permit review. DCM is not aware of any proposed changes to the previously authorized project. Please indicate below your agency's position or viewpoint on the proposed renewal request and return this form to Curt Wevchert at the address above by ApAI 17, 2020. If you have any questions regarding the proposed project, contact Tara MacPherson (910)-796-7266. When appropriate, in-depth comments with supporting data is requested. REPLY: %( This agency has no objection to the renewal request as proposed. "Additional comments may be attached" This agency has determined that circumstances or development standards have changed and warrant a new CAMA major permit application review. See attached. PRINT NAME Shannon Jenkins w1GENCy NC DMF - Shellfish Sanitation SIGNATUREG f'1 uiPG for Shannon Jenkins 04/01 /2020 State of North Carolina I Envlronm,mul Quality I Coutal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 a March 27, 2020 FROM: Curt Weychert, Assistant Major Permit Coordinator NCDEO - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) curt.weych a WZ cden r.goy SUBJECT: CAMA Major Permit Renewal Review Applicant: Project Location: NC Dept. of Cultural Resources/USS NC Battleship ROY COOPER MICHAEL S. REGAN BRAXTON DAVIS "o Permit No: 30-15 USS North Carolina Battleship Memorial Facility, on the west bank of the Cape Fear River, on Eagle Island, New Hanover County This project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, 15A NCAC 07J. 0404(c) allows the Division of Coastal Management to circulate the request to the state agencies to determine if any changes in circumstances or in development standards warrant a new application and LAMA major permit review. DCM is not aware of any proposed changes to the previously authorized project. Please indicate below your agency's position or viewpoint on the proposed renewal request and return this form to Curt Wevchert at the address above by April 17, 2020. If you have any questions regarding the proposed project, contact Tara MacPherson (910)-796-7266. When appropriate, in-depth comments with supporting data is requested. REPLY: _Z This agency has no objection to the renewal request as proposed. "Additional comments may be attached'" This agency has determined that circumstances or development standards have changed and warrant a new CAMA major permit application review. See attached. PRINT NAME Uax SAT -'Ll.n n AGENCY TVC+ IP_C_ SIGNATURE DATE r+-2--2p2r7 Soto of North Catolin I Envitooroemal Quality I C-e lMavagemmt 400 Commars Ave. Mordiead City, NC28557 (252)808-2808 �l ,.� ROY, COOPER [iose. C` MICHAEL S. REGAN �i BRAXTON DAVIS �� � • . _� � � %)lh'(!i�(. /ill•/Illb,lfl lRIS1LL1 March:27, 2020 FROM: Curt Weychert, Assistant Major Permit Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax:252-247-3330 (Courier04-16-33) curt.wevchertAncdenr.cov SUBJECT: CAMA Maior Permit Renewal Review Applicant: NC Dept. of Cultural Resources/USS'NC Battleship Permit No: 30-15 Project Location: USS North Carolina Battleship Memorial Facility, on the west bank of the Cape Fear River, on Eagle Island, New Hanover County This project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, 15A NCAC 07J. 0404(c) allows the Division of Coastal Management to circulate the request to the state agencies to determine if any'changes in circumstances or in development standards warrant a new application and CAMA major permit review. DCM is not aware of any proposed changes to the previously authorized project. Please indicate below your agency's position or viewpoint on the proposed renewal request and return this form to Curt Wevchert at the address above by April 17,.i66. If you have any questions regarding the proposed project, contact Tara MacPherson (910)-795-7266. When appropriate, in-depth comments with supporting data is requested. REPLY:' _� This agency has no objection to the renewal request as proposed. "Additional comments may be attached" This agency has determined that circumstances or development standards have changed and warrant a new CAMA major permit application review. See attached. PRINT NAME M A V 2. 