HomeMy WebLinkAboutSC_02-50_HinesLocal Government !/
eAteyvil-I
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment
and Natural Resources and the Coastal Resources Commission for development
in an area of environmental concern pursuant to Section 113A-118 of the
General Statutes, 'Coastal Area Manay� ment.'
Issued to n l L%/Wr authorizing developrpent in _Prtv#t% b JYA1 z,,_1L
Permit Number
as requested in the permittee's application, dated
This permit, issued on �" Z%• O 2 is subject to compliance with the application and site drawing (where consistent
with the permit), all applicable regulations and special conditions and notes setforth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
PERMIT TO BUILD A SINGLE FAMILY DWELLING
I - The structure shall comply with the NC Building Code, including the Coastal and Flood Plain Construction Standards, Chapter 4041; Velunx .o.I
the Local Flood Damage Prevention Ordinance as required by the National Flood insurance Program. If any provisions of the building code or a
flood damage prevention ordinance is inconsistent with any of the following AEC standards, the more restrictive provision shall control.
2- The structure must set back 60 feet from the first line of stable natural vegetation.
3- The structure must be located entirely off ofthe frontal dune, and if a primary dune is present, behind the crest of the primary dune.
4- The structure must be elevated on pilings with a diameter of at least 8 inchos and the lowest horizontal structural member must meet the 100-year
flood level elevation of determined for this lot
5- All pilings shall have a tip penetration of 16 feet below existing grade or 5 feet below mean sea level whichever is less. For those structures so
located on the primary dine or nearer to the ocean, the pilings must extend to five feet below mean sea level.
6- Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or reduced
disturbed areas will be immediately stabilized.
7- This permit may be renewed for one year if requested before the expiration date.
8- The permittee is required to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement which
will be effective for sixty days barring a major shoreline change. Construction must begin within 60 days of the determination or the measurement is
void and must be redone.
9- Sand used to strenthen dunes must be brought in from an outside source and must be of the same nature as the sand in the area in which it is to be
placed. No sand is to be removed from the lot
t 0- Sand held in storage in any dune, other than frontal or primary dunes may be moved laterally in order to strengthen existing primary or frontal dunes
if the work would enhance the protection to the proposed development activity and the sand is immediately stabilized.
]I- All development must be consistent with all applicable, Federal, State, and Local standards.
12. Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by changes in the shoreline
configuration. The structure shall be relocated or dismantled within two years of the time when it becomes imminently threatened, and in any case,
upon its collapse or subsidence. However, if natural shoreline recovery or beach re -nourishment takes place within two years of the time the structure
becomes imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or dismantled at that time.
This condition shall not affect the permit holder's right to seek authorization oftemporary protective measures allowed under CRC Rules.
13- All construction will be landward of the vegetation line.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
From the date of an appeal, any work conducted under this per-
mit m..st cease until the appeal is resolved.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
Any maintenance work or project modifications not covered
under this permit requires further written permit approval.
All work must cease ^rhen this permit expires on December
31, ? DOS
In issuing this permit it is agreed that this project is consistent
with the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without
the written approval of the Division of Coastal Management.
Local Permit Officer (signature)
name
May- 2KZ,5.-
address
Permittee
(signature required if special conditions above apply to permit)
Locality �Gl/7 6, 4( ///` " L Permit Number dO2'
GENERAL INFORMATION
LAND OWNER
Name 4t jarnes Fi N tnea,
Address -TZ% Otd Kest.rat �JG
City Alpp—g State _JC— Zip 219523 Phone 91�,38i. 13ox✓
AUTHORIZED AGENT
Name A
Address
City
State Zip Phone
LOCATION OF PROJECT Z �j 1 fc SGuZkI Si tn�� DYrJ�.
(If not oceanfront, is waterbody natural or manmade?)
