Loading...
HomeMy WebLinkAbout87915_Andrew Zimmerman_20221018 S''' ICAMA DREDGE FILL ..y., No 87915 ABCD' 0 5 GENERAL PERMIT ,�.}_ �'5O I Previous previous �p 'rC Date previous permit issued n New _ Modification n Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name . - - - Authorized Agent • Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) ' Phone#( ) tell- i7 CL Email Subdivision �� City Of//l.-ate"+-C ZIP ZV 5 7/ Affected n cw n EW PTA n ES n PTS Adj.Wtr.Body (nat/man/unk) AEC(s): n OEA n IHA n UW SPIMA n PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity L. (Scale: / ) Shoreline Length Access Length i _� i-- Pier(dock)length • i - - _ " Fixed Platform(s) ` 1 Floating Platform(s) I } i rt _(_----1-_. f t i -- j ♦ r Finger pier(s) II I Total Platform area Groin length/# ' . I I _ i- _ L.._ ._L l ___ . . , ; L I Bulkhead/Riprap length .- ' . f ti I I - ____ ) Avg distance offshore Breakwater/Sill ( I ,, I' , Max distance/length ' , I I I 1 i Basin,channel 1 Cubic yards ._ _ _ _ . � _ ..-_ ----- Boat ramp - -. ..r-- ---,1- 4. Boathouse/Boatlift Beach Bulldozing 1� � X i -�+ I ' Other l_ 1 t;`. SAV observed: yes no —t--�--., j,r j - i Moratorium: n/a yes no . »... 1'' f I 11- r( ' `rt • I Site Photos: yes no .- --.-''jP (�' ` Riparian Waiver Attached: yes no _ ' _. 1 : f j A building permit/zoning permit may be required by: Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one) nSee note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)TCrj Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 o�°``°�"1 L'CAMA DREDGE & FILL 14.5 2 N� 87915 ABCD 3 GENERAL PERMIT T ► "1►�=_'c. I Previous permit Date previous permit issued New Modification Complete Reissue I I Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I5A NCAC V Rules attached. I I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision • City ZIP Affected CW EW I I PTA ES PTS Adj.Wtr.Body (nat/man/unk). AEC(s): _OEA P IHA UW SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: - ) Shoreline Length • • I I I Access Length I i.--- .. _.. •T �y, T _ Pier(dock)length _ ( i Fixed Platform(s) • To 1 { •r „ K ra_ ( • Y 4 I. 1 I_ I j I ;. Floating Platform(s) ' • r• — ` + r I t. Finger pier(s) i. ;,_ti - I 4r �. ► i { Total Platform area ,� I �` • { Groin length/# I ' I ( ' N . .� Bulkhead/Riprap length 1 ` r`- » . -i-•—. • ( I' Avg distance offshore I - I --�{—- �, ' : >a Breakwater/Sill f I • + , f • I 1 Max distance/length I - 3 ` i, { !S 1 r I I t e _ Basin,channel • r. �F { • ( ��" r'. Cubic yards I I_ _..._a - A Ir' I �� j I --- • Boat ramp . 1 l`��' , . I� I -a'.. Boathouse/Boatlift * I + +iF —� '} i.' s Beach Bulldozing -I I s Other I- y 1 s ' SAV observed: yes no • ' ' ' ~,i ' I/ ' - . a • - • Moratorium: n/a yes no ) .• ,.} f x x I , x Site Photos: yes no ? i r. "• I. } 1 ` Riparian Waiver Attached: yes no I I , _ J ! h I I' ,it" I •, " '.r A building permit/zoning permit may be required by: Permit Conditions - TAR/PAM/NEUSE/BUFFER(circle one) nSee note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) ^..\-/ • Agent or Applicant PRINTED Name - Permit Officer's PRINTED Name , Signature"Please read compliance statement on back of permit" Signature Application Fee(s) Check#/Money Order 'Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER o 5, Governor • S MICHAEL S. REGAN Seaerary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director • BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION (( A riparian buffer authorization is required-for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 026.0233 and 0259. The Division of Coastal IL Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your proiect proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provified the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in tone 1(begins at the most landward of either normal water line(NWL)or normal high water line(NHW L)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian bufferrules. 2. Clearing& Grading:Clearing and grading of Zone 2(begins at the landward edge of Zone l and extends 20 feet landwards is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be, satisfactorily restored as described in condition 5 below. • s. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)'feet landward (unless specifically authorized otherwise by DC1v1)from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to • '• this shoreline stabilization project must be restored with woody,vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30)after compl tion of the bulkhead. a Pre-project site conditions: Le %$ Gec7 €.4tre- 7 Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signet e below you agree to be held responsible for meeting all of the above listed conditions a .d verify that all informati• i plete and accurate. # sas Age Hied Name Permit Officer's W ature r eon, i/ 7 Agent ' . °yirgnature s Issue 3] tQ CAJ/A GEN' RAL PERMIT tf: O 79� State of North Carolina I -nvironnental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington.NC 27889 152-946-5481• Wilmington Omcel 127 Cardinal Olive ntn;ng 1NC 23405-38451 Sorehead city Office:400 Commerce Avenue Morehead Cry.NC 2859 : 52-808-2808 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion toto be completed by owner or their agent) Name of Property Owner: Y 7ra Pto Address of Property: 1 Mailing Address of Owner: 3±' IQ-- OL 4 O 'EJcw) 9p04Cel 6 e_&r°4OI P.6- . Owner's email: anAl2&aZ�oaJ, ; 0wnersPhone# 33b- 2FCYg ' 07407 Agent's Name: Agent Phone#: Agent's Email: • ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adiacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions, must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481, No response is considered the same as no objection if you have been ° notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature* Revised May 2021 - i rrlracc' ril cR 1 vk* 4 5 \\1\,,evkvJ N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Lkat,(tiC• PC 1 ' t =.0 . ( A-.} Address of Property: 1 1 1 1 rbV 1 O 1 11_4. Mailing Address of Owner: ( 19 l rock '? 1 ilt to Owner's email: icije A MCCkAJ yYrbiner's Phone#: 91 t — (a`ci 2 107 Agent's Name: Agent Phone#: Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions,must be provided with this letter. I DO NOT have objections to this proposal.X I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of raceipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been • notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback TO s L C _ r Signature of Adjacent Riparian Property Owner • -OR- I do not wish to waive the 15' setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: • Mailing Address of ARPO: ARPO's email: ARFO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature* Revised May 2021 ,z 7 1 1itc> N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) ? r Name of Property Owner: E1 /�ftL &3, "DNA_/j Address of Property: c-e, CV- PC. r t . 0 2Ish1Tdk-Lt A., Mailing Address of Owner: [ ) 3t 'Co tit P r Rt t` '? S-7 Owner's email: PATMA U 45 © Owner's Phone#: ' _5-`2_- 1...4 Q - 7 C 'S CcrJTkrt-1 LI +Ji; Agent's Name: 't-ki ,. Agent Phone#: Agents Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION • (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing,with dimensions,must be provided with this letter. t/I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be • contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply'to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign • the appropriate blank below.) �,t4tJI)- I DO wish to waive some/all of the 15'setbac ( Signature of Adjacent Riparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: • Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature" Revised May 2021