HomeMy WebLinkAbout87910_Randy Shillingburg_20221005 d`t rkt�I ICAMA El DREDGE & FILL "kg. No. 87910 A BCD
s1 GENERAL PERMIT _D#- I-1455 Previous permit
Date previous permit issued
❑New I I Modification n Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC ❑Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County): -
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected n CW n EW n PTA ❑ES I I PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): n OEA I I IHA n UW I-SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale:, G )
Shoreline Length _. _
Access Length I _ I -T_.-�..__.... --- -...<:,-- - i--j- _- 17/: --k 'lam
I 4 4.
Pier(dock)length - 1 • I - I 1
•
�l _
Fixed Platform(s) /" I
— i
Floating Platform(s) _T._._
— � i
Finger pier(s) f ! ! ;
Total Platform area ,. i
Groin length/# i -- -- `�--..; � -r f j I fit If
Bulkhead/Riprap length 1 I
Avgdistance offshoreI �. _. - _ --
Breakwater/Sill I t ! 1I
Max distance/length ! ?i }
y
Basin,channel r 1' •
Cubic yards I, k" -H ----"--1--
Boat ramp ,) - - -
(
Boathouse/Boatlift ! i 'Y I �s 1
Beach BulldozingI i I
: II 1t i
Other '4
J J
SAV observed: yes ;j R
Moratorium: n/a yes ono �'r- , , ' 1 •
I
Site Photos: yes no f t 'r n ` # ,} j i
Riparian Waiver Attached: yes no " r i o ( i 0.. r ✓t?X�� 4'3 I
A building permit/zoning permit may be required by: ,, t •
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
nSee note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
AV h? l.r.
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
rTar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
u'"Nr.4,1 ICAMA t . DREDGE & FILL -1,?.K.) N9 87910 ABC D
f GENERAL PERMIT t 14 D' Previous permit
Date previous permit issued
New I 'Modification I 'Complete Reissue Partial Reissue
As authorized by the State of North Carolina.Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
ISA NCAC Rules attached. I I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected CW I I EW I PTA ES PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): u OEA _IHA UW SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
I
Access Length _ t--__ i—.-_._.._.._.1-., ._ �_---- °'
1 _..--= ----,
Pier(dock)length .t- ` I I -- I
I i I
Fixed Platform(s) I I i
--i I I
•1 I II
$ I I I I
Floating Platform(s) _ } —i
1 . —,— j
Finger pier(s) 1 I
111 j
Total Platform area 1 I 1
Groin length/# � l j
Bulkhead/Riprap length +-- { •
��_.
Avg distance offshore — - i j t-- -- ` I —
Breakwater/Sill : " f 1
Max distance/length } } I i I
Basin,channel 1 [ __I,-
Cubic yards _—1'-_.r.._,..._ pp I I
Boat ramp t f —` -- --— I 1 t-T—
Boathouse/Boatlift 1
Beach Bulldozing I I ,
Other
I 1 i
SAV observed: yes no I ' j I 1
Moratorium: n/a yes no .-a. j"�' ' t _ t �'
Site Photos: yes no If ` ; I i , ! I I j
Riparian Waiver Attached: yes no i I f II * ', I
A building permit/zoning permit may be required by:
Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one)
ISee note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://porta I.ncden r.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER.
Gareor
MICHAEL S. REGAN
^ Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL DUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& •
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 1SA NCAC 028.0233 & .0259.The
Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below_Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.This
drawing will be used to aid in compliance and monitoring efforts. '
• Pre-project site conditions: �car - i�t eft/ p�ax / Agri` � Ji�1e._
Gt 4‘erck74 7i
By your si ature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all ' rm ion r viged s complete and accurate.
( Ittv.
Agent or I' ant Printe4 Name Permit Officer's Signature
2
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT#: ‘79/6) Jr-
State of North Carolina I Environmental Quality I Coastal Management
Washington Office I 943 Washington Square Mall Washington.NC 278891252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wihnngton,NC 28405-3845 1910-r 96-7215
Morehead City Office 400 Commerce Avenue Morehead City.NC 2855?1252-808-2808
•
AGENTAU HORLZA7fON t=OR CAMA PERMITAPPLICA77Qt$.
'f� 11V 6U t .
• 'Name of Properly Owner Requesting Permit; J ). --1 D/�/ �' l� d
Mai sAddress:
`17 GUicP� .( / �s
. . 2 n a e. , -. . - • • - ''.; i X. :1 .
Soy z�9= e3
Phon•e•tVurr+her' , W
a
EmaNAddress '` ��H S62r ��1NR;6 • �a`10o 4°i'^
t ceray ttie1l have smirk, etlr :I
' A ep✓ra La.. C-t rc d / ,rs (_.. �L
Agent/'Cw!tractor i
to ad onrtmy• behalf.for the purpose ofe
p::_. _ 'for and obtaining all CAM' pemiffs �'
1
-neoessarytorthe following proposed development �. �:r a,...
+ •myp►pper y boated at i
'County2. •
• /JFiifh714 !
:''- L:'' ''' la•m i;:t" ' .'. to grant, end do rn fact grant perm►sston to • '1• • • •xion• with evaluatin
davp/iceboa ; v g information muted to this J • r;
> '. ~t t- a 3 s .f aAt l £ P +. d tC ' r ' '
r
er,'tntQrt pn,�• sft _ A+yv 7 t, ,y, J y s s
S r t ,. - r r - .*: a 'j t }t} _ ( arty xt
{�. tf 2. G -.tom t.i r: i c . 71
< L— 3 f'x• s y t • u r >+ ,4 rt).A
x2' as '.. gna�,�� F r � + > r ,.. '�'. r v
4s,• �""+.a'�-K��+D'^'�Qb)ti z�, tk , 'a.'
s r fin. i
•^ d4(Y:lt Ul \� dJ f 4. "r 1if J f..'
