HomeMy WebLinkAbout30-90 Swan Point MarinaPermit Class Permit Number STATE OF NORTH CAROLINA Department of Natural Resources and Community Development and Coastal Resources Commission vl PrMt't for X Major Development in an Area of Environmental Concert puisuanttoNCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 30-90 FEB 8 7 = Issuedto Swan Point Marina: c/o Triangle Sales of Raleigh Inc. P.O. Box 10 Sneads Ferry NC 28460 authorizing development in Onslow Countyat Chadwick Bay, AIWW off of SR 1523 at Sneads Ferry as requested in the permittee's application dated 1 /9 /90 including This permit, issued on Flebnkmy 23, 1990 . is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Travel Lift 1) The structural. integrity, weight carrying, and live load capacities of the . travel lift access piers shall meet the requirements of the N. C. Building Code. 2) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Emeavation 3) In order to avoid periods of peak biological activity, no maintenance (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1993 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. ,4 rge T. Everett, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Svan Point Marina ADDITIONAL CONDITIONS Permit #30-90 Page 2 of 3 excavation will be permitted between the dates of April 1 and September 30 of any year without the prior approval of the N. C. Division of Coastal Management in consultation with the Division of Marine Fisheries. 4) The existing diked spoil disposal area shall be inspected by a representative of the Division of Coastal Management prior to spoil deposition, to insure suitability of the site. 5) All excavated materials will be confined landward of the mean high water (MHW) elevation contour within adequate dikes or other retaining structures to prevent spillover of solids into any vegetated wetlands or surrounding waters. 6) The terminal end of the pipeline from the dredge into the diked retention area will be positioned at or greater than 50 feet from any part of the dike and a maximum distance from spillways to prevent dike erosion and to allow adequate settlement of suspended solids. 7) A water control structure will be installed at the intake end of the effluent pipe leading from the retention area in order to ensure maximum settlement of suspended solids. 8) Flow from the diked retention area will be confined by pipe, trough, or similar device to a point at or below the mean low water.(MLW) elevation contour to prevent gully erosion and siltation. 9) No vegetated wetlands will be excavated or filled. 10) Excavation will not exceed 6 feet below the elevation of mean low water (MLW). 11) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction -related discharge (increases of 25 NTUs or less are not considered significant). NOTE: The proposed project is certified under General Water Quality Certification No. 1273 issued on November 10, 1978, for discharges of liquid effluent from diked upland disposal areas. General 12) Approval of this activity was based on determination that there would be no obstruction to navigation. Under conditions existing in the Atlantic Intracoastal Waterway (AIWW), a possibility exists that the structure may be damaged by wave wash from passing vessels. Unreasonable slowing down of vessel traffic cannot be required because it would tend to nullify the navigational benefits on which the AIWW was justified. Issuance of this permit should not be construed as relieving the permittee of taking proper , steps to insure the structure and moored boats will not be damaged by wave wash normally to be expected in the AIWW. Swan Point Marina Permit 030-90 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent sand blasting residue and/or other facility waste from entering the adjacent waters. Such discharge, either directly or indirectly, to adjacent waters could contravene state water quality standards, thereby violating state