Loading...
HomeMy WebLinkAboutNTB_19-14_FinlayW ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretory BRAXTON C. DAVIS Moctor March 6, 2019 Robert Finlay 30 Temple Street Suite 400 Nashua, NH 03060 lblissonnette@r finlay.com RE: EXEMPTED PROJECT (MINOR) EXEMPTION Structural Accessway (I 5A NCAC 7K .0207) — Exemption# NTBEX19-14 650 New River Inlet Road, North Topsail Beach, NC AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard AEC Dear Mr. Finlay: 1 have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. Based on the information provided, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing dated received by DCM on February 20, 2019, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter. STRUCTURAL ACCESSWAY EXEMPTED 1. The accessway must not exceed five feet in width and shall provide only pedestrian access to the ocean beach. 2. The accessway must be constructed so as to make negligible alterations to the frontal dunes. This means that the accessway must be constructed on raised posts or pilings of five feet or less in depth, so that wherever possible only the posts or pilings touch the frontal dunes without any alteration to the dunes. In no case shall the frontal dune be altered so as to significantly diminish its capacity as a protective barrier against flooding and erosion. 3. Construction of the accessway be shall consistent with all other applicable local ordinances and N. C. Building Code standards. 4. No portion of the proposed walkway may extend beyond the mean high water boundary, nor shall it extend onto the wet sand beach. The walkway shall terminate as close as possible to the toe of the existing frontal dune. cere , 1 Jaso ail Field Representative cc: DCM — WIRO; Kate Winzler, Town of North Topsail Beach North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 910.796.7215 of Dune 650 New Ri North Tops will be orien ZONING & FLOODPLAIN DEVELOPMENT APPLICATION NOT VALID UNLESS SIGNED aY APPLICANT Application shall be made prior to any development activities located within the Town of North Topsail Beach. The following items maybe required with the application for a zoning and floodplain development permit: 7 A plot plan drawn to scale; 7 V-Zone Certification with accompanying plans and specifications verifying the engineered structure and any breakaway wall designs; and 7 an Elevation Certificate. 1 HEREBY CERTIFY THAT 1) ALL INFORMATION IN THIS APPLICATION IS CORRECT AND ALL WORK WILL COMPLY WITH NTB TOWN CODE AND ALL OTHER APPLICABLE STATE AND LOCAL LAWS AND ORDINANCES AND REGULATIONS. THE PLANNING DEPARTMENT WILL BE NOTIFIED OF ANY CHANGES IN THE APPROVED PLANS AND SPECIFICATIONS FOR THE PROJECT PERMITTED HEREIN; 2)1 FURTHERMORE CERTIFY THAT I AM AUTHORIZED TO GRANT, AND DO IN FACT GRANT PERMISSION TO NTB ZONING & FLOODPLAIN ADMINISTRATOR AND HIS OR HER AGENT(S) TO ENTER ON THE PROPERTY NOTED ON THE NTB PERMITS) FOR THE PURPOSE OF INSPECTIONS; 3) 1, THE UNDERSIGNED, UNDERSTAND THAT THE ISSUANCE OF A FLOODPLAIN DEVELOPMENT PERMIT IS CONTINGENT UPON THE ABOVE INFORMATION BEING CORRECT AND THAT THE PLANS AND SUPPORTING DATA HAVE BEEN OR SHALL BE PROVIDED AS REQUIRED. I ALSO UNDERSTAND THAT THE PRIOR TO OCCUPANCY OF THE STRUCTURE BEING PERMITTED, AN ELEVATION AND/OR FLOODPROOFING CERTIFICATE SIGNED BY A PROFESSIONAL ENGINEER OR REGISTERED LAND SURVEYOR MUST BE ON FILE WITH THE INSPECTION DEPARTMENT INDICATING THE OAS BUILT" ELEVATIONS IN RELATION TO MEAN SEA LEVEL (MSL). 4) 1 AM THE OWNER/AGENT/CONTRACT PURCHASER/LESSEE (CIRCLE ONE) AND BY SIGNATURE AUTHORIZE SUBMITTAL OF THIS APPLICATION. SITE DATA PHYSICAL ADDRESS 650 V—CV , 1-ft -'M 41 Jac[ .v%B TAX PARCEL ID If ZONING SETBACKS: FRONT(FT): SIDE(FT): REAR(FT): OTHER(FT) LOT SIZE (SQ FT) TOTAL PROPOSED IMPERVIOUS SURFACE (SQ FT) APPLICATION FOR THE FOLLOWING DEVELOPMENT ONLY: ❑ Excavation ❑ Road Construction ❑ Residential Construction I ❑ Replace HVAC ❑ Fill ❑ Driveway Construction ❑ Nonresidential Construction ❑ MechanicaltElectrical ❑ Grading INCLUDE ENG SW PLANS ❑ Addition ❑ Other (specify): ❑ Utility Construction ❑ Renovation DESTIPTION OF WORK'&J241Ar/' f� C����o.�a�r[�r.�/..J� n �i�,k-4 �yCbsir 11"a�L�f Te FIRM DATA: FLOOD MAP# FLOOD ZONE: ❑ VE ❑ AE CBRS: ❑ YES ❑ NO BFE(Fr):_Regulatory flood elevation plus 2FT freeboard (FT): STRUCTURE BUILT AFTER JULY 2, 1987 ❑ YES ❑ NO DEVELOPMENT STANDARDS DATA: • ELEVATION IN RELATION TO MEAN SEA LEVEL (MSL) AT OR ABOVE WHICH THE LOWEST FLOOR (INCLUDING BASEMENT) MUST BE CONSTRUCTED FT. • ELEVATION IN RELATION TO MEAN SEA LEVEL (MSL) AT OR ABOVE WHICH ALL ATTENDANT UTILITIES TO INCLUDE, BUT NOT LIMITED TO, ALL HEATING, AIR CONDITIONING AND ELECTRICAL EQUIPMENT MUST BE INSTALLED FT. • WILL GARAGE BE USED FOR ANY PURPOSE OTHER THAN PARKING VEHICLES, STORAGE OR BUILDING ACCESS? ❑ YES ❑ NO • PROPOSED METHOD OF ELEVATING THE STRUCTURE • WILL ANY WATERCOURSE BE ALTERED OR RELOCATED AS A RESULT OF THE PROPOSED DEVELOPMENT? ❑ YES ❑ NO • TOTAL AREA OF OPENINGS REQUIRED: (1 SQ. INCH PER SQ. FT OF ENCLOSED FOOTPRINT AREA BELOW BFE). BUILDING PERMIT APPLICATION North Topsail Beach 2008 Loggerhead Court North Topsail Beach, NC 28460 910-328-1349 Please Fill out Form COMPLETELY HT B BOILBIN6 INSPECTIONS RECEIVED Permit Project / Number Address /� Sd ,i�({J ig1 '�,.4 PJ .q/j,� Owner Name ;5--9 6W A'74 „ Mailing Address p Signature Telephone Number General Contractor N.C. License Number 90 9 7 Expiration Date os _o/ _, Address ���y(4 ��, �� �.iL Contact Number /aZ3 76 7 Sp6,< Signature Date 2�-2 / �J Square Footage Heated Unheated Estimated cost of Project A Q * - 3� Description of Work /A ,p Pt Issued By Date approved **100.00 fine foYnot scheduling a final inspection Building Permit Fee Zoning Permit Fee Additional Fees Receipt Number TOTAL RECEIVED of Dune 650 New R North Tops; will be orier