>A 4 (/ 1 � / V S Y "i
d�J' Y� A. \ h 1 4 S }a E r
if^,ja.,. ,. a Y�.ke P }y�, F tit dry ' `1i n
lQ. +� �' �b�uY,Eu V(k�:`+,�� '� Mi}yt #y f � xw ..i]rJ Z} � A n 1 Ky, }ti
'�� {vfO Gtl ,e _,...'�` r a' a k. a s j, a ♦•_ b P• A
r#\r�t.r x ,� ��i'S� • y ":s ._w+ ,,'i t+ j .t
P S my l 4 k t "r
'-`1. )^a ▪ .tii r . yr , �a a� —. s a Y-- S 4 fa 1
L d-.an °`� roes . L '"--1 t.. v .- J.. e.t rg4pa2. i tv.,- . t t .-,,,t
t 1 k .'I. 530.4 �,f2 i.:2;i.C" h�aE qtt-kt3. x1 J y'r. -3 .kt F'r:. [ .+
'i c-�"c ' Yr. • ,-4 4't i-_'l to., `� .'msa',Sa "d',?r"s' :' i`.rr' !'i.., r� tx`y:/ t
r.
sI , ` �< {P� ,,, 3-.� E „ aye ,A 41y1'*s.,£ Aeidt.^t 'rf--72, u ,.. i"w"g.'+•3?r. '-`'j ! r
,,,�13 ) .1 d," C3 ",F.;�PrT,._a,t : t-1,r1K "�3" /"' M FP }r. !f r :1,.
I\ 11
'oit4 , ,". r r YF 'i- i 2.s..S.A' :' „��[ p .G' 'I'' .y{r. t•'' 'J -d.
y: .*' 'ie b-'rt`r� n - °,- ,'ci.„ ,QR s"'.. r .- r F : i .; r
_ �2'r .•..R p4 k � .r�0'<M 3'[e � `t�'C. L yF�C�Sy i "1 `' y- . L;
• w �, . •
a T
Y �L rlM P �tt AA$ k "fkA ! ft 1. +" 3
_ • " VA, {.. 4, +'.ty y, ir'r--, . ,' '1xi -'ry v„�' x a �tdL z` •-' , r a.a,d^�,,;�
r.a .,,..y~-. -a. r.€, w.. i•a i;•.. e..X+: r fir'-. - `�"t� '", =ht ,
m s. L ru A 4 y
r
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner: IA Niel 7 \SA://. (f
Address of Property:
Mailing Address of Owner: p 1 t iIc (j(4-4./e---"L5 ,/- 4-1 2 G�
heft �' s`i,g, 7 0
Owner's emait J�i r�® y� 1`Q� •�O er's Phone#:_ 361 1/ -. t 5 - 9'6 3 g
Agent's Name: Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing, with dimensions, must be provided with this letter.
14IO NOT have objections to this proposal.
DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at (252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15'setback
Signature of Adjacent Riparian Property Owner
-OR
I do not wish to waive the 15' setback requirement (init. I the blank) 41..... _.--7---_ "-,.
Signature of Adjacent Riparian Property Owner: c'
Typed/Printed name of ARPO: CA 'K �l1—
Mailing Address of ARPO: 61 (e413412,
Il
•
ARPO's email:e ARPO's Phone#: 614 . ,2J✓"I•S 4 0
Date: *wai r is valid for up to one year from ARPO's Signature*
Revised May 2021
•
N.C.DIVISION OF COASTAL MANAGEMENT
•
' ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL• RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner. /FAq�Jo� SA;II;44�A v� / � )
Address of Property: fl7 "w:do W e,ei f/J i�7 Ji/ Ak Q 7pp
08
Mailing Address f Owner �F? 7 -aid kei "5 a, 1� ' "' -' l A/C 27f 0 p
owner's er '�Yshti1lrvjawy/0y4haxume`rs Phone#: 3()9— 3fq— 9a 3
Agents Name: Agent Phone*
Agents Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be Completed by the Adjacent Property Owner)
1 hereby certify that t own property adjacent to the above referenced property.The ind Vidual applying for this
peimit.has described to me,as shown on the attached drawing,the development they-are proposing.A
description or drawing,with dimensions,must be provided with this letter.
DO NOT have objections to this proposal. I DO have objections to this proposaL
if you have.objections to.what is being proposed,you must notify the MC. Division of Coastal
Management(DM In writing within 90 days of receipt of this notice. Correspondence should be
mailed to 943 Washington.Square,Mail,Washington,NC 27889.DCMrepresenta'tives cap also be
contacted.at(252)946.6481:No response Is considered the satire as no objection If you have been
notified by Certified Mail.
I,understand that anyWAIVER SECTION •
proposed.pler,dock,mooring pilings,boat ramp,breakwater,boathouse,lift,or
groin must be set back a minimum distance of 15'from my area Of dparian.access unless waived by me
(this does not apply.to bulkheads or riprap revetments).(If you wish to.waive the setback,you must sign
the appropriate blank below.)
I DO•Wish towalvesome/ail of the 15'setback.
•
-OR Signature ofAdJacent Riparian Property Owner
I do not wish to waive the 15'setback requirement(Initial the blank)
Signature of Adjacent Riparian Property Owner.
Typed/Printed name of ARPO: A./1 AtMy //, S lb /• (/
Mailing Address ofARPO: 8-6y tNj C., Pa /crs. , $a/"4 /G� a70
ARPO's email: ARPO's Phone#: 33b 33 �' 9o1' Ok
799
Date: 0 y/'a'?/2c. } *waiver is valid for up tonne year from ARPO's Signature*
Revised May2021