law. Maintenance Clause The Division of Coasrtal Management will be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit and that notification shall include: A. the number of the original permit. B. a statement that no dimensional changes are proposed. C. a copy of the original permit plats with cross -hatching indicating the area to be maintained, the area to be used for spoil, and the estimated amount of material to be removed. D. the date of plat revision and the permittee's signature shown anew on the original plat. e� 3 MAR 3 0 1990 State of North Carolina �----•-•--► Department of Environment, Health, and Natural Resources Division of Coastal Management James G. Martin, Governor William W. Cobey, Jr., Secretary March 26, 1990 Mr. H. J. Dunn, President Swan Point Marina Post Office Box 10 Snead's Ferry, North Carolina 28460 Re: Request to Modify State Permit #30-90 Dear Mr. Dunn: George T. Everett Director I have reviewed your request to modify State permit #30-90 by increasing the width between the two travel lift piers by one (1) foot and adjusting the location of the travel lift approximately twenty (20) feet north of its permitted location. I find.your request consistent with existing State rules and guidelines and in keeping with the intended use and practices of the project. I hereby submit this letter of refinement authorizing the modification as described in your letter dated March 15, 1990. Please contact Ed Brooks if you have any questions. Thank you. Sincerely, James H. Herstine District Manager JHH/tlh cc: John Parker, DCM Preston Pate, DCM 7225 Wrightsville Avenue • Wilmington, North Carolina 28403 • Telephone (919) 256-4161 An Equal Opportunity ARirrnadveAction Employer WTLMINGTON REGIONAL OFFICE DIVISION OF COASTAL MANAGEMENT 256-4161 M E M O R A N D U M To: Jim Herstine / From: E. F. Brooks Subject: State Permit #30-90 Swan Point Marina Date: March 22, 1990 Mr. H. J. Dunn has requested a minor. change in his above referenced permit. The change consists of increasing the width between the two travel lift piers by one (1) foot, and adjust the location of the travel lift approximately twenty (20) feet north of its permitted location. The proposed change, does not. represent any expansion of the project or additional impacts on the marine resources. I recommend a letter of refinement be issued to accommodate the proposed location change inside the existing marina basin. EB/tlh �.� TEXACO FISHERMAN'S � PARADISE SWAN POINT MARINA P.O. BOX 10 LMAR 1SNEAD'S FERRY. NORTH CAROLINA 6 1990 $NERD'S FERRY 28460 (919)327-3096 IE (919) 327-1 OB 1 1{f u RAI-EICH 27612 (919) 787-0966 ------------------- lCarch 1=, 1900 2)ivis_3n of Coastal [ ana erien"L P.O. _Dx 76S i<_ore_newa L,r,-7. C.28557 Bear -._ . Jones: -.__cl0^ed olease finC. a modified Cots?' 0- cur T7ernlit as pe_ ou - Tihone conversation with Er. Jci.n _'{er. The Chan ,'e CO's;Si StS Of aCIC'1.i-nfr 1 1 to the �� i_St`_ince 'et`.9ee-n criers e.nc. chan_;in the location of one of t:e ,;e_s. Tj- :a T ( MAR . 1 1990 OFFICE OF COASTAL MANAGEMENI WI.LMMGTON REGIONAI- OFFICE Permit Class Permit Number NFw 30-90 STATE OF NORTH CAROLINA - Department of Natural Resources and Community Development and Coastal Resources Commission r MAR 16 1990 for UL :X X Major Development in an Area of Environmental Concern.._. ...... pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issuedto Swan Point Marina, c/o Triangle Sales of Raleigh, Inc., P.O. Box 10, Sneads Ferry. NC 28460 authorizing development in Onslow Countyat Chadwick Bay, AIWW off of SR 1523 at Sneads EP acy as requested in the permittee's application dated 1 /9/90 including atthed plats, sheets 1-5 of 5 dated revised 1/90. This permit, issued on February 23, 1990 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. Traval Lift 1) The structural integrity, weight carrying, and live load capacities of the travel lift access piers shall meet the requirements of the N. C. Building Code. 2) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Excavation 3) In order to avoid periods of peak biological activity, no maintenance (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December'°31. 