Loading...
HomeMy WebLinkAbout87905_David Kenyon_20221005 1,4°'("ms'itc,, 1 ICAMA _ DREDGE & FILL 11..K. No 87905 ABCD 2 GENERAL PERMIT -1--p ,�1 46D Previous permit Date previous permit issued ❑New I I Modification n Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected CW 0 EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk) AEC(s): n OEA n IHA n UW 1 1 SPIMA n PWS Closest Maj.Wtr.Body- - ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ' ?c j Shoreline Length ( • r Access Length I.. •-'----_.__-- -. Pier(dock)length _ ' -+ r l� Fixed Platform(s) -I I d -ii 64' �� `, I _. _ r , y n Floating Platform(s) t I _C I { r, a 1— _ f- Finger pier(s)_ II .. t.----F i i . 1 Total Platform area I ; i I Groin length/# I . _i__� Bulkhead/Riprap length i. TI 1 (-I i_. , -� — 1 P P gt i } Avg distance offshore e Breakwater/Sill { Max distance/length I "�" . Basin,channel I �I Cubic yards i. N • L ..__.._._..._.._._} Boat ramp 1- , • —-- �._ 7 !.�__..._.�.. is , -4 1 Boathouse/Boatlift 1 1 Ti ,/ Beach Bulldozing I I ' ��� 1 rY i,.,cl,� r r Other i . ..1 6 — . 4I =— i T I' J I O SAV observed: yes no k1 k+`, "�. i , — I / <. Moratorium: n/a yes no JI 6-r ri j } i! J Site Photos: yes no J--i— I° r' f 1 v --- 1 — , ( t, 1 r(-, , . I Riparian Waiver Attached: yes no I I i t�"_ r t i l A building permit/zoning permit may be required by: Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one) DSee note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) ;' e' Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ,a0`°"4t4tt,l ICAMA DREDGE & FILL ti(e) N9 87905 ABCD a GENERAL PERMIT TG1- Previous permit Date previous permit issued New Modification Complete Reissue Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC n Rules attached. 1 General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) _ Email Subdivision City ZIP Affected I I CW EW J PTA I ES PTS Adj.Wtr.Body (nat/man/unk) AEC(s): I I OEA I 1 IHA UW SPIMA PWS Closest Maj.Wtr. Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length - 1 1 I Access Length �__._..__ - 1! i - ---.--�.. I— '1__. _.._....1_.._-- ."` Pier(dock)length ( 1 1 ; j Fixed Platform(s) i t ! I Floating Platform(s) 1 ( I Finger pier(s) • i I. Total Platform area - 1 I j Groin length/# I ) 6 i 1 1 Bulkhead/Riprap length — -r i Avg distance offshore ---4---- — ,` I Breakwater/Sill - ' } j Max distance/length I _ 1 Basin,channel j I ! j Cubic yards I Boat ramp [ { _, �.... I -- _ I Boathouse/Boatlift i I 1 f I Beach Bulldozing I( ! j t - } I • Other 1 ` I 1 1 ( ., __ -,{_--..._.... 1— 1 SAV observed: yes no ;..H . ! 7 /� t 1 1 Moratorium: n/a yes no 6 • Site Photos: yes no l ' f } - /% i Riparian Waiver Attached: yes no i I , I 1.-t • 1 I I r A building permit/zoning permit may be required by: TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr,org/web/cm/dcm-home Revised 6/01/2021 11/2 ROY COOPER. t Governor MICHAEL S. REGAN .. - Secenay Coastal Management BRAXTON DAVIS rahemiNvfAi.awurtY Director BUFFER AUTHORIZATION CERTIFICATE • FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259.The Division of Coastal Management(DCM),through a Memorandum of Understanding with the Division of Water Resource's (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the • construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. 2. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly(which is defined as.between 75 and 105 degrees)unless otherwise approved by DCM.The • alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. • 3. Access Width:The width of the pier or docking facility access way shall be limited to six(6) feet. 4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your .. property indicating the relative location of the pier or docking facility and any requested access way.This drawing will be used to aid in compliance and monitoring efforts. L • Pre-project site conditions: La/ � Tfr" � " • c 0 / ctiz �/ e25 By your signature below you agree to be held responsible for meeting all of the conditions listed abo an verify that all information provided is complete and accurate. whist?AOli estirM • Agent or Applicant Printed Name Permit Officer's)Sign re c Ata."- /o%/ Z� Agent or Applicant Signature Issue D te. / CAMA GENERAL PERMIT if: 37?°S State of North Carolina I Environmental Quality f Coastal Management Washington Office I943 Washington Square Mall Washington NC 27889I252-946-648I • Wilmington Office I 27 Cardinal Drive Ext.Wilmington.NC 28405-38451 910-796-721S Morehead City Office 1400 Commerce Avenue Morehead City.NC 211557 1252-808-2808 n tk4 , /13 ervi- From: dkenyon57@yahoo.com Subject: Re:Estimate from B Prescott Marine Construction,LLC " D Date: September 28,2022 at 12:38 PM To: Brandi Robertson brandiprobertson@gmail.com Brandi- I authorize you to act as my agent for the lift and bulkhead permit. I am ok it we do the dock now and move the lift and build the bulkhead later,when permit is ready. Yes,hopefully Ian dies out and goes well west of us. Just let me know when you are ready to start. Thanks, Dave Sent from my iPhone On Sep 28,2022,at 9:40 AM,Brandi Robertson<brandiprobertson@gmail.com>wrote: Dear Mr.Kenyon, We will be watching the Tide closely and will be in touch if we think we can work on your project this week. If not,we will see you next week. We will not accept a deposit until we are on site and