Loading...
HomeMy WebLinkAbout40-15 Amended Town of Holden BeachPermit Class' - ...... _ ..................Permit Number AMENDED 40-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission COQ Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of Holden Beach, PO Box 449, Supply. NC 28462 Authorizing development in Brunswick County at AIWW. 110 Rothschild Street. Holden Beach ac requested in the permittee's application dated 8/8/14 (MP-1, MP-2&bH-3) 4/l/14 ( -4) including the attached workplan drawings (4) Cl, C4-05 dated 10/17/14, C2-C3 dated 8/8/14 and C6 dated 2/20/25 This permit, issued on May 13, 2015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Anv violation of these terms may Upland Development 1) Unless specifically altered herein, this permit authorizes the land disturbing activities associated with the development of the above referenced property, including the park and associated amenities, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910)796-7215 for this determination. RFCEIVED (See attached sheets for Additional Conditions) MAY 2 8 1015 �'M^MMAi GI7S. tgls permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Towti of Holden Beach ADDITIONAL CONDITIONS Docking Facility Permit #40-15 Page 2 of 5 2) Unless specifically altered herein, this permit authorizes the docks, piers and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terns and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) This permit authorizes (3) three transient boat slips in association with this docking facility. RECEIVED Excavation MAY 2 6 2015 04` KW- Mw kNM 9) No excavation shall take place outside the area indicated on the attached workplan drawings. 10) In order to protect fisheries resources, no excavation shall be permitted between April 1 and September 30 of any year without prior approval of the Division of Coastal Management in consultation with the US Army Corps of Engineers. 11) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the depth of excavation exceed the depth of the connecting waters. 12) The temporary placement of double handling of excavated materials within waters or vegetated wetlands is not authorized. Towh of Holden Beach ADDITIONAL CONDITIONS Spoil Disposal Permit #40-15 Page 3 of 5 13) All excavated materials shall be confined above normal high water level and landward of regularly or irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of solids into any wetlands or surrounding waters. 14) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the initiation of any dredge activities. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Division of Energy, Mineral and Land Resources, 127 Cardinal Drive Extension, Wilmington, NC 28405. 15) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 16) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. U.S. Army Corps of Engineers Condition 17) The permittee shall mitigate for the loss of coastal wetlands by executing the proposed mitigation plan received and approved on 10 March, 2015. The plan titled: Mitigation Narrative for Tower Park, for the Town of Holden Beach 110 Rothschild Street, Holden Beach, Brunswick Co., N.C. (March, 2015). This plan proposes the restoration of 485 sq. ft. of coastal marsh to compensate for the losses of 155 sq. ft. of coastal marsh. This plan, including monitoring and reporting, must be adhered to and all success criteria must be met in order to maintain compliance with this condition. Maintenance Clause 18) The Division of Coastal Management will be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit and that notification include: a. The number of the original permit b. A statement that no dimensional changes are proposed c. A copy of the original permit plan(s) with cross -hatching indicating the area to be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed. d. The date of plan revision and the permittee's signature shown anew on the original plan RECENED MAY 2 6 1015 ok.pp-,wnH a" Town of Holden Beach Permit #40-15 Page 4 of 5 ADDITIONAL CONDITIONS General 19) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 20) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, outside of the area indicated on the attached workplan drawings. 21) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at htto://www.fws.gov/nc- es/mammal/manatee guidelines.vdf. 22) Unless specifically altered herein, any mitigative measures or environmental commitments specifically made by the applicant in the "Mitigation Narrative for Tower Park" dated March, 2015, shall be implemented, regardless of whether or not such commitments are addressed by individual conditions of the permit and any subsequent modifications. 23) This permit does not authorize any development with the 30' of the normal high water line. 24) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 25) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project No. 14-1241. RECENED MAY 2 6 1015 1464,4."nw 6" Towh of Holden Beach Permit #40-15 Page 5 of 5 ADDITIONAL CONDITIONS NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2014-02232. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. RECEIVED Mpy 2 6 1015 NMWrWfM b� Permit Class - Permit Number AMENDED 40-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission .for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of Holden Beach, PO Box.449 Supply NC 28462 Authorizing development in Brunswick County at AIWW. 110 Rothschild Street; Holden, Beach a„ c reauPctPd in the permittee's application dated 8/8/14 (MP-1, MP-2 & MP-3) & 4/1/14 (MP-4), including the attached workplan drawings (4) C1 C4-6'dated 16/17/14`C2-0 dated 8/8/14 and C6 dated 2/20/25 This permit, issued on May 13, 2015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special' conditions,and notes, set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may, cause.the permit to be.null and void. Unlaad Develonment 1) Unless specifically altered herein, this pennit.authorizes ;the land disturbing activities associated with the development of the aliovereferended".property; including the park and associated amenities, all as expressly and specifically set forth in the' attached permit application and workplan drawings,. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910)79,6-7215 for this determination. (See attached, sheets for Additional Conditions) This permit action may be' appealed by the.permittee or . Signed by the authority of the Secretary of DRNR and the other.qualified persons within twenty, (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on -site to Department Pei& V0 11 personnel when the project is inspected for compliance. Any maintenance work or, project modification not' covered Braxton C. Davis, Director Division of Coastal Management hereunder requires further Division approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31; 2018, In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management. Program. Signature of Permittee Town of Holden Beach Permit #40-15 Page 2 of 5 ADDITIONAL CONDITIONS Docking Facility 2) Unless specifically altered herein, this permit authorizes the docks, piers and other structures and uses that are expressly and specifically set forth in the attached permit application and workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility, without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the - docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) This permit authorizes (3) three transient boat slips in association with this docking facility. Excavation 9) No excavation shall take place outside the area indicated on the attached workplan drawings. 10) In order to protect fisheries resources, no excavation shall be permitted between April 1 and September 30 of any year without prior approval of the Division of Coastal Management in consultation with the US Army Corps of Engineers. 11) Excavation shall not exceed -6 feet below the normal low water level. In no case shall the depth of excavation exceed the depth of the connecting waters. 12) The temporary placement of double handling of excavated materials within waters or vegetated wetlands is not authorized. Tawn of Holden Beach Permit #40-15 Page 3 of 5 ADDITIONAL CONDITIONS Snoil IIDisnosal 13.) All excavated materials shall be confined above normal high water level and landward of regularly or irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of solids into any wetlands or surrounding waters. 14) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the initiation of any dredge activities. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Division of Energy, Mineral and Land Resources, 127 Cardinal Drive Extension, Wilmington, NC 28405. 15) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 16) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. U.S. Army Corps of Engineers Condition 17) The permittee shall mitigate for the loss of coastal wetlands by executing the proposed mitigation plan received and approved on 10 March, 2015. The plan titled: Mitigation Narrative for Tower Park, for the Town of Holden Beach 110 Rothschild Street, Holden Beach, Brunswick Co., N.C. (March, 2015). This plan proposes the restoration of 485 sq. ft. of coastal marsh to compensate for the losses of 155 sq. ft. of coastal marsh. This plan, including monitoring and reporting, must be adhered to and all success criteria must be met in order to maintain compliance with this condition. Maintenance Clause 18) The Division of Coastal Management will be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit and that notification include: a. The number of the original permit b. A statement that no dimensional changes are proposed c. A copy of the original permit plan(s) with cross -hatching indicating the area to, be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed. d. The date of plan revision and the permittee's signature shown anew on the original plan Town of Holden Beach ADDITIONAL CONDITIONS General Permit #40-15 Page 4 of 5 19) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 20) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, outside of the area indicated on the attached workplan drawings. 21) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at http://www.fws. o� v/nc_ es/mammal/manatee euidelines off. 22) Unless specifically altered herein, any mitigative measures or environmental commitments specifically made by the applicant in the "Mitigation Narrative for Tower Park" dated March, 2015, shall be implemented, regardless of whether or not such commitments are addressed by individual conditions of the permit and any subsequent modifications. 23) This permit does not authorize any development with the 30' of the normal high water line. 24) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 25) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. MOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project No. 14-1241. Town of -Holden Beach Permit #40-15 Page 5 of 5 ADDITIONAL CONDITIONS NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2014-02232. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. CEFENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary May 13, 2015 Town of Holden Beach P.O. Box 449 Supply, N.C. 28462 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Dou as V. Huggett Major Permits and Consistency Manager N.C. Division of Coastal Management 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247.33301 Internet: www.nccoastalmanagement.net An Equal Opportunity / Affirmative Action Employer 4 NCD-EN R North Carolina Department of Environment and Natural Resources Pat McCrory Governor May 13, 2015 John Q. Holden 14584 San Pablo Drive Jacksonville, FL 32224 Dear Mr. Holden, Donald R. van der Vaart Secretary Thank you for your letters concerning the Coastal Area Management Act (CAMA) major permit request submitted by the Town of Holden Beach requesting authorization to construct a docking facility with excavation and a park at 110 Rothschild Street, Holden Beach, Brunswick County. The Division appreciates your concerns about the proposed project. The Coastal Area Management Act permit review process involves a coordinated state and federal review of each permit application, with all review agency comments considered by the Division before final action is taken on a permit application. In this case, no inconsistencies with the Coastal Area Management Act were identified as a result of this review. Consequently, the Division has issued an amended Major Permit to permit No. 40-15 for the proposed activity. A copy of the permit is being provided to you for your information. If you wish to object to the actions taken on this permit application, you may request an appeal of this decision within twenty (20) days of the permit decision. If you would like copies of the appropriate appeal forms or should you like to discuss the specifics of the process, please contact me by telephone at (252) 808-2808, or by email at Jonathan.Howell@ncdenr.gov. Sincerely, Jonathan R. Howell Asst. Major Permits Coordinator 1601 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-86001Internet: www.nodenr.gov An Equal Opportunity 1 Affirmative Acbon Employer— Made in part by recycled paper