1993 In issuing this permit, the State of North Carolina agrees that,your'project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. 7 0 orge T. Everett, Director Division of Coastal Management This permit and its conditions are hereby accepted. �,i Signature of Permittee BULKHEAD Q, V,;! MIM ktik 150 - I 010- I L-"Jt. EXISTING BASIN MAINTENANCE DREDGING ? AT SWAN POINT MARINA t .- NEAR SNEADS FERRY t Iola: ONSLOW CO., N.C.' -Lb,Lt .3 ra FOR DUNN .*FAMILY P.O. BOX 8.55 SNEADS FERRY, N.C. TLAN 50 0 5-0.. 1-4=6 i-SCALE IN FEET. __Pao 17 Me 0 I DOCK f• JAN 2 3 lggp : I ,; . KiRl i1:__ J ------ State of North Carolina - Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 .lames G. Martin, Governor William W. Eobey, Jr., Secretary Mr. John R. Parker, Jr., Chief Major Permits Processing Section Division of Coastal Management Raleigh, North Carolina 27611 Dear Mr. Parker: The attached copy of an SWAN POINT o-Ticar s—f'c January 17, 1990 George T. Everett Director *** EXPEDITE *** tted by: Al"TRIANGLE SALES OF RALEIGH, INC, _ -) OFF NCSR 1523 ONSLOW Location of ProjectCounty X for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major development permit,.... for a CAMA major development permit (only) .... for a dredge and fill permit (only) .... has been reviewed by this District Office and is being forwarded to you along with a Field Investigation Report for further application processing, including circulation to State agencies having interest and/or jurisdiction over the subject matter which might be affected by the project. The recommendation of this Office is covered on the reverse side; attached; X will be f)orwarded Taber. Sincerely, J es H. Herstine, Manager W lmingt0n District PO Box 27687 Raleigh North Carolina 27611 7667 Telephone 919-733 1293 (A) This office has no objec m to the project as proposed. (B) This off iI e has no comme on the project as proposed. (C) This office approves of _he project (or project concept) and/or recommends these minor refinements `-r project management. (D) This office objects to the project and recommends permit denial based on a finding of: (1) adverse impacts under G.S. 113-229(e) 1-5 (the dredge and fill law)as enumerated below: (e)(1) ... that there will be significant (e)(2) ... that there will be signifi- adverse effect of the proposed dredg- cant adverse effect on the value ing and filling on the use of the and enjoyment of the property of water by the public; any riparian owners; (e)(3) ... that there will be significant adverse effect on public health, safety, and welfare; (e)(4) ... that there will be signifi- cant adverse effect on the con- servation of public and private water supplies; (e)(5) that there will be significant adverse effect on wildlife or fresh water, estuarine or marine fisheries. (2) Inconsistency with Rules of the Coastal Resources Commission as enumerated in 15 NCAC 7H (or other). Please site rule. (3) Inconsistency with the local Land Use Plan (please elaborate). (4) Inconsistency with Rules, Guidelines, or Standards of this .agency or a finding that the project is in conflict with other authority or interest as stipulated below. (E) Attachment. Include memorandum or other documentation that support findings relating to D1-4; or provide general comments. e Re: Recommendation of stage Permit - Triangle Sales of Raleigh, In4:;i JAN 2 9 19M I have no objections to the protect subject to the following conditionsL:'±_- i..—._...__.. -----.