HomeMy WebLinkAbout79186B - Young, John 411 CAMA / DREDGE & FILL 5 N° 79186 A Z C D
GENERAL PERMIT D # 71 Liq ' Previous permit# i.!!;1
New Modification Complete Reissue .Partial Reissue Date previous permit issued r..)/!a
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 1 . 1 1 U`- .
',Rules attached.
Applicant Name :co hr CA•a v"\t Y D44►iq Project Location: County fj�Pgc.•�'o r ''! _
a
Address l 5 3 i r k rc i Df,1 ve. J Street Address/State Road/Lot#(s)
City ..'.i;A1A,4 �bn State \)(- ZIP -� S 9 1S .� . �_�- 1 I:).,- ,,, _
Phone # (15Z) 2/V - 7-'5 3c E-Mail - Subdivision
Authorized Agent 1--5 .5 NA t,^t (mac r."st-. City -ke51h,,+c,1 ZIP 2-4 Ss9
Affected ❑CW ❑EW aPTA ❑ES 7PTS Phone # ('52) 2Z.1 - 1530 River Basin 7+tiR 1 7 4P
❑OEA I]HHF ❑IH ❑UBA ❑N/A
AEC(s): Adj. Wtr. Body-17:Vz-. 2.'1 na /man /unkn)
❑ PWS:__
Closest Maj.Wtr. Body F
ORW: yes / no PNA yes / no
t. \ ' < 0 '-�C. `r
Type of Project/Activity -,4-GI , ice, _ - r ,` v"��
. .-c)i 0 7/4. e) 1 ,-, 3 ))( G/,7,-/,4i.......0- (Scale: )
Pier(dock)length
f I it l II I 11
Fixed Platform(s) 1 I j -�A Z RV J I \
- ;- f J i
Floating Platform(s) 1 I
Finger pier(s) � i � 1
I I i I
Groin length I 4 ' I I I I I i
number — = I l
Bulkhead/Riprap length 1 //�, - i —.-- ?IA f I
avg distance offshore Z.' I I I
max distance offshore Z
I
II
Basin,channel
&j, 5 1--s _, I I .
cubic yards • •
or
Boat ramp - — -i Er. s�Fi ( .._....__
11l
Boathouse/Boatlift I -
i
}w l l " I l!(3r rJ
Other Beach Bulldozing � 4/ . __. St"'I '1 1 i �ItJ l i
{l / sari } t i
t , ypy., rj '' — 1 .
Shoreline Length J C i St�; e ,, ,,,,J , , r- ,1J
�T
SAV: not sure yes ' -._._._._. ; l ; L_._....-__..
C:)--It .
.. I I i
Moratorium: n/a yes p M s
�, I I !YO Pe" C)? I i j
Photos: y� no 7%(y.7 1 — I t t- i I I I
Waiver Attached: Lye. , no -- 1
L
L_t2.. ' I / J
A building permit may be required by: C 7 y C, /4)45h;pa q i2`� See note on�back regarding River Basin rules.
( Note Local Planning Jurisdiction) 1 /
Notes/Special Conditions G07 i 5 01/fi'^4AJi.',( 11/;?v[, i,")Z'
- �// fetes. /vilt�
hvk� hat) no4 -fc ,(-,-, . -ci 1.,0-1-e,6vari\ ) I) rXI iN b sS
y bgrne , '\ :
Agent or Applicant Printed Name Permi i er s Printed Name
Signature **Please read compliance statement on back of permit** Signature
" -1-1'L1 '` `/bD• �i (i7 /SS - od - Z.c22_ - /cc - /-: - ao2-2...
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves: Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves: Camden, Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
-A0 C AT
CAMA / DREDGE & FILL C 1 V 9 79186 ABCD
GENERAL PERMIT - 1), 7/ 44 , Previous permit #
> New Modification Complete Reissue [—.Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC I II . f f car. .
E Rules attached.
Applicant Name - Project Location: County _14: , ''
Address .'1-' 3; %.- r i' _ 'r -,, Street Address/State Road/Lot#(s)
City .-3A/-' ,hYl State '3L ZIP . -1- `a ,
Phone# ("'7-) ZL'3 E-Mail Subdivision
Authorized Agent T 'S > 1\ 1 i,. ,. t L.,, h c,.T City /`-t-i jy,,r.tc.. ZIP = S y
cw DEW I:ilPTA DES IZPTS Phone# ( .A 2) ZZ' - 143c River Basin 7 J 7.'rl Yh
Affected IDEA !_.1 HHF ❑IH O UBA ❑N/A
AEC(s): Adj. Wtr. Body-r z-.:'e (nat /man /unkn)
PWS:
Closest Maj.Wtr. Body -', 'r
ORW: yes / no PNA yes / no
Type of Project/Activity - i,i , ,1 eil/
ei it e �;r , (- (Scale: )
Pier(dock)length
i
Fixed Platform(s) ! ! `- •d a a vtii-r2 1 I .
