Loading...
HomeMy WebLinkAboutEX46-22 CM Wilford Enterprises (2368 and 2370 New River Inlet Rd)ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director CM Wilford Enterprises 55 Hamlet Grove Dr. Pittsboro, NC 27312 NORTH CAROLINA Environmenta/Quality October 10, 2022 EX 46-22 RE: EXEMPTED PROJECT REDISTRIBUTION OF SAND WITHIN THE OCEAN HAZARD AREA OF ENVIRONMENTAL CONCERN (15A NCAC 07K .0103(c)). PROJECT LOCATION/ADDRESS — 2368 New River Inlet Road, North Topsail Beach Dear Ms. Wilford, I have reviewed the information submitted concerning the redistribution of sand against and near your residence at 2368 New River Inlet Road, and have determined that the activity you propose of a 1500 Sq. Ft in the front side of the house to be redistributed to Mr. Fred Burns property at 2389 New River Inlet Rd. is exempt from needing a CAMA Minor Development Permit and it also meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. REDISTRIBUTION OF SAND WITHIN THE OCEAN HAZARD AREA OF ENVIRONMENTAL CONCERN EXEMPTED 1. All redistribution shall be located no greater than 1500 square ft area and shall redistribute the sand within the ocean hazard AEC, on the property of 2368 New River Inlet Rd and moved to 2389 New River Inlet Rd.. 2. No ground disturbance or land disturbing activity shall occur outside the areas identified on the workplan drawings. 5. This exemption does not allow for any development oceanward of the seaward toe of the engineered man-made berm. Any proposal to modify or alter the development plan as proposed will require additional authorization from the Division of Coastal Management. Noarz' .M on�wiwau� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.280 Wilford Page 2 This exemption does not eliminate your requirements to obtain any other State, Federal or Local authorization. Construction of the structure authorized by this exemption shall be completed by December 31 of the third year of the issuance date of this exemption. Sin rely, m 'WlEt�� Environmental Specialist II, DCM cc: Kate Winzler, NTB Permitting Specialist ow+Tuw��muio-wq North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808