DESCRIPTION OF PROJECT
AREAS OF ENVIRONMENTAL CONCERN (AEC) CLASSIFICATION D C T� VE
Permit (To be filled in by the Local Officer prior to completing application.) J�
XOcean Hazard _ Estuarine Shoreline _ORW Shoreline _ AUG 2 0 2002
PROPOSED USE DIVISION OF
Residential _ Commercial/Industrial _ Other COASTAL MANAGEMENT
SQUARE FOOTAGE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR
BUILT -UPON SURFACESf (such as driveways, etc.) within 75 feet of the shoreline (575 feet
of an ORW shoreline)
SQUARE FOOTAGE OF TOTAL FLOOR AREA OF BUILDING 2134
SQUARE FOOTAGE OF SITE 8 15 4 is
OTHER PERMITS MAY BE REQUIRED: Zoning, Drinking Water Well, Septic Tank
(or other sanitary waste treatment system),
The activity you are planning may require Burning, Electrical, Plumbing, Heating and
permits other than the CAMA minor Air Conditioning, Insulation and Energy
development permit. As a service we have Conservation, FIA Certification, Sand Dune,
compiled a listing of the kinds of permits that Sediment Control, Subdivision Approval,
might be required. We suggest you check Mobile Home Park Approval, Highway
over the list with your LPO to determine if Connection, and others.
any of these apply to your project.
STATEMENT OF OWNERSHIP
I, the undersigned, an applicant for a CAMA minor development permit, begin either the owner of property in
an area of environmental concern or a person authorized to act as an agent for purposes of applying for a
CAMA minor development permit, certify that the person listed as landowner on this application has a sig-
nificant interest in the real property described therein. This interest can be described as follows: (check one)
an owner of record title, Title is vested in see Deed Book
page in the County Registry of Deeds.
an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in
County.
if other interest, such as written contact or 1 D e laj. ,b m ate sheet and attach to this
application((I1��4JJ��
AUG 2 0 2002
DIVISION OF
NOTIFICATION OF ADJACENT PROPERTY OWNERS
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I
have given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for
a CAMA permit.
(Name) (Address)
(1) W'111tam CAVRon go? R'&-'k h I�Oaci C(,Aon ttc- ew-Wze
(2) 1'nroIcl Tm6sks SZt] Pe.0ole- Dr%Je� Greens6oro WC ?_Pro
(3)
(4)
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
I acknowledge that the land owner is aware that the proposed development is planned for an area which may
be susceptible to erosion and/or flooding. I acknowledge that the local permit officer has explained to me the
particular hazard problems associated with this lot. This explanation was accompanied by recommendations
concerning stabilization and floodproofing techniques.
PERMISSION TO ENTER ON LAND
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer
and his agents to enter on the aforementioned lands in connection with evaluating information related to this
permit application.
This application includes: general information (this form), a site drawing as described on the back of this ap-
plication, the ownership statement, the AEC hazard notice where necessary, a check for $50.00 made payable to
the locality, and any information as may be provided orally by the applicant. The details of the application as
described by these sources are incorporated without reference in any permit which may be issued. Deviation
from these details will constitute a violation of any permit. Any person developing in an AEC without a per-
mit is subject to civil, criminal and administrative action.
This the 2foday of jFl 2oa2
ar.person authorized to'act as his agent
of filing a CAMA permit application.
s�
CAMA I
NOTICE OF FILING OF APPLICATION FOR CAMA MINOR DEVELOPMENT PERMIT
Pursuant to NCGS 113-119(b), Town of Surf City, a locality authorized to issue CAMA permits in Areas
of Environmental Concern hereby gives NOTICE that on 08-02-02, James H. Hines applied for a CAMA
permit to erect a single family dwelling in the Ocean Hazard AEC at 2516 South Shore Dr. The
application may be inspected at the address below. Public comments received by 08-15-02 will be
considered. Later comments will be accepted and considered up to the time of permit decision. Project
modifications may occur based on further review and comments. Notice of the permit decision in this