Floating Platform(s) �99•�� --- _/^ ' I
4441
Finger pier(s) ` �—� I I � ,.— \, 1
Groin length _ I ' y I
number _�..._.......... ... ..._ t ____-____.1I I -- I I !
Bulkhead/Riprap length 4 1 I" 1 ( A ' ►' `
avg distance offshore 2 j I I 1
max distance offshore t ' .
Basin,channel
i�\ •�r? S �) I I _ f
Y cR
1.
cubic yards • R
Boat ramp _ I f , , I
Boathouse/Boatlift — _
I • iI i, i i
IIIIIIW
Beach Bulldozing ) 5t. { �l t t✓ I
Other i 4 r .
TM' I i } ! i
Shoreline Length ! 1 R • r "' r �- I,•' I I w• ` �, 4 1
SAV: not sure yes ,no _1—'' .--7 I s. 5 t ! 1 `
y
Moratorium: n/a yes no �! •4i \1. 1 K'!,, 1/em5 i �T, r' ` I I - 1
Photos: yes (no , i /i 1 1
Waiver Attached: yes no ! 1 I ` �' a _ I I _-_
1 %t,..
A building permit may be required by: X See note on back regarding River Basin rules.
( Note Local Planning Jurisdiction)
Notes/Special Conditions `o f , 5 / /
)- i l, \ i• F*. .. \ 1. ',, ? , - . f k't 4 �,,. 1!f_ ,!;,- I1 . , x i,„
.,j
i
rLi Al J 0 r tT. 4. ; , C- - ;I is
Agent or Applicant Printed Name Permit icer's Printed N
‹ .
Signature **Please read compliance statement on back of permit** Signature
i ri' ' i I j. '--- %`^'> ' C. Z.C.- Z Z ; 'ems v Z .,
Application Fee(s) M Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves: Carteret, Craven, Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves: Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
NC
' Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY
Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
t. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL) or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects,but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bul)<head. •
a Pre-project site conditions: ,471 '/5 Maim �o) kevit Ivy j/G h r.
`4x��C tL
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed co itions and th II
information is complete and accurate.
/VI/Lf o o ea •
Agent or Applicant Printed Name Permit Offi s Si ature
Ag t or pplican�gr Signature Q / / Issue/SC Date
^ ZtiZ2
CAMA GENERAL PERMIT#: / ( (� ,cam
State of North Carolina I Environmental Qualtty I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 278891252-946-6481
Wilmington Office 1127 Cardinal Drive Evt wiming c.NC 28405-38451 910-796_7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1 252-808-2806
C.,' ity 61( ' CITY OF WASHINGTON
‘-igeil
ZONING COMPLIANCE
Whi1on
O R T H C A R O L I N A
CERTIFICATE
DATE: 10/19/2022 PERMIT NUMBER: 010492331A2022
ISSUED TO: Charles Young
ADDRESS: 153 Tar Heel Dr., Washington
ZONING DISTRICT: Residential
SCOPE OF WORK: Bulkhead replacement.
APPROVED BY: Glen Moore
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: 4he/mcP o_@At 4Pa Jn(JQS
Mailing Address: j`;3 in tho0 I / U/10C
L09.5h 4oH /Vo. Q911&&
Phone Number: c - ccio(Y/
Email Address: ( "a �F11/0/mWJ 5 C01// OYI ar 1. 00')
I certify that I have authorized r (Ahn p a'
�ent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development:
at my property located at
in County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Signs
U%J )cAP G. yours 3
Print or Type Name
Title
JO IcQnca
Date
This certification is valid through I /
• N.C. DIVISION OF COASTAL MANAGEMENT
• ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN'RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed� by owner or their agent) , •
Name of Property Owner: /, b\)% v�e)e ' / "� '"r�S7 '1_ .
