Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutGrantham, CarolMay 30 03 03:34p Town Of Ocean Ile 910 579 2940 p.5
v ..
Date: 5-.2 $ - V 3
Owner Name: MAC C w 411 �G r a,J'i � fLM
Owner Address: 3 L1 la o�
OCeo.�—Togs�eL^--/ /
Re: Exempted project at ��J_� Ocean Isle Beach
Dear Property owner:
We have reviewed the information submitted to this office in your inquiry concerning the
necessity of filing an application :nor a minor development permit under the Coastal Area
Management Act. The activity you propose is exempt from needing a minor development permit
as Jong as it meets the conditions specified below. If your plans should change and your project
will no longer meet those conditions please contact me before proceeding.
DESCREMON OF ACTIVITY AND CONDITIONS: REiPAIRJMAINTENANCE OF CONCRETE
BULKEEEAD
1) NO new/live concrete can enter the surface waters.
2) New concrete shell can only be poured at LOW TIDE_
3) New concrete shell shall use a quick drying or drying additive.
4) Back fill can be rock, soil, c:-ushed cement or other inert materials.
5) Concrete can not be poured beneath low tide.
6) See the attached repair diagram for concrete bulkheads.
This letter of exemption is valid for a period of 90 days only and authorizes the reoair of the
concrete bulkhead onW A new application will need to be submitted if repairs are not
commenced within that time. Pi
E C E, 7K V ED
Sincerely, J3MAY 3 0 2003
A�N. DIVN OF
COASTAL IMANAGEMENT
Brian Sasser
Local Permit Officer for Division o.L Coastal Management
cc: DCM Field Representative /
CONTRACTOR
ADDRESS:
G
PHONE #:
WN Of OCEAN ISLE BEACH/THREE WEST 1 -IIRLi >IKEET/OCEAN ISLE BEACH. NC 28469/(910) 579-2166-
May 30 03 03:34p
Town Of Ocean Ile
910 579 2940
p.6
New cap
3'in depth
8" to 10" in width
New shell. Poured at low tide only!
Backfill area. Rock, soil, or
crushed material
Existing concrete shell i
Low tide
Repair diagram for concrete bulkheads
1) New concrete shell shsdl be poured at LOW TIDE ONLY.
2) New concrete shell sh<<ll use a quick curing/drying additive.
3) NO new/live concrete can enter the surface waters.
4) Backfill can be rock, sDil, crushed cement, or other inert materials.
v K v
11A1 3 I ...3
DIVISJOiV OF
COASTAL MANAGEMENT
CONTRACTOR SIGNATURE:
DATE: S- f—V —O3
Date: 5--2 9 - 0 3
Owner Name: D. Co i1 1Jra +�x
Owner Address: Z1 btlayok
D[eow Male Zt%& . .
Re: Exempted project at �� �Q /A�JO�C�T(S5 Sec_ /T, Ocean Isle Beach
Dear Property owner:
We have reviewed the information submitted to this office in your inquiry concerning the
necessity of filing an application for a minor development permit under the Coastal Area
Management Act. The activity you propose is exempt from needing a minor development permit
as long as it meets the conditions specified below. If your plans should change and your project
will no longer meet those conditions please contact me before proceeding.
DESCRIPTION OF ACTIVITY AND CONDITIONS: REPAIR/MAINTENANCE OF CONCRETE
BULKHEAD ^�
1) NO new/live concrete can enter the surface waters.
2) New concrete shell can only be poured at LOW TIDE.
3) New concrete shell shall use a ouick drying or drying additive.
4) Back fill can be rock, soil, crushed cement or other inert materials.
5) Concrete can not be poured beneath low tide.
6) See the attached repair diagram for concrete bulkheads.
This letter of exemption is valid fi
concrete bulkhead only! A new
commenced within that time.
Sincerely,
will need to be submitted if
Brian Sasser
Local Permit Officer for Division of Coastal Management
cc: DCM Field Representative
CONTRACTOR:
ADDRESS:
G
PHONE #:
capsc��
r of the
are not
3T
`A p i\
TOWN OF OCEAN ISLE BEACH/THREE WEST THIRD STREET/OCEAN ISLE BEACH. NC 28469/(910)
New shell. Poured at low tide only!
New cap /
Existing concrete shell
Low tide
3' in depth
8" to 10" in width
Backfill area. Rock, soil, or
crushed material
Repair diagram for concrete bulkheadsV
at LOW _`"1) New concrete shell shall be
2) New concrete shell shall use a gu ck curin¢/d:yigOaddi ve.p�`!� `\��y-
3) NO new/live concrete can enter the surface waters. PS1PPL
4) Backfill can be rock, soil, crushed cement, or other inert materials.
CONTRACTOR SIGNATURE:,/( w c-'ZA �
DATE: S-Ly-ors