__� (1) The structural integrity, weight carrying, and live load capa© 3es of the travel lift access piers shall meet the requirements of the North Carolina Building Code. (2) Maintenance Clause: The Division of Coastal Management will be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit and that notification include: A. the number of the original permit. B. a statement that no dimensional changes are proposed. C. a copy of_the-pziginal permit plat(s) with cross -hatching indicating the area to be maintained, the area to be used for spoil, and the estimated amount of material to be removed. D. the date of plat revision and the permittee's signature shown anew on the original plat. A. In order to protect juvenile shrimp and fin fish populations, no excavation or filling will be permitted between April 1, and September 30, of any year without the prior approval of the Division of Coastal Management, through the Division of Marine Fisheries. B. The proposed existing diked spoil disposal area shall be inspected by a representative of the Division of Coastal Management prior to spoil deposition, to insure suitability of the site. The spo17 disposal site shall include, but not limited to, the following conditions: 1. All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spill -over of solids into any marsh or surrounding waters. 2. The disposal area effluent will be contained by pipe, trough or similar device to a point at or beyond the mean low water level to prevent gully erosion and unnecessary siltation. 3. The terminal end of the pipeline will be positioned at or greater than fifty (50) feet from any part of the dike and maximum distance from spillways to allow settlement of suspended solids. 4. A water oontrvl structure will be installed at the intake end of the effluent pipe to assure compliance with wager quality standards. Note: It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent sand blasting residue and/or other facility waste from entering the adjacent waters. Such discharge, either directly or indirectly, to adjacent waters could contravene state water quality standards, thereby violating state law. State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management . 7225 Wrightsville Avenue • Wilmington, North Carolina 28403 James G. Martin, Governor George T. Everett William W. Cobe SJanuary 17, 1990 Y� Jr.,ecreta n' Director Triangle Sales of Raleigh, Inc. Post Office Box 10 Sneads Ferry, North Carolina.28460 Dear Mr. Dunn: The Division of Coastal Management hereby acknowledges receipt. of your application for state approval to install a.travel lift for use in the existing marina. You are also a requesting a maintenance dredging clause for the existing basin be included in the permit for future maintenance work. It was received on January 10, 1990, .and appears to be 'adequate for processing at this time. The projected deadline for making a decision is March 26, 1990. An additional .75-day review period may be necessary and if so, .you will be advised of the extension and the new deadline. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the site of your proposed project. You should post this card at a conspicuous point along your property where it can be observed from a public road. Some examples would be: nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this Notice could result in an incomplete application. A field report has 'been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review, the agencies may contact you directly. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Si &eey, 12 E. F. Brooks Coastal Field Representative I EFB/tlh cc: Jim Herstine, DCM Alison Arnold, COE Preston Pate DCM Brad Nofzinger, LPO 7225 *rightsville Avenue, Wilmington, North Carolina 28403 Telephone 919-256-4161 *** EXPEDITE *** u • • •• • n r da t� 1. Applicant's name Triancrle sales of Raleigh, Inc. 2. Ix)cation of project site 3? Investigation type: Dredge & Fill X I CAMA- 0 Trvestigative procedure: (A) Dates of site visit 12-11-90 (B) Was applicant present' Yes 5. Processing procedure: Application received 1-10-90 office WiRO 6. site description: (B).AEC(s) involved: (C) Water dependent: (A) Iocal Land Use Plan Onslow