begin work. I will update your estimate to include all the elements we are addressing. I also will send you an estimate for the Bulkhead Project you discussed with Tyrone. We will need to obtain a permit to relocate the boat lift. I am trying to gather all the necessary paperwork in a short amount of time,fingers crossed that we can get a permit quickly. Please respond to this email granting me permission to act as your Authorized Agent. This will allow me to obtain the permit on your behalf. Please feel free to contact me if you have any questions. Sincerely, Brandi Prescott Robertson B Prescott Martine Construction,LLC BrandipRobertson @ gmail.com 252.249.0149 On Sep 28,2022,at 7:31 AM,Dave Yahoo cdkenyon57@yahoo.coms wrote. Brandi- I would like to go ahead with this dock repair as soon as you can fit it into your schedule.Do you need a deposit? I am also interested in quotes for a bulkhead and moving the lift,as discussed with Ty. Thanks! Dave On Sep 26,2022,at 2:14 PM,B Prescott Marine Construction,LLC<auickbooks@notification.intuit.com>wrote Dear Dave&Gail Kenyon, Please review the estimate below.Feel free to contact us if you have any questions. Please note that all final invoices will be based on"As Built"dimensions.Prices are subject to change based on possible increasing material costs. We look forward to working with you. Thanks for your business! B Prescott Marine Construction,LLC Estimate PO Box 874 Oriental, NC 28571 US (252)249-0149 ✓ . . Estimate #: 2079 Date: 09/26/2022 Exp. Date: $10,560.00 Address: Dave & Gail Kenyon 863 Fork Point Rd. Oriental, NC 28571 Date Activity Amount 09/26/2022 Dock Repair: Replace Stringers and Decking - 5'x 10,560.00 88'= 440 sq ft, 440 @ $24.00 09/26/2022 *Replace Headers as Needed Total: $10,560.00 ALL ESTIMATES ARE VALID FOR 90 DAYS AND MAY BE UPDATED BEFORE CONSTRUCTION BEGINS. Estimate 2079_from_B_Prescott_Marine_ConstructionLLC.pdb N_C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONJWANER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by Owner or their agent) Name of Property Owner I ;ak)i \"-- e r t Address of Property C� , ) Ed( Oth i _K2 Mailing Address of Owner_ C owners email: C\ f 1 � 5 4> �- �oM �,(�,�Q. ,j,�_�,-}�--^Owner's Ph�,e# 7:�oC- (��su-�15� Agent's Name: 15rajtvi( P. t o2dtSol Agent Phone' a 5r 2 iq-ditt't Agent's Email: brctrd p d be y OV1 1'yIQ t t r_C�1Nl ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that 1 own property adjacent to the above referenced property.The individual applying for the permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions, must be provided with this letter_ J' I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the MC. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mail, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail *AVER SECTION I understand that any proposed pier,dock, mooring pilings,boat ramp,breakwater, boathouse,lift,, or groin must be set back a minimum distance of-1S from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign the appropriate blank below.) I DO wish to waive sornelall of the 15'setback Signature of Alacent Riparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner. \ ' _ A , Typed/Printed name of ARPO: Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date: 'waiver is valid for up to one year from ARPO's Signature` Revised May 2021 h-Paaaq PoiroC uol\AADy A-21-poo? cn.)N pasochia wap-ru_i_s lt,Aadwa • -- - -' • Qinotrok\ 1-02,0 (TifflOg N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WANER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by bwner or their agent) Name of Property Owner. I T C��i i 6 e No in. Address of Property: �' 1 0 h o ( Pc Oui 21 . ) D r icry -11 Mailing Address of Owner: _)( -'`-�-- Owner's email: G'l K-� vi �/c`i�1r5 i L� , -^Owner's Phone#_ —o' Lc/15 " )/,5 Agent's Name: bravo-A P. R Db `c0 1 Agent Phone#' d oR- 1"I-Ol iq Agent's Email: b rar} ( p v o►Je of 1 G�rri�r , ce)vv ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A descr,pL ti drawing,with dimensions,must be provided with this letter_ 7I DO NOT have objections to this proposal. I DO have objections to this proposal. On If you have objections to what is being proposed, you must notify the N.C. Division of Coastal ►'1�CrL Management(DCltr/) in writing within 10 days of receipt of this notice_ Correspondence should be mailed to 943 Washington Square Mail, Washington, NC 27889. 0CM representatives can also be contacted at(252) 946-6481. No response is considered The same as no objection if you have been notified by Certified Mail_ WAIVER SECTION I understand that any proposed pier,dock, mooring pilings,boat ramp,breakwater, boathouse,lift, or groin must be set back a minimum distance of-15'from my area of riparian arcs ss unless waived by me (this does not apply to bulkheads or riprap revetments). (If you with to waive the setback,you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) ,/ Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: �/t'/ X• / )Q1l/,'6 Mailing Address of ARPO: 5/ _ /QP j� IP i,ft RI• cic/5iV/j¢-//VL4. �g� 7/ /' /yn., CD' vZ /p ARPO's email: /2i�3? iC /YJ C, ARPO's Phone#: e2-, ' ' -.7�� Date: 9' 2- / ' off— }waiver is✓valid for up to one year from ARPO's Signature* Revised May 2021 • Gree-lc AActirnotto Pel- / Lxis+1,.9 sfn,ctuve, _ Newseol &oa 4 TrieC(±q- is l laS T roCei*)