Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
40-15 Town of Holden Beach
I� _.............. _..............................Permit Number Permit Class + ` NEW 40-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Qy Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of Holden Beach, PO Boa 449, Sunuly. NC 28462 Authorizing development in Brunswick County at AIWW, 110 Rothschild Street, Holden Beach as mque_sted in the permittee's application dated 8/8/14 (MP-1, MP-2 & MP-3) & 4/1/14 ( P-4). including the attached workplan drawings (4) Cl, C4-05 dated 10/17/14 C2-C3 dated 8/8/14 and C6 dated 2/20/25 This permit, issued on Mnreh 16, 201 S , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Dockina Facility 1) Unless specifically altered herein, this permit authorizes the docks, piers and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) I his permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on -site to Department- V f7+►nf personnel when the project is inspected for compliance. Any maintenance work Di Di project modification not coveredzt Cetvt o Braxton C. Davis, Director Division of Coastal Management hereunder requires further Division approval. g All work must cease when the permit expires on December 31, 2018 MAR 7 7 20This permit and its conditions are hereby accepted. PC. — In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Town of Holden Beach Permit #40-15 Page 2 of 4 ADDITIONAL CONDITIONS 3)o�tt pt shall be made by the permittee to prevent the full and free use by the public of all navigable wa t or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit authorizes (3) three transient boat slips in association with this docking facility. Excavation 8) No excavation shall take place outside the area indicated on the attached workplan drawings. 9) In order to protect fisheries resources, no excavation shall be permitted between April 1 and September 30 of any year without prior approval of the Division of Coastal Management in consultation with the US Army Corps of Engineers. 10) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the depth of excavation exceed the depth of the connecting waters. 11) The temporary placement of double handling of excavated materials within waters or vegetated wetlands is not authorized. Spoil Disposal 12) All excavated materials shall be confined above normal high water level and landward of regularly or irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of solids into any wetlands or surrounding waters. 13) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the initiation of any dredge activities. RECEIVED hC" MHD CITY 1 Town of Holden Beach a Permit #40-15 Page 3 of 4 ADDITIONAL CONDITIONS Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Division of Energy, Mineral and Land Resources, 127 Cardinal Drive Extension, Wilmington, NC 28405. 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 15) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. U.S. Army Corps of Engineers Condition 16) The permittee shall mitigate for the loss of coastal wetlands by executing the proposed mitigation plan received and approved on 10 March, 2015. The plan titled: Mitigation Narrative for Tower Park, for the Town of Holden Beach 110 Rothschild Street, Holden Beach, Brunswick Co., N.C. (March, 2015). This plan proposes the restoration of 485 sq. ft. of coastal marsh to compensate for the losses of 155 sq. ft. of coastal marsh. This plan, including monitoring and reporting, must be adhered to and all success criteria must be met in order to maintain compliance with this condition. Maintenance Clause 17) The Division of Coastal Management will be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit and that notification include: a. The number of the original permit b. A statement that no dimensional changes are proposed c. A copy of the original permit plan(s) with cross -hatching indicating the area to be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed. d. The date of plan revision and the permittee's signature shown anew on the original p1REIVED General MAR 2 7 10b Pv�+-hnnV pt' 18) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 19) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, outside of the area indicated on the attached workplan drawings. Town of Holden Beach ADDITIONAL CONDITIONS Permit #40-15 Page 4 of 4 20) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at bZ://www.fws.pov/nc- es/mammal/manatee guidelines odf. 21) Unless specifically altered herein, any mitigative measures or environmental commitments specifically made by the applicant in the "Mitigation Narrative for Tower Park" dated March, 2015, shall be implemented, regardless of whether or not such commitments are addressed by individual conditions of the permit and any subsequent modifications. 22) This permit does not authorize any development with the 30' of the normal high water line. 23) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 24) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project No. 14-1241. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2014-02232. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. 4 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO AT =ON OF March 23, 2015 Regulatory Division Action ID No. SAW-2014-02232 and State Permit No. 40-15 Mr. David Hewett Town of Holden Beach Post Office Box 449 Supply, North Carolina 28462 Dear Mr. Hewett: Reference your application for a Department of the Army permit to construct a public park and transient docking facility with boat basin excavation within the AIWW, Holden Beach, Brunswick County, North Carolina. Coordinates in Decimal Degrees are: 33.915728 N, -78.2701933 W. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process (copy attached) for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence construction activity in strict accordance with applicable State authorization, attached Federal special conditions, and the approved plan. Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2016. RECEIVED MAR 2 6 1015 13CM-b-40- p tz A' -2- Questions or comments may be addressed to Mr. Tyler Crumbley, Wilmington Field Office, Regulatory Branch, telephone 910-251-4170. Sin d, Tyler C (rumblley Regulatory Project Manager Enclosures (2): CAMA permit GP 291 conditions Copy Furnished (with enclosures): Mr. Shane Lippard Right Angle Engineering, P.C. 212 Princess Street Wilmington, North Carolina 28401 Copies Furnished (without enclosures): Mr. Fritz Rhode National Marine Fisheries Service Habitat Conservation Service Pivers Island Beaufort, North Carolina 28516 Mr. Pace Wilber National Marine Fisheries Service Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources RFCFwED 400 Commerce Avenue MAR 2 6 7015 Morehead City, North Carolina 28557-3421 ucne_h wq P!?Y -3- Ms. Debra Wilson Division of Coastal Management North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 M& Chad Coburn Division of Water Resources North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Ms. Karen Higgins Division of Water Quality North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Todd Allen Bowers US EPA Region 4 Life Scientist Water Protection Division 61 Forsyth Street, SW Atlanta, Georgia 30303-8960 BOSN3 Mr. Scott McAloon United States Coast Guard Sector North Carolina Waterways Management 2301 East Fort Macon Road Atlantic Beach, North Carolina 28512 RECEIVED MAR 2 6 Zob Dgm-mmci plTY AN"A w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor March 11, 2015 Mr. David Hewett Town of Holden Beach P.O. Box 449 Supply, NC 28462 Subject: Request for State Stormwater Management Permit Application Tower Park Stormwater Project No. SW8131216 Brunswick County Dear Mr. Hewett:: Donald R. van der Vaart Secretary On December 2, 2014, the Wilmington Regional Office received notification that the subject proposed requires a CAMA Major Permit. The North Carolina Administrative Code requires any project that proposes more than 10,000 square feet of new built -upon area, or is part of a larger common plan of development, or that must receive Sedimentation and Erosion Control Plan approval for the disturbance of more than 1 acre, or that must receive a CAMA Major permit, to apply for and receive a Stormwater Management Permit from the Division of Energy, Mineral and Land Resources. Please understand that the NPDES 010000 Federal Construction Stormwater Permit that is issued with the Erosion Control Plan approval letter is NOT the same as a Coastal Stormwater Management Permit. Any construction on the subject site, prior to receipt of the required Coastal Stormwater permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Therefore, either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date, must be received in this Office no later than May 6, 2015. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. If you have any questions, please call me at (910)-796-7343 or email me at linda.leWs@nodenr.gov. Sincerely, p Linda Lewis Environmental Engineer III GDS/arl: GAWQISharedlStormwaterlPermits & Projects120131131216 HD 12015 03 req_swapp 131216 cc: Shane Lippard; Right Angle Engineering, P.C. Brunswickk County Building Inspections Division of Coastal Management Wilmington Regional Office Stormwater File RECEIVED MAR 19 %"F k'k Nu'A"UM! Im Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-72151 Fax (910) 350-2004 An Equal Opportunity 1 Affirmative Action Employer • 30% Post Consumer Paper • Internet: httip:lloortal.ncdenr.oralwelbil DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTEMTON OF: March 11, 2015 Regulatory Division Action ID No. SAW-2014-02232 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Huggett: CIL— Reference the application fiom the Town of Holden Beach, Mr. David Hewett to construct a public park and transient docking facility with associated boat basin excavation within the AIWW, 110 Rothschild Street Holden Beach, Brunswick County, North Carolina. Coordinates in Decimal Degrees are: 33.915728 N,-78.2701933 W. The proposed Marina includes excavation of 155 sq. ft. of vegetated coastal wetlands, 6,132 sq. ft. of open water below MLW and the construction of a 3-slip transient dock with associated boat basin excavation. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S: Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at http://www.fws.gov/nc-es/mammal/manatee guidelines. ndf. 2. Dredging is not authorized between April 1 and September 30 of any year. RECEIVED MAR 16 1015 "M•MH© CITY -2- 3. The pemuttee shall mitigate for the loss of coastal wetlands by executing the proposed mitigation plan received and approved on 10 March, 2015. The plan titled: Mitigation Narrative for Tower Park, for the Town of Holden Beach 110 Rothschild Street, Holden Beach, Brunswick Co., N.C. (March, 2015). This plan proposes the restoration of 485 sq. ft. of coastal marsh to compensate for the losses of 155 sq. ft. of coastal marsh. This plan, including monitoring and reporting, must be adhered to and all success criteria must be met in order to maintain compliance with this condition. 4. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. 5. All work authorized by this permit must be performed in strict compliance with the most recent plans (received on 9 January, 2015), which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 6. The docks and piers extending over wetlands will be elevated sufficiently (a minimum of 3 feet) above the wetland substrate to prevent total shading of vegetation, substrate, or other elements of the aquatic environment. 7. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. 8. Approval of the structure is based on determinations that there would be no obstruction to navigation. The structure may be damaged by wave wash from passing vessels. Issuance of this permit should not be construed, as relieving the permittee of taking proper steps to insure the structure and moored boats will not be damaged by wave wash. RECEIVED MAR i 6 1015 DCM-MHD CITY 992 9. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 10. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 11. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 12. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. hi the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Quality at (919) 733-5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 13. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 14. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 15. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. RECEIVED MAR 16 7N DCM-MHD CITY ME 16. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 17. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 18. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 19. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Mr. Tyler Crumbley, Wilmington Field Office, Regulatory Division, telephone (910) 251-4170. Sincerely,, Vv"t' Tyler Crumbley, Project M Wilmington Regulatory Field Office Copy Furnished: Ms. Karen Higgins Division of Water Resources RECEIVED North Carolina Department of MAR 16 2015 Environment and Natural Resources 1650 Mail Service Center 0CM,MAo eITY Raleigh, North Carolina 27699-1650 -5- Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Fritz Rohde National Marine Fisheries Service Habitat Conservation Service Pivers Island Beaufort, North Carolina 28516 Mr. Pace Wilber National Marine Fisheries Service Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Todd Allen Bowers US EPA Region 4 Life Scientist Water Protection Division 61 Forsyth Street, SW Atlanta, Georgia 30303-8960 BOSN3/Mr. Joseph M. Edge United States Coast Guard Sector North Carolina Waterways Management 2301 E. Fort Macon Road Atlantic Beach, North Carolina 28512 Ms. Debra Wilson Division of Coastal Management North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Mr. Chad Coburn Division of Water Resources North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RECEIVED MAR 1 6 pmt DCM-MHD CITY CDEH North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary March 23, 2015 Town of Holden Beach P.O. Box 449 Supply, N.C. 28462 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, V, 1d Douglas V. Huggett Major Permits and Consistency Manager 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301Internet: www.nccoastalmanagement.net An Equal Opportunity/ Affirmative Action Employer DCM Coordinator: Z�/� Permit#: �D "/`- MAILING DISTRIBUTION SHEET Permitee: DCM Field Offices Elizabeth City / Morehead City Washi SS i mmgton US ACOE Offices: Washington: Raleigh Bland Wilmington: (with revised work plan drawings) Cultural Resources: Renee Gledhill -Early or (e vironmental.review@ncdcr.gov Public Water Supply: Lane J. Williams (WIRO ite-(WARO) NC DOT: / Ken Pace Shellfish Sanitation: r Patti Fowler State Property:(Tim Walton Water Resources: en Higgins (Raleigh Jo essy . C DOT) Washington: Anthony Scarborough Wilmington: Joanne St is — 401 ad Coburn - 401 tormwater Wildlife Resources: LPO: Fax Distribution: Permitee Agent #:_ aria Dunn WARD) J �� N� ENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary March 12, 2015 John Q. Holden 14584 San Pablo Drive Jacksonville, FL 32224 Dear Mr. Holden, Thank you for your letters concerning the Coastal Area Management Act (CAMA) major permit request submitted by the Town of Holden Beach requesting authorization to construct a docking facility with excavation and a park at 110 Rothschild Street, Holden Beach, Brunswick County. The Division appreciates your concerns about the proposed project. The Coastal Area Management Act permit review process involves a coordinated state and federal review of each permit application, with all review agency comments considered by the Division before final action is taken on a permit application. In this case, no inconsistencies with the Coastal Area Management Act were identified as a result of this review. Consequently, the Division has issued a Major Permit No. 40-15 for the proposed activity. A copy of the permit is being provided to you for your information. If you wish to object to the actions taken on this permit application, you may request an appeal of this decision within twenty (20) days of the permit decision. If you would like copies of the appropriate appeal forms or should you like to discuss the specifics of the process, please contact me by telephone at (808) 252-2808, or by email at Jonathan.Howell@ncdenr.gov. Sincerely, lllelcll-e� Jonathan R. Howell Asst. Major Permits Coordinator 1601 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-86001Internet: www.ncdenr.gov An Equal opportunity 1 AKrmaOve Action Employer— Made in part by recycled paper 4 9 RECEIVED Date: Sept. 19 2014 OR 0 6 20N To: Debra Wilson, District Manager Bermr "Ma env Division of Coastal Management From: John Q. Holden, Jacksonville, Fl. Ref: Tower Park proposal on Holden Beach next to my property I object, again, to the street/parking lot as revised and presented. It appears they have taken possession of most of the end of Rothschild St. The parking lot, as now shown, requires vehicles to use much of the area along my property line for maneuvering in and out of the parking spaces. It seems possible that in the future they could close the street such as to prevent entry to my lot. I do not object to the play ground. I do object to the traffic maneuvering m and out of the planned parking spaces in close proximity to entry onto my lot. I have made modifications to the enclosed drawings. These show an alternate parking lay -out that I believe will solve the problem. I will present this to the Town of Holden Beach via mail. Their new drawing still does not acknowledge the 10.8 ft. opening from my lot onto Rothschild St. I have had the lot resurveyed (cost in excess of $900), and the opening does exist. I am waiting for the Corps of Engineers to release the remainder of the lot. This will render the lot useable in many ways, provided entry to it is not hindered or blocked. Attachments: four RECEIVED DCM WILMINGTON, NC SEP 2 3 Z014 RECEIVED DEC 0 5 2014 ■ Complete Items 1, 2, and 3. Also complete Rem 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpisce, or on the front If space permits. 1. Article Addressed to: I�fSv�l ��bID� ��Cso�ville, FL 3�a 94 MIO—MI-,1MHM cay A. I✓ Rwelwcfl/\(PH) C. Date of `Delivery D. Is deliveryaddress diff;ere Cr f'u tee If YE ❑ No s�Q 3. Service Type ❑ Certified Mail ❑ Express Mail ❑ Registered ❑ Retum Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7007 2680 0002 7419 4869 (transfer from service Isbell PS Form 3811, February 2004 Domestic Return Receipt fg25s5e2Af t154o rFordefive tal Service,, RECEIPT IED MAIL,, Mail only; No Insurance Coverage Provided) nformation visit our website atwww.usps.com�; `^.�NRil°J ru 0 C3 Return Receipt Fee (Endorsement Required) O Restdcted Delivery Fee (Endorsement Required) O CO .n Totel Postage & FBBE Ill N 0 O r- ADJACENT RIPARIAN PROPERTY OWNER STATEMENT ) RECEIVED I hereby certify that I own property adjacent to The Town of Holden Beach 's (Name of Property Owner) DEC 0 5 10+4 property located at (Address, Lot, Block, Road, etc.) on The Atlantic Intracoastal Waterway, in Holden Beach , N.C. (Waterbody) (CitylTown and/or County) P'rMPMHr) EITy The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. 1 have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must rill in description below or attach a site drawing) Drawing is attached. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below. I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. Property Omer Information) (Adjacent Property Owner Information) Print or Type Name Mailing Address City/State/Zip Telephone�fNumb r Date / Signature John Q. Holden 14584 San Pablo Drive Jacksonville, FL 32224 904-992-9411 RECEIVED DCM WILMINGTON, NC (Revised 611812012) SEP 2 3 2014 TANGENT 14 �PNc3? 'T 13, —T gTPL EDGE OF_DREDGED PTI�TWPER AGP BO' Ep CNANNP.1.. NAVIGATION ER ON DM pRE� .NwRK BOUHDARY LME OF HIGHW BGOKSIIS, PAGE ]RAND INMnpD i CABIN .� NIGH W AGE.l NDTED AS MEAN (LINES LI-L4) MGVD)NDVEMBa IfAO Lij '_ N, - RONRAP AP - SALT MAgSH WIN I • �I 1 . JOHN JOHN 0. HOLDEN I , PIN; 202617112003 —. DB: 162 O PG: 194 / i -. ` OLD BULKNEAp PARKING AREA is 46' - ' I 75AEC —_ _ < x .SHELTER 4. SOP ii.-�" p ROW — — — — — _ I CIF — SEDIRIGHT-0�WAYfR SNOWNONMAPCABMETH _ 40 ______ TS' AEC JOHN A. HOLDEN BRIDGEWATER PROPERTY OWNERS ASSOC, PIN: 202617102914 DB: 1046 O PG: 765 ' 13.9' 45 PIN: 202617106987 1919 O PG: 23 12' DB: < 25' ' t O — MUFTI -PURPOSE T I ■ ULRIIEAD, JOHN A. HOLDEN Ro ZS' (COURT BRIDGEWATER PROPERTY OWNERS ASSOC. PIN: 202617102829 I � k"y i PIN: 202617106994 C SHALL TAKE D8: 1046 O PG: 765 DB; 2214 O PG: 781 wIKIDCAP I ' TEMPORARY RECYCLE ' 18.6' = CONSTRUCTION ENTRANCE srwrKN1 < = <� BARRIE h CATHERINE SPANGLER PIN: 202617106990 'ILTRAm,' DB:402 O PG: 889 C) WATER TOWER DISCHARGE LINE ' ", 1 PARKING AREA ' n JOHN A. HOLDEN PIN: 202617102824 f ' _ OF HOLDEN BEACH �1 C!) rrI �DB: 1046 O PG: 765 w 3 p¢ TOWN PIN: 202617G: 68 O PG: 689 L—�.-62' I m UNn t�D C) V's� DB: 437 wwTERrowea o TOWN OF HOLDEN BEACH m :'7 uxJam G; Z < - TOWN OF HOLDEN BEACH ,N 4 PIN: 202617107806 m 08: 3122 O PG: 105 m IAP N GDm� O ® HOLDEN C PIN: 202617104811 DB: 437 O PG: 689 I �N y m JO �PIN:2617102739 ew�R Z%` D8: 111Z46 O PG: 765<xAw� 7 C) --- '5' _ -.rP�� TANGENT14 BDpG pF DRgppgp CHANNEL IN/ NAYIOA'GCN A4lRKRRSIA �1 BOUNDARY UN60F CTAS RRCOSOSp IN OSRDSOOK 11Is. PADS \MNwN •uwwu IMo, NAP CABINRr14 PAOR9 ,NCTEOAS,VSAN HIGH WTBR A 1 I9 MOW) NOVgVge519W (LINR8l1441 1! Iltt JOHN 0. HOLDEN PIN: 202517112003 .�i�u DB: 152 0 P0; 194 AREA , A�' JOHN A. HOLDEN PIN: 202617102914 DB: 1046 0 PC: 755 ILKHNAU' JOHN A. HOLDEN PIN: 202617102829 f xonu in , KB DB: 1045 O PG: 765 WtK DCAP LrmnoN tP JOHN A. HOIDEN PIN: 202617102824 DO: 1046 O PC: 765 Z JOHN A. HOLDEN P PIN: 202617102732 08; 1046 0 PG: 765 ! ^CRACGAS BID, CNANNI`1. eC 46.I.BpCK FtW_,M 15 9KOn! ..-.w •ti _ . 9v �1j 7NR.71R 4 A1� �nruHnclN I 40W �•: .f �, ,.i �• ARYUSp RIOX OM W Y (R SNOWN ON NAPGOINRTA 4 ' -- 73' AEC _ .. 