County Land Classification frc IUP High Density, Transition/ Conservation Development faints -identified in IUP None for proiect of this tvoe Ocean hazard Estuarine amine acastal Wetlanis Public Tiust Waters X . Estuarine Waters X. :Other': .._ Yes = X; No - Other (D) Tnt-erxled use: Public Private Commercial X (E) Type of waste water treatment:- Existing Septic Tank System Planned None (F) Type of structures: Existing Marina Planned Travel Lift (G) Estimated annual rate of erosion source 7. Habitat description: AREA Dredged Filled Other (A) Vegetated wetlands: (B) Non -vegetated wetlands: Existing Basin Bottom 54,400 sf. (future maintgnancel (C) other: Spoil Disposal Area Approx. 3 acres and (D) Total Area Distirrlxd: Ulma- uru. clause I Triangle Sales of Raleigh, Inc. Page two 9. PROJECT DESCRIPTION The applicant's property consists of an approximately 5 acre tract of land located off, and near the end of NCSR 1523 and adjacent to the AIWW, between New River and Chadwick Bay, near the community of Sneads•Ferry;•in Onslow County. The majority of this property has been developed into a commercial marina, known as Swan Point Marina', and has an associated upland repair facility. A good portion of the marina basin was excavated years ago into upland areas. On the north side of the marina.basin, a bulkheaded peninsula of land approximately 350' long•x.,25' 'wide protects the basin area from adjacent open. -water areas. -Portions of this marina facility were authorized by State Permit #589. The existing marina consists of approximately 60 wet -slips and has. fueling -facilities`to service transient boats :traveling the AIWW.-,­,Upland development includes a ships store, an approximately 80' x 70' building where mostly ..marine engine repair work is done, and gravel, concrete and packed sand parking areas. A dragline boom and cradle system allows for the 'dry storage!,. for_ smaller vessels on7.upland, parking.%.areas :while undergoing repairs. Restroom : and .:shower facilities, are also provided to patrons of this marina, but a-pumpout facility is not available. The applicant proposes to install a travel lift in the existing marina basin to facilitate boat removal to augment -their boat repair business. One of the existing boat slips on the eastern side 'of the basin would be deleted to allow for the installation of the travel lift. Two piers,50 feet long, 4 feet 6 inches wide, and 19 feet apart (inside to inside) would provide the water access runway for the travel lift mechanism. Each pier would be constructed on a double row of 10 sets of pilings, on 5 feet centers with 8" x 12" support timbers, and associated cross -bracing., A 12" x 24" steel I-beam, turned on it's side will provide the track for the travel lift wheels. The remainder of the 416" pier width would be covered with wooden decking. Although .no excavation work is proposed at this time, the applicant is also requesting a maintenance dredging clause be incorporated into his permit for future maintenance .of his existing marina basin. Based upon his observed rate of siltation over the past several years, some maintenance work is projected within two years. The existing basin is approximately 320 feet long and 170 feet wide. Based upon a maximum excavation depth of 3 feet to retain -6 feet water depth at mean low water, maintenance dredging of the entire basin could generate approximately 6,000 cubic yards of spoil material. The applicant has written permission from the owner, to use one of two existing spoil disposal sites, Grant Island or Oak Island, located west of the marina site, across the Atlantic Intracoastal Waterway. The suitability of the disposal site would be inspected at the time of any future maintenance request. Triangle Sales of Raleigh, Inc. Page three 9. PROJECT DESCRIPTION - Continued Both the travel lift project and the maintenance dredging clause were included in a recent application for State permit to substantially expand the size of the existing marina. Subsequent denial of that project necessitated the re -application for State permit for the current proposed project. 