Address of Property: I c ��J hee ) 1'U l• `� � ' 1� J_ p��yo�r`
•
•
Mailing Address of Owner: 4p,n^t • li7$
Owner's email:j C yoi -4c: G! Owner's Phone#i ar2 -a°7` S3v
Agent's Name: ' J Agent Phone#:
Agent's Email: •
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the-Adlacent Property Owner)
. I hereby certify-that I own property adjacent to the above referenced property.The individual applying for this
permit has described.to,me;.as shown on the attached drawing, the development they-are proposing, A
description or drawing;with dimensions, must-be provided with this-letter.- - -
` O NOThave objections to this;proposal. I DO have.objections to this proposal.
•
If you have objections to what Is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in;writing within.10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington,,NC 27889.DCM representatives can also be
contacted at(252)'94616481. No.response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings,boat ramp, breakwater, boathouse, lift,or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.). •
•
I DO wish to waive some/all of the 15'setback '
Signature of�paria petty Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank) -
•
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO;, I CYP`HCL `d
on �1
c/y
Mailing Address of ARPO: . i T c� lO Y�/ S e I 1 X'r�� ` 1 ' `C
ARPO's email: ARPO's Phone#: 2 Z 94 SO`) c
. Date: - l 2 1 •waiver Ismaili]for up to one year from ARPO's Signature*
Revised July 2021
TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION &WAIVER FORMS
CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners (15A
NCAC 7J.0204(b)(5)). Proof of actual notice (a sign-off by the owner on this form) or certified mail return
receipts (showing delivery of notice) are needed.
The purpose of this notice is to make adjacent riparian property owners aware of the proposed development
so that they have an opportunity to provide comments (or potentially object to) the proposed development,
and to give DCM an opportunity to consider these comments/objections before a permit decision is made.
"Permission" of adjacent property owners is not necessarily required for DCM to issue a permit; however,
permission must be obtained for certain types of proposed developments if they fall within a 15'setback area
along the riparian access area of the adjacent property, as determined solely by DCM. It is in the applicant's
best interest to provide comprehensive and accurate notice so that any concerns or objections can be
resolved early in the permit review process. In addition, if the adjacent riparian property owner appeals the
permit decision, insufficient notice could be a basis for granting such an appeal.
Who is an Adjacent Riparian Property Owner?
What is Adjacent? (Note: DCM reads this broadly to ensure comment by potentially impacted neighbors)
• A property that shares a boundary line with the site of proposed development; AND
• A property that fronts a natural or manmade waterbody that is connected to coastal waters and
can support some form of navigation, even a kayak or canoe, including a common canal system
or a manmade basin.
• Easement holders?Yes, if the easement could be impacted by the proposed development.
• Streets/Roads? Only if the street/road could be impacted by the proposed development. This
might include street-ends which might be used for parking and beach access.
• Holders of recognized submerged lands claims/shellfish franchises.
What is Riparian?
Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a
question about whether an adjacent property is considered "riparian," please reach out to DCM Staff -
especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water.
Who/What is a Property Owner?
For private individuals (or families), send notice to the address listed on the tax card. If the property is owned
by an Inc. or LLC. please send notice to the person listed as the registered agent on the NC Secretary of
State's Corporations Look Up site: https://www.sosnc.gov/search/index/corp. For Condominiums or
neighborhoods with an owners' association (HOA/POA), send notice to the association (which is usually a
corporation, for which you send notice to its registered agent).
What is Notice, and how do I ensure it is received?
• You can meet with your adjacent property owner, provide a description or drawing of the
proposed development, and ask them to sign this form and return it to DCM; OR
• You can hand-deliver this form and a description or drawing, and ask your neighbor to return it to
DCM (consider providing them with a stamped envelope); OR
• You can mail this form by USPS Certified Mail, return receipt requested (the Green Card). If you
choose this option, you must provide either the signed & returned green card OR track the
certified mail package number on USPS.GOV's online tracking system, and provide the tracking
print-out as proof of delivery to DCM
If you have any questions about this process, please reach out to DCM Staff and DCM Legal Counsel
and we will work to answer your questions.
Revised July 2021
•
N.C. DIVISION OF COASTAL MANAGEMENT'
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED-or HAND DELIVERY
•
(Top portion to be completed by owner or thei agent),
•
Name of Property Owner: .J t7�" et` h / )r i �f D
Address of Property: (<3 to I Lee / t J es . kAi Cin `S-�`� / Vt✓� Z7d0 �
Mailing Address of Owner:' Sa CPI e •
Owner's email:jC-7 S S'sd�f~I Ow ersPhone#: zwit �Z zL7•LSW
Agent's Name: Agent Phone#: -
Agent's Email:' - . .