1 HARGE LINE OLDEN BEACH2617104817 .0 PG: $09Towu HOLDEN BEACH2617104811 LMN7 0 PC: 689 INR1 weliolmits BRIDGEWATER PROPERTY OWNERS ASSOC. PIN: 202617106987 08: 1919 O PG: 23 BRIDGEWATER PROPERTY OWNERS ASSOC. PIN: 202617106994 DO: 2214 O PG: 7B7 BARRIE R CATHERINE SPANGLER PIN: 202017106990 Do;: 402 O PG: 889 PARpNQ AREA h TOWN OF HOLDEN BEACH PIN: 202517107806 `a rn 0& 3122 0 PG: 105 � „v m n m m O � 3: Atlantic Moto, , © L1 L2 —� L3 T----- Mean � as of j LS / 7/29/?p1¢ 46 z o Tra us A,,,, °ems 0) / � E� Area Engineers m ment Areo U.S. BtoC Cto° f o m 0- &, Corps �/ A) `c R/W of 0.4 r A 1A#qaVc IMm _ . (al / � i`".'t T14-R2 • �oN S 89-4]'-ZI.45 5" W D o Tract '2' 4 2( .0¢,Acres 10.82' 3 Lot 23 S 84'06'11' W 149.96' y an Lot 11 o G — — — Z O N Tie Line Lot 10 `! f'0 E ' o ? 70.72o z ao rn Or. R.H• Ho/den Subdivision o Na - — -MoP Cob. 4. P9. 2 - — — a ' Block 4-N c A 'a ro Lot 9 'O g io N N rn Ct a A Lot 8 Intracoastal RECEIVED OF 05 'fWatem DCM-MHD CITY ...ram wy ( ,t o # Town of Holden Be 3115170 MoP Cob. 20, p9. 4 Tract A- & B. PEA%-t Total.. zz G N � a) O — — — — — — — — — — — -- Town of Holden Beach y o 4341687 o � dtaP Cob. 4. P9, 2 tR Block 3-0 Lots 9 & 10 Tie S 81'"24- W Cott "(^DaT os"'oo Lf!r_' , Brunswick Avenue Hest Mean Hi h LINE 8�RING Woter Lines b Lt � N 78'34'21" E DISTANCE Z. N 89-34' 11- E 16-44' ., C L4 N 87-14.44' E 28.62' i N 85'50'OA• c 28.28, RECEIVED DCM WILMINGTON, NC r7 RECEIVED DEC. 0 5 7014 Date: May 9, 2014 To: Debra Wilson, District Manager, Division of Coastal Management From: John Q. Holden, Jacksonville, Fl. Ref: Tower Park proposal on Holden Beach next to my property Cc: David Hewett, Holden Beach Town Manager I strongly object to the proposal as presented. Reason: Rothschild street has been changed into a parking lot, and the survey now shows my lot as having no access to that street. All previous maps show my lot as having access to Rothschild street (named after my father, Dr. R.H. Holden). The survey as shown, now, is inaccurate. Until such time my permanent access as been established, I can not grant permission for your requests. I have offered to the Town of Holden Beach an opportunity to buy the lot to use as they see fit. They have declined with no counter offer. I long as I own the property, I will not be encumbered, nor shut off from street access. Holden Attachments: four RECEIVED DCM WILMINGTON, NC ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to The Town of Holden Beach s RECEIVED (Name of Property Owner) property located at 110 Rothchild Street DEC 0 5 2014 (Address, Lot, Block, Road, etc.) DPW-WHD PIN on The Atlantic Intracoastal Waterway, in Holden Beach , N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. �S I have objections to this proposal. SFE A77AC1JlriE�7$ DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) Drawing is attached. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below. I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) (Adj4cent Property Owner Information) Signature Print or Type Name Mailing Address City/State/Zip Telephone Number Date John Q. Holden 14584 San Pablo Drive Jacksonville, FL 32224 904-992-9411 n RECEIVED Dare Y D� DCM WILMINGTON, NC (Revised 611812012) SIZE DATA SF AC miK PRa.ECf NEA A.M, 1.M NSTUEBfB uRrs waenr aT,me ua m9EOMD Pc9e aRLMR ao1 PRwg4➢ 161AC01 FIO31Y MY nal PPOUSm P.VAN NEA nll � P.u9wq AIFA 7aR Rae m'RP9® mEw+,a na cu-rc-vc ww me maPovn Ir1L-nmoz aam PR�RMD BDCQ WIFE MY 10 nm EII I¢CRIE AIIOI , aW MAMA m1E11 @1OFR 1lYNI n M roTR oR-sM RfiRARF m TRR ns wcwA9E AIFA mlFn / GIRT-IIYtI NfA IIY SURVEY LEGEND LABEL srR DExavnoN 016 IIIUDIMRID NRFb.,P [FI Oi WK. MUN �iU�NU `CxAM1 RF IUWNU P.l NAAST MDSRM ND.,Fi RECEIVED OEC 0 F iq r-hnlgm rrr.,ry TANGENT 14 EDGE OF DREDGED CHANNEL BOIRD YLDSOFTUCTASRECORDER w DEEDB 3115,PAGENANDwMAP CABwET24,PAGE W. NOIFD AS MEAN HIGHWATFA19D VD)NOVEMBER I99R (L LI-1A) ��rov s r a SSUpV�S WWWy�W /VOW ' /S "AX R EiVO fiG� v� F 19CC FS s PARaN�G AREA q p HOLDEN / PIN: 20 O PG.. 94 - O8: 162 W qIX NOTES MR THE SGE CONTRACT L WORC SHALL WE F1LL, GBADD1Q M M WAM DEYILEs, BULKRFi EROSIONC 01.AWSELECTSWAoFA9 2. GRADESSHOWNAREFEw3HELEVATpNSOFSURFACES SUBGRADESHALLTARE wfO ACCOUNF3IONEANDA3PNALTTOGETCBBRFLTP ATN3M 3. VgYL SNF3T PBEBULKNEIDSNALLBEDBIVENTA2n3F][WSEDT. WOODCAP ANR WHALERS EHALLBE PRESSURETAEAIED. I. NO WORK SNALLOCCIF BEIDW 1TIEkffaN NIGH WATER LDIE i EACH CATCH BASW SHALL BESOODEOTON PJ�CH SwE ENIRE wPLLTRATpN BASw PLUS T SHALL 0E SODDED. NOTES: I. UFIDRFSLAENCE: BOOK 3113, PAGE M W T BRUNSWICKCOUNTY R�6TRV. 2, ADIBINwc DEED REFERENLt4 HA,5l9 oN GTIRRPMwFORAUIION F'wwD wT3reeauuswMK WUNIYTAxaFFTCE 3. ALL BEMINGS ARE BASFDWNC GAO)NORTx MADE3-mNkALL wSFANCFS ARE HORIZONFAL GM1OUND D6TANLES. 1. TR.SCf ARFA4AW Lw63HOWN BASEDON DIFORMATIONFOUNDw MAP CA Um,PAGE153. TRAC!A TOTALAREA=2AE39 SF, TRACTBTOTAL AREA-wjww 5. NORMALIMAIWATERLMEACOASTALWET1ANOLwEASMARKEDBY R110NMWO (110)0N1AWARYR,MAVERMBIt BYHOLIEV SNw£0.1CAMAION IANUARY la mD a as wETu3B)LRIE AS D¢wBATm er EMlLx xucxES DFACfjaN IANUARY&m13 T TMSPROIECI's LOCATED wTNE LUMBEx RIYEIf BASIN R $OIL QN THE SREC:NEWH.W FwE SANO (EKCF35NELY ORABFD3. 9. NCDEN0.WATERCIASSIFMATIONFORT1Ew1RAWA5 WATERWAY 65A,HQW IB. LATBDNGATMESITE333.91MN.Mm1'W JOHN A HOLDEN PIN: 202617102914 DB: 1046 O PG. 765 NAVKiAT MARKPR SIA —\.� r W y Y W W W v LL Y W W Y .Y W W W a• W W a W 8ALTS3.3R91W e W o+ W W W W W W v W W RT � � r1° � ° W r• o LIT jOHN A. HOLDENN� 202617102829 \ \ PIN: Do O PG: 765 Ik \ DB: II 'I il TEMPORARY II. I�� rt srAT4r3 -_ -- CONSTRUCTION I ENTRANCE I`jII WATER TOWER ` %f(/ DISCHARGE LINE i JOHN A- HOLDEN II B^ d Y TO OF HOLDEN BEACH $ PIN: 202617104817 O PG: 689 PIN: 202617102824 I. �,} 1046 O PG: 765 {S s p8: 437 DO: iI�! )' wATERTOWFR .' NpDEN BEACH P TOWN 481 PIN: 202® 689 'll PG DO: 437 +`_ I JOHN A. HOLDEN FFF+Kt ,J 1 PIN: 202617102739 I GB: 1046 O PG: 765 I SZIi'��• 1' 1 TBOADWAY I _- VE t0.01ECt CpNIA0L P01NT��"` TOMHRA3 I/ HG�EN BEACH CHAPEL 202617101 628 TOWI'I HOLDEN BEACH 4PG_ PIN: - PO'- De: vIN_ 202617 493 RECEI�b CM WILMINGTON, NC MAY 12 2014 WALE PST, NOISIAiaenS N301OH SIAM VHV43 3Y 3NOZ r 10.05 r, 81- 28 3" F- g G. F' a O O O i 20 n 21 a n 22 23 12.388 a 12.959 6 i3.585 a in 15 407 — a c0_ rT- o SQ. FT. ' o SO. FT. ` o SO. Ff. --- -- -- _ -- - = 10 06.29 66.29 66.29 70.83 >R0P05'eD WATER LiFEt in DR. R.H. _-----�% 1-1©LD;-`J " 25 � 24 N m � I C to ». 7 3?? t SUBDINASION MAP B00S 4. i PAGE 2 L_ FTC ------- z C2S69 7O,00 85:00 TDIS DIS 511NG WATER LINE 19 j 7 1 5 1 3 1 1 I i I t I I I I t I 1 I qqo' 6 5 4 R, L DEC 0 6 2014 RECEIVED WILMINGTON, NC t )y the Planning Board i110t RECEIVED DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT OF 0 6 7n14 APPLICANT'S NAME: Holden Beach Tower Park DCM-MHD CITY 2. LOCATION OF PROJECT SITE: 110 Rothschild Street adjacent to the Atlantic Intracoastal Waterway, in Holden Beach, Brunswick Co. Photo Index— 2006: 4-6218 R-1, 12 2000: 4-40 R-12,13 1998: 4-39 R-7,8 State Plane Coordinates - X: 2221499 Y: 61083 Rover File: n/a Lat: 33"54'56.11" N Long:78`16'12.14" W 3. INVESTIGATION TYPE: CAMA/ D & F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 06/02/13, 05/01/14 Was Applicant Present — No, No S. PROCESSING PROCEDURE: Application Received — 04/22/14, Completed 11/07/14 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Town of Holden Beach Land Classification From LUP - Developed/Vacant (B) AEC(s) Involved: ES, EW, PTA, CW (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment:Existing —Municipal Sewer Planned - N/A (F) Type of Structures: Existing — Public park and bulkhead Planned - 3-slip transient docking facility with boat basin (G) Estimated Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands 12 sq.ft. 330 sq. ft. Coastal Shaded (B) Non -Vegetated Wetlands 6,132 sq. ft. 720 sq. ft. Open Water Incorporated (C) Other 10,000 sq.ft. High ground (D) Total Area Disturbed: 65,340 sq.ft. (1.5 acres) (E) Primary Nursery Area: No (F) Water Classification: SA Open: Yes 8. PROJECT SUMMARY: The applicant is proposing to construct a public park and transient docking facility with boat basin excavation. . '�'FCEIVED Holden Beach Tower Park ncr n K 2014 Page Two Ui.M-MHD CITY 9. PROJECT DESCRIPTION The applicant's property is located at 110 Rothschild Street adjacent to the Atlantic Intracoastal Waterway (AIWW) in the Town of Holden Beach, Brunswick County. Directions from the Holden Beach Bridge are as follows: turn right at the stop sign after crossing the bridge; make the first right turn onto Rothschild Street; travel approximately 0.10 miles past the water tower. The project site will be located on the right side of the road. The project site is bordered by the waters of the AIWW to the north, residential properties to the east and west and Brunswick Avenue property to the south. The project site is comprised of three parcels totaling approximately 1.5 acres in size. The site is vegetated primarily with lawn grasses and landscaped vegetation. The elevation of the tract ranges from 4-10 feet above mean sea level. The shoreline of the site has been stabilized with a bulkhead and coastal wetland vegetation is present water ward of the existing bulkhead. The coastal wetland vegetation consists primarily of Smooth Cord Grass (Spartina alterniflora) and Salt Meadow Hay (Spartina patens).The coastal wetland vegetation ranges from approximately 50-90 feet in width. The site is a partially developed Town park with a playground, bocce ball courts and unimproved parking areas (see Sheet C3). The Tower Park project received a Sedimentation and Erosion Control permit (BRUNS 2014-023) from the Division of Energy, Mineral and Land Resources. A State storm water permit (SW8131216) was obtained from the Division of Water Resources. CAMA General Permit #63252D authorized the existing bulkhead. The waters of the AIWW are classified as SA by the North Carolina Division of Water Resources and are open to the harvest of shellfish and the waters of the AIWW are classified as SB. This area of AIWW is NOT designated as Primary Nursery Area. The entire property lies within the jurisdictional limits of the Town of Holden Beach. 10. PROPOSED PROJECT The applicant is proposing to construct a public park and transient docking facility with boat basin excavation. The proposed public park component would consist of two parking areas, a multi -purpose court and two bocce ball courts on the high ground of the project site. A playground, picnic shelter, restrooms, access walkway and portion of the parking area are proposed within the Estuarine Shoreline Area of Environmental Concern (AEC). The proposed transient docking facility would originate from the north east corner of the project site. The proposed docking facility would have a 6 feet wide access pier extending water ward from the bulkhead over the marsh for a distance of approximately 55 feet. The access pier would continue over open water for an additional 20 feet where it would terminate at an access ramp extending to the east. The proposed access ramp would extend to a floating dock measuring approximately 6 feet in width by 10 feet in length. This floating dock would be oriented parallel to the shoreline and would be connected to a floating dock measuring approximately 6 feet in width by 90 feet in length which would also be oriented parallel to the shoreline. The proposed transient floating dock system has been designed to be located within the federal channel with the associated anchor pilings to be located outside of the federal channel setback. The proposed transient floating dock system would provide dockage for three (3) vessels (see Sheet C4). The applicant is also proposing to excavate a boat basin in the location of the proposed floating docks. As proposed the boat basin would be slightly irregular in shape and would have an average width of 50 feet and an average length of 150 feet (see Sheet C4). The proposed boat basin would include the excavation of approximately 12 square feet of coastal wetlands. As proposed, the boat basin would be excavated to a final depth of -6 feet at Mean Low Water. The applicant is proposing to place spoil material on the Town owned AA RECEIVED Holden Beach Tower Park Page Three DFI. 0 6 1014 DCM-MHD CITY disposal area located at the end of Scotch Bonnet Street, also known as DA290. The proposed spoil disposal area would measure approximately 100 feet in width by 100 feet in length. 11. ANTICIPATED IMPACTS: As proposed, the public park would result in approximately 2,070 square feet of impervious surfaces within the Estuarine Shoreline AEC. With the exception of the proposed 4 feet wide walkway to the access pier, no portion of the proposed development would be located within the 30 foot Coastal Shoreline Buffer AEC (see Sheet Cl). As proposed, the docking facility would extend approximately 30 feet into a water body that measures approximately 300 feet in width. The proposed docking facility would not extend into the channel portion of the water body and would be located within the federal channel setback with the proposed anchor pilings for the floating dock outside of the setback. The proposed docking facility would incorporate approximately 720 square feet of Public Trust Area and Estuarine Waters AECs. The proposed docking facility would result in the shading of approximately 330 square feet of Coastal Wetlands Areas of Environmental Concern. As proposed, the docking facilitywould not exceed the X of the width of the water body, not exceed the established pier head line, nor encroach into the channel portion of the water body. The proposed docking facility would not encroach into either 15 foot adjacent riparian property owner setback. As proposed, the docking facility would provide mooring for three (3) vessels. The proposed docking facility would be located approximately 89 feet from the adjacent docking facility to the east. As proposed, the boat basin excavation would result in the disturbance of approximately 6,132 square feet of shallow bottom habitat. The applicant is proposing to excavate approximately 12 square feet of coastal wetlands associated with the boat basin, however additional impacts can be expected due to sloughing during and after dredging. As proposed, approximately 1,000 cubic yards of material would be excavated to a final depth of- 6 feet at MLW. The applicant is proposing to disturb approximately 10,000 square feet of high ground disposal area (DA290). Minor increases in turbidity can be expected during construction. Submitted by: Holley A. Snider Date: November 26, 2014 Office: Wilmington P6hnif glass NEW Permit Number 40-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of Holden Beach, PO Box 449, Supply, NC 28462 Authorizing development in Brunswick County at AIWW, 110 Rothschild Street, Holden Beach as requested in the permittee's application dated 8/8/14 (MP-1, MP-2 & MP-3) & 4/1/14 (MP-4). including the attached workplan drawings (4) Cl C4-05 dated 10/17/14 C2-C3 dated 8/8/14 and C6 dated 2/20/25 This permit, issued on March 16, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Unless specifically altered herein, this permit authorizes the docks, piers and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. P �a U-- Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Town of holden Beach Permit N40-15` Page 2 of 4 ADDITIONAL CONDITIONS 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit authorizes (3) three transient boat slips in association with this docking facility. Excavation 8) No excavation shall take place outside the area indicated on the attached workplan drawings. 9) In order to protect fisheries resources, no excavation shall be permitted between April 1 and September 30 of any year without prior approval of the Division of Coastal Management in consultation with the US Army Corps of Engineers. 10) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the depth of excavation exceed the depth of the connecting waters. 11) The temporary placement of double handling of excavated materials within waters or vegetated wetlands is not authorized. Spoil Disposal 12) All excavated materials shall be confined above normal high water level and landward of regularly or irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of solids into any wetlands or surrounding waters. 13) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the initiation of any dredge activities. Town o%Holden Beach Permit #40-15 Page 3 of 4 ADDITIONAL CONDITIONS Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Division of Energy, Mineral and Land Resources, 127 Cardinal Drive Extension, Wilmington, NC 28405. 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 15) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. U.S. Army Corps of Engineers Condition 16) The permittee shall mitigate for the loss of coastal wetlands by executing the proposed mitigation plan received and approved on 10 March, 2015. The plan titled: Mitigation Narrative for Tower Park, for the Town of Holden Beach 110 Rothschild Street, Holden Beach, Brunswick Co., N.C. (March, 2015). This plan proposes the restoration of 485 sq. ft. of coastal marsh to compensate for the losses of 155 sq. ft. of coastal marsh. This plan, including monitoring and reporting, must be adhered to and all success criteria must be met in order to maintain compliance with this condition. Maintenance Clause 17) The Division of Coastal Management will be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit and that notification include: a. The number of the original permit b. A statement that no dimensional changes are proposed c. A copy of the original permit plan(s) with cross -hatching indicating the area to be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed. d. The date of plan revision and the permittee's signature shown anew on the original plan General 18) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 19) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, outside of the area indicated on the attached workplan drawings. Town of Holden Beach ADDITIONAL, ' CONDITIONS Permit #40-15 Page 4 of 4 20) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at b—q://www.fws.gov/nc- es/mammal/manatee guidelines.odf. 21) Unless specifically altered herein, any mitigative measures or environmental commitments specifically made by the applicant in the "Mitigation Narrative for Tower Park" dated March, 2015, shall be implemented, regardless of whether or not such commitments are addressed by individual conditions of the permit and any subsequent modifications. 22) This permit does not authorize any development with the 30' of the normal high water line. 23) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 24) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the pennittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project No. 14-1241. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2014-02232. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. L MITIGATION NARRATIVE FOR TOWER PARK FOR THE TOWN OF HOLDEN BEACH 110 ROTHSCHILD STREET HOLDEN BEACH, BRUNSWICK CO., N.C. March, 2016 TABLE OF CONTENTS 1.0 General Project Information 2.0 Purpose and Benefit 3.0 Environmental Impacts 4.0 Mitigation APPENDIX Figure 1. Tower Park Site Plan Figure 2. Tower Park CAMA Mitigation Plan Photos 1 and 2 General Project Information The project involves construction of a new recreational park facility by the Town of Holden Beach. The park includes the following amenities: picnic shelter, restroom/laundry building, bocce court, multi -purpose court, playground, docking facilities, and two parking areas. (See Figure 1.) The property address is 119 Davis Street, Holden Beach, NC. The site is 1.82 acres, of which 1.4 acres will be disturbed for this project. There are no 404 wetlands on the property, but coastal wetlands are located along the shoreline of the Atlantic Intracoastal Waterway (AIWW). This area is classified as SA waters, which according to NCDENR means "Tidal salt waters that are used for commercial shellfishing or marketing purposed and are also protected for all Class SC and Class SB uses. All SA waters are also HQW by supplemental classification." Uses in SC waters include "fishing, boating and other activities involving minimal skin contact; fish and noncommercial shellfish consumption; aquatic life propagation and survival; and wildlife." Listed uses for SB waters are "primary recreational activities including swimming, skin diving, water skiing and similar uses involving human body contact with water". HQW (High Quality Waters) "is a supplemental classification intended to protect waters which are rated excellent based on biological and physical/chemical characteristics through Division (NCDENR) monitoring or special studies, primary nursery areas designated by the Marine Fisheries Commission, and other functional nursery areas designated by the Marine Fisheries Commission." This will be a phased project requiring NCDENR Stormwater, Sediment and Erosion Control, and CAMA permitting. Existing municipal water and sewer services are available at the site 2. Purpose and Benefit: The Town of Holden Beach is a great family beach that promotes tourism as its biggest benefit. Providing a park with a transient docking facility would further promote tourism and provide a boost to economic development. The docking facility would also provide a harbor of safe refuge for transient, non-trailerable vessels from the ocean seas. Its location along the AIWW and being approximately 1.5 miles from Lockwood Folly Inlet is beneficial to these transient vessels. There are transient docking facilities along the ICWW, but most are clustered around Southport which is 16 nautical miles away. There is only one between Holden Beach and the South Carolina State line. So there is need to provide more along the 15 mile stretch between Holden Beach and South Carolina. Plus the nearest sewer pump out Bridgeview Park Mitigation Plan 2 March, 2015 availability is approximately 9 miles away at St. James Marina. Providing a sewer pump out at this proposed facility would fill a great need. The proposed design will provide for 3 slips of 30' in length that will be parallel to the Intracoastal Waterway. Since the dock will be parallel to the waterway, multiple slips could be used by one vessel essentially making a 90' slip available making it the second longest docking possibility within 60 nautical miles. The docking facility will be on Holden Beach property that also has on it a water tower and Town Hall building which also houses the police force. The site is served by four security cameras contributing to boater safety and security. The planned restroom facility will provide two. restrooms with showers. The shower portion will be locked and boaters can gain key code access by registering at the Town Municipal Building. The locked area will also provide a washer and dryer for laundry of the boaters. Among the great amenities that Holden Beach has to offer, the natural beach has been its drawing power for decades. With healthy turtle habitat and a thriving association that helps to protect them, the turtle sanctuary has been a big hit with tourists for years. There are restaurants, shops, municipal parks, beach accesses, and a post office all within walking distance of the proposed facility. Within a short driving distance of using the "Rent -a -Wreck" program, there are marine supply stores, hardware stores, grocery, and pharmacies available. A "Shore -to -Shopping' program will also be available to boaters that need supplies delivered directly to their vessel at the dock. Transient boaters bring with them specific needs as they are traveling. Pedestals are needed to provide electrical and water connections to the boaters. These essential amenities are considered a basic attraction for boaters and have been mentioned on numerous occasions as needed at the Town of Holden Beach docks. Boaters will also need information about the Town of Holden Beach, such as information on local retail and eateries, medical services, and boater amenities (where to fuel up or have boats serviced). Many of the transient boaters depend on computer access for weather updates, communication with other boaters and the Town of Holden Beach, news, emergency notifications, etc. Therefore, the Town of Holden Beach plans to provide a wireless modem connection for their use when in dock. Along with electricity, this is the one amenity most boaters request. Many boaters are traveling for weeks at a time and need contact for various reasons. This would also be an additional means to promote the Town and support the economy. The boaters can get useful information from the Town of Holden Beach and the Brunswick County Chamber of Commerce websites. There is no fueling facility proposed for the project, but gas and diesel fuel are available on the opposite side of the waterway at Holden Beach Marina. Docking fees will be approximately $2.60 per linear foot per night totaling $78 for a 30 foot slip. Considering average costs of $50 for dinner for two, possible $30 car rental and purchase of groceries and other supplies; at 10% capacity, at 10% capacity an economic benefit of around $177,400 per year could be realized. Bridgeview Park Mitigation Plan 3 March, 2015 3. Environmental Impacts The proposed docking facility will accommodate 3 transient boat slips each 30' in length. The docking facility must be located a minimum of 100' from the adjacent property's docking facility to the east. A six-foot wide wooden pier will be constructed form the land side out to an aluminum ramp. The ramp will go down parallel to the floating dock to a 6' x 10" landing. Wood pilings will anchor the floating dock. Dredging of existing material will be required to achieve -6' of depth at mean low water for boat access to the dock. Dredging to this depth will disturb 155 SF of coastal marsh. 