10. ANTICIPATED IMPACTS Since one of the existing wet slips in the existing marina basin would be deleted to provide the space for the travel lift installation, no new incorporation of public trust and estaurine waters are required, only a change of use of the already impacted space. There will be some short-term turbidity -associated with driving of the pilings for the travel lift piers, but no increase in the long term negative impacts of the current water quality or existing marine resources is anticipated. With respect to future maintenance dredging of the existing marina basing no long term negative impacts are expected provided, such maintenance work is timed to avoid periods of peak biological activity. Submitted by: E.F. Brooks Date: January 17, 1990 Office: Wilmington Please type or print. Carefully describe all anticipated JAIV 10 1990 development activities, including construction, excava- tion, fillip 5i ut: S"ANA'U'01!L Jl g, paving, land clearing, and storcon-OFFICE OF nr11 Ml" f gyou pl;m4oOniild a marina, also complete and trol. If the requested information is not releevantvant to your attach Form DCM-MP-2. project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. b. Is the proposed activity maintenance of an existing project, new work, or both? o th 1 APPLICANT c. Will the project be for community, private, or a. Name Triangle Sales of eta lei e', Tnc. commercial use? orcme rc ial Address r _ n- —nY 1() City Sneads 2errzy State -"T 0 Zip 28460 Day phone (91q) 327-1051 x Landowner or Authorized agent b. Project name (if any) ^,,;,ar aoin+ ..c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT d. Describe the planned use of the project. Marina existing 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract Exist in— Marina b. Size of individuallot(s) /-_ c. Elevation of tract above mean sea level or National Geodetic Vertical Datum ri a. Street address or secondary road number off 1523 e. Soil type(s) and textures) of tract Vegetation on tract 17one b. City, town, community, or landmark tinaari ,q 'erry f. Man-made features now on tract I=arina c. County 0=nslov; g d. Is proposed 'work within city limits or planning jurisdiction? 1'i o e. Name of body of water nearest project 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) _Conservation _Transitional _Developed _Community _Rural _Other h. How is thetra�t zoned by local government? _ o - onea i. How are adjacent waters classified? a. Describe all development activities you propose (for j, Hasa professional archaeological survey been example, building a home, motel, marina, bulkhead, carried out for the tract? ' ° If so, by whom? or pier)._'_aintena.nce of exit ' -`-razrol l -i r t V=6 5 UPLAND DEVELOPMENT 8�2. �uuiyicic uu� 6cUuu11 ti uic piUlc�t UIUIUUGb Wly IWIU development. OFFICE OF COASTAL %NAUN110t a. T and number of buildings, facilities, or WILAt:`l . ter supply r k • Type g m. Water supplysdurce stmcturesproposed :..•.y n. If the project is oceanfront development, describe die steps that will be taken to maintain established b. Number of lots or parcels public beach accessways,or provide new access. c. Density (Give the number of residential units and the units per acre.) d. Size of area to be graded or disturbed -o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable e. If the proposed project will disturb more than one.' floor? acre of land, the Division of Land Resources must ' receive an erosion and sedimentation control plan at least3O days before land disturbing activity begins. 