1 5 ( .t, r, AGENCY NC D PW W Ih M w t e RECEIVED AU SIGNATURE m� "y v R 6 2020 DATE �! G ( 2 o MP SECTION DCM - MHD CITY State of North Cwolina I Environmental Quality I Coastal Managemm 40D Commove Ave. Morehead City, NC 28557 (252) 808-2808 Weychert, Curtis R From: Mairs, Robb L Sent: Thursday, April 30, 2020 9:38 AM To: Weychert, Curtis R Cc: Benson, Tyler G; Currey, Gregory E CIV USARMY CELRP (USA) Subject: RE: Renewal Circulation for USS NC Battleship Part 2 of 2 Hey Curt, This follows our phone call yesterday p.m. on this renewal request, and sorry for the delay. The NC DWR has no objection to the renewal of State Permit #30-15, which was assigned under NC DWR project #2002-730v3. Thanks, Robb Mairs Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality 910 796.7303 office robb. mairs(a)ncdenr. aov https•//deo nc gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401-wetlands-buffer- ep rmits 127 Cardinal Drive Extension MLtZPb7 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Weychert, Curtis R Sent: Friday, March 27, 202010:27 AM To: kvafier@nhcgov.com; Deaton, Anne <anne.deaton@ncdenr.gov>; Harrison, James A <James.Harrison @ncdenr.gov>; Christenbury, Mike <mike.christenbury@ncdenr.gov>; Gledhill-earley, Renee <renee.gledhill-earley@ncdcr.gov>; Butler, Rodney A <Rodney.Butler@ncdcr.gov>; Zeigler, Mark D <mzeigler@nccommerce.com>; Harris, David B <davidharris@ncdot.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Walton, Tim <tim.wa[ton @doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Humphrey, Jeremy <jeremy.humphrey@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Kathryn Thurston <Kathryn.Thurston@wilmingtonnc.gov>; Currey, Gregory E CIV USARMY CELRP (USA) <Gregory.E.Currey@usace.army.mil>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov> Cc: Pietila, Tanya K <tanya.pietila@ncdenr.gov>; MacPherson, Tara <tara.macpherson@ncdenr.gov>; Cannon, Amanda 1 <Amanda.Cannon@ncdenr.gov> Subject: Renewal Circulation for USS NC Battleship Part 2 of 2 Please use the attached folder to complete your review of Permit # 30-15. Thank you, Curt Curtis Weychert Assistant Major Permit Coordinator North Carolina Division of Coastal Management North Carolina Department of Environmental Quality 252-808-2808 X211 Curt.WeycheMC nCdenr.00v 400 Commerce Ave 'Morehead City, NC 28557 D_EQ� -4 Weychert, Curtis R From: Benson, Tyler G Sent: Wednesday, April 29, 2020 11:48 AM To: Weychert, Curtis R Subject: USS NC Battleship Project Hey Curt, Hope all is well with you. I just wanted to let you know that DWR does not have any comments or concerns regarding the NC Battleship project at this time and is still being reviewed. Thanks, Tyler Benson Environmental Technician I Division of Water Resources - Wilmington Regional Office: 127 Cardinal Drive Extension; Wilmington, NC 28405 Tyler. Benson@ncdenr.gov; (P)910 796 7336 e:, o 0 E QO :-9 Nr'HTH CAFDw= fiepaelsievnt of rnvinmw"1214"a ty Email ccnescondence to and from this address is subject to the North airolina Public ,Reccrds Law and may Ue discmed to third parties. EAGLES ISLAND OUTLINE OF EXPEDITION TRAIL r NORTH SIDE SYSTEM ACCESS / COFFERDAM 1 � 1� COVERED PAVILION/ OUTDOOR CLASSROOM WIER S)OPENING IN FIFE AM SECOND P RK \ SIDE VISIT WAX EXIT Y W \ Y W /W SECU MEMORIAL WALKWAY a 1 I ISO'w0a F.I.c uD i WIEXISTING MAINTENANCE OFFICES AND STORAGE YARD L W 1 1 W W W 1 1.�Yiw MY PATH OF THE 111113 RAILROAD TRACKS EXISTING \ DOLPHINS TO REMAIN � I W ��� � �-YG✓r'tl1aPP� �— -�\ EXIaTNO USS NC BATTLESHIP Us$WWa." CAROLa1A GOAD l� STREETLIGHTHBIa RBAg . �-- WITH _.. __. _._... WRH BANNERS AND FI.A09 .roman EAGLES ISLAND EXPEDITION TRAIL SYSTEM ACCESS 10'-0' W IDE COVERED PAVILION / OUTDOOR CLASSROOM ON TIMBER PILES OFFERING VIEWS OF'NILMINGTON, THE PARK AND THE BATTLESHIP NEW FLOATING DOCK WITH BOAT AND KAYAK LAUNCH ~ »• �r1fdO \ IaYrAIrIMw MiR�.41WB \ UWI � r� a AMPHITL EATER\ STAGE ri OPEN AIR —� PAVILION ON THE CENTER + AXIS OF MARKET STREET PHASE TWO �w Conceptual Master Plan: B USS North Carolina Battleship Park I •••••••••.........,••• Iwrownixawmwwv 11. I I I 1a-10530 M .Q. G A1.1 z