4. Mitigation The Town of Holden Beach proposes to mitigate this loss through restoration of 485 SF within the coastal marsh zone as shown on Figure 2 and Photos 1-2. Vegetation in the area has been disturbed by foot traffic. Grading of the restoration site is not required. Spartina alterniflora (Smooth Cordgrass) plugs will be planted at 18" o.c. between April 1 and June 15, 2015. Using a dibble or shovel, a 4"-6" hole will be opened. Two to four teaspoons of a time -release fertilizer will be applied in the planting hole prior to installing the plug and packing the soil back around it. To further ensure the success of the mitigation project, the Town will remove wooden steps at the end of Davis Street. Following the restoration, an annual monitoring report will be provided to USACE and NMFS for three to five years based upon success of the restoration. Recommendations for remediation (additional fertilization or plant replacement) will be included in the annual report. 5. Success Criteria Recommendation for plug installation is between 18" and 24" o.c. To promote greater success, 18" o.c. planting is proposed. Success criteria for the project is survival rate of 75% of new plants. Following the restoration, an annual monitoring report will be provided to USACE and NMFS for three to five years based upon success of the restoration. Recommendations for remediation (additional fertilization or plant replacement) will be included in the annual report. Bridgeview Park Mitigation Plan 4 March, 2015 TANGENT I4 ELAAti OPeItLDem GW]NP1______ " —" 80' Y.nmfu���. j '.'1 w 1i pM: 10361]IISWS y � / ;. 1 1 uwx _ aOW ___ 'mMYa 0.1994 W 1 B65¢v'U) umunr. °°� xu raa>, M+�ReNm�t�..Nmmr .� nIY•�.,•axmer.imAv.u..-nws.,».=eemN.w..nx�. wr tttWG1FD 4YPNYl Im Ns`6I �' r ffiwnns�rsuxtu L9P(6a'�w�xuv/vlml u Ki�nnzcwsnumxrcvnn: mmsmuruvsmvsr 3vXx A. xanw PM:twfi80 PGfi]65 ve: ' qµ 10381]�039 1EYPgtARY vxlvc' caxsmucnax ENTRANCE WI P. XON3N I j- IOMM Cf ,pHN PIN. 30281]102B3A OR: IOIfi O PG: II�i�� roWNE w+: a xvinEu m .wxn PIN: 30360 PY]31 ]65 vB: Ivw 1 M1olai cvNnO.wert�'v. �� aA�a X�1G 6� c62B ve: +za b OsrFA "' Baly w+ vRGPEfltt vWxws Azsa. 4 PIN: 303fi1]IOfi9B] pB: 1919 O PG 'V p � pm!RPoWEWI.PRMERT' OWNEflS 155GC. ' PM: 3036®]I W9]B1 vB: zzla �i Y�i BWI[ k CA mEGNE �ANCAE 130]PO9BB9 BEACx 10 vM�2026�1] �GB p5 OB: 313R O E, y NC]M4 p1RN: RO'b1TWt9, ve sae o LEGEND MEAN XIGX WATER TINE 1 30'CAY1 BARER LME 75 AREA M EN CNYENTO .EEMN (EC) . BUVHUD — NEW BU1 EA PaWO0 SLT FENCE PRWOSID BONtOWAI% M. BYI6 W OISNRBM'CE ii PAV AREA - R W9.5, fi ME a •.. .f.'�T CENCRE]E 50EW0.z . EOAST. W D4 TOWER PARK t: PIdN R� f p'•? � � R�lCr[i•L' A m .+ WFGATCN I. INSTALL SPARTINA ATIME IS ORA PLUGS AT ID' 2. OPBMZE DISTURBANCE CE OF URRIO I I NNE IS.ER 4. MINIUSE DIBBLE DISTURBANCE OF MEN AOHOL MARSH,- 4. USE DIBBLE OR .(OPEC TO MEN A HOLE 4- _ _ - _ _ _ 6 INCHES DEEP. 5. APPLY )N TSP. L - 1 OHO LIME-REtEAEE FFAPNZER (OSMOCOTE OR -- - _ - _ - - 9SERT IN THE AN PLANING HOLE. fi. INSERT PLUG AND PACK SOIL AROUND IT. _ _ - SUCCESS CRITERIA: ....1 YJ $F E%ISJINC _ _COASTAL MARSH IMPACT-.__. I. AN ANNUAL MONITORING REPORT WILL BE PRODUCEWN D BY THE TO _ __ - __ _ / / / \ OF HOLDEN BEACH DOCUMENTING THE SUCCESS OF THE PLANTS IN _ THE MITIGATION AREA. 2 THE REPORT SHALL INCLUDE RECOMMENDATIONS FOR REMEDIATION (FERTIUZATON OR REPLACEUENT) FOR FANNG PLANTS- 3. REPORT KILL BE PRONOEO i0 USACE AND NMfS. - �- ��--- 4. ANNUAL MONITORING SHALL BE CONDUCTED FOR 5 TEARS FROM _ PERMIT DAIS. - _.. . LEGEND .'.'.I.'.'.".>.' _.. �.._ COASTAL IMEMAND _ '� --•jI _ - 1 40A W1:1LRID LINE �; 1--- _ _ MHW MEAN HIGH WATER UNE ENSTING BUINHEAD O COASTAL M1lUNA P�Y✓W 485 SF MITIGATION AREA II n {a0`N PLUG SPARTINA ALTERNIFLORA WO.C. I pro 1I I RRIDGEWATER PROPE _______________________ -� PIN: 2026 1 I D9: 1919 ' Vf- area. Photo 2 — Adjacent undisturbed coastal marsh area and new bulkhead. I DESIGN NARRATIVE FOR TOWER PARK RECEIVED FOR THE TOWN OF HOLDEN BEACH DEC 0 5 2014 DCMAkAHD CITY 110 ROTHSCHILD STREET HOLDEN BEACH, BRUNSWICK CO., N.C. August 2014 TABLE OF CONTENTS 1.0 General Information 2.0 Stormwater Information 3.0 Site Description 4.0 Project Need 5.0 Objectives 6.0 Expected Results and Benefits 7.0 Environmental Impacts 8.0 Adjacent Properties 9.0 Erosion Control Considerations 10.0 Construction Schedule 11.0 Vegetation Plan 12.0 Maintenance Plan APPENDIX e + PROJECT AREA TOTALS ��17 BUILT UPON AREA CALCULATIONS s PIE STORM WATER CALCULATIONS FIGURES B e QUAD SHEET CONSTRUCTION PLANS RECEIVED DCM WILMINGTON, NC Tower Park AUG 0 2014 August 2014 General Information a. Tower Park b. 119 Davis Street, Holden Beach, NC c. 1.82 Acres on Project Site d. 1.4 Acres to be Disturbed for this project e. Wetlands 1. Coastal Wetlands do exist on the site and shown on plans. 2. No wetlands will be impacted by this project. f. Ownership — Town of Holden Beach 110 Rothschild Street Holden Beach, NC 28462 g. Description of Development RECEIVED DEC 0 6 1014 D6M•MMD CITY The project is construction of a new recreational park facility. There will be a picnic shelter, restroom building, bocce court, multi -purpose court, playground, docking facilities, and two parking areas. The total impervious amount includes all of the proposed development on the site. To treat all of the proposed impervious areas, infiltration devices will be constructed to prevent runoff to the adjacent SA waters of the ICWW. The docking facility is for 3 transient boat slips 30' in length. A six foot wide wooden pier will be constructed from the land side out to an aluminum ramp. The ramp will go down parallel to the floating dock to a 6' x 10' landing. Wood pilings will anchor the floating docks. Dredging of existing material will be required to achieve -6' of depth at mean low water. A vinyl sheetpile bulkhead will be installed 1' inside the mean high water line along the full ICWW frontage of the property. 1. Previous or Existing Permits — none 2. Tax parcel ID Number— 232NB009, 232NB011, and 232NB005 h. Pre-1988 Built Upon Area, If Applicable — None in this project. i. This project will be phased. j. Sewer for the site is existing municipal. Water supply is existing municipal system. k. No historic sites exist within the project. I. There are no non-compliance issues known. 2. Stormwater Information a. This project drains to the ICWW, SA waters. Classification #15-25. b. The project will be designed to NCDENR high density standards. The overall BUA percentage will be 34.3%. c. Total proposed impervious for the project to be 26,916 square feet. d. Treatment will be by infiltration basin and infiltration trenches. e. All of the impervious runoff will be treated by infiltration. f. A 50' buffer from the Mean High Water line of the SA waters is provided. g. CAMA permits will be required. h. No off site runoff will be coming into this project. RECEIVED DCM WILMINGTON, NC Tower Park 0 S 2014 August 2014 i. The driveways will be connected to Davis Drive, Rothschild Street, and Brunswick Street. j. Seasonal High Water Table investigation was conducted by ECS and the soil report is included with this narrative. RECEIVED 3. Site Description: The project site is in Brunswick County, NC. err 0 b 1014 UCM-MHD CITY New construction onsite will consist of a cul-de-sac road, two parking areas, multi- purpose court, bocce court, picnic shelter, restroom building, pier, transient dock, and sand playground. The infiltration basin is located around the cul-de-sac area while all of the other impervious areas will have infiltration trenches. The proposed restroom building site and picnic shelter will receive structural backfill to raise the finish floor level accordingly to accommodate for necessary slope within the collection system. Land use in the vicinity is primarily residential with some commercial. 4. Project Need: The Town of Holden Beach is a great family beach that promotes tourism as its biggest benefit. Providing a park with a transient docking facility would continue to promote tourism and provide a boost to economic development. The transient boat docking facility would also provide a harbor of safe refuge for these transient non-trailerable vessels from the ocean seas. Its location along the ICWW and being approximately 1.5 miles from Lockwood Folly Inlet is beneficial to these transient vessels. There are transient docking facilities along the ICWW, but most are clustered around Southport which is 16 nautical miles away. There is only one between Holden Beach and the South Carolina State line. So there is need to provide more along the 15 miles between Holden Beach and South Carolina. Plus the nearest sewer pump out availability is approximately 9 miles away at St. James Marina. Providing a sewer pump out at this proposed facility would fill a great need. The proposed design will provide for 3 slips of 30' in length that will be parallel to the Intracoastal Waterway. Since the dock will be parallel to the waterway, multiple slips could be used by one vessel essentially making a 90' slip available making it the second longest docking possibility within 60 nautical miles. The docking facility will be on Holden Beach property that also has on it a water tower and Town Hall building (housing the Police force) and is served by four security cameras contributing to boater safety and security. At this Tower Park site the Town of Holden Beach is planning the construction of a restroom facility which will also provide a boater bath house that will have two restrooms with showers. The shower portion will be locked and boaters can gain key code access by registering at the Town Municipal Building. The locked area will also provide a washer and dryer for laundry of the boaters. RECEIVED DCM WILMINGTON, Tower Park August 2014 RECEIVED DFF 0 6 2014 DCM-MHD E3ITY There are great amenities that Holden Beach has to offer. The natural beach has been its drawing power for decades. With healthy turtle habitat and a thriving association that helps to protect them, the turtle sanctuary has been a big hit with tourists for years. There are restaurants, shops, municipal parks, beach accesses, and a post office all within walking distance of the proposed facility. Within a short driving distance of using the 'Rent -a -wreck" program, there are marine supply stores, hardware stores, grocery, and pharmacies available. A "Shore to shopping" program will also be available to boaters that need supplies delivered directly to their vessel at the dock. Transient boaters bring with them specific needs as they are traveling. Pedestals are needed to provide electrical and water connections to the boaters. These essential amenities are considered a basic attraction for boaters and have been mentioned on numerous occasions as needed at the Town of Holden Beach docks. Boaters will also need information about the Town of Holden Beach, such as information on local retail and eateries, medical services, and boater amenities (where to fuel up or have boats serviced). Many of the transient boaters depend on computer access for weather updates, communication with other boaters and the Town of Holden Beach, news, emergency notifications, etc. Therefore, the Town of Holden Beach would like to provide a wireless modem connection for their use when in dock. Along with electricity, this is the one amenity most boaters request. Many boaters are traveling for weeks at a time and need contact for various reasons. This would also be an additional means to promote the Town and support the economy. The boaters can get useful information from the Town of Holden Beach and the Brunswick County Chamber of Commerce websites. S. Objectives The Town of Holden Beach project seeks to accomplish the following objectives: ➢ Provide dock capacity at the Town of Holden Beach waterfront along the ICWW with the construction of nine transient slips. ➢ Provide dock amenities at the Town of Holden Beach waterfront to include: • Electricity • Water • Wireless Computer Connection • Sewer Pump -out • Restroom/Shower Availability ➢ Increase transient boater visits to the Town of Holden Beach and area marinas to promote economic development. 6. Expected Results and Benefits The expected result of this project is an increase in transient boater traffic that will translate into a boost in the local economy. With the increase in boaters, the shops in Town will realize an increase in business. Employment opportunities would increase which would have a major impact on the economy of the area. Area marinas and boat businesses would also benefit from the additional boating traffic. A close relationship between the Town and these businesses provide partnerships that benefit the transient boaters, as well as, the Town and local businesses. A "Shore to Shopping" program RECEIVED DCM WILMINGTON, NC Tower Park AUG 0 S 2014 August 2014 RECEIVED DEC, 0 5 7014 would provide opportunities for additional sales at the local Food Lion which equates to DCM-MHD CITY additional employees, most who come from the local area. Boaters will, many times, return by car to stop and spend time and money. The construction of the docks will help develop the Town of Holden Beach as a destination point for both boaters and vehicular traffic. The Town will also develop a "Rent -a -wreck" program that will purchase a government surplus vehicle to be available for rent by transient boaters. This vehicle will allow the boater to drive ashore to get supplies, eat at restaurants, get needed prescriptions at the nearby Walgreen pharmacy, or even venture over to the golf course of choice. The vehicle will be kept at the Town Hall which is only steps from the dock. There are numerous amenities and links to local, regional and national points of interest from this proposed dock location. Below are some benefits that the Town and guests could experience as a result of this project being constructed. 1) Link to Destinations • The proposed project will provide significant links to the beautiful beaches as close as 500 feet of the docking facility. • Harbor of safe refuge will be provided being so close to the Lockwood Folly Inlet and Shallotte Inlet. • Post Office within walking distance of the dock to purchase stamps, send mail, and even receive general delivery • Close proximity to other recreational areas, restaurants, and National Historical Landmarks • Significant location to provide services approximately at a mid -point between Historic Southport and the South Carolina State line. 2) Access to Opportunities • Local opportunities to experience are the Olden Holden Bike Tour, Turtle Talk, natural beachfronts, parks, postal services, and numerous golf courses. • Regional opportunities available are the Ingram Planetarium, Museum of Coastal Carolina, Green Swamp Preserve, extensive golf course offerings, and several vineyards/wineries. • National opportunities of significance in the area are the LISS Battleship NC, Oak Island Lighthouse/Lifesaving Station, Fort Fisher Civil War Site, Brunswick Town, and Historic Southport. 3) Economic Impact • Transient boaters docking in Holden Beach will help the local tourism industry. Docking fees will be approximately at a rate of $2.60 per linear foot per night for a total for a 30' slip to be $78 per night, dinner for two costs roughly $50, car rental $30, a grocery stock up could be $200, and marine supplies/services could be another $200. Each boater stop alone could contribute $540 per day of stay. • At 10% capacity an economic benefit of $177,390 per year could be realized. RECEIVED DCM WILMINGTON, NC Tower Park Nub 0 8 2014 August 2014 RECEIVED OFr. 0 5 2014 7. Environmental Impacts DCM-MHDCITY The project will disturb approximately 1.4 acres of land along the ICVWV which will comply with the NCDENR requirements of the Sediment Erosion Control rules. Approximately 25,796 square feet of impervious surface is proposed on this site of which all will be controlled with applicable infiltration BMP's as required by the issued NCDENR permit. There will be no impervious areas constructed within 50' of the mean high water line. Approximately 12 square feet of coastal marsh will be impacted by the dredging for the dock facility. The location of the docks and dredging have been designed to minimize that impact, but could not be fully avoided. 8. Adjacent Property: The properties adjacent to the site are residential multi -family and the town hall administration building. 9. Erosion Control Considerations: The following erosion control measures are used on this project: 1. Temporary Gravel Construction Entrance/Exit To prevent sediment from leaving the site, temporary gravel construction entrance should be installed where Road enters the site. For dimensions and specifications, see construction details. 2. Land Grading The existing slope of the site is from south to north toward Sturgeon and Brunswick River. Roadways to be sloped to follow with natural grades. 3. Silt Fence Silt fence should be installed prior to clearing and grading activities. Silt fence should be checked routinely. If needed, silt fence should be cleaned and replaced if damaged. See Construction Detail for dimensions and specifications. 4. Sediment Basins During construction, the infiltration basin will be used as a sediment basin to prevent disturbed areas from exiting the site. Also, a temporary sediment basin will be constructed at the low point of the site adjacent to the picnic shelter to prevent sedimentation leaving the site at the road/waterway. 10. Construction Schedule: 1. Obtain plan approval and other applicable permits. 2. Hold pre -construction meeting at least one week prior to beginning construction. 3. Install temporary construction entrance/exits. 0CM WILM NIGTON, NC Tower Park August 2014 AU6 0 8 2014 4. Before clearing and grading of the site, install silt fencing and clean and replace as RECEIVED necessary. 5. Begin clearing and grading of the site. DEC 0 5 2014 6. Construct sediment basin/wet detention pond for construction phase activities. DCM-MHD CITY 7. Fill site as needed to accomplish finish grades. 8. Install storm infiltration trench piping and catch basins. 9. Install new roadway. 10, All erosion and sediment control practices will be inspected bi-weekly and after each rainfall event. Needed repairs will be made immediately. 11. After the entire covered area is stabilized, install level spreaders outlets into virgin material keeping check dams upstream. After completed, all temporary measures will be removed and permanent vegetative repairs to be completed. 11. Vegetation Plan: 1. After complete stabilization of the entire covered area, top cover soils will be roughened by making 1"-2" deep grooves perpendicular to the slope. 2. Spread lime (agricultural limestone) evenly over the area at a rate of 1.5 tons/acre, spread 10-10-10 fertilizer at a rate of 1000 lb/acre and incorporate into the top 6" of soil. 3. Loosen surface prior to applying seed. 4. Broadcast seed at recommended rates. 5. Rake seed into the soil and lightly pack to establish good contact. 