'If applicable, has a sedimentation and erosion 6 EXCAVATION`AND FILL control plan been submitted to the Division of Land INFORMATION .Resources? f. Give die percentage of the tract within 75 feet of a: Describe below the purpose of proposed excavation mean high water to be covered by impermeable or fill activities (excluding bulkheads, which are surfaces, such as pavement, buildings, rooftops. covered in Section 7.). Length Width Depth g. List the materials, such as marl, paver stone, asphalt•, Access channel or concrete, to be used for payed surfaces. (MLW) or (NWL) h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. j. Have these facilities received state or local approval? k. Describe existing treatment facilities. 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). Boat basin Other (break- water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas spoil dis— posal area b. Amount of material to be excavated from below water level in cubic yards KO rYFfrit\71 f1A&ZE c. Typeofmaterial 951' sand 5, mud }� 320' 1 0' 6' i`:iLfi v � 500' 600' d. Does the area to be excavated include marshland, swamps, or other wetlands? - no e. High ground excavation, in cubic yards �i f. Dimensions of s it disposal area 5001 x 6u01 g. Location of spoil disposal area Existing spoil - .area 8C" ro4� .; ' ' _'1 Frnrl -i ,0.j Ct l h. Do you claim title to the disposal area? ro If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? iFe If so, where? 8a;,.e a n j. „ Does the disposal area include any marshland, swamp's, or water areas. 1To k. Will.the fill material -be placed below mean high water? No _ 1. Amount of fill in'cubic yards I /A in. Type of fill material 1t �' , n. Source of fillmaterial c. Shoreline erosion during preceding 12 months, in d. Type of bulkhead material e. Amount of fill, in cubic yards, to be placed below mean high water f. Type of fill material 8 ADDITIONAL INFORMATION In addition to'the completed application form, the follow-' ing items must be submitted: A copy of the deed (with state application only) or othe r�.:'n• instrument under which the applicant claims title to the:. affected property. If the applicant is not claiming to be the owner of said property; then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. I, o. Will fill material be placed on arch or other . wetlands? ' '' An accurate work plat (including plan -view and cross sectional drawings) drawn to scale in black ink.on an 8 p. Dimensions of the wetland to be filled 1/2 x 11 white paper. (Refer to Coastal Resources j` /A Commission Rule 710203 for a detailed description.) q. How will excavated or fill material be kept on site and erosion controlled? r. What type of construction equipment will be used (forexample dragline, backhoe, or hydraulic diedgep Hydraulic Dredge s. Will wetlands be crossed in transporting equipment to project site? no If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap =' b. Average distance waterward of mean high water or normal water level Please note that original drawings are preferred and only high quality copies will be accepted. Blue -line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan,.if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. rill 1�b1 JAN i! o 1 0 90 .:. f}FFiCE Qi C0!hG",I_ �"A,7JAGCi+'!`idt. 3 Name 3obby _'t. Ca,, -,le Address 2 C • I= 110. sc_�er, 11. C. 2724.7 Name Ji.m 1rulelher Address ,Sneads Ferry, K. C. 20460 Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, . permittee, and issuing dates.. 5A rS 75=67-23-502 25.00 A check for , :Wade payable to the Department of Health, Environment & Natural Resources to cover the costs of processing the application. A -signed -AEC hazard notice for projects in oceanfront and inlet areas. A statement on.the use of public funds. If the project . involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. . The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state'and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of Project. This is the _-2— day of Lando67ner orAuthorized agent - JAN 10 1990 OFFICC OF COA.iTP.L NAIANF.C.EP+�.E'll PlILN;ING 0!9 REGIONAL 'OFFICE 4 �m J` i Kc V r ge Js 6.Y, �f- ^�^ .