matter will be provided upon written request
Steve Padgett
Town of Surf City
PO Box 2475
214 North New River Dr.
Surf City, NC 28445
(910)-328-4131
Please Publish on 08-07-02
�C2217ED
AUG 2 0 2002
DIVISION OF
COASTAL MANAGEMENT
tr
�Ln
Er
u ru
1iREENSBDRO NC 27§ili
nnJ Poetege
0 0165
.d Certmed Fee n$
Postmark
.-i Retum Re elpt Fee Here
r4 (Endorsemerrt Required)
O
O Rmffiaed Delivery Fee
(Endona Required)
o $ S4. 07/3u/2002
O TOW PPebpe i Fen
S
m ben aev�rro ae pmpenw by %d
Er---- - aK°�------------ M--b-_U,5....... ------ ------•---_---------------
--•------0-----t-K t V-...-----'-----------------------
r
I
Ir
P' CLINTON NC 28328
ru Ppy $ $0.37
o 0165
Cad ied Fee 08 F^asimerk
RH
(oreenreM w�ere
EWk m ' w-
O
p ResMc Del Fee
(Endoree Requir.M
u7/3ur2ou2
O TPTaI Portage &Fees 1 $
S
m ��(Pb/�e�� cbrN) RP aereep mea,.l
ir - —" ' ' F(Q71--------r -- ---(-� n- ------- ----- ---------------
U_ 3e APL Ab.; w
kLn C Z15-6
CRABTREE VALLEY STATION
RALEIGH, North Carolina
276129996
07/30/2002 (919)781-0297 01:39:28 PM
Sales Receipt
Product Sale Unit Final
Description My Price Price
CLINTON NO 28328 $0.37
First -Class
Return Receipt $1.75
Certified $2.30
Label Serial #: 70993400001160229966
__.=.9=e
Issue PVI: $4.42
GREENSBORO NC 27410 $0.37
First -Class
Return Receipt $1.75
Certified $2.30
Label Serial k: 70993400001160229959
eoeviceea
Issue PVI: $4.42
$7.40 1 $7.40 $7.10
Nondenom Flag
PSA Bk
Total: $16.24
Paid by:
Cash $20.00
Change Due: -$3.76
Lie
Bill#: 1000600702970
Clerk: 08
Refunds only per DMM P014
— Thank you for your business —
Customer Copy
ECF2Hv ,
AUG 2 0 2002
c
DIVISION Ot-
COASTAL MANAGt Mc
T
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to 1 41 1 one s+ S r 's
(Name of Property owner)
property located at 25 t 6 South hors yr
(Lot, Block, Road, etc.)
on- sa,_ys�a�d .in Surat C��Y
They have desc Abed to me as shown below, the development they are proposing
at that location, and, I have no objections to his proposal.
DESCRrMON AND/OR DRAWING OF PROPOSED DEVELOPMENT
(To be filled in by individual proposing development)
CSee, a{{achacb �YavJin )
AUG 2 0 2002
DIVISION OF
COASTAL MANAGEMENT
Signature of Adjacent Owtler
/
�c-C,A0
Print or Type Name
Telephone um r
/ dZ
Date
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to ctr _nM j� i n�St sir I
(Name of Property owner)
property located at Zt>t(o f2R%A'M Shwe- P
(Lot, Block, Road, etc.)
on�l�ot95av� �s�and inN.C.
They have deccribed to me as shown below, the development they are proposing
at that location, and, I have no objections to his proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Co be filled in by individual proposing development)
wee, att,'<-bed
d YGvJ , ti5
ECKV.3
AUG 2 0 2002
DIVISION OF
COASTAL
ture of Adjacent Owner
�,va/dfl ����tl•7S—
fi'z
Print or Type Name
�36-29�/k//
Telephone Number
>
� a
Date
First Line of
Stable Vegetation
sZ�vd
ATLANTIC OCEAN
Water Ltne
ZOl
Deck
fo
-i Dwelling _
'7.st
Driveway
&cl'
NC HIGHWAY 50 — SOUTH SHORE DRIVE
60 FT. R/W
F (CEV V E C
AUG 2 ? 2002 i i
DIVISION OF I..
COASTAL MANAGEMF
CAMA Proposed Development
Drawing
Location: 2516 S. Shore Drive
Surf City, NC 28445
Owner: James H. Hines, Jr.
Date: July 26, 2002
AEC HAZARD NOTICE
Project Is In An: K— Ocean Erodible Area High Hazard Flood Area Inlet Hazard Area
Date Lot Was Platted:
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules on buildingstandards, oceanfront
setbacks and dune alteration are designed to minimize,but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
Z feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as Meet landward in a major storm.
The flood waters in a major storm are predicted to be about
--/f feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
complete.
*Lx4 0iJ/
plicant' Signature
2lo clui 2002.
Date
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for development inthis
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If theproperty has seen little change and theproposed
development can still me-t the setback requirement, the
LPO will inform you thatyou may begin work. Itis impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
o.,/v
Local Permit Officer
25�75-
Address
/I/c Z M`--
Locality
%1,9- us- W-?/
Phone
HVE
AUG 2 0 2002
DIVISION OF
COASTAL MANAGEMENT
Revised 11193