6. Mulch with 4000 lb/acre grain straw or equivalent and anchor by weighted farm disc set nearly straight or other mulch anchoring tool. 7. Mow as needed and refertilize in late winter or early spring by topdressing with 10- 10-10 fertilizer. 8. Graded surfaces shall not be exposed without grass coverage for more than 15 days. If grades are not complete and exposure is more than 15 days, temporary seed with rye grain at 50 lb/acre. 12. Maintenance Plan: 1. Contractor shall maintain all sedimentation and erosion control devices during construction. RECEIVED DCM WILMINGTON, NC Tower Park h 0 8 2014 August 2014 RECEIVED nrr n 5 10# uum-MH9 CITY 2. All devices shall be checked after each rain event and weekly. Repairs shall be made immediately when detected. 3. Contractor shall complete the inspection reports required by the approved Storm Water Permit and have logs available on site. 4. Any deficiencies shall be brought to the immediate attention of the Engineer and Owner. Seed Types and Application Rate / Schedule Temporary Seeding Grass Type Amount / 1000 SF Time of Seeding Initial Rye Grain 1-2 Ibs Nov. —Jan. 25 Ibs 10-10-10 Brown Top Mullet 1-2 Ibs June —Aug. 25 Ibs 10-10-10 Permanent Seeding Grass Type Amount Time of Initial Fertilization / Fertilization / Fertilization / /1000 Seeding 1000 sf 1000 sf 1000 sf sf Maintenance maintenance maintenance Burmuda, 1-2 Ibs Apr. — 25 Ibs March -April Each 4-8 Aug. -Sept. Common June 10-10-10 12lbs Weeks 12lbs 10-10-10 1-2 Ibs N. 10-10-10 Fescue, Tall 5-7 Ibs Sept. — 25 Ibs Feb -March May & Dec. Sept. -Oct. (Kentucky Oct. 10-10-10 12 Ibs '/2 to 1 lb. n. 12 Ibs 31) Feb. — 10-10-10 10-10-10 Oct. Bermuda March — 25 Ibs March -April Each 4-8 Aug. -Sept. Sod Apr. 10-10-10 12lbs Weeks 12lbs 10-10-10 1-2 Ibs N. 10-10-10 END OF PLAN RECEIVED DCM WILMINGTON, NC Tower Park t1G 8 2014 August 2014 Trails.com. roui yu,Go b M. oulEoan EM LVA enter. 33.9144°N 78.2701°W lewtion at center. 0 feet (0 meters) uad: USGS Holden Beach rg Name: o33078h3 rg Source Scale: 1:24,000 RECEIVED DEC D 6 1014 DCM-MHD CITY RECEIVED DCM WILMINGTON, NC APR 2 2 2014 I / Lo To JLc. k fag v Ma Mu To To Mu To Ma Mk/ Bn0 FO Bab 1 o KrB t RECEIVED Mu LO KrB Ba8 LO l BnB \ 1719 l DEC 0 5 2014 LO K,B Ma L to anbury KrB Mu Ba ,' Lo BaB ,- z1 DCM-MHD CITY Ma aaB Lo Mk _ --_KrB Mu Lo w Lo m BaB Fo KrB ° _ F o To LL1 _.., Lo 5_ F. Aces ion a R La Mu ': ly 4 WaB KrB KrB '- _ Mu iii2 Ma y: y, BHT Ld $ . LO -:.. Ma g L° Lo i �6e ,. 1236 s Q� Waa Wao CA DV . Lo _0 MCA NhE NhE _.. O NhE NhE NhE P NhE' , iilu NeE WATERWAY NsE giT�L NhE - Co Holden Beach_ __ Ilu'I N E NeE l tr r MINGTON, NC 2 2 Z014 0CM MP-1 APPLICATION for RECEIVED Major Development Permit err 0 5 2014 (last revised 12/27/06) UCM-MHD CITY North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Town Of Holden Beach Tower Park Applicant 1: First Name MI Last Name David Hewett Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box _ City State 449 Supply NC ZIP Country Phone No. FAX No. 28462 USA 910-842-6488 ext. 910-842-9315 Street Address (t different from above) City State ZIP 110 Rothschild Street Holden Beach NC 28462- Email david.heweft@hbtownhall.com 2. Agent/Contractor Information Business Name Right Angle Engineering, P.C. Agent/ Contractor 1: First Name MI Last Name W. Shane Lippard Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 212 Princess Street Wilmington NC ZIP Phone No. 1 Phone No. 2 28401 910 - 251 - 8544 ext. ext. FAX No. Contractor # 910 251 2208 Street Address (t different from above) City State ZIP Email raepcsl@bellsouth.net <Form continues on back> RECEIVED DCM WILMINGTON, NC AUG 0 8 2014 252-808-2808 :: 1-888-4111COAST :: www.nccoastaimanagement.net Form DCM MPA (Page 2 of 4) RECEIVED APPLICATION for DK 0 5 2014Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 110 Rothschild St. Subdivision Name City State Zip NIA Holden Beach NC 28462 - Phone No. Lot No.(s) ffmany, attach additional page with list) 910-842-6488 ext. PID:232NB005,PID:232NB011,PID:232NB009, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Lumber Atlantic Intracoastal Water Way c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown Atlantic Intracoastal Water Way e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Town of Holden Beach, NC 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 260' 1.4 acres = 60, 984 sf c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 0.61, 0.46, 0.33, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 10, ❑NHW or ®NWL e. Vegetation on tract Grass, shrubs and coastal wetland vegetation f. Man-made features and uses now on tract Vacant g. Identify and describe the existing land uses da iacent to the proposed project site. The Town of Holden Beach water tower and recycling center is located in the same block. To the west, the land is vacant. To the east is residential (condos). To the north is the AIWW, to the south is the town hall complex. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? C-1 (Commercial) (Attach zoning compliance certificate, if applicable) ®Yes ❑No DNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No DNA National Register listed or eligible property? RECEIVED <Form continues on next page> DCM WILMINGTON, NO AUG 0 8 2014 252-808-2808 .. 1.888-4RC6ASs ., ww w, tic coastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes []No (iii) If yes to either (i) or (I) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. RECEIVED None, municipal sewer available to the site DFr 0 5 2014 DCM-MHD CITY o. Describe existing drinking water supply source. None, municipal water available to the site p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Govemment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed project is a municipal park open daily, with playground, basketball and bocce courts, picnic area, restrooms w/ showers and transient boat dockage featuring three slips 30' in length. The town will collect fees per foot, per day for dockage. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. (1) Pile driver to install pilings. (1) Hydraulic dredge for the removal of material. Track equipment to be used above the bulkhead on uplands. Equipment to be stored onsite on uplands. d. List all development activities you propose. The proposed project is a municipal park with playground, basketball and bocce courts, picnic area, restrooms w/ showers and transient boat dockage featuring three slips 30' in length. The town will collect fees per foot, per day for dockage. Parking and sidewalks are included in the plan. e. Are the proposed activities maintenance of an existing project, new work, or both? New f. What is the approximate total disturbed land area resulting from the proposed project? 1.5 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? In. Describe location and type of existing and proposed discharges to waters of the state. None I. Will wastewater or stonnwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA j. Is there any mitigation proposed? []Yes []No ®NA If yes, attach a mitigation proposal. RECEIVED <Form continues on back> DCM WILMINGTON, NC AUG 0 S 2014 252-808.2808 .. 1.888-4RCOAST .. www.nccoastalmanagement.net Fonn DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or iocation map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instnanent under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (dpanan) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mall. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Name John O. Holden Phone No. 904-992-9411 Address 14584 San Pablo Dr. N, Jacksonville, Ft. 32224 Name Bridgewater Property Owners Association Phone No. 910-842.9996 Address 109 Jordan Blvd, Holden Beach, NC 28462 Name Phone No, Address g. A list of previous state or federal permits Issued for work on the project tract. Include permit numbers, permitlee, and issuing dates. Sediment and Erosion Control - Issued 3-19.2014 CAMA Minor#HB13-018 NC Stormwater - Submitted Feb, 2014 CAMA GP 63252 511114 h. Signed consultant or agent authorization form, If applicable. I. Wetland delineation, if necessary. J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Polity Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands. attach a statement documenting compliance with the North Carolina Environmental Policy Act. 17. Certification and Permission to Enter on Land l I understand that an y permit Issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Dtod W. Wewe. RECEIVED Signature. DEr. 0 6 2014 Please Indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information DCM-MHD CITY RECEIVED DCM WILMINGTON, NC AUG 0 8 2014 252-808-2808 :; 1-888-4RCOAST :: www,nccoostaimanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 50 Width 150 Avg. Existing Depth 3 MLW NA NA Final Project Depth 6 MLW I F_NA_�JNA 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. sand 1000 CY (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ®CW 12 ❑SAV ❑SB OWL _ ®None (ii) Describe the purpose of the excavation in these areas: dredge material to achieve -6' depth at mean low water at the dock. d. High -ground excavation in cubic yards. RECEIVED 0pr 0 5 2014 DCM-MHD CITY 1 �. DISPOSAL OF EXCAVATED MATERIAL []This section not applicable a. Location of disposal area. Town -owned disposal area at the end of Scotch Bonnet Rd. c. (i) Do you claim title to disposal area? ®Yes []NO ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: dredged material b. Dimensions of disposal area. 160' x 160' d. (i) Will a disposal area be available for future maintenance? ®Yes []No ❑NA (ii) If yes, where? Town -owned disposal area at the end of Scotch Bonnet Rd. DA 290 (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (ii) If yes, how much water area is affected? RECEIVED DCM WILMINGTON, NC AMi 0 8 2014 252.808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development Is a wood groin, use MP-4 - Structures) a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑BreakwaterlSill ❑Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap _ Breakwater/Sill_ Other_ I. Source of fill material. ***'**Bulkhead previously permitted under HB#13-018 VM. d. Maximum distance waterward of NHW or NWL: I. (1) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ❑NA (h) If yes, state amount of erosion and source of erosion amount Information. h. Type of fill material. npr o 5 2014 DCM-MHD CITY 4. OTHER RLL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. (I) WIII fill material be brought to the site? ®Yes ❑No ❑NA b. (I) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or (il) Amount of material to be placed in the water 0 other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ili) Dimensions of fill area 100 x 100 ❑DW ❑SAV _ ❑SB (iv) Purpose of fill OWL ®None — slope site for development of park (II) Describe the purpose of the fill in these areas: a. How will excavated or fill material be kept on site and erosion b. controlled? sediment erosion control plan, temporary sediment basin c. (1) WIII navi atonal aids be required as a result of the project? d. ❑Yes atonal ❑NA (it) If yes, explain what type and tow they will be implemented. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? dam bucket dredge, track hoe, backhoe (I) WIII wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental Impacts. 9%!J& t aoly Town of Holden Beach Date V Appii t Na e Tower Perk Applicant Slignabire Project Name RECEIVED DCM WILMINGTON, NC :_ 08 :: 1-888-4RCOAST :: www,nccoastalinanaflement.net r RECEIVED Form DCM MP-3 DFr. 0 5 2014 UPLAND DEVELOPMENT DCM-MHD CITY (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 1 1 picnic shetler, 1 reslroom, playground, court, and parking c. Density (give the number of residential units and the units per acre). na e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes ❑No ❑NA (ii) If yes, list the date submitted: approved March 19, 2014 g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0% i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 34.3% j. Describe proposed method of sewage disposal. Town of Holden Beach municipal system I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industriall commercial effluent, 'Wash down" and residential discharges). none d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 1.5 AC f. List the materials (such as mad, paver stone, asphalt, or concrete) to be used for impervious surfaces. concrete sidewalks, asphalt parking, asphalt roof shingles h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ®Yes []No ❑NA (ii) If yes, list the date submitted: _4-3-14 k. Have the facilities described in Item (i) received state or local approval? ®Yes []No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stornwater design? []Yes ®No ❑NA If yes, attach appropriate documentation. RECEIVED DCM WILMINGTON, NC O S 2011 252-808-28082 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net revised: 12/26/06 Form BGM MP-3 (Upland Development, 'Page 2 of 2) M. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) community, municipal system o. When was the lots) platted and recorded? 12-30-1998 Date��2 11 Project Name Appli IN e Applicant ignature n. (1) Will water be impounded? ❑Yes ®No ❑NA (11) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA RECEIVED OR 0 5 709 DCM-MM9 efTY RECEIVED DCM WILMINGTON, NC AUG 0 8 2014 m ana,rement.ne t revised: 12126106 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) RECEIVED DEC 0 5 2014 DCM-MMD CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. ❑This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ®PublirJGovernment ❑Private/Community ®Yes []No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? []Yes ®No (if) Number 2 If yes: (iii) Length 90'. 124' (ii) Number (iv) Width 6�6' (iii) Length — (v) Floating ®Yes ®No (iv) Width (v) Floating []Yes []No e. (i) Are Platforms included? ®Yes ❑No f. (1) Are Boatlifts included? []Yes ®No If yes: If yes: (ii) Number 1 (if) Number (iii) Length 10' (iii) Length (iv) Width 6' (iv) Width (v) Floating ®Yes []No Note: Roofed areas are calculated from dnpfine dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 3 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 0 ❑ Dockage, fuel, and marine supplies ® Dockage ('Wet slips) only, number of slips: 3 ❑ Dry storage; number of boats: _ [3 Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, . ❑ Land cut and access channel charter boats, sail boats, mixed types). ®Open water; dredging for basin and/or channel mixed. transient ❑Open water; no dredging required []Other; please describe: k. Typical boat length: 28' I. (i) Will the facilittyy be open to the general public? ®Yes ❑No m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? RECEIVED DCM WILMINGTON, NC 252.808.2808 :: 1-88&-4RCOAST :: www.nccoastalmanagement.net Form DCM MR'-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. b. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: Describe treatment type and disposal location for all sanitary wastewater. RECEIVED DCM-MHD CITY c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of 'No Sewage Discharge' signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of.? h. I. Give the number of channel markers and "No Wake' signs proposed. 2 Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. I. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marinaldocking facility proposed within a primary or secondary nursery area? Dyes []No RECEIVED DCM WILMINGTON, NO AUG 0 8 2014 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB RECEIVED OWL ❑None DEf. 0 6 gnu p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes ❑No DCM-MHD CITY If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dnpline dimensions. 4. GROIN (e.g., wood, sheelpfle, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PublictGovernment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED DCM WILMINGTON, NC A'�� R 2014 252-808-2808 :t 1.888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Form DCN1 MP-4 (Structures. Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 15' gg' Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body d. Water depth at waterward end of structure at NLW or NWL 300' -6 MLW RECEIVED e. (i) Will navigational aids be required as a result of the project? []Yes ®No ❑NA SFr 0 b 1014 (it) If yes, explain what type and how they will be implemented. DCM-MHD CITY & OTHER ®This section not applicable l a. Give complete description: April 1, 2014 Date Tower Park Boat Dock Project Name To f Holden Beach App t N ie �l __. A_•c.ry-r pelican ignalure ✓�f RECEIVED DCM WILMINGTON, NC LEGEND -.. �.._ LOASTA-MR D dos wEnaxD LINE MEAN HIER WATER LINE X CAMA BREFOR RIF --_- 75AREA OF ENNRONMEHTAL CONCERN (OEC) ® BUL HEAR FROPOSFO BOPROW PAYED AREA - 0 V.5. 6' ABC CONCRETE 90EWALK COASiPl WELIANOS nRUCAL DATUM DIAGRAM I TPaI9��3 6' RXEO PIER ------- ---------- APR- N-WITH• - '�""`�'PRFSSURE.� ��i CEO- FAD RC. �. PBen OOD PIER SALE ¢� _ sv a0i o.¢ m m as awns wpm .�_ - I MARSU //qy��. ����'►�� w .0 mmn u a Iraam.nw Iwm ';`!$ - ♦ t1,II�L=`� _ - ,_ �,/// _"" _'__ M wrn twW�rlh TPaI9��3 6' RXEO PIER ------- ---------- APR- N-WITH• - '�""`�'PRFSSURE.� ��i CEO- FAD RC. �. PBen OOD PIER SALE ¢� _ sv a0i o.¢ m m as awns wpm .�_ - I MARSU //qy��. ����'►�� w .0 mmn u a Iraam.nw Iwm ';`!$ - ♦ t1,II�L=`� _ - ,_ �,/// _"" _'__ M wrn twW�rlh 1 m.n. mru uv.-r.uv I—T amtu a mE s,<Is..... M smm wamNa. awml. 11 11.1 A,1. ssrsssa�«.,. nxrs. j5 PE w_vnlds mwms rtc IW�Vl vc u¢nwl woeuan AT Ro El 6' RXED PIER muai�uc9nrwm�v w✓n was tali mmws ur s ���\\ .w w„�m..aa vmc m�m.mx rnumvm SFDFLOAIIN -- " LANDRTQ �. .'. ALUMRNM RM1I.O' �•% F 0, 30' BUFFER i I PVW / � RO C L- _- 1' _�I -75" AEC {I I BRIDGEWATER PRO 119 PIN: 202 919 � DB: m PoO 5�7i41. M019.51 22215321•. 5105489 •O3 9816 ORIIC.5 II21459.61. 005 61150.10 uzldsz dy 61 .L6 zzauo m. 61 .07 z2z1582)9. 6142686 .CB z221501 ]0 6 •LB z2z1590] 6 TOWN OF HOLDEN BEACH 10 �omrmm TOWER PARK F CAMA +'f ♦M : �ti¢ SITE PLAN JI 12 I TOWN TOWN DISPOSAL�1 SITE 4 US ARMY CORPS DF ENGINEERS 0 �� DISPOSAL SITE DA290 (NOT USED FOR NIS PROJECT. E E -y o0 ➢ z �❑ o n m n OWER 000 PARK DREDGE gTE pa LOCATION MAP NOT TO SCALE PARK CAMA DISPOSAL AREA 05 R % 4 � 4 �i$ =a5 in6§8sw DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Town of Holden Beach PROJECT NAME: Holden Beach Tower Park COUNTY: Brunswick LOCATION OF PROJECT:110 Rothschild St., adjacent to the AIW W, in Holden Beach DATE APPLICATION RECEIVED COMPLETE BY FIELD:11-7-14 FIELD RECOMMENDATION: Attached: YES CONSISTENCY DETERMINATION: Attached: n/a FIELD REPRESENTATIVE: Snider DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE RECD:12-5-14 ADJ. RIP. PROP NOTICES RECD: APPLICATION ASSIGNED TO: C) 75 DAY DEADLINEA MAIL OUT DATE:12-2-14 FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE DENY To Be Forwarded: n/a To Be Forwarded: n/a RECEIVED DEC 0 6 2p Dew-r mm elTV DISTRICT OFFICE: WILMINGTON FEE REC'D: 400 &q4b END OF NOTICE DATE: 12-26-14 150 DAY DEADLINE: STATE DUE DATE: 12-26-14 FED COMMENTS RECD: N= AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative 1)L- 91, 14 ✓ Coastal Management - LUP Consistency Division of Community Assistance Land Quality Section (DEMLR) 1 Z I S- I N ✓ r Q e r Division of Water Resources (401) -�2a 1r y y-12 Storm Water Management (DEMLR) I t-19- IN e', i -J , 4{ • 3>S\e� State Property Office i-a-0; / Division of Archives & History I Z-Z2-ly ✓ Division of Environmental Health Division of Highways I z- t(+-I'l ✓ Wildlife Resources Commission IL - 15 - I K ✓ Local Permit Office Division of Marine Fisheries / DCM 12-w t4 typo Corps of Engineers QW-s \Z tt-ly CCDEENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary January 09, 2015 Brunswick County DWR Project #: 14-1241 Town of Holden Beach Mr. David Hewett P.O: Box 449 Supply NC 28462 Subject Property: Tower Park —110 Rothschild Street, Holden Beach Approval of 401 Water Quality Certification with itional conditions Dear Mr. Hewett, You have our approval, in accordance with the attached conditions to excavate a boat basin and a transient docking facility for a proposed public park as described in your application received by the N.C. Division of Water Resources (DWR) on December 03, 2014, with additional information received on January 9, 2015. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 3900 (GC 3900). This Certification allows you to use the Regional General Permit #198000291 (GP291) when issued by the U.S. Army Corps of Engineers and the CAMA permit when issued by the Division of Coastal Management. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This Certification can also be found on line at: hqp://portal.ncdenr.orp-/wLb/wg/swp/ws/40 I/certsandperm its. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. RECEIVED JAN 2 0 1015 "1-0 k4Uu . r JI 1636 Mail Service Center, Raleigh, North Carolina 27699-1636 Phone: 919-607-64641Internet: hftp:/Mwa.ncwater.org An Equal Opportunity1Alfinnarive Action Empbyer—Made in pad by recycled paper Town of Holden Beach — Tower Park Brunswick County 2014-1241 The Additional Conditions of the Certification are: 1. The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Type Amount Approved This Version Plan Location or Reference nits 404 Wetlands (Excavation) 155 square feet (0.004 acres) CAMA Major Permit Application 01/09/15 2. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. e. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification and authorized by this written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. RECEIVED JAN 2 0 1015 M&W Orlw i:ux Town of Holden Beach — Tower Park Brunswick County 42014-1241 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by DWR. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and downstream of the above structures. All devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Energy, Mineral, and Land Resources has released the project. 5. Turbidity The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 6. e -a—pplicaftpennittee and their authorized agents shall conduct all activities in a marmer— consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. 7. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699- 1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permits. You can contest this Certification as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings. You may obtain a petition form from the Office of Administrative Hearings at http://www.ncoah.com or call (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this Certification, you must file the petition with the Office of Administrative Hearings. A petition is considered filed when the original and one (1) copy is received in the Office of Administrative Hearings during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the Office of Administrative Hearings at (919) 431-3100, provided the original and one copy of the petition RECEIVED JAN 8 A 2015 H60-Whit lvl1r. Town of Holden Beach — Tower Park Brunswick County 2014-1241 is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. Mailing address for the Office of Administrative Hearings: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel, Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Karen Higgins in the Central Office in Raleigh at 919-807-6301 or Chad Coburn in the DWR Wilmington Regional Office at 910-796-7215. Sincerely, Jim on Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDENR Enclosures: Certificate of Completion GC 3900 cc: Shane Lippard — Right Angle Engineering, P.C., 212 Princess Street, Wilmington, NC 28401 Jonathan Howell — DCM Morehead City Debbie Wilson — DCM Wilmington RECEIVED Tyler Crumbley — USACE Wilmington Field Office JAN 2 0 7^'4 Karen Higgins — 401 and Buffer Permitting Unit WiRO Certification of Completion DWR Project No.: Applicant: Project Name: Date of Issuance of Wetland Permit: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: Ep JAN20701 W�: va-tv4n41.44x hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date ANGENT Z N�G FDREXMCHANN L_--- - -- - _ ---PUbtPOUT AV A1� - -_ lowbo "NO 3EWA(iB•DIS�" aNs —000 -- - ------< . woo DOM woo- ---- _1 -��.. YLW - �J r.1.owTWa DOCgs. a a +PL.f)i TIN+ 1 135 SF w + + �L . COASTAL -: + + ..... - i . .I.ANb `' � •. . MA ... _ -... + .. ALUbII UM RAW x 1 pp w TREAT P WOODPIER�_+ x +. a�. 20 40 00 -° A=fwA ���f/W �/ NC ENR Pat McCrory North Carolina Department of Environment and Natural Resources Governor John E. Skvarla, III Secretary December 2, 2014 Division of Coastal Management8 MEMORANDUM: DEC 02 29% TO: Chad Coburn 8Y`----- t 401 Wetlands DWR - WiRO FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. ci t_t,C A REPLY: This agency has no objection to the project as proposed. RECEIVED This agency has no comment on the proposed project. AN 2 0 1015 This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE L N.C. Division of Coastal Management 127 Cardinal Drive E#., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.nccoastalmana.gement.net An Equal OPP)nunity \ Affirmative Action Employer &4xi,271 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 2, 2014 Division of Coastal Management MEMORANDUM: TO: Tim Walton Dept of Administration State Property Office John E. Skvarla, III Secretary RECEIVED DEC 0 3 2014 DOA STATE PROPERTY OFFICE FROM: Jonathan Howell, INC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, INC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. JAN 0 B 2015 This agency has no comment on the proposed project. al -WA µm a -r This agency approves of the project only if the recommended changes u are incorporated. See attached. SIGNEC This agency objects to the project for reasons described in the attached comments. DATE I-� � stal Management Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964Internet: www.necoastalmanagement.net An Equal opportunity \ Affirmative Action Employer AF��A� MDEE R North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 2, 2014 Division of Coastal Management MEMORANDUM: TO: Heidi Cox Environmental Engineer Public Water Supply 0 3 20 wi%o P f water ly ub//c Re dater S u" upP/y John E. Skvarla, III Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED A,Oro Cox DATE I �hhq RECENED DEr. 1 1 7nq, N.C. Division of Coastal Management DCM-MHD CITY 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastalmanagement.net An Equal Oppanunity \ Alfinnative Action Employer A NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary December 2, 2014 WSTRICT 3 Division of Coastal Management DEC 0 3 2014 MEMORANDUM: RECEIVED TO: Anthony Law NC DOT Brunswick County FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the A1WW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. '�{fr 1Z/f Y' /l� RECEIVED SIGNED vim— ( DATE DEC 18 1014 N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastalmanagement.net An Equal Opportunity \ Afiivnahve Action Employer RECEIVED DEC Ig2m NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 2, 2014 Division of Coastal Management MEMORANDUM: TO: Jeremy Humphrey NH DEH Shellfish Sanitation Section John E. Skvarla, III Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. DEC 17 2014 This agency has no comment on the proposed project. DCM-Mheerry Gd��P This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. for 5i,,-p,..,ve T/eNklA15 SIGNED %alfrr�tl -, LX� DATE IV N.C. Division of Coastal Management 127 Cardinal Drive Exl., Wilmington, NC 28405 Phone: 910-796-7215 \ FAX: 910-395-3964 Intemet: www.ncooastalmanagement.net An Equal Opportunity \ Affirmative Action Empoyer w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 7, 2014 MEMORANDOM To: From: Through: Applicant: Project Location: John E. Skvarla, III Secretary Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09) Shannon Jenkins, Environmental Program Supervisor Patti Fowler, Section Chief, Shellfish Sanitation and Recreational Water Quality Town of Holden Beach for Tower Park 110 Rothschild St., adjacent to AIWW, in Holden Beach Proposed Project: Construction of a public park and transient docking facility including boat basin exaction. The project as proposed would cause a reclassification of a portion of the Intracoastal Waterway in this area from Conditionally Approved Open to Prohibited based on the close proximity of the existing dockage to the east of the site which has 10 boat slips. The addition of three new transient slips within 100 feet of the existing 10 slips to the east would result in a shellfish harvesting closure 100 feet around the perimeter of both dockage areas. In discussions with the applicant, Holly Snider has indicated that the applicant has agreed to revise the plans in order to avoid a reclassification of these waters. This would be achieved by relocating (moving approximately 30 feet to the west) the proposed 3-slip dock so that it is a minimum of 100 feet away from the 10-slip dock to the east. RECEIVED DEC 17 1601 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-86001 Internet: www.ncdenr.gov DC"HD CITY An Equal Opportunity \ Affirmative Acfion Employer - Made in part by recycled paper Ir F � DRAM North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary December 2, 2014 �ECEIVE Division of Coastal Management ii MEMORANDUM: DEC 0 2 2014 TO: Georgette Scott BY: Stormwater Section DEMLR - WiRO FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. 5LI) This agency has no comment on the proposed project. his agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATES S Zyr RECEIVED N.C. Division of Coastal Management DEC. 15 2014 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastalmanaoement.net DCM-MHD CITY An Equal Opponunity \ Affirmative Achm Empoyer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 2, 2014 Division of Coastal Management MEMORANDUM: TO: Dan Sams District Manager DEMLR - WiRO b"c a John E. Skvarla, III Secretary FROM: Jonathan Howell, INC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, INC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St, adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. -ram 1I . S a c-o /1� << , s }0 cue C�q is f� 2rrr� w c rci 5`�+i .w� C✓ Iral �tav o J � Cwna . a �a &Pro � 1 This agency objects to the project for reasons clescribeid m the attached comments. SIGNED/ i -- / DATE -1)t C RECEIVED DEC 15 20A N.C. Division of Coastal Management 127 Cardinal Drive Ext.,Wilmington, NC 26405 DC� u1H©CI1Y Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastaimanagement.net An Equal Opportunity \ Atfr nalive Action Employer FT NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor John E. Skvarla, III Secretary December 2, 2014 C . f 4.11.��4 . 03 5456 Division of Coastal Management ti DEC 2014 MEMORANDUM: N REMVED w won TO: Maria Dunn s Cq NCWRCWaRO �11Z02 iRO FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED. I DATE Iz Iz z�14 RECEIVED N.C. Division of Coastal Management DEC 16 bli 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796.7215 \ FAX: 910-395-3964 Internet: www riccoastalmanagement.net t W"r-, ' "C An Equal Opportunity \ Affirmative Action Employer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 2, 2014 Division of Coastal Management MEMORANDUM: TO: Rhonda Wooten LPO Holden Beach John E. Skvarla, III Secretary FROM: Jonathan Howell, INC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St., adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE � �RECEIVED DEr. 12 209 N.C. Division of Coastal Management nPPo9-1 CITY 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796.72151 FAX: 910-395-3964Internet: www.nccoastaimanaclement.net An Equal Oppoounity Affirmative Action Employer Recommendations for State Permit —Holden Beach Tower Park 12/01/14 The total area for the docking facility was calculated as follows: RECEIVED Shoreline length = 260 ft. x 8 sq. ft. = 2,080 sq. ft. allowable. DFr. 0 5 1014 Proposed floating dock = 6 feet x 10 feet = 60 square feet Proposed jet dock = 6 feet x 90 feet = 540 square feet DCM-MHD CITY Total = 600 square feet It is the staffs recommendation to construct a 3-slip transient docking facility and to excavate a boat basin is CONSISTENT with the Rules of 15A NCAC 7H.0206 (d) Use Standards for Estuarine Waters, Rules of 15A NCAC 7H.0207 (d) Use Standards for Public Trust Areas and The Rules of 15A NCAC 07H.0600 Development Standards Applicable to all AECS.. It is staffs recommendation that the boat basin excavation is CONSISTENT with the Rules of 15A NCAC 7H .0208 (b) Specific Use Standards (1) which states Navigation channels, canals and boat basins shall be aligned or located so as to avoid primary nursery areas, shellfish beds, beds of submerged aquatic vegetation as defined by the MFC, or areas of coastal wetlands except as otherwise allowed in this Subchapter. It is staffs recommendation that the expansion of the existing docking facility is CONSISTENT with the Rules of 15 NCAC 7H.0208 (b)(6) Specific Use Standards for Piers and Docking Facilities. I have no objections to the proposed project. Any permit issued should include the following conditions: 1. This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of the structure without permit modification. No non -water dependent uses of structures may be conducted on; in, or over public trust waters without permit modification. 2. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 3. The authorized structure and associated activity must not cause an unacceptable interference with navigation and shall not exceed the established pier head line. 4. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. 5. In order to protect water quality, runoff from the construction must not visibly increase the amount of suspended sediments in adjacent waters. 6. This permit does not authorize the interference with any existing or proposed Federal project, and, the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury, which may be caused from existing or future operations undertaken by the United States in the public interest. Recommendations for State Permit —Holden Beach Tower Park 12/01/14 The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the project without having the permit transferred to a third -party. 8. This permit authorizes a maximum of three (3) boat slips. At no time shall more than three (3) vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. 9. All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spill -over of solids into any marsh or surrounding waters. 10. The spoil material will be properly graded and provided a ground cover sufficient to restrain erosion within thirty (30) working days of project completion. 11. Excavation will not exceed -6.0 feet below the mean low water level. In no case shall the depth of excavation exceed the depth of connecting waters of the existing dredge channel. 12. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. RECEIVED DEC 0 5 2014 DCM-MHD CITY .Q�WA w NCDENR RECEIVED DEr 0 5 1014 North Carolina Department of Environment and Natural Resources DCM-MHDCR• Division of Energy, Mineral, and Land Resources Stormwater Section Pat McCrory, Governor John E. Skvarla, III, Secretary April 3, 2014 David Hewett, Town Manager Town of Holden Beach 110 Rothschild Street Holden Beach, NC 28462 Subject: State Stormwater Management Permit No. SW8 131216 Tower Park High Density Commercial Infiltration Trench / Chamber Project Brunswick County Dear Mr. Hewett The Wilmington Regional Office received a complete Stormwater Management Permit Application for Tower Park on February 26, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 131216 dated April 3, 2014, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until April 3, 2022, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, at (910) 796-7215. _� Sinc rely, v a �Tracy avis, P.E., Director Division of Energy, Mineral and Land Resources GDS/csb: G:IWQS1StormwatehPermits & Projects120131131216 HD12014 04 permit 131216 RECEIVED cc: Shane Lippard, P. E., Right Angle Engineering. P. C. DCM WILMINGTON, Brunswick County Building Inspections Brunswick County Engineering APR 2 2 2014, Wilmington Regional Office Stormwater File Division of Energy, Mineral, and Land Resources - Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 NCDENR. North Carolina Department of Environment and Natural Pat McCr 'y Governo December 2, 2014 _C,�C GrtZG11't I08ources, Ioliir�Stkvar Secretary Division of Coastal Management MEMORANDUM: TO: Renee Gledhill -Early tT JC4I'`V° �jtL Dept -of Cultural Resources Archives & History` FROM: Jonathan Howell, NC'DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA/'Dredge&Fill Application. Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild st.,:adjacentto the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Ptease indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howe tl at the address above by December 26, 2014. If you have any questions regerding•the proposed'project,,contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. k This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See, attached. This agency objects to the project for reasons described in the attached comments. SIGNED �'`�'-`^ """ ��="-1utDATE N.C. Division 61 Caasial hianagemcnl 127Ca1dlnnlNveExl.,l'Vilniir4on,NC2405 DEC O J 211j4 P'nane �91o;9&72181 FAX 910.395_396 4 Inlemet: v,MV nccoastnlmanagemont.net M EqQ J CPPxiX-V 1,G1'iM II.ti E k: M 8rW OO tr Howell, Jonathan From: Coburn, Chad Sent: Monday, January 05, 2015 4:21 PM To: Howell, Jonathan Subject: Tower Park Holden Beach Hey Jonathan, Did you guys ever see any changes in the layout of the above project? It's open for shellfish and they wanted the structures to be at least 100 feet apart to prevent a closure. Thanks! Chad Coburn, Senior Environmental Specialist NC Division of Water Resources Water Quality Regional Operations Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910-796-7379 email: chad.coburnCancdenr.eov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Howell, Jonathan From: Coburn, Chad Sent: Thursday, January 08, 2015 1:29 PM To: Howell, Jonathan Subject: FW: Tower Park Holden Beach Hey Jonathan, Have you heard about anything in regards to the Shellfish issues on this one? Thanks! Chad Coburn, Senior Environmental Specialist NC Division of Water Resources Water Quality Regional Operations Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910-796-7379 email: chad.coburn@ncdenr.eov E-mail correspondence to and from this address may be subject to the North Carolina. Public Records Law and may be disclosed to third parties. From: Coburn, Chad Sent: Monday, January 05, 2015 4:21 PM To: Howell; Jonathan Subject: Tower Park Holden Beach Hey Jonathan, Did you guys ever see any changes in the layout of the above project? It's open for shellfish and they wanted the structures to be at least 100 feet apart to prevent a closure. Thanks! Chad Coburn, Senior Environmental Specialist NC Division of Water Resources Water Quality Regional Operations Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910-796-7379 A W;� I:M R North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor ' Secretary December 2, 2014 . RECEIVED Division of Coastal Management DEC B 20t4 MEMORANDUM: DCM-Flsheriea TO: Shane Staples wARo . Fisheries Resource Specialist DCM - WaR0 FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Town of Holden Beach for Tower Park Project Location: 110 Rothschild St.,• adjacent to the AIWW, in Holden Beach Proposed Project: construction of a public park and transient docking facility including boat basin excavation Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by December 26, 2014. If you have any questions regarding the proposed project, contact Holley Snider at (910)796-7270 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phony 91a796-72151 FAX: 910.395.3964 intemet: www nccoastalmanaoemgnt.net An Equal oppodunily\Aftnative Actiw Employer F.V; I 4 Howell, Jonathan From: Staples, Shane Sent: Monday, December 15, 2014 4:46 PM To: Howell, Jonathan Subject: RE: Town of Holden Beach For the proposed dredging at the Tower Park project from Holden Beach I would ask that a silt curtain be used around the area to be dredged. If a silt curtain is not used then I would ask that the PNA moratorium April 1—September 30 be observed. The coastal marsh along the AICWW is not designated as PNA but does have nursery functions of cover and feeding habitat for juvenile finish and shellfish. Thanks From: Howell, Jonathan Sent: Monday, December 15, 2014 2:11 PM To: Staples, Shane Subject: RE: Town of Holden Beach I have not, just send me an email with the moratorium dates and I will include them on the permit. Jonathan From: Staples, Shane Sent: Monday, December 15, 2014 9:24 AM To: Howell, Jonathan Subject: Town of Holden Beach Have you done anything with comments from the Town of Holden Beach Tower Park project? I no commented based on PNA and SAV maps. I talked with Jess! about another project involving dredging and to be consistent with what has been done there in the past I should have asked for the PNA moratorium. Should I just resend that or send it as an amendment. Sorry for the inconvenience. I also contacted Fritz for his input before I change anything. Shane F Staples, Fisheries Resource Specialist NC Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 252-948-3950 Email correspondence to and from this address is subject to the North Carolina Public.Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation a'R Howell, Jonathan From: Crumbley, Tyler SAW <Tyler.Crumbley@usace.army.mil> Sent: Thursday, February 05, 2015 11:58 AM To: Howell, Jonathan Cc: Coburn, Chad; Snider, Holley; Crumbley, Tyler SAW Subject: RE: [EXTERNAL] Town of Holden Beach 2014-02232; NMFS comments The comment (extended) period for this project ended on the 2nd of February 2015. The NMFS has objected to the project as proposed. I am awaiting the response from the applicant and will be corresponding with NMFS to resolve this. The proposed permit conditions will be provided upon resolution of this issue. If you have any questions or concerns regarding this action, please let me know. Thanks. Tyler Tyler Crumbley Project Manager U.S Army Corps of Engineers -Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax:910-251-4025 email: tyler.crumblev@usace.armv:mil "The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://regulatory.usacesurvey.com/" -----Original Message ----- From: Crumbley, Tyler SAW Sent: Tuesday, February 03, 2015 3:13 PM To: david.hewett(@hbtownhall.com smtp-Lippard, Shane Cc: Howell, Jonathan; Coburn, Chad; Snider, Holley; Crumbley, Tyler SAW Subject: FW: [EXTERNAL] Town of Holden Beach 2014-02232; NMFS comments David, Please find the attached comments and recommendations from NMFS regarding Essential Fish Habitat impacts. I will need to respond to them ASAP. Please contact me with any questions. Thanks. It -Tyler Tyler Crumbley Project Manager U.S Army Corps of Engineers -Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax: 910-251-4025 email: tyler.crumblev@usace.army.mil "The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://regulatorV.usacesurvev.com/" -----Original Message ----- From: Robin Wiebler- NOAA Federal fmailto:robin.wiebler@noaa.eovl Sent: Tuesday, February 03, 2015 10:55 AM To: Crumbley, Tyler SAW; NC FWS Pete Benjamin; NC DCM Doug Huggett; NC DCM Shane Staples; NC EPA Todd Bowers; SAFMC Roger Pugliese; David Dale - NOAA Federal; Sharon Rolfes - NOAA Federal; Fritz Rohde - NOAA Federal Subject: [EXTERNAL] Town of Holden Beach 2014-02232; NMFS comments Administrative Assistant Habitat Conservation Division Atlantic Branch PHONE: 843 762-8604 Robin.W iebler@noaa.gov Howell, Jonathan From: Crumbley, Tyler SAW <Tyler.Crumbley@usace.army.mil> Sent: Tuesday, February 03, 2015 3:13 PM To: david.hewett@hbtownhall.com; smtp-Lippard, Shane Cc: Howell, Jonathan; Coburn, Chad; Snider, Holley; Crumbley, Tyler SAW Subject: FW: [EXTERNAL] Town of Holden Beach 2014-02232; NMFS comments Attachments: TownOfHolden Beach-TowerPark_2014-02232_EFH_FINAL.pdf David, Please find the attached comments and recommendations from NMFS regarding Essential Fish Habitat impacts. I will need to respond to them ASAP. Please contact me with any questions. Thanks. -Tyler Tyler Crumbley Project Manager U.S Army Corps of Engineers -Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax:910-251-4025 email: tyler.crumblev@usace.army.mil "The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: htto://regulatory.usacesurvey.com/" -----Original Message ---- From: Robin Wiebler- NOAA Federal [mailto:robin.wiebler@noaa.sovl Sent: Tuesday, February 03, 2015 10:55 AM To: Crumbley, Tyler SAW; NC FWS Pete Benjamin; NC DCM Doug Huggett; NC DCM Shane Staples; NC EPA Todd Bowers; SAFMC Roger Pugliese; David Dale - NOAA Federal; Sharon Rolfes - NOAA Federal; Fritz Rohde - NOAA Federal Subject: [EXTERNAL] Town of Holden Beach 2014-02232; NMFS comments Administrative Assistant Habitat Conservation Division Atlantic Branch PHONE: 843 762-8604 Robin.Wiebler@noaa.sov CF�y_ 4�� UNITED STATES DEPARTMENT OF COMMERCE ,efM oW National Oceanic and Atmosphedc Administration NATIONAL MARINE FISHERIES SERVICE _ Southeast Regional once arrAm o, •' 26313th Avenue South St. Petersburg, Florida 33701.5505 httpl/sero.nmfs.noaa.gov February 2, 2015 F/SER47:FR/pw (Sent via Electronic Mail) Colonel Kevin P. Landers, Sr., Commander U.S. Army Corps of Engineers Wilmington District 69 Darlington Avenue Wilmington, North Carolina 28403-1398 Attention: Tyler Crumble Dear Colonel Landers: NOAA's National Marine Fisheries Service (NMFS) reviewed the public notice for Action ID No. SAW-2014-02232 dated December 19, 2014. The Town of Holden Beach proposes to develop a public park and transient docking facility with boat basin excavation in the Atlantic Intracoastal Waterway (AIWW), Holden Beach, Brunswick County. The project area is not designated as a Primary Nursery Area by the State of North Carolina. Submerged aquatic vegetation is not expected to be present. The Wilmington District's initial determination is the proposed project may adversely affect essential fish habitat (EFH) or associated fisheries managed by the South Atlantic Fishery Management Council (SAFMC), the Mid -Atlantic Fishery Management Council, or NMFS. As the nation's federal trustee for the conservation and management of marine, estuarine, and diadromous fishery resources, the following comments and recommendations are provided pursuant to the authorities of the Fish and Wildlife Coordination Act and the Magnuson -Stevens Fishery Conservation and Management Act (Magnuson -Stevens Act). Description of the Proposed Project The applicant proposes to construct a transient docking facility on the northeastern comer of the project site. The proposed facility would have an access pier (6 feet wide) extending waterward from the bulkhead over marsh for approximately 55 feet. The access pier would continue an additional 20 feet over water and terminate at an access ramp. The access ramp would extend to a floating dock (6 feet by 10 feet). The floating dock would be parallel to the shoreline and would be connected to a larger floating dock (6 feet by 90 feet), which is also parallel to the shoreline. The floating dock would provide dockage for up to three vessels. The applicant is proposing to excavate a boat basin that would be slightly irregular in shape and would have an average width of 50 feet and an average length of 150 feet. The boat basin would be excavated to -6 feet mean low water (MLW). Approximately 1,000 cubic yards of material would be excavated. Impacts to Essential Fish Habitat The excavation of the boat basin would disturb approximately 6,132 square feet of shallow bottom habitat and a minimum of 155 square feet of coastal marsh. NMFS expects the coastal marsh impacts to be higher due to sloughing during and after boat basin excavation. SAFMC identifies salt marsh and shallow sub -tidal bottom in estuarine waters as EFH for brown shrimp, pink shrimp, and white shrimp. SAFMC identifies these areas as EFH because fish and shrimp concentrate in these habitats for feeding and refuge and experience high growth and survival rates when located in these habitats. Detailed information on the EFH requirements of species managed by SAFMC is provided in a comprehensive amendment to the fishery management plans and Fishery Ecosystem Plan of the South Atlantic Region. Other species of commercial or recreational importance found in the project area include red drum, Atlantic croaker, spot, Atlantic menhaden, bay anchovy, striped mullet, weakfish, and blue crab. A number of these species serve as prey for fish that are managed by SAFMC (e.g., king mackerel, Spanish mackerel, and cobia) or for highly migratory fish managed by NMFS (e.g., billfishes and sharks). NMFS finds the project, as proposed, does not reflect all practicable avoidance and minimization of impacts to EFH. Dredging could be limited to the time of year when juvenile shrimp and fish are least abundant. The floating dock could be shortened on the western end to avoid impacts to coastal wetlands. No mitigation is proposed by the applicant for impacts to coastal wetlands. EFH Conservation Recommendations NMFS concludes the proposed dock construction and dredging would adversely impact EFH. Section 305(b)(4)(A) of the Magnuson -Stevens Act requires NMFS to provide EFH conservation recommendations when an activity is expected to adversely impact EFH. Based on this requirement, NMFS provides the following: EFH Conservation Recommendations The permit shall restrict dredging to the period of October 1 to March 31 to protect juvenile shrimp and finfish using the shallow water and intertidal areas. The permit shall require mitigation for the loss of coastal wetlands. There is a section of impaired wetlands on the applicant's property near the northern end of Davis Street that could be restored. Section 305(b)(4)(B) of the Magnuson -Stevens Act and its implementing regulations at 50 CFR 600.920(k), requires the Wilmington District to provide a written response to the EFH recommendations within 30 days of receipt. If it is not possible to provide a substantive response within 30 days, in accordance with the "findings" between NMFS and the Wilmington District, an interim response should be provided to NMFS. A detail response must then be provided prior to final approval of the action. The detailed response must include a description of measures proposed by the Wilmington District to avoid, mitigate, or offset the adverse impacts of the activity. If the Wilmington District's response is inconsistent with the EFH conservation recommendations, the District must provide a substantive discussion justifying the reasons for not following the recommendation. The detail response should be received by the NMFS at least ten days prior to final approval of the action. 2 Thank you for the opportunity to provide these comments. Related questions or comments should be directed to the attention of Mr. Fritz Rohde at our Beaufort Field Office, 101 Pivers Island Road, Beaufort, North Carolina 28516-9722, or at (252) 838-0828 / for cc: COE, Tyler.Crumbley@usace.army.mil USFWS, Pete_Benjamin@fws.gov NCDCM, Doug.Huggett@ncmail.net NCDCM, Shane.Staples@ncdenr.gov EPA, Bowers.Todd@epa.gov SAFMC, Roger.Pugliese@safinc.net F/SER4, David.Dale@noaa.gov F/SER47, Fritz.Rohde@noaa.gov Sincerely, / to VA Virginia M. Fay Assistant Regional Administrator Habitat Conservation Division _Y Howell, Jonathan From: Crumbley, Tyler SAW <Tyler.Crumbley@usace.army.mil> Sent: Wednesday, March 11, 2015 3:47 PM To: Howell, Jonathan Subject: Recommended Conditions: SAW-2014-02232 / Tower Park Docking Facility / Town of Holden Beach / Brunswick County / CAMA Major_GP291 Jonathan, A hard copy of the recommended conditions will be sent in the mail. We recommend that the following conditions be included in the State authorization: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at http://www.fws.gov/nc-es/mammal/manatee_guidelines.pdf. 2. Dredging is not authorized between April 1 and September 30 of any year. 3. The permittee shall mitigate for the loss of coastal wetlands by executing the proposed mitigation plan received and approved on 10 March, 2015. The plan titled: Mitigation Narrative for Tower Park, for the Town of Holden Beach 110 Rothschild Street, Holden Beach, Brunswick Co., N.C. (March, 2015). This plan proposes the restoration of 485 sq. ft. of coastal marsh to compensate for the losses of 155 sq. ft. of coastal marsh. This plan, including monitoring and reporting, must be adhered to and all success criteria must be met in order to maintain compliance with this condition. 4. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. 5. All work authorized by this permit must be performed in strict compliance with the most recent plans (received on 9 January, 2015), which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 6. The docks and piers extending over wetlands will be elevated sufficiently (a minimum of 3 feet) above the wetland substrate to prevent total shading of vegetation, substrate, or other elements of the aquatic environment. 7. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910-3282 at least two weeks prior to beginning work and upon completion of work. 8. Approval of the structure is based on determinations that there would be no obstruction to navigation. The structure may be damaged by wave wash from passing vessels. Issuance of this permit should not be construed, as relieving the permittee of taking proper steps to insure the structure and moored boats will not be damaged by wave wash. i 9. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 10. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 11. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 12. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Quality at (919) 733- 5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 13. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 14. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 15. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 16. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 17. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 18. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 19. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Tyler Crumbley Project Manager U.S Army Corps of Engineers -Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC28403 Phone: 910-251-4170 Fax:910-251-4025 email: tyler.crumbley@usace.army.mil "The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http:Hregulatory.usacesurvey.com/" A WD N North Carolina Department of Environment and Natural Resources Pat McCrory, Governor December 2, 2014 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Division of Coastal Management Major Public Notice: • Holden Beach Tower Park / Brunswick County • Ttereve Enterprises / Onslow County John E. Skvada, III Secretary RECEIVED W. 0 5 2014 DCM-MHD CITY Kyle & Heather: Please publish the attached Notice in the Friday, December 26, 2014 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by Credit Card (number on file with Elsa Lawrence, Ref acct # 796-7215). Please send a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. Sincerely, • Shaun K. Simpson Permit Assistance & Customer Service Division of Coastal Management cc: WiRO Jonathan Howell - MHC DCM Ronnie Smith - USACE Michele Walker- DCM N. C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3954 Internet: www.no=stalmanagement.net An Equal OppoAunily \ Affinnalne Action Employer RECEIVED DEC 0 5 ?OR NOTICE OF FILING OF DCM-MHD CITY APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that the following applications were submitted for development permits in an Area of Environmental Concern as designated under the CAMA. According to said applications, On November 7, 2014, the Town of Holden Beach, proposed to construct a public park and docking facility, with boat basin excavation at 110 Rothschild Street, adjacent to the AIWW, in Brunswick County, and on November 18, 2014, Ttereve Enterprises proposed to construct a bulkhead, reconfigure the existing docking facility, and conduct maintenance dredging at 120 Halls Point Rd., adjacent to New River, in Sneads Ferry, in On[sow, County. Copies of these applications may be examined or copied at the offices of Holley Snider (BR Co.) and Jason Dail (ON Co.) N.C. Dept. of Environment & Natural Resources, Div. of Coastal Management, 127 Cardinal Drive Ext., Wilmington, North Carolina 28405, (910-796-7425) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to December 26, 2014 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. MAJOR PERMIT FEE SCHEDULE JHB Tower Park / $400 / New Hanover Co. RECEIVED OF 0 5 2014 DO'N"W n Pity DCM % DWQ % Development Type Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% $400 0% $0 III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $250 100% $250 0% $0 III(B). Public or commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $400 100% $400 0% $0 III(C). If General Water Quality Certification No. 490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60% $240 40% $160 MID). If General Water Quality Certification No. 490 see attached cannot be applied: $400 60% $240 40% $160 IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60% $285 40% $190 RECEIVED Temporary Sediment Erosion Control OFc 0 5 1014 Tower Park Site DCM-MHB IFITY Infiltration Basin used for Sediment Erosion Control During Construction Calculate Volume Required for Storage V= 3800 cilac A = 0.30 AC V= 1080 CF of storage required Calculate Surface Area Required for Erosion Control Drainage area #1 to Infiltration Basin #1 Drainage Area = 0.30 acres Impervious Area = 0.10 acres of existing Percent Impervious = 33.3% During Construction 0 = CIA = for 10 yr Storm C pervious = 0.3 C(wsghted) = 0.37 C exposed earth = 0.5 I = 7.20 1 (inRv) = gl(h+T) for T=5 to 120 minutes Tc = 5 A = 0.30 Q=CIA = 0.79 cfs Calculate Surface Area Required for Erosion Control opeak = 0.8 cfs SA= (0.01)'Qpeak SA = 345 SF of trap area for efficiency Use 1 trap (inf. basin) = 345 SF per trap 1080 CF per trap volume Assume depth to provide storage = 1.5 FT Basin to be 30 FT wide around cul-de-sac Trap Volume Provided = 2100 CF — More than required Trap Surface Area Provided = 3100 SF at temp pool. More than required. DCM WILMINGTON, NC AUG 0 8 2014 Tower Park Site Cul-de-Sac Drainage Area #1 Infiltration Basin #1 RECEIVED DEC 0 5 1014 DCM-MHD CITY Basin Parameters Drainage Area to basin = 0.21 AC 9106 SF Impervious Area to basin= 0.08 AC 3375 SF Percent Impervious = 37.06% Minimum Required Volume (Schueler Method, see calculations)' Rv = 0.05 + 0.009 (37,06) = 0.3836 Downstream Surface Water Class: SA Required Runoff Depth = 1.5 inch Req. Storage Volume = (1.5"112'1 0.3836 0.21 ' 43560 = 437 fit" 3266 gal 1 Yr. Pre -Post Volume Calculation Rv-Pre = 0.05 Rv- Post = 0.3836 1 Yr. NOAA Depth = 4.08 in. Req. Storage Volume 3630 ' 4.08 0.33 0,21 = 1033 ft� Volume to Basin = Runoff Depth ' Rv ' Area = 1.5 0.3836 0.08 = 0.04 AC - in. " Water table is consistent across BMP and has a high infiltration rate. Basin is easily maintainable. Storage volume required = 1033 CF 7727 Gal Surface area at TP of basin= 3100 SF @ Elev = 9.0' Surface area at bottom of basin= 1100 SF @ Elev = 8.0' Proposed basin depth= 1.0 FT Proposed basin volume= 2100 CF Storage vs. Required = 2.03 Designed to waive requirement for Vag. Filter and Bypass Hydraulic Conductivity By Soils Report-- 19.2 inlhr = 1.60 CFIHr1SF (use half for waiving of bypass and filter strip) Volume requiring infihration= 2100 CF Area of bottom of basin= 1100 SF Dewatering Time= V = 0.05 days 2'K'A 1.2 hours RECEIVED DCM WILMINGTON, NC Sediment Erosion Control Tower Park Site Temporary Sediment Basin Calculate Volume Required for Storage V= 3600 disc A = 0.80 V= 2880 CF of storage required Calculate Surface Area Required for Erosion Control Drainage area #2 to Infiltration Basin #2 Drainage Area = 0.80 acres Impervious Area = 0.40 acres of existing Percent Impervious = 50.0% During Construction Q = CIA = for 10 yr Storm C pervious = 0.3 C(weighted) = 0.40 C exposed earth = 0.5 1 = 720 1 (inthr) = gith-T) for T=5 to 120 minutes Tc= 5 A = 0.80 Q = CIA = 2.30 cfs Calculate Surface Area Required for Erosion Control Qpeak = 2.3 cis SA= (0.01)'Qpeak SA = 1004 SF of trap area for efficiency Use 1 trap (inf. basin) = 1004 SF per trap 2880 CF per trap volume Assume depth to provide storage = 2.5 FT Basin to be 17 FT wide Trap Storage Length = 59 FT of excavated storage needed for surface area Actual Used= 70 FT Trap Volume Provided = 2975 CF — at permanent pool. More than required Trap Surface Area Provided = 1190 SF at temp pool. More than required. Size Outlet Pipe D = 16(Qnl(s" S)"(318) Qpoat = 2.30 cis during construction s = 0.50% n = 0.013 D (theoretical) = Ile in D (actual) = 15.0 in minimum. 12.0 in. actual pipe used based on SW Pond Calculations Size Emergency Spillway - Assuming clogged outlet structure, all flow over spillway Channel Lining: Rip Rap n= 0.030 1 S= 1.00% 3 Q Mannings (cfs)= 54.01 �e-26.0 ft. Length= 20 R Velocity= 3.36 We Depth min Freeboard= 0.60 R Max allowable. More than 100 yr. RECEIVED Dr. 0 5 2014 DCM-MHD CITY RECEIVED DCM WILMINGTON, NC Holden Beach Tower Park Skimmer Sizing Calculation for Faircloth Skimmer DA-2 RECEIVED nFc 0 51014 DCM-MHB effy Calculate Skimmer Size Basin Volume in Cubic Feet F9,Days Cu.Ft Skimmer Size 2.0 Inch Days to Drain' Orifice Radius 0.9 Inch[es] Orifice Diameter 1.8 Inch[es] 'In NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet RECVED DGM WILMINGTON, N( AU6 0 8 2014 RECEIVED ECS CAROLINAS, LLP ni 0 5 10H UCM-MHD CITY "Setting the Standard for Service" Geotechnical • Construction Materials - Environmental • Facilities NCe�' `"'" F"9'"ee"�r"'"r'1p1B September 20, 2013 Mr. Shane Lippard, P.E. Right Angle Engineering 212 Princess Street Wilmington, North Carolina 28401 Reference: Report of Infiltration Testing Davis Street Site Holden Beach, Brunswick County, North Carolina ECS Project No. 22.19500 Dear Mr. Lippard: ECS Carolinas, LLP (ECS) recently conducted infiltration testing for the design of the stormwater best management practice (BMP) areas at the vacant property off of Davis Street in Holden Beach, Brunswick County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On September 19, 2013, ECS conducted an exploration of the subsurface soil and groundwater conditions at three requested locations shown on the attached Test Location Plan (Figure 1). ECS located the test areas with a boring plan provided by Right Angle Engineering. The purpose of this exploration was to obtain subsurface information of the in -place soils for the stormwater BMP areas. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the groundwater level and the seasonal high water table (SHWT) observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT Groundwater B-1 24 inches 42 inches B-2 42 inches 70 inches B-3 55 inches 80 inches ECS has conducted three infiltration tests utilizing a compact constant head permeameter near the hand auger borings in order to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT or in the most restrictive soil horizon. RECEIVED DCM WILMINGTON, NC atx, 0 8 2014, 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T: 910-686-9114 • F: 910-686-9666 • www.ecslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Midwest, LLC • ECS Mid -Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP Report of Infiltration Testing Davis Street Site Bald Head Island, Brunswick County, North Carolina RECEIVED ECS Project No. 22.19500 September 20, 2013 nrr. 0 5 2014 DCM-MHD CITY Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour B-1 Brown fine to med. SAND 10 inches 19.2 B-2 Tan/grayTan/gray fine to coarse SAND 18 inches 21.4 B-3 Tan/ ra fine to coarse SAND 31 inches 22.1 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's testing of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us at (910) 686- 9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Project Geologist Attachments: Figure 1 - Test Location Plan Infiltration Testing Form Kris J. Stamm Principal RECEIVED DCM WILMINGTON, NC AUG 0 8 Z014 ' fa J� Not - IA it ® APPROXIMATE BORING LOCATIONS SCALE SHOWN ABOVE Davis Street Site Holden Beach, NC ECS Project # 19500 September 19, 2013 KBW RECEIVED nFr. 0 6 2014 UCM-MHD CITY Figure 1—Test Location Plan Provided by: Goo fla(M IBD DCM WILMINGTON, ED Infiltration Testing Form Davis Street Site RECEIVED Holden Beach, Brunswick County, North Carolina ECS Project No. 22.19500 DEC, 061014 September 19, 2013 DeW-WHFF elTV Location Depth Soil Description B-1 0-12" Brown fine to med. SAND 12"-36" Tan/gray fine to coarse SAND 36"-48" Gray fine to med. SAND w clay lens Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Infiltration Rate: 19.2 per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 42 inches below the existing grade elevation. Location Depth Soil Description B-2 0-101, Brown fine SAND 10"-16" Gray silty SAND 16"-48" Tan/gray fine to coarse SAND 48"-70" Gray fine to med. SAND w clay lens Seasonal High Water Table was estimated to be at 42 inches below the existing grade elevation. Infiltration Rate: 21.4 per hour Test was conducted at 18 inches below existing grade elevation Groundwater was encountered at 70 inches below the existing grade elevation. Location Depth Soil Description B-3 0-80" Tan/gray fine to coarse SAND Seasonal High Water Table was estimated to be at 55 inches below the existing grade elevation. Infiltration Rate: 22.1 per hour Test was conducted at 31 inches below existing grade elevation Groundwater was encountered at 80 inches below the existing grade elevation. BOM WECVED ILMINGTON, NC _} z ),TA N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date April 16, 2014 Name of Property Owner Applying for Permit: The Town of Holden Beach David Hewett, Town Manager Mailing Address: PO Box 449 Supply, NC 26462 RECEIVED DEC. 0 5 1014 DCM-MHD CITY I certify that I have authorized (agent) Right Angle Engineering. P.C. to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct Tower Park , at (my property located at) 110 Rothschild Street Holden Beach NC This certification is valid thru April 16, 2015 L�j y ►_4 Signature and Date DCM iia TW'No APR 2 2 2014 ® RECEIVED W-►`rya DEC. 0 5 1014 D" \R DCM-MHD CITY North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory John E. Skvarla, III Governor Secretary December 1, 2014 Shane Lippard, agent for the Town of Holden Beach Right Angle Engineering 212 Princess Street Wilmington, INC 28401 Dear Mr. Lippard: The Division of Coastal Management hereby acknowledges receipt of your request for State approval to develop Town Park and transient docking facility located at 110 Rothschild Street adjacent to the Atlantic Intracoastal Waterway, in the Town of Holden Beach, Brunswick County. It was received complete on 11/07/14, and appears to be adequate for processing at this time. The projected deadline for making a decision is 01/23/15. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from November 7, 2014, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Si ce li ely, Holley Sm Coastal Management Representative Enclosure cc: Jonathan Howell, DCM Debra Wilson, DCM Rhonda Wooten, Holden Beach LPO Tyler Crumbley, COE 127 Cardinal Drive Ext., Wilmington, INC 28405 Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer \T0'1'IC1: CAMA PERMIT APPLIED FOR PROJECT: licant proposes to construct a adjacent to the AIWW, Brunswic oun v �' !1111111 ills . . / APPLICANT: RECENED Shane Lippard DU 0 5 2014 Right Angle Engineering 212 Princess Street Wilmington, NC 28401 For: Town of Holden Beach FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: NC Div. of Coastal Management 127 Cardinal Dr. Ext. Wilmington, NC 28405 Holley Snider, Field Representative 910-796-7270 IIIIIIIIIIInlllllllllllllllllllllll B3115 Paaia :�'ePe RECEIVED Bru�aWek Canty, kC RwLbr of DwM oaw ] of 4 R. C ew Ow nl:r 0 5 B2-1Y201eIe: 24:le. eee B lck ty, N[ 1014 K REVEME STR : f2eee.N (R242MI �-) 'S ReseMf �! re'; TO662�D �i�t UCM-MHD CITY Refund— __ _r+r., OlDrgMl ❑dII:P11C111J n....., xx w , •-.n.3: NORTH CAROLINA GENERAL WARRANTY DEED STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK�a}f�o��• a0 .PE+�ENkE THIS DEED, made this the 1 1 day of December, 2010, by and between HOLDEN BEACH ENTERPRISES, INC., a North Carolina corporation, of 3711 Windy Point Road SW, Supply, NC 28462, party of the first part, hereinafter referred to as Grantor, and TOWN OF HOLDEN BEACH, of 110 Rothschild Street, Holden Beach, NC 28462, party of the second part, hereinafter referred to as Grantee; WITNESSETH: THAT the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee, its successors and assigns, in fee simple, all of those certain tracts or parcels of land situated in the Town of Holden Beach, Lockwood Folly Township, Brunswick County, North Carolina, and being more particularly described on Exhibit A which is attached hereto and incorporated herein as a part of this Deed. In accordance with NCGS Section 105-317.2, the mailing addresses of Grantor and Grantee are as stated above. The property herein conveyed does not include the primary residence of Grantor. TO HAVE AND TO HOLD the aforesaid tract or parcel of land and all privileges and appurtenances thereunto belonging to the Grantee in fee simple. AND the Grantor does hereby covenant with Grantee that Grantor is seized of the premises in fee simple, that it has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, subject to the following exceptions: street rights -of -way, restrictive covenants of record, utility easements of record, the lien for 2010 ad valorem property taxes, and the right-of-way for the Atlantic Intracoastal Waterway. RECEIVED Prepared by: BAXLEYSMITHWICK PLLC, Attorneys at Law DCM WILMINGTON, NC WITHOUT OPINION ON TITLE APR 2 2 2014 Hie eat RECEIVED IN WITNESS WHEREOF, the Grantor has caused this instrument to be duly executed, SFr. 0 5 2014 the day and year first above written. HOLDEN BEACH PROPERTIES, INC. ?'4esov-16— D. Griffin, Jr., Pres STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK I, a Notary Public of said County and State, certify that James D. Griffin, Jr. personally came before me this day and acknowledged that he is President of HOLDEN BEACH ENTERPRISES, INC., a North Carolina corporation, and that he, as President, being authorized to do so, executed the foregoing deed on behalf of the corporation. Date: December 2010 V4,4'kp Notary Fgjbllc signatutb ea= My Commission Expires: LESGi/.' '•.... i DCM-MHD CITY RECEIVED DCM WILMINGTON, INC APR 2 2 2014 RECEIVED 01'r 0 5 2014 DCM-MHD CITY .ML 1 Brumulck Cemly, NC R"glct"r of 0"eAf p"q" 3 of 4 4�11.11-1 BEING those tracts or parcels of land lying and being in the Town of Holden Beach, Lockwood Folly Township, Brunswick County, North Carolina, as more particularly described as follows: TRACT A: BEING all of Tract A, containing 26,639 square feet; all of Tract B, containing 20,197 square feet; and all of Tract C, containing 14,364 square feet, as shown on a plat of surrey by Thomas W. Morgan, P.L.S.. Brunswick Surveying, Inc., dated December 17, 1998, and recorded in Map Cabinet 20 at Page 453 in the Office of the Register of Deeds for Brunswick County, North Carolina, to which plat reference is made and which is incorporated herein for greater certainty of description of said property (sometimes referred to as'Tracts A, B and C made from a portion of Block 3- 0, Dr. R. H. Holden Subdivision"). TRACT B: Commencing at Monument "HB 7", (N.C. Grid Coordinates: N=60,680.126 and E=2,223,872.558); thence S 81-3845 W 1548.05 feet to Monument "HB 8", (N.C. Grid Coordinates N=60,455.183 and E=2,222,340.932); thence N 79-49-43 E 905.87 feet to a rebar, thence N 06-08-03 W 815.22 feet to a rebar, thence N 38-29-53 E 35.58 feet to a point at the intersection of the northern right-of-way line of South Shore Drive and the eastern right-of-way line of Halstead Street, the point of beginning and also being the southwestern comer of Lot 1, Block K, Wild Dunes Subdivision (Map Book 4, Page 2); thence along the northern line of South Shore Drive S 67-50-22 W 52.02 feet to a point at the intersection of the northern right-of-way line of South Shore Drive and the western right-of-way line of Halstead Street, and being the southeastern comer of Lot 9, Block L, Wild Dunes Subdivision; thence along the western right-of-way line of Halstead Street N 06-08-03 W 137.38 feet to a point in the edge of marsh of the Atlantic Intracoastal Waterway; thence along the edge of marsh of the Atlantic Intracoastal Waterway N 71-57-12 E 51.10 feet to a point in the eastern line of Halstead Street and the western line of the aforesaid Lot 1; thence along the eastern right-of-way line of Halstead Street S 06-08-03 E 133.56 feet to a point in the northern right-of-way line of South Shore Drive, the point of beginning, and containing 0.15 acre, all bearings are oriented to N.C. Grid North, N.A.D. 1927. All distances are horizontal ground distances (sometimes referred to as "Halstead Street Extension"). And being the same tract or parcel as described in that Withdrawal of Street from Dedication dated 5/13/1999, recorded in Book 1305 at Page 586, Brunswick County Registry.. TRACT : COMMENCING AT MONUMENT "HB 13", (NC GRID COORDINATES: N=58,928.47 & E=2,208,008.50); THENCE N 820 16'14" E 3,658.53 FEET TO MONUMENT'GRIF", (NC GRID COORDINATES: N=59,420.25 & E=2,211,631.81); THENCE 870 02' 57" W 738.88 FEET TO A POINT IN EASTERN LINE OF SCOTCH BONNET DRIVE AND BEING THE SOUTHWESTERN CORNER OF TRACT ONE OF THE NC AGRICULTURAL FOUNDATION TRACT AS RECORDED IN DEED BOOK 1200, PAGE 285 AND ALSO A PLAT RECORDED AS A DEED ATTACHMENT IN DEED BOOK 1192, PAGE 922 AT THE BRUNSWICK COUNTY REGISTER OF DEEDS; THENCE N 020 51' 57" W 973.67 FEET ALONG THE EASTERN LINE OF SCOTCH BONNET DRIVE TO A POINT IN THE ATLANTIC INTRACOASTAL RIGHT-OF-WAY LINE, THE POINT OF BEGINNING; THENCE N 890 40' 55" E 125.12 FEET TO A POINT; THENCE N 890 49 55" E 189.58 FEET TO A POINT; THENCE S 2r 25' 44" W 27.92 FEET TO A POINT; THENCE S 180 37'01" W 40.28 FEET TO A POINT; THENCE S 010 29' 11" W 34.75 FEET TO A POINT; THENCE S 890 22' 26" E 23.12 FEET TO A POINT; THENCE S 460 1 V 01" E 45.56 FEET TO A POINT; THENCE S 560 02' 33" E 35.46 FEET TO A POINT; THENCE N 830 32' 58" E 37.26 FEET TO A POINT; THENCE N 750 32' 25" E 29.80 FEET TO A POINT; THENCE N 880 38' 39" E 27.23 FEET TO A POINT; THENCE N 29" 06' 41" E 31.29 FEET TO A POINT; THENCE S 750 00' 10" E 37.41 FEET TO A POINT; THENCE N 230 19'53' E 29.18 FEET TO A POINT; THENCE S 52015' 29' E 30.20 FEET TO A POINT - RECEIVED DCM WILMINGTON, NC APR 2 2 2014 RECEIVED IIIII��NI Illlibllllllllllllll 83115 PN73 8'.. c1"mmo s 9"1"u„!ck kY. K R"glat"r of D.. " Page 4 of EXHIBIT A - Page 2 of 2 Pages THENCE S DOG 05' 2T W 48.11 FEET TO A POINT; THENCE S 03R 01' 25" E 47.09 FEET TO A POINT; THENCE S 32R 19' 38' E 20.55 FEET TO A POINT; THENCE S 520 43' 25" E 30.58 FEET TO A POINT; THENCE S Or 59' 58" E 24.92 FEET TO A POINT; THENCE N 850 OT 18" E 31.68 FEET TO A POINT; THENCE N 12° 22' 40" W 40.91 FEET TO A POINT; THENCE N 040 26 54" E 25.72 FEET TO A POINT; THENCE N 110 45' 00" E 26.90 FEET TO A POINT; THENCE N 120 59' 39" W 22.37 FEET TO A POINT; THENCE N 110 25' 48 W 26.12 FEET TO A POINT; THENCE N 070 14'25" E 29.09 FEET TO A POINT; THENCE N 210 12' 45" W 28.99 FEET TO A POINT; THENCE N 010 54' 25" W 69.97 FEET TO A POINT; THENCE S 890 40' 55' W 100.00 FEET TO A POINT; THENCE N 000 19' 05" W 125.00 FEET TO A POINT; THENCE N 890 40' 55' E 100.00 FEET TO A POINT; THENCE S 009 19'05" E 125.00 FEET TO A POINT; THENCE N 890 40' 55" E 187.94 FEET TO A POINT; THENCE S 01011' 23' W 29.84 FEET TO A POINT; THENCE S 020 12'18" E 27.13 FEET TO A POINT; THENCE S 090 32' 46" E 34.89 FEET TO A POINT; THENCE S 630 4T 27" E 29.88 FEET TO A POINT; THENCE S Or 40' 30" W 18.3e FEET TO A POINT; THENCE S W 42' 28" E 43.33 FEET TO A POINT; THENCE N 740 31' OT E 20.03 FEET TO A POINT; THENCE S 800 59' 59" E 32.20 FEET TO A POINT; THENCE N 560 27' 42" E 19.45 FEET TO A POINT; THENCE N 380 43' 26" E 27.91 FEET TO A POINT; THENCE N 890 32' 18" E 27.36 FEET TO A POINT; THENCE N 70° 39' 25" E 46.28 FEET TO A POINT; THENCE S 5r 46 41' E 35.61 FEET TO A POINT; THENCE S 520 2T 33' E 32.12 FEET TO A POINT; THENCE N 750 21' 39' E 23.61 FEET TO A POINT; THENCE N 000 52' 41" W 32.24 FEET TO A POINT; THENCE N 750 32' 42" E 19.29 FEET TO A POINT; THENCE S 44" 37' 57" E 20.44 FEET TO A POINT; THENCE S 860 27' 20" E 40.67 FEET TO A POINT; THENCE S 840 30' 39" E 38.50 FEET TO A POINT; THENCE N 480 00' 54" E 24.Oe FEET TO A POINT; THENCE N 18" 11' 39" W 29.71 FEET TO A POINT; THENCE N 260 46' 24" E 21.37 FEET TO A POINT; THENCE N 150 24' 36" E 32.63 FEET TO A POINT; THENCE N 410 32' 40" W 27.83 FEET TO A POINT; THENCE N 000 31' 54" E 7.29 FEET TO A POINT; THENCE N 890 40' 55" E 194.33 FEET TO A POINT; THENCE N 890 40' 55" E 125.26 FEET TO A POINT IN THE WESTERN LINE OF GREENSBORO STREET; THENCE RUNNING WITH THE WESTERN LINE OF GREENSBORO STREET EXTENDED N 040 00' 19" W TO THE MEAN HIGH WATER LINE OF THE ATLANTIC INTRACOASTAL WATERWAY; THENCE RUNNING WITH MEAN HIGH WATER LINE OF THE ATLANTIC INTRACOASTAL WATERWAY IN A WESTERLY DIRECTION TO THE EASTERN LINE EXTENDED OF SCOTCH BONNET DRIVE; THENCE RUNNING WITH THE EASTERN LINE EXTENDED OF SCOTCH BONNET DRIVE S 02° 51' sr W TO A POINT IN THE ATLANTIC INTRACOASTAL WATERWAY RIGHT-OF-WAY LINE, SAID POINT BEING THE POINT OF BEGINNING. ALL BEARINGS IN THE TIE LINE ARE ORIENTED TO N.A.D.1983. ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES (sometimes referred to as "that 18.6 acre +/- tract located between Greensboro Street and Scotch Bonnet Drive, Parcel 231 MC 001 "). TRACT D: Being all of Lot 200 as shown on a plat entitled "Preliminary Of Addition To Holden Beach East", and recorded in Map Book 16 at Page 32, in the Office of the Register of Deeds for Brunswick County, North Carolina, to which plat reference Is made and which is incorporated herein for greater certainty of description of said ,r property. /,pFf/'1 t�/J/ og.. 0 5 1014 DCM-MHD CITY RECEIVED DCM WILMINGTON, NC APR 2 2 2014 212 Princess Street April 16, 2014 RIGHT ANGLE u ENGINEERING, PC Wilmington, NC 28401 Tel. (910) 251-8544 Certified Mail — Return Receipt Requested Mr. James D. Griffin, Jr. Bridgewater Property Owners Association 109 Jordan Blvd. Holden Beach, NC 28462 Dear Mr. Griffin, RECEIVED Du 0 5 2014 Fax (910) 251-2W88M-MHR PITY The Town of Holden Beach is applying for a CAMA Major permit to build a municipal park including playground, ball courts, picnic area, restrooms and boat dockage (3 slips), located at 110 Rothschild Street adjacent to the Atlantic Intracoastal Water Way, in Brunswick County, North Carolina. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Debra Wilson, District Manager, Division of Coastal Management, Wilmington, NC 28405- 3845 within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 910-251-8544, or e-mail me at raepcsl(r�belisouth.net Sincerely, W. Shane Lippard, P.E. Project Manager Enclosures RECEIVED DCM WILMINGTON, NC RIGHT ANGLE ENGINEERING, PC 212 Princess Street Wilmington, NC 28401 Tel. (910) 251-8544 Fax (910) 251-2208 RECEIVED Certified Mail — Return Receipt Requested DEf. 0 5 2014 DCM-MHD CITY April 16, 2014 Mr. John Q. Holden 14584 San Pablo Drive Jacksonville, FL 32224 Dear Mr. Holden, The Town of Holden Beach is applying for a CAMA Major permit to build a municipal park including playground, ball courts, picnic area, restrooms and boat dockage (3 slips), located at 110 Rothschild Street adjacent to the Atlantic Intracoastal Water Way, in Brunswick County, North Carolina. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Debra Wilson, District Manager, Division of Coastal Management, Wilmington, NC 28405- 3845 within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 910-251-8544, or e-mail me at raepcsl(a)bellsouth.net Sincerely, W. Shane Lippard, P.E. Project Manager RECEIVED Enclosures DCM WILMINGTON, NC APR 2 2 2014 ■ Complete items 1, 2, and 3. Also complete Item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Mr. Janes ItTilikIJr. IOq Gordan "�Ivd. ktd-evx Zemk (MC 4//v ' 01g nt Date D. Is delivery address different from Item 1? u Yer If YES, enter delivery address below: ❑ No 3. Seprice Type Certified Mail ❑ Express Mail ❑ Registered O Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Number (rws rfroms 7007 2680 0002 7419 5262 (fiansfer from service IebeQ PS Form 3811, February 2004 Domestic Return Receipt 102595-02 M-1540 RECEIVED DEC 0 5 2014 DCfa•MNMD in" RECEIVED DCM WILMINGTON, NC APR 222014 ` RECEIVED 01r. 0 b 2014 DCW-MHA ernr NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Pat McCrory, Governor Director John E. Skvada, III, Secretary March 19, 2014 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Town of Holden Beach ATTN: David Hewett 110 Rothschild St. Holden Beach, NC 28462 RE: Project Name: Tower Park Project ID: BRUNS-2014-023 Acres Approved: 1.50 County: Brunswick, various, Holden Beach River Basin: Lumber Stream Classification: Other Submitted By: Shane Lippard, P.E., Right Angle Engineering, PC Date Received by LQS: Februaryl8, 2014 Plan Type: New Dear Mr. Hewett: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-541)(b). Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCG010000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the 'ob site. Also, you should consider this letter to give the Notice required by G.S. 113A-61.1 �a) of our right of periodic inspection to ensure compliance with the approved plan. Wilmington Regional Office RECEIVED 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone:(910) 796.72151 Fax (910) 350��% WILMINGTON, INC APR 2 2 2014 RECEIVED Letter of Approval with Modifications and Performance Reservations Project :- Tower Park err 0 5 10N March 19, 2014 uCM-MHD CITY Page 2 of 4 North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project it is determined that the erosion and sedimentation control plan is inadequate to meet the requtrements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 thru 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you have provided. You are requested to file an amended forth if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, i5�" ack Rhonda Hall Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications and Performance Reservations NPDES Permit cc: Shane Lippard, P.E., Right Angle Engineering, PC DWQ Regional Supervisor -C-0EIVED DCM WILMINGTON, NC AN 2 2 Z014 RECEIVED Letter of Approval with Modifications and Performance Reservations Project :- Tower Park DEr. 0 5 2014 March 19, 2014 Page 3 of DCM-MNDCmY MODIFICATIONS AND PERFORMANCE RESERVATIONS Project Name: Tower Park Project ID: BRLJNS-2014-023 County: Brunswick 1. This plan approval shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. 2. The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete. 3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less steep. Bank slopes may be mowed, but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches. 4. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All highland would still have to be in compliance with the N.0 Sedimentation Pollution Control Act. 5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer is responsible for compliance with the requirements of the Division of Water Resources (DWR), the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to Installation. The Land Quality Section must be notified of a relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation resents a problem or contradicts any requirements of either DWR, the Corps, or the EPA, it is the responsibility of the developer to inform the Land Quality Section regional office so that an adequate contingency plan can be made to assure sufficient erosion control RECEIVED remains on site. Failure to do so will be considered a violation of this approve WILMINGTON, NC APR 222014 RECEIVED Letter of Approval with Modifications and Performance Reservations Dff. 0 5 2014 Project :- Tower Park March 19, 2014 DCM-MHB eITV Page 4 of 4 6. Any borrow material brought onto this site must be from a legally operated mine or other approved source. Any soil waste that leaves this site can be transported to a permitted mine or separately permitted construction sites without additional permits. Disposal at any other location would have to be included as a permit revision for this approval. 7. This permit allows for a land disturbance, as called for on the application plan, not to exceed 1_5 acres. Exceeding that acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention measures. 8. The construction detail for the proposed silt fence requires reinforcing wire and steel posts a maximum of eight (8) feet apart. Omission of the reinforcing wire is a construction change that necessitates more Posts for support, i.e., the spacing distance needs to be reduced to no greater than six (6) feet apart. 9. Because the sediment traps and basins are shown on the plan as the primary sedimentation and erosion control devices on this project, It is necessary that the traps and basins and their collection systems be installed before any other grading takes place on site, and that every structure that receives more than one acre of drainage is built so that each dewaters only from the surface. If that proves to be impractical, a revised plan must be submitted and approved that addresses erosion and sediment control needs during the interim period until the traps and basins are fully functioning. 10. A graveled construction entrance must be located at each point of access and egress available to construction vehicles during the grading and construction phases of this project. Access and egress from the project site at a point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the entrances is critical. 11. As a condition of the provided NPDES General Stormwater Permit, groundcover stabilization must meet specific time frames. Slopes (including cuts, fills, and ditch banks)) that are steeper than 3 horizontal to 1 vertical left exposed will, within seven (7) ca(endar days after completion of any phase of grading, be provided with groundcover. Slopes that are 3 horizontal to 1 vertical or flatter will be provided with groundcover within fourteen (14) calendar days. 12. As a part of routine monitoring of the approved land -disturbing activity, the financially responsible party shall assure inspections of the area covered by the approved plan after each phase of the plan has been completed and after establishment of tempporary ground cover in accordance with North Carolina General Statute 113A 54.1(e). RECEIVED DCM WILMINGTON, NC RECENED U.S. ARMY CORPS OF ENGINEERS prr 0 5 1014 WII.MINGTON DISTRICT UCM-MHD CiTV Action Id. SAW-20134)0217 County: Brunswick U.S.G.S. Quad: Holden Beach NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Town of Holden Beach Attn: Ms, Rhonda Wooten Address: 110 Rothschild Street Holden Beach, NC 28462 Property description: Size (acres) —1.0 Nearest Town Holden Beach Nearest Waterway AIWW River Basin Lumber USGS HUC 03040207 Coordinates 33.915442N,-78.270147 W Location description: Property is located directly adlacent to the Atlantic Intracoastal Waterway between Rothschild and Davis Streets, Holden Beach (island), North Carolina. PJNs:232NB005 & 232NB011. Indicate Which of the Following Apply: A. Preliminary Determination Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Artily (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for -further instruction. Also, you may provide.new information for further consideration by the Corps to reevaluate the JD. B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X _ We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. RECEIVED a i r') DCM WILMINGTON, NC APR 222014 RECEIVEQ, X The Property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area ncr 0 5 2014 Management Act (CAMA). You should contact the Division of Coastal Management in DCM-MHO eRf Wilmington, NC, at (910) 796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Emily Hughes at910-2514635. C. Basis For Determination This site exhibits wetland criteria as described in the 1987 Corns Wetland Delineation Manual and Coastal Plain SuPPlement and is directly adlacent to the Atlantic Intracoastal Waterway, a Section 10 Navigable Water of the U.S. This determination is based on information Provided by and a site visit by Emily Hughes on 1/8/2013. D. Remarks E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Ann: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by _. "It is not necessary to r,&4 an RFA form to a Div' ' ffice if you do not object to the determination in this correspondence." Corps Regulatory Offic' . Date: 5/31/2013 :E::x�pro(Date; 1/2018 The Wihnington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit b=•//gar2 nmT usace army mU&urvey html to complete the survey online. Copy furnished: RECEIVED DCM WILMINGTON, NC APR 2 2 2014 I I ii�A�AA� EAAI �6aRRu t J I I 1 I I I I I I I 1 1 1 l 1 1 1 1 1 91 I t All TRI 1 11 1 I I Ito j I I I Tm \ \ \ \ \ \ V \ R \\ DCM WI \ A P R A I, Bw.aN.Yavenwimeuawr°ur.u: ' AI��! r a F TOWN OF HOLDEN BEACH, NC wart g ItSurvelnng, rc i r eeo-c,weroe KDLM BBACg,NMM CAR01MA 2014 NC RECEIVED ncr p 6 211M \I T ANGLE JCM.MMi) E!