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adiacent Property Owner)
I'hereby certify I own property adjacent to the above referenced property.The individual applying for this
permit has described•to:me, as shown on the attached drawing,the development they are proposing. A '
description� or drawing,with dimensions, must.be provided with this letter.
/
V I DO NOT have objections to this,proposal. I DO have objections to this proposal.
If you.have objections-to what is being proposed; you must notify the N.C. Division of Coastal
Management(DCM) in writing within..10 days,of receipt of this notice. Correspondence.should.be
'mailed to 943 Washington Square Mall, Washington, NC'27889. DCM representatives can also be
contacted at.(252) 946-6481.No.response is considered the.same as no objectioriaf you have been
notified by Certified Mail.
WAIVER SECTION -
I understand that any proposed pier,dock, mooring pilings,boat ramp,breakwater, boathouse, lift, or.
groin must be set back a minimum.distance'of 15'.from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign
the appropriate blank below.), .
DO wish to waive some/all'of the 15'setback ^\ . 1 •
Signature fAdj ent Riparian Property Owner
- -OR-
I do not wish to waive the 15'setback requirement(initialti the blank)-: : . . :
Signature of Adjacent Riparian Propertyn Owner: 1 Ma.1(klr&r1 )Y PiV
Typed/Printed name of ARPO: 1`I Qu(()1�t��1 Y IrA t V)e..A(
•
Mailing Address
_of.ARPO:. 157 1 ail I1ee,t dr. VUa6kI✓1
ARPO's email: C•)e,6GOfOtvaCOkp95Mat I AR O%Phone#: 152 '140 Z' 51
Date: c9 15/Z _ *waiver is valid for up to one year from ARPO's Signature*
•
Revised July 2021
TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION &WAIVER FORMS
CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners (15A
NCAC 7J.0204(b)(5)). Proof of actual notice (a sign-off by the owner on this form) or certified mail return
receipts (showing delivery of notice)are needed.
The purpose of this notice is to make adjacent riparian property owners aware of the proposed development
so that they have an opportunity to provide comments (or potentially object to) the proposed development,
and to give DCM an opportunity to consider these comments/objections before a permit decision is made.
"Permission" of adjacent property owners is not necessarily required for DCM to issue a permit; however,
permission must be obtained for certain types of proposed developments if they fall within a 15'setback area
along the riparian access area of the adjacent property, as determined solely by DCM. It is in the applicant's
best interest to provide comprehensive and accurate notice so that any concerns or objections can be
resolved early in the permit review process. In addition, if the adjacent riparian property owner appeals the
permit decision, insufficient notice could be a basis for granting such an appeal.
Who is an Adjacent Riparian Property Owner?
What is Adjacent? (Note: DCM reads this broadly to ensure comment by potentially impacted neighbors)
• A property that shares a boundary line with the site of proposed development; AND
• A property that fronts a natural or manmade waterbody that is connected to coastal waters and
can support some form of navigation, even a kayak or canoe, including a common canal system
or a manmade basin.
• Easement holders? Yes, if the easement could be impacted by the proposed development.
• Streets/Roads? Only if the street/road could be impacted by the proposed development. This
might include street-ends which might be used for parking and beach access.
• Holders of recognized submerged lands claims/shellfish franchises.
What is Riparian?
Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a
question about whether an adjacent property is considered "riparian," please reach out to DCM Staff -
especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water.
Who/What is a Property Owner?
For private individuals(or families), send notice to the address listed on the tax card. If the property is owned
by an Inc. or LLC, please send notice to the person listed as the registered agent on the NC Secretary of
State's Corporations Look Up site: https://www.sosnc.gov/search/index/corp. For Condominiums or
neighborhoods with an owners' association (HOA/POA), send notice to the association (which is usually a
corporation, for which you send notice to its registered agent).
What is Notice, and how do I ensure it is received?
• You can meet with your adjacent property owner, provide a description or drawing of the
proposed development, and ask them to sign this form and return it to DCM; OR
• You can hand-deliver this form and a description or drawing, and ask your neighbor to return it to
DCM (consider providing them with a stamped envelope); OR
• You can mail this form by USPS Certified Mail, return receipt requested (the Green Card). If you
choose this option, you must provide either the signed & returned green card OR track the
certified mail package number on USPS.GOV's online tracking system, and provide the tracking
print-out as proof of delivery to DCM
If you have any questions about this process, please reach out to DCM Staff and DCM Legal Counsel
and we will work to answer your questions.
Revised July 2021