Loading...
HomeMy WebLinkAboutSC_02-55_Nunalee & Biberstein, m Local Government Permit Number CAMA MINOR DEVELOPMENT PERMIT as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission for development in an area of environmental concern pursuant to Section 113A-118 of the General Statutes, "Coastal rea ManagePont." Issued to Eta a lee i'� S Jlpt authorizing developmgnt in �'Q p as requested in the permittee's application, dated 'L,04 0 This permit, issued on / 'G is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes setforth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. PERMIT TO BUILD A SINGLE FAMILY DWELLING I - The structure shall comply with the NC Building Code, including the Coastal and Flood Plain Construction Standards, Chapter 4041, Volume 7, and the Local Flood Damage Prevention Ordinance as required by the National Flood insurance Program. If any provisions of the building code or a flood damage prevention ordinance is ineonsistu t with any of the following AEC standards, the more restrictive provision shall control. 2- The structure must set back 60 feel from the first line of stable natural vegetation. 3- The structure must be located entirely off ofthe frontal done, and if a primary dune is present, behind the crest of the primary dune. 4- The structure must he elevated on pilings with a diameter of at least 8 inches and the lowest horizontal structural member must meet the 100-year flood level elevation of determined for this lot 5- All pilings shall have a tip penetration of 16 feet below existing grade or 5 feet below mean sea level whichever is less. For those structures so located on the primary dine or nearer to the ocean, the pilings must extend to five feet below mean sea level. 6- Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or reduced disturbed areas will be immediately stabilized. 7- This permit may be renewed for one year if requested before the expiration date. 8- The permittee is required to contact the Local Pertit Officer shortly before he plans to begin construction to arrange a setback measurement which will be effective for sixty days baring a major shoreline change. Construction must begin within 60 days of the determination or the measurement is void and must be redone. 9- Sand used to slrerdhen dunes must be brought in from an outside source and must be of the same nature as the sand in the area in which it is to be placed. No sand is to be removed from the lot 10. Sand held in storage in any dune, other than frontal or primary dunes may be moved laterally in order to strengthen existing primary or frontal dunes if the work would enhance the protection to the proposed development activity and the sand is immediately stabilized. H. All development must be consistent with all applicable, Federal, State, and Local standards. 12- Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by changes in the shoreline configuration. The structure shall be relocated or dismantled within two years of the time when it becomes imminently threatened, and in any case, upon its collapse or subsidence. However, if natural shoreline recovery or beach re -nourishment takes place within two years of the time the structure becomes imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or dismantled at that time. This condition shall not affect the permit holder's right to seek authorization oftenporary protective measures allowed under CRC Rules. 13- All construction will be landward of the vegetation line. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this per- mit m,.st cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modifications not covered under this permit requires further written permit approval. All work must cease when this permit expires on December 31, In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Local Permit Officer (signature) name address Permittee (signature required if special conditions above apply to permit) Locality 5ztejer, Permit Number GENERAL INFORMATION LAND OWNER / Name Address City AUTHORIZED AGENT State vee- Zip Phone � 6&2 3 Name f i5 Li (, .02"la Address`` i 0 Z v y0 q City fit✓ -�rG/ ,Lc„ State �_ Zip _, 5 Phone 910- 7?