� k¢I f �S, i EXISTING SPOIL,AREA ' "3� SITE _ M =r-yaf4 y FEEDRy S �•.� JAN t p 1990 f ` `��•_ OFFICE OF COASTAL N1AP1P."uFy9Eld1 w � MI-MINGTON REGIONAL OFr E 1E .' a e N£W - .. R/V£R CACRES K/NLET Iy pOGE ' •• DIKED SPOILAREA WITH �PJW / ' I ✓r •.+ ..� i. STILLING BASIN AND _ PIPED SPILLWAY'' LOCATION MAP x _ SCALE: 1". 2.0 YILES : f 1/� 1," / •,� "SPOIL AREA RELOCATED FROM N.C. D.- ONSLOW CO. ROIP MAP y + \ ram, J / + '� JULY 19a8, SEESHEETIAD.D.T.- SWAN `POINT MARINAOil WAINTENANCE: DREDGING �/ i v '• JOHNSON.— GREGORY- �� J2� .HUTAFF FULCHER 4 J.A.FULCHER " G��Gi /r0 b o` i j ; \ r EXPANSIQN.::PR_OJECT f� AT":SWAN PO�ai INTARINA NEAR .SNEADS FERRY .} %� V4Ww,ONSLOWOyNC.r� L FOR �655 DUNN FAMILY.. ? SNEADS FERRY. t3 C. aoo 0 aoo } SCALE -- CHAD"WICK BAY--- - AUG. 19-SHEET .IOF5 _MATCH LINE JOINS SHT. IA ----- REY Wood,Piling Stylele.r (-Suggested 911 A, di 1 �i- - - - @ S' - PILES PROPOSED ELEVATION i W � IZ11X 24 Wl= - EJ(IZT. I 1 'si 1 tZE7611JIR1(q WATER LEVEL- 2" PLANK WALKWAY - WGaLL e•.i2'. - K 1 �IhLlVKINV- � N 10 SPACES 5.0' EACH - SIDE VIEW ' -END VIEW The above drawings constitute a suggested method of _ " 'i' rxm WATER LEVEL construction only. User must obtain approved plans from his, own engineering firm to meet the specific requirements of his WOOD PILING DRIVEN TO particular operation. 25 TON HEARING : I ENLARGED END VIEW - EXPANSION PROJECT AT . SWAN POINT MARIRA I NEAR SNEADS FERRY .. JAN 10 1990 oNSLOW Co. - ILC. FOR DUNN FAMILY OFFICE OF CMSiAt. fit;iiiAaeNiEfJI PO. BOX 655 N110EIf4GTON REMQ.N.4L OFFICE SNEADS FERRY,N.C. _. Shezf Z e�6 i HIGH WATER,EDGE OF - - jGRASS'; - • SPILLWAY PIPE' DI t TYPICAL :POIL AREA -SECT[ -yea TYPICAL STIL 4liG BASIN �J HIGH WATER,EDGE OF - - jGRASS'; - • SPILLWAY PIPE' DI t TYPICAL :POIL AREA -SECT[ -yea TYPICAL STIL 4liG BASIN �J p r i JAN F p 195U QF F OF dEIOP:L OFf!CL =' EXPANSION PROJECT • ''"" ". AT POINT P,QARINA ' NE4R.SNEADS: FERRY.;: � FOR. DUNN FAMILY R0, BOX 855 SNEAD5 FERRY;Pl C ' :AUG': 1985 SHEET 3—OFS I Suggested Launching Pier Dimensions 41-e �j) 1CLEAA WIDTH I41-61\ - ����ntttON.CU�P10..' '. . (INSIDEGUAHU METHOD) - Running clearance shown Is the ` .. .. _ minimum recommended. Clearance can be Increased by reducing the Inside pier L width or by Increasing the width of the boat hoist. Dock Dimensions MODEL NUMBER , DIM "A" CLEAR WIDTH DIM "B" TIRE CLEARANCE DIM-C-. PIER WIDTH DIM "D" LENGTH DIM "E" WHEEL CTRS mm FrAN. mm FTJIN. mm FTJIN. mm FTJIN. mm 4267 3.0" 76. 4'-6" 1372 32'-0" .9574 '15'-8" 4773 4572 '3.0" 76 4',6" 1372 37'-0" 11278 16'-0" 5078 j k25 5182 4.0" 102 4'-6" 1372 43'-0" •13106 19'-0" 5791 5182 4.0" 102 4'-6" 1372i 50'-0" 15240 19'-0" 5791 6096 3.0" 76 4'-6" 1372 55'-0" 16764 22'-0" 6706 6401 3.5" 89 4'-6"10721 55'-0" 16764 23'-4" 7112 .7772 '4.75" ,92T 5'-6" 18761 75'-0"- 2266029'-2" 8890 ' on 100 BFM ICW of machine should be at least 6" more than; ICW of pier �'gasp:,';�r.zV::;�,:,�r:�:xs*�s:���,�••� .yru.�:,.-.0 Wheel a MODEL NUMBER. 10AMO 15AM0 -.25BFM 35BFM '60BFM -70BF.M:. 1C0BFM VERTICAL= 9,950 15,250 22.000.. 29,500 ;60,000 - 57,000 85,000. LATERAL : -1. 00'- 1.500 1 2,500- .: 3,3ca nil - + 5,600 - '6,400) !1 90,000 EXPANSION PROJECT v 7 i 1 AT SWAN NEAR SNEA SOINT FE-RRYRIHA 1'h1 Yl,C pF'1 ONSLOW CO.'AtC. JAN vO FOR DUNN FAMILY PO. BOX 655 1 ' - SNEADS FERRY,Mr- -, OFFCF_ OF COASIAL N&ANIAC00EN1 WiLNiiNitiTCNJ REGIONAL OFFICE A-9 [Tro BULKHEAD).:k3•S 52( J A N N 0 lfis r OFFICE OF CO.RSIIAL MANAGAmETd1 I- Q �x15Y1N�+_E��Slt�1 yAli! IJf N j FEcIONAi OFFICE" - ...--'- --- - - i �it�1?Et�1QF�CE._D\'ZEDCz{NCi-"io—G.O.�.�cl. rb1 I� 35? , 8' DOCK Al" o � -. ' o ' -ter•--� e L 150, t x EXISTING BASIN j MAINTENANCE DREDGING PR°P k . AT SWAN POINT MARINA - ®ULKHEAD 1 h NEAR SNEADS FERRY t.�c �r�.' J ONSLOW CO., N C __fNTtrr2loR_ Cncsclt�Cz t3 FOR DUNN .FAMILY ' P.O. BOX 855 SNEADS FERRY, N.C. ;PLAN I' :: so o 50.. .. _. ' ..-...SCALE IN FEET ..,.� .,,. ,gym gNrG'r � 1'f`• T, �'bSaA \^�\ lQ4/1 _ w .,iyr - +i ..-