„Y ENGINEERING, P.C. 212 Princess Street • Wilmington, North Carolina 28401 • Tel. (910) 251-8544 • Fax (910) 251-2208 • email: raepc@aol.com J r ATTENTION: WE ARE SENDING: LETTER OF TRANSMITTAL DATE / / _ /1(—_ 14 PROJECT NO: pC J RE: RECEIVED TRANSMITTAL NO: PAGE OF ❑ Originals ❑ Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ❑ Calculations ❑ Other QUANTITY DRAWING NO. REV. DESCRIPTION STATUS 1 r 1. C 4 4- r Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. Approved As Submitted 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS :IVED NGTON. NG NOV 2 5 Z914 IGHT ANGLE uu ENGINEERING, PC 212 Princess Street Wilmington, NC 29401 Tel. (910) 2514MU August 8, 2014 Holley Snider NC Division of Coastal Management NCDENR 127 Cardinal Drive Ext. Wilmington, NC 28405 Dear Holley, Fax (910)251-2208 RECEIVED DEC 0 6 2014 Dnw-s'n n rn^ In response to your comments, attached are revisions to the Major CAMA Permit Application for Tower Park for the Town of Holden Beach, NC. Please let me know if you have questions or need additional information. Tou W. Shane Lip ard, P.E. Project Manager Attachments: • Application Forms DCM-MPI, DCM-MP2, DCM-MP3 and DCM-MP4 • Project Design Narrative • Quad map • Soil map • Construction drawings RECEIVED DCM WILMINGTON, NC AUG 0 8 2014 R€UVED 212 Princess Street April 22, 2014 IGHT ANGLE uu ENGINEERING, PC Wilmington, NC 28401 TeL (910) 251-8544 Holley Snider NC Division of Coastal Management NCDENR 127 Cardinal Drive Ext. Wilmington, NC 28405 Dear Holley, DK 0 5 2014 ne":nngw p* i" Fax (910) 251-2208 RECEIVED APR 2 2 2014 Attached is a Major CAMA Permit Application for Tower Park at submitted for the Town of Holden Beach, NC. Please let me know if you have questions or need additional information. Thank you, V `�' - S2, � W. Shane Lippard, P.E. Project Manager Attachments: • Check for $400 fee • Application Forms DCM-MPl, DCM-MP2, DCM-MP3 and DCM-MP4 • Project Narrative • Quad map • Soil map • Construction drawings • Property deed • Agent Authorization Form • US Army Corps of Engineers Jurisdictional Determination • Notification Letter to Adjacent Property Owners • Signed Return Receipt from James D. Griffin, Jr. (the other owner's receipt has not yet been returned) • Stormwater Permit Approval Letter • Sediment and Erosion Control Approval RECEIVED DCM WILMINGTON, NC APR 222014 Snider, Holley To: shane lippard Cc: dhewett@hbtownhall.com Subject: Tower Park Major Permit Application Attachments: add info.doc RECEIVED W. 0 5 2014 DCM-MHn t'Itt Good Morning Gentlemen, This email is to follow up on the April 25, 2014 letter requesting additional information to complete the major permit application for the Tower Park at the Town of Holden Beach. I have attached the letter outlining those items and would be happy to discuss the details and specific items needed to deem the application complete. Please be advised that on May 9, 2014 DCM staff received a letter of objection (cc'ed to Town Manager David Hewett) from John Q. Holden stating that the proposed parking area on the east side of the Tower Park restricts access to his property from Rothschild Street. The letter also states that the submitted survey is in accurate. You are encouraged to reach out to Mr. Holden and address his concerns prior to resubmission of your permit application. Any changes to the drawing that would potentially affect the riparian property owners, may require that they be re -notified to complete the application process. I am more than willing and happy to assist you with completing your application package. Please feel free to call or email me if you have any questions or I can be of assistance to you in any. Sincerely, Holley Snider Field Representative NC Department of Environment & Natural Resources NC Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7215, Fax: (910) 395-3964 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. ABe Green - Don't print this e-mail unless required. RECEIVED WISR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Governor April 25, 2014 Shane Lippard Right Angle Engineering 212 Princess Street Wilmington, NC 28401 RE: CAMA Major Permit Application Tower Park Town of Holden Beach, Brunswick County Dear Mr. Lippard: DEC 0 5 2014 BeWi WMApi*r John H. Skvada, III Secretary The Division of Coastal Management hereby acknowledges receipt of your application for state approval for construction of a park at 110 Rothschild Street, adjacent to the Atlantic Intracoastal Waterway, in the Town of Holden Beach, Brunswick County. However, your application lacks information necessary for complete processing. The attached checklist indicates the deficiencies of your application. If you respond within three working days from the date of this fax or E-mail, or within five days from the receipt of this letter with the required additional information, processing of your application will promptly continue and will not be placed on hold. If you are not able to respond within three or five days, your application will not be accepted as complete for processing. Additional information may be required pending further review by the fifteen (15) review agencies. The attached checklist indicates the deficiencies of your application. If you have any questions concerning this matter, please call me at my Wilmington Office at (910) 796.7215. Sincerely, Holley Snid Field Representative cc: Jonathan Howell David Hewett, Town Manager Holden Beach Tim Evans, Building Inspector Town of Holden Beach 127 Cardinal Drive Exi., Wilmington, NC 28405 Phone: 910-796-72151 FAX:91039W964 Internet: www,n=astaimanagement.net An Equal Opportunity 1 Affirmalive Action Employer RECEIVED DEC. 0 5 2014 PAGE 2 19r.M_K71Wn,1n» CHECKLIST OF ADDITIONAL INFORMATION AND RECOMMENDATIONS FOR PROCESSING APPLICATION 1. PERMIT APPLICATION FORMS Not all questions on the application have been answered, or indicated as "not applicable." Please address the following items: Form DCM-MP-1: Number 4.e, please clarify that coastal wetlands are present on site. Number 6, please list CAMA minor permit #HB13-018 for development of 126 Rothschild Street. Form DCM MP-2: • Please clarify the dimensions provided for the boat basin. • Number 1, please clarify the amount of proposed excavation associated with the boat basin. Please clarify the specific dredge and fill dimensions, calculations and quantities for in -water excavation including coastal wetlands. • Number 2, please clarify the ownership of and dimensions of the disposal area. • Number 3.d and g, please clarify the maximum distance water ward of NHW the bulkhead is proposed and the amount of fill to be placed below NHW. • Number 4, please clarify the dimensions of the other fill activities. Form DCM MP-3 • Please complete letters f thru m on the application form. Form DCM MP-4: • Number 1, please include all of the proposed docks and piers. • Number 2 is not applicable. 2. TOP OR PLAN VIEW DRAWINGS Your application must include a drawing(s) showing the following: Existing and proposed features (i.e. dunes, shorelines, water bodies, marsh lands, wetlands, existing and proposed man-made structures, exact areas and dimensions of proposed excavation, fill and/or spoil disposal, existing water depths, approximate mean high, low, and average water levels, property boundaries and riparian corridors, width of the adjacent water body, distance of proposed structure(s) to federally maintained channels, and names of the adjacent property owners. Please clarify the shoreline including, but not limited to the mean high water boundary, the coastal wetland boundary, the proposed bulkhead, the proposed rip rap associated with the extension of the water tower overflow pipe and all the development proposed within the area of environmental concern. • Please submit a detailed plan view drawing for the proposed excavation adjacent to the proposed docking facility. VICINITY MAP NO SCALE 9TE DATA SF AC wTAL PRo.m eREA MINI T" BeEHRBD) UUITs ORE '"BEE PRIER 8 065 1.0 PRaP. I .lc SIELIR Lew 0.04 PRCP04D RESTROAl PADUTY Iw am g IIEJ DPA ING NSA In 1sn all PROM SE) PM INO AREA 02 4T alb FROP03D SG AUC5 Lew aM Q -CE-SAC ROAD JAJT 0.C8 PRVOYll YULM-PURPOSE C0.RT con am PROPOSED RODE COURT 1112 aw EX RECYpE SIATgI CRICMETZ 10 gJDN w 12 aw OC WATER TOME0. Cp1GRETE ISLM1 4C0 0.m MAIL PI -SEE IMPEANwS 2 TRP 0.8 ORAxA¢ AREA JENSTY BULT- AREA SURVEY LEGEND LABEL SYM. DESCRIPTION IPFOW IRON PIpEM1OD iOVND nJs 11AG w-uRN1sEr mnc alr mry mory iwumo cMs mrvcum+. sEr NCfA GE NONVMEM PFi rls • n ODETIC `;.�AILMFOIMD sFr Ws RAueoADseae ms • sw.mmm�.sTw Tocop gSAZ �yTIC EgW AY TANGENT 14 ATL W P EDGE OF DREDGED CHANNEL i _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 80' NAVIGATION BOUNDARY LINEOFTRACTAS RECORDED M DEED BOOK 3115, PAGE M AND IN MAP CABINET NE PAGE 453. NOTED AS MEAN HIGH WATER 2.9(NGVD) NOVEMBER 1990 (LINES L1-L6) ------- ---7 -_ _ • - • P RAP 2'APRDN'W11H -- ' GEO—FABPoC JOHN O. HOLDEN PIN: 202617111120j94 DS: 162 REROUTE 8' DIP WATER TANK OVERFLOW PIPE TO NEW RIPRAP APRON _ AIWW ROW 1. WORKSFL MCLUDEFML,GRADING,SEORMWATERDEVICES,BULKHEAD, EROSION CONTROL AND SELECE SOD AREAS. 2. GRADES SHOWN ARE FINISH ELEVATIONS OF SURFACES. SUBGRADE SHALL TAKE INTO ACCOUNT STONE AND ASPHALT TO GET CORRECT ELEVATION. 3. VINYLSHEETMLEBULKHFADSHALLBEDMVEN5'ANDEXPOSED5'. WOODCAP AND W HALERS SHALL SE PRESSURE TREA iED. 4. NO WORK SHALL OCCUR BELOW THE MEAN HIGH WATER LINE. 5. EACHCATCHBASINSHALLBESODDEDYONEACHSIDE. ENTIRE INFILTRATION BASIN PLUS 5' SHALLBE SODDED. NOTES: 1. DEEDREFERENCE:BOOK 3115, PAGE b INTHEBRUNSWICKCOUNTY REGISTRY. 2. ADJOINING DEED REFERENCES BASED ON CURRENT INFORALIIION FOUND IN THE BRUNS W ICK COUNTY TAX OFFICE 3. ALL BEARINGS AND COORDINATES ARE BASED ON NC GEED NORTH (NADO-2011} ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES. 4. TRACT AREAS AND LINES SHOWN BASED ON INFORMATION FOUND IN MAP CABINET 20, PAGE 453. TRACT A TOTAL AREA=26,639 BE, TRACT B TOTAL RE AA-20,1995F 5. NORMAL HIGH WATER LINE A COASTAL WETLAND LINE AS MARKED BY RHONDA WOOTEN (TED) ON JANUARY 8, 2013 A VEWFlED BY NO= SNIDER (CAMA) ON JANUARY 15, NJ 6. 404 WETLAND LINE AS DELINEATED BY ENRLY HUGHES NSACE) ON JANUARY 8, 2013 7. THIS PROJECT IS LOCATED 1N THE LUMBER RIVER BASIN. 8. SOIL ON THE SITE IS NEWNAN MINE SAND(EXCESSIVELY DRAINED). 9. NCDENR WATER CLASSIFICATION FOR THE ITRACOASTAL WATERWAY IS SA HOW - 10 LATLONG AT THE SITE IS 339144°N, 78.270VW PARKIN AREA 75 PEC �{' _ L� JOHN A. HOLDEN PIN: 2026171102914 06, 1046 JOHN A. HOLDEN PIN: 2026171102829 765 FIB: 1046 TEMPORARY CONSTRUCTION ENTRANCE JOHN A. HOLDEN PIN: 2026171102824 765 DEL 1046 JOHN A. HOLDEN PIN: 739 DEL 10466,7100 PGZ 765 PROTECT CONTROL POINT BE CHAPEL ,OLDEN2026171OA65 PIN: ® PG: 28 013: 158 Sd iCiAR6H IMPACT- �Y \ SALT MARSH - PICNIC _ SHELTER PLAYGROUND i 13-9' RECYCLE STATION i 'off —WATER TOWER DISCHARGE LINE \ OWN OF HOLDEN BEACH PIN: 3020, PG 4689 DB: 4 WATERTO�R TOWN OF HOLDEN BEACH PIN: 2D2r PG 41311 689 OB: 437 �8 NRCOURT 62 P �s �•-yy i t1 �. �I EXISTING DOCKS F \ � i ' OLD i BULKHEAD 33 BL�FER A 46— h^� EOP P\,— d_A MTRAF-WA_YLWATERWAY �RGW VISE GHT-0E R0, PAGE 453 �1 MAP,CABI 20, PAGE 053 REST 75 AEC I_ BRIDGEWATER PROPERTY OWNERS I ASSOC. ---_ PIN: 202617106987 US: 1919 0 PG: 23 I z BRIDGEWATER PROPERTY OWNERS ASSOC. t PIN: 202617106994 W a DB: 2214 0 PG: 781 I' FP° o w� 0 ATHERINE SPANGLER _ BARRIE 17106990 r p a PIN: 02 f DB: 402 0 PG: 889 ' PARKING AREA 1 ' —1 TOWN OF HOLDEN BEACH No PIN: 312260 PG8005 DB: a 5- e.M A /DMA SIGN-77 / EY &VICTORIA 6EE PROTCCE LIMB LINE DATATABLE LINE1132 mSTANCE SBn�Wu'e 102 w•a� E .'n. Wvn. L. LN LN w°m RECEIVED OEC 0 5 2014 DCW-WHPI PITY LEGEND 404 WETLAND LINE MEAN HIGH WATER LINE —� 30' CAMA BUFFER LINE — — — — — — 75' AREA OF ENVIRONMENTAL CONCERN (AEC) OLD BULKHEAD NEW BULKHEAD PROPOSED SILT FENCE PROPOSED BOARDWALK —DL— LIMITS OF DISTURBANCE PAVED AREA — 2" SF9.5, 6" ABC !T CONCRETE SIDEWALK COASTAL WETLANDS RECEIVED DCM WILMINGTON, NC NOV 072014 TOWN OF HOLDEN BEACH TOWER PARK wnv JEFFR 2 0261710678 nF-PIN: __BRTJNSOKA VE1'NE 1 0 PG: 908 wIBEACH DB: 984 Nunn uuul TOWN CH OF HOLDEN 6,7105743 PIN: 202 PG: 36L.• 0 . Ti OF HOLDEN BEA TOWN HALL. 00: g01 TOWN PIN: 202 ®1O 493 iFAI PF021B1T DB: 1180 0 b 60 Ib •��f'n SCALE: I'-w REVISIONS NORTH C OUNA NC LEGEND COASTAL WETLAND 404 WETLAND LINE MEAN HIGH WATER LINE 30' CAMA BUFFER LINE - - - - - - 75' AREA OF ENVIRONMENTAL CONCERN (AEC) ® BULKHEAD IIIIIIIIIIIIIII IIII PROPOSED BOARDWALK PAVED AREA - 2' SF9.5, 6" ABC CONCRETE SIDEWALK COASTAL WETLANDS VERTICAL DATUM DIAGRAM a4.96'(MHW)------ ------- 2.01- t29Y ------------- OW SIDEWALK I I L- EDGE OF MARSH AT BANK = 200 (COASTAL VEG. LINE) 6' FIXED PIER moss SECTION NOTES: 1, DEED REFERENCE: BOOK 3115. PAGE 70 IN THE BRUNSWWICK COUNTY REGISTRr 2. AD"NING DLEXI REFERENCES BASED ON CURRENT INFORMATION FOUND IN THE BRUNSWm COUNTY TAX OFFICE. ItA - 13 / ---------- TANC:ENTA- ---/ S A „ EDGE OF DREDGED CHANNEL -. -. - - ---- - - - -- DREDGE AREA _- - --------- - _-"PUMPOUT AVAILABLE'AND- -- --- -13 TO-6 MLW _- - - -- "NO SEWAGE DISCHARGE_ SIGNS.. - -- -12- 6132 SF _MARKER SIA� ICU - - _... - -to-- - -__ 165.576 ___..---- -CIS o- - -_ -- --_- - -_ - - MLW ISO M� i - ICU••- _.. �'• "Lw 2 _ • • T"•-• - - 12 SF COASTAL } -- MARSH IMPACT RIP -RAP 3 APRON -WITH ` GE FABRIC , 3. ALL BEARINGS AND COORDINATES ARE BASED ON NC MID NORTH WAD83-2011); ALL DISTANCES ME HORIZONTAL MOUND DISTANCES. 4. TRACT AREAS AND LINES SHOWN BASED ON INFORMATION FOUND IN MAP CABINET 20, PACE 453. TRACT A TOTAL AREA=26,639 V. TRACT B TOTAL AREM20,197 SF 5. NORMAL HIM WATER LINE k COASTAL WELAND LINE AS MARKED BY RNMDA WOOTEN (PI ON MIL 2%3 h VERIVIED BY HCLLET / SNIDER (CAMA) LA T 15. 2013 6. 404 WETLAND LINE AS DELINEATED BY EMILY HUGHES (USAGE) M JANUMT S. M13 7. THIS PROJECT IS LOCATED IN ME LUMBER RhER BASIN. B. SOIL M THE SITE IS NEWHAN THE SAND (EXCESSLT DRAINED). 9. NCWNR WATER CLASSIFICATION FOR THE INTRACOASTAL WATERWAY IS BA. HOW 1G PEc 10. LATAONG AT THE 5TE IS 33.914AN, 78.2701Y1 JJ 11, ELEVATIONS NORTH OF THE MEAN HIGH WATER (MI LINE ARE SHOWN REFERENCED TO MEAN LOW WATER (WHY) DAWN BASED ON H.0 A.A. STATION I565S97. ELPVATIONS SCUT! OF THE NNW LINE ARE SHOWN REFERENCED TO MEAN SEA IEYEL (MSL) DAMN NI W. /- 2" % 1' X 4' 2' AT2- / CAP 0 BRACE POST (TYP.1 11 1 1,. X KIN6, RAMP 1 �DECC B NNYL SLEET PILE "Pfp C.C. BULKHEAD �OO� % 6• PILING W O.C. DEPTH TO REFUSAL OR 15' 6' FIXED PIER ELEVATION A i% S \ � PLAYGROUND SALT MARSH 6' W IDE PRESSURE TREATED WOOD PIER r EX. BB/BU_ILKK/HE■AO r � .i C PICNIC SHELTEK C0PS�AL 4P /P PF1 *C AN 0Lsa D) %fl 55 i DOCKS G J »7• �ROI�SED FLOAT@IG DOCKS FLOATING - \ - liAND[HG, • ay. - ALUMINUM RAMP L - iF - RECERIED Y EXISnNG BULKHEAD �4 `EX. POP C '/ DEC, 0 5 1014 DCM-MHD CITY BUFFER _ ___-J---- - 75' AEC ';' Fo I V DCtvI WIL 11 (END BRq vR PROI Nov 0 -MOP 2014 �g ,gig o zo w eo NOTES: T. cmmACTm SHALL FIELD LOCATE EXISTING WATER AND SEWER MAINS PRIM SCALE. I•=CO• TO CONNECTION. NOTIFY TOM M LELAND TO COORDINATE CONNECTOR. 2. NO CONNECTION SHALL BE MADE UNTIL ALL TESTING AND DISNFECTm HAS BEEN APPROVED BY ENGINEER. 3. CONTRACTOR TO VERIFY SIZE, BEEN. MATERIAL AND LOCATOR OF ALL EXISTING UNDERGROUND UTUTES PRIOR TO THE START OF CONSTRUCTION. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ME BRACING/SUPPORTING POWER POLES AS REWIRED TO FACILITATE CONSTRVCTON OF UTILITIES. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY NMI ZONTAL -CONTROL POINTS' DESTROYED DURING CONSTRUCTON. NOTE THAT THESE EXISTING "CONTROL PORTS' ARE NOT SHOWN ON CONSTRUCTION PLANS. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE, WRIFY, AND REPLACE THEY 'CONTROL POINTS.' THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS. 7. CONTRACTOR SHALL COORDINATE THE CONSTRUCTION BE UTUTY LINES WTH RESPECTIVE MHW = 2.02 MSL UTLITES OWNERS AND RESOLVE ANY CMNM CTS WE TO E EXISTING UTILITIES.�- - B. CONTRACTOR SHALL BE TOTALLY RESPONSIBLE TO REPAIR AND/OR REPLACE ME EXISTING UTLITES DAMAGED OR IMPACTED, INCLUDING STORM DRAINAGE SYSTEMS. EXCAVATION LOCATION COORDINATES BY NC GRID • C7 2221575.41. 61019.51 • C2 2221532.14, 61054.89 • C3 2221498.14, 61174.05 • C4 2221469.61. 61150.10 • C5 2221452.43. 61165.92 • C6 2221440.07, 61196.69 • C7 222150179. 61224.86 • CB 2221507.38 61215.14 • C8 2221500.75 61187.13 9. PIPELINE CONNECTORSHALE S ARE APPROXIMATE CONTRACTOR SHAFIELD LOCATE PIPELINES TOWN OF HOLDEN BEACH um LOCAL CONDITIONS AND GET ENGINEER'S APPROVAL PRIOR TO PROCEEDING WITH CONSTRUCTOR. 10. PRIM TO BIDDING, CONTRACTOR SHALL MST SITE AND SE FAMILIAR WITH WORK 10/17/2M4 MLW 226 M4 REWIRED TO COMPLETE DES'GN INTENDED SHOWN ON PLANS, ANY DISCREPANCIES _ - SHALL BW BROUGHT TO ENGINEER PRIOR TO BIDDING. TOWER PARK ak IT MLRK UMITS ARE TO BETHE EXTENT OF RIGHT-OF-WAY PLUS UTILITY EASEMENT, SHOWN AND WATER QUALITY SWALE& NO CLEARING SHALL BE DONE OUTSIDE THEY WORK UMI HOLDEN BEAM BRUNSWICK COUNTY NORTH CARWNA 12 ELEVAnONS SHOWN ARE REFERENCED TO NAVBB. MRYET INFORMATG PRONDED BY _ `SA- SHERWIN CRIBB. SITE NFORMATON n •' SM •'l. CAMA �PNC \ T WETLANDS EXIST WITHIN THE PROPOSED PROJECT AREA. APPROVED LINES ARE SHOWN. ICI `i M113 r�� 1.� SIM PLAN t`I 91FAL wNCL� RAT c+xcxr '+.'?'A aae? ` aL2HW1¢4t'QKETI®W"A 1•.G DCM 1WE 1 . 25' EDGE OF WEDGE -LIMIT R VISI • L1 It •=•1",n W1Mtita. K 2BIN (Mol aI-mFH u NC 4 i r ICJ cr s r ACCESS ROAD IL{* 4 ► ' 14. i 1 SILT FENCE ° 1 0 50 Iwo 11 scnDe r=IW z_ E% xDDxD tl __ - to- - PLACED IN / / — _ E% iDWN / �Y B DISPOSAL AFEA / \ / 2 � TOWN n DISPOSAL SCOTCH BONNET DR. y SITE US ARMY CORPS OF ENGINEERS ONEENSBONC ST. DISPOSAL SITE DA290 (NOT USED FOR THIS PROJECT. n m --� n ❑LJ LJ LJ�� a 0 z � ma C7 � O n m a Z 4. C TOWER 0000 PARK DREDGE SITE pv LOCATION MAP NOT TO SCALE R6U RECEIVED DCM WILMINGTON, NC NOV 0 7 2614 TOWN OF HOLDEN BEACH 1oinim,4 TOWER PARK FH. A. twurvsxtac cairvtt NMCABCUNA j EOM O+W 1+W 2+W 34W NW 6+W 6+W ]+W M-W NHC F�1SH CAMA a DISPOSAL AREA Nem,a iWFEA& L '•4 RB37917 po. _ I 8T ANGLE (.M wil 11��'ffL llf PW}S SINET '� '� .�.o« RERN"ONSMN'S-6M RVI (IIO) DI-9R RECEIVED DR 0 5 2014 DCM-MHD CITY NC ----------------------- I------�------- ----,— narrvMAP NoscALE 12 SF COASTAL W + - REROUTE TANK- MARSH.IMPACT ,. OVERFLOW AROUND - RIP RAP , BULKHEAD APRON WITH BASIN'BA GEO-FABRIC L] - u W 314 LF YIN' - me " cc :S usW Lz W WN o W TOP OF BULKHEAD - &0, h^ \ "' ,.w 1 7- 0L1F� PARKING AREA f2 WORK NOTES FOR THE SITE CONTRACT: — — — — — — — I. WORK SHALL INCLUDE FRL GRADING. STORM WATER DEVICES, BULKHEAD, EROSION CONTROL AND SELECT SOD AREAS. 1 GRADES SHOWN ARE FINISH ELEVATIONS OF SURFACES SUBGRADE SHALL TAKE INTO ACCOUNT STONE AND ASPHALT TO GET CORRECT ELEVATION. 3. VINYL SHEETPILEBULKHEADSHALLBEDWI 5'ANDS SED5'. WOODCAP AND WHALERS SHALL BE PRESSURE TREATED. 4. NO WORK SHALL OCCUR BELOW THE MEAN HIGH WATER LINE 5. EACH CATCH BASIN SHALL BE SODDED 5' ON EACH SIDE. ENTIRE INFILTRATION BASIN PLUS 5-SHALL BE SODDED. P'FILTRATION TRENCH CATCH BASIN SCHEDULE C7 HIP INF.TRENCH PIPE INV. TR HIP ENCH SHOUT EEEV m. u SJ F v RYB fA 1 RRE 1 fJ 15 _A Riw a8 g1iH11 )A la 63 ,�.r Kal S.P Ia CONSTRUCTION ENTRANCE LEGEND LABEL SYM. DESCR@TION RFARF 10.0N PRE AODFdIKD SA'REBAR SET �0.S O MAO HwIL FOVFO CMF Ltl�'C+.CMON.FOUND CMS C,EODETIC MONUMEM PKFS PM. NAIL FOVNO PI(S C KNABSET PALL0.0AD5%KE rourrNm'sET INFH.TKATION TRENCH SCHEDULE I.TY WIpIH LENGTH INF T0.%iCH %PEINV. INF TRENCH PIPE WE NPIPFS INTRENCH ' s 10.0 ( SHEET /� PICNIC L CB4 - _ FLOW /� SHELTER z PLAYGROUND.•.. - — — — — I I LT.i FF=7.0 LT. - _B 11.0 C ,�o f C81-0m 9.5 8.01 �l I'3 0�" IT fl 1. —W� WATEBTOWFR PROJECT LIMIT LIRE DATA TABLE LINE BEARING DISTANCE m°wloY ERR 9af^siPE u5 V-31 4 WI AME U9 ryM 19)14 yYOY4 Till pUPIH.V WNC DATA TABLE RECEIVED DEC. 0 5 2014 DCM-MHD CITY u 7W OF BULK EAD - 7.0 I r � / / LEGEND �+ 30, BUFFER i / 404 WETLAND LINE T STRUCTURE NORMAL HIGH WATER LINE TEMPORARY i ♦ WITH r — —.6p• B�FEK 30' CAMA BUFFER LINE - - - - I / i- - - - - - - 50' BUFFER FROM MEAN HIGH WATER LINE -- -- 75' AEC PROJECT LIMITS 6—A ------ 75' AREA OF ENVIRONMENTAL LT CONCERN (AEC) EXISTING BULKHEAD -7.5 PROPOSED BULKHEAD 0-1 0 SOIL BORING LOCATION ■ CATCH BASIN PROPOSED CONTOUR LINE 2 B t ��� PROPOSED SILT FENCE IIIIIIIIWllI1Wl PROPOSED BOARDWALK I PARKING AREA —DLL LIMITS OF DISTURBANCE 78 PAVED AREA - 2' SF9.5, 6" ABC CONCRETE SIDEWALK I RECEIVED RECEIVED I1 DCM WILMINGTON, NC DCM WILMINGTON, NC e 9 NOV 0 7 2014 Alnl� 0 8 R+ TOWN OF HOLDEN BEACH Bro/zIN4 y' W TOWER PARK �- 10.5. �' s1ovM � _ xoLOFTl lens eRuxsxcx cauNrr xLRTH cuRalxA � �(4 GRADING AND ` �S 0.�w3 EROSION CONTROL PLAN Heo1,T sFAL PF O]9l1> "'4 POl• I 8T ANGLE R 38 ED Im ;sy488 �• Dw ��xc xetol CZ SCALP: I --RI ♦ CB2- B-2 4a I.T. #2- I.T. i3-7 iTl S`n 0I I, I - - - ------ - - - - -- ---, VICINITY MAP NOSCALB I. WORK SHAITMCLUDE HL GRADING, STORM WATER DEVICES, BUWIFAD, EROSION CONTROL AND SELECF SODAREAS 2. GRADES SHOWN ARE FINISH ELEVATIONS OF SURFACES.$UBGRADE SHALL TAKE INTO ACCOUNT STONE AND ASPHALT TO GET CORRECT ELEVATION. 3. V WLSHEETMLEBULKHEADSHALLBEDRIVENSANDE%POSED5'. WOODCAP AND WHALERS SHALL BE PRESSURE TREATED, 4. NO WORK SHALL OCCUR BELOW THE MEAN HIGH WATER LINE 5. EACH CATCH BASP'SHALL BE SODDED 5' ON EACH SIDE. ENTIRE BiF11.TAAUON BASIN PLUS 5' SNALL BE SODDED. DVFTLTRATION TRENCH CATCH BASIN SCHEDULE 00 TOP BOTTOM INF. TRENCH PIPE mV. INF.TRENCH SHWN ELEV. aA 43 x. I.oEou..zl u » a u63 74 CaYB Y tNEMy fD ]n Y RYA H 5➢ SD LEGEND LABEL STM. DESCRTPIWN IPPMi IXdi VIR/RODIdMD 10.5 yH'IEBaR SEf Mac df MaG xuLiwmo CONL. MON.iIXMD CMS CdiC. MDN. SEf NCGS GEODETIC MONUMFM I.K NAIL FOUND p XNL SET MS pa1LROaDSVIKE VNS PoIMNOTSEf UVITLTRATTON TRENCH SCHEDULE I.r.r wIDTx T.ENCrN mP TRENCH 'PE M. mF.TIUMH PIPE SIZE IPIM INTIBECCH 1. / / / / / / 30BUFFER — — DEC. 0 5 2014 DCKI-MiHD CITY IINx"WED 404 WETLAND LINE NORMAL HIGH WATER LINE 30' CAMA BUFFER LINE 50' BUFFER FROM MEAN HIGH WATER LINE I. PROJECT LIMITS — — — 75' AREA OF ENVIRONMENTAL CONCERN (AEC) EXISTING BULKHEAD PROPOSED BULKHEAD SOIL BORING LOCATION ■ CATCH BASIN PROPOSED CONTOUR LINE PROPOSED SILT FENCE ➢IDlWllllllllll PROPOSED BOARDWALK LIMITS OF DISTURBANCE PAVED AREA - 2" SF9.5, 6" ABC CONCRETE SIDEWALK RECEIVED DRAINAGE DOM WILMINGTON, NC RECEIVED DCM WILMINGTON, NC A4&4-$-2-814 NOV 0 7 2014 0 p W 120 SCALE: 1'-!tl