-9 e7/ % LOCATION OF PROJECT `f (If not oceanfront, is waterbody natural ormanmade?) Q�u--T-y� DESCRIPTION OF PROJECT AREAS OF ENVIRONMENTAL CONCERN (AEC) CLASSIFICATION (To be filled in by the Local Permit Officer prior to completing application.) �7y Id Ocean Hazard Estuarine Shoreline ORW Shoreline _ Public Trust Shor PROPOSED USE �r A( SEP 2 3 2002 7� Residential Commerical/Industrial Other DIVISION OF SQUARE FOOTAGE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS ODASTAL MA%EMEN BUILT UPON SURFACES (such as driveways, etc.) within 75 feet gf the estuarine shoreline, or 575 feet of an ORW shoreline, or 30 feet of the public trust shoreline. SQUARE FOOTAGE OF TOTAL FLOOR AREA OF BUILDING Z 5ZV SQUARE FOOTAGE OF SITE /©' 5DO OTHER PERMITS MAY BE REQUIRED: The activity you are planning may require permits other than the CAMA minor development permit. As a service we have compiled a listing of the kinds of permits that might be required. We suggest you check over the list with your LPO to determine if any of these apply to your project. Zoning, Drinking Water Well, Septic Tank (or other sanitary waste treatment system), Burning, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA Certification, Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway Connection, and others. a STATEMENT OF OWNERSHIP I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in an AEC or a person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person listed as landowner on this application has a significant interest in the real property described therein. This interest can be described as: (check one) C _4�&an owner or record title, Title is vested in see Deed Book page in the County Registry of Deeds. _ an owner by virtue of inheritance. Applicant is an heir to the estate of ; probate was in County. _ if other interest, such as written contact or lease, explain below or use a separate sheet and attach to this application. NOTIFICATION OF ADJACENT PROPERTY OWNERS I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit. (Name) (Address) (1) Ar�!(c! C% e� tit 371;2 G%��•ara �i; �i�Geasdoiy /ri(e Z 7M2 . (z) Do,_�.�•G;. 2 f��2�. > < E,�.�S�G/a,ri 1 sQ nuc� �i Ll.�C. �80 Z (3) (4) - - FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS: I acknowledge that the land owner is aware that the proposed development' a cfan area which be susceptible to erosion and/or flooding. I acknowledge that the local perm fi )ias g>Vlained torn particular hazard problems associated with this lot. This explanation was ac e y recommendati concerning stabilization and floodproofing techniques. SEP 2 3 2002 PERMISSION TO ENTER ON LAND Is IvISION OF I furthermore certify that I am authorized to grant and do in fact grant permis )LoCIO A40jS&N9rNT and his agents to enter on the aforementioned lands in connection with evalua ormation related to this permit application. e This application includes: general information (this form), a site drawing as described on the back of this application, , the ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality, and any information as may be provided orally by the applicant. The details of the application as described by these sources are incorporated without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any person developing in an AEC without permit is subject to civil, criminal (� and administrative action. This the day of 2C Land owner or person aulthorized to act as his agent for purposes of filing a CAMA permit application. CAMA I NOTICE OF FILING OF APPLICATION FOR CAMA MINOR DEVELOPMENT PERMIT Pursuant to NCGS 113-119(b), Town of Surf City, a locality authorized to issue CAMA permits in Areas of Environmental Concern hereby gives NOTICE that on 08-26-02, Biberstem and Nunalee applied for a CAMA permit to erect a single family dwelling in the Ocean Hazard AEC at 1006 South Shore Dr. The application may be inspected at the address below. Public comments received by 09-05-02 will be considered. Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision in this matter will be provided upon written request Steve Padgett Town of Surf City PO Box 2475 214 North New River Dr. Surf City, NC 28445 (910)-328-4131 Please Publish on 08-28-02 EIVE Sc? 2 3 2002 DIVISION OF COASTAL MANAGEMENT AEC HAZARD NOTICE Project Is In An: Ocean Erodible Area Date Lot Was Platted: This notice is intended to make you, the applicant, aware of the special risks and conditions associated with development in this area, which is subject to natural hazards such as storms, erosion and currents. The rules of the Coastal Resources Commission require that you receive an AEC Hazard Notice and acknowledge that notice in writing before a permit for development can be issued. The Commission's rules onbuilding standards,oceanfront setbacks and dune alteration are designed to minimize, but not eliminate, property loss from hazards. By granting permits, the Coastal Resources Commission does not guarantee the safety of the development and assumes no liability for future damage to the development. The best available information, as accepted by the Coastal Resources Commission, indicates that the annual ocean erosion rate for the area where your property is located is '2- feet per year. The rate was established by careful analysis of aerial photographs of the coastline taken over the past 50 years. Studies also_' adicate that the shoreline could move as much as253 feet landward in a major storm. The oodwatersinamajorstormarepredictedtobeabout feet deep in this area. Preferred oceanfront protection measures are beach nourishment and relocation of threatened structures. Hard erosion control structures such as bulkheads, seawalls, revetments, groins, jetties and breakwaters are prohibited. Temporary devices, including sand bags, may be allowed under certain conditions. This structure shall be relocated or dismantled within two years of becoming imminently threatened. The applicant must acknowledge this information and requirements by signing this notice in the below space. Without the proper signature, the application will not be comp' e. -1 pplicanrs Signature A7.2_' O 2 Date High Hazard Flood Area _ Inlet Hazard Area SPECIAL NOTE: This hazard notice is required for development in areas subject to sudden and massive storms and erosion. Permits issued for development in this area expire on December 31 of the third year following the year in which the permit was issued. Shortly before work begins on the project site, the Local Permit Officer will determine the vegetation line and setback distance at your site. If theproperty has seen little change and theproposed development can still meet the setback requirement, the LPO will inform you that you may begin work. It is impor- tant that you check with the LPObefore the permit expires for official approval to continue the work after the permit has expired. Generally, if foundation pilings have been placed and substantial progress is continuing, permit renewal may not be necessary. If substantial progress has not been made, the permit must be renewed and a new setback line established. It is unlawful to continue work after permit expiration without this approval. For more information, contact: 5� - Local Permit Officer —� DF&ax Z V 7-5-- Address /� / S't n` Locality 2'10 -,7,;2 oR - Y/3/ Phone R031HVE SEP 2 3 2002 DIVISION OF COASTAL MANAGEMENT Revised 11193 m m OFFICIAL U SE Postage $ % �Q.G G'r! y 0 r lJ11 � ,a Certified Fee lr ,a p Retum Recelpt Fee (Endorsement Required) ' oayri6G6't f O Resbicted Dellvery Fee C3 (Endorsement Required) F O m Total Postage & Fees C3 sent ur� Cht.�dlu�avo ruC3 srreet. �l �PoBoNe.a fir..r _------- � dh -�l---STtMate, LP+. A Ln CFF .0 �p Postage E .� Certified Fee ra Retum Receipt Fee 0 (Erdomamant R.qulred) C3 FtZ"Wcled Delivery Fee (Endorsement Requlmd) 1-3Total Postage 6 Feed $ C3 o senr ra ne ru sr;asc�� C3 wPO Box No.-'11G�' [� ------------'---- a! 1� C�lf�% state, Z/Pa4 ri SAP 2 3 2032 DIVISION OF COASTAL MANAGEMENT NOW OR FORMERLY ALPHIN w D.B. 412, P. 544 0 0 60' AEC UNE (TO BE VERIFIED) 0 0 PROPOSED M 4' WOOD N WALK to (V 0 PROPOSED DWELUNG PROPERTY ZONED R-10: SETBACKS _ FRONT - 25' _ I 8.50 'eop„UN .50" SIDE - 7.5' REAR - 60' AEC LINE MIN. BUILDING 750 Sq.Ft. LO REFERENCES n A .. PROPOSED.. •, fV ,� DRIVE D.B. 412, P. 544 '• 4 • . .. D.B. 651, P. 188 D.B. 1640, P. 152 M.B. 1, P. 55 D' .., c SIR _50,0 100.2 EIR s 58'30'OU- W BENT N EIR N SOUTH SHORE DRIVE m 60' R/`N (ASPHALT —PUBLIC) m N SMN CA INTERSECTION OF SOUTH SHORE DRIVE h SEAHORSE AVENUE THIS IS TO CERTIFY THAT THE SUBJECT PROPERTY IS LOCATED IN FLOOD ZONE VARIES' WHICH IS A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. COMMUNITY PANEL NUMBER 370186 0005 E JANUARY 22, 1995 , NOW OR FORMERL CHADDERTON, JR D.B. 1640, P. 15: Z ZONE 'VE" ELEVATIONS 15 _ FLOOD ELEVATION 14' ZONE EVE" FL00D NOSE, PROPOSED DWELLING k EAVES - 1.450 Sq.Ft. PROPOSED DRIVE - 1.111 S .Ft. TOTAL LOT AREA - 10.546 Sq.Ft. EIP 219.ti EIP N I I I I 534'E I Ff-GNn SEp 2 3 2002 3.60' ? C� 3.80' `� ;~j SCM -1'�CNETIC CRETE MONUMENT (CONTROL CC r'n SMN - N I NNER SPK - SEAT (PpARK,Sp �, ,1 0 ,0Q)I 12' SIR S5Jif$)I.9 iU1 1 iy1A p' O _IVIf 3e E µ SMN EIR E NO IRON ROD (FOUND) EIP - EXISTING IRON PIPE (FOUND) ECM - EXISTING CONCRETE MONUMENT (FOUND) EPK - PARKER-KALON NAIL (FOUND) EMN - EXISTING MAGNETIC NAIL (FOUND) EAI - EXISTING ANGLE IRON (FOUND) R/W - RIGHT OF WAY - CENTERUNE MBL - MINIMUM BUILDING LINE D.&U.E.-DRAINAGE k UTILITY EASEMENT N/F - NOW OR FORMERLY C.C. - CONTROL CORNER - 6 06 - POWER UNES - 4' CHAIN UNK FENCE 1006 SOUTH SHORE DRIVEN I, CHARLEC FRANCIS RIGGS. PROFESSIONAL LAND BOUNDARY SURVEY & PRELIMINARY PLOT PLAN FOR 02—OB-28 SURVEYOR, DO HEREBY CERTIFY THAT HAVE SURVEYED THE PROPERTY AS SHOWN HEREON IN MARK N U N ALEE ACCORDANCE WITH THE STANDARDS OF PRACTICE DA1° FOR LAND SURVEYING IN NORTH CAROLINA. THAT AUG. 15, 2002 THE RATIO OF PRECISION AS CALCULATED BY LATITUDES AND DEPARTURES IS : 1,10.000 nuw m PRELIMINARY PLAT LOT 9, TRACT 8, J.W. SIDBURY ESTATE, A PORTION NOT FOR RECORDATION, '" OF I.L. DARDEN PROPERTY (D.B. 651, P. 188) CONVEYANCE OR SALES. TOPSAIL TOWNSHIP, PENDER COUNTY, NC CHARLES F. RIGGS & ASSOCIATES, INC. IND./5 P.O. BOX 1570, JACKSONVILLE, N.C. 28541-1570 30' 15' 0 30, aaur: 202 WARLICK STREET, JACKSONVILLE, N.C. 28540-1570 TELEPHONE: (910) 455-0877 1" = 30' FACSIMILE: (910) 455-9033 E—